date project plan to develop a learning & development strategic plan for prepared by: 1 ©2012...

Post on 17-Jan-2018

214 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

3 ©2012 RAY SVENSON CONSULTING, INC. BACKGROUND AND RATIONALE

TRANSCRIPT

DATE

PROJECT PLAN TO DEVELOP A LEARNING & DEVELOPMENT STRATEGIC PLAN

FOR

Prepared by:

1

©20

12 R

AY S

VENS

ON C

ONSU

LTIN

G, IN

C.

RAY SVENSON CONSULTING, INC. • 112 Two Mile Bridge Road • Roberts • MT • 59070www.raysvensonconsulting.com • e-mail: ray@raysvenson.comOffice phone: 406-446-1861 • Mobile phone: 406-425-4013

2©2012 RAY SVENSON CONSULTING, INC.

PROJECT PURPOSEThe purpose of this project is to

3©2012 RAY SVENSON CONSULTING, INC.

BACKGROUND AND RATIONALE

4©2012 RAY SVENSON CONSULTING, INC.

SCOPE

5©2012 RAY SVENSON CONSULTING, INC.

DELIVERABLES Analysis findings and conclusions

Future L&D System Architecture

Implementation Plan

6©2012 RAY SVENSON CONSULTING, INC.

KEY ROLES AND RESPONSIBILITIES Project Leader

Project Manager

Design Team

7©2012 RAY SVENSON CONSULTING, INC.

KEY ROLES AND RESPONSIBILITIES (cont.) Sponsors

Executive Steering Team

Consultant

8©2012 RAY SVENSON CONSULTING, INC.

CRITICAL INTERFACES

9©2012 RAY SVENSON CONSULTING, INC.

PROJECT APPROACH

Phase 4:Future L&D

System Architecture

Phase 5:Implementation

Plan

DevelopSpecifications

and Design Details

Phase 2: Data Collection

Phase 1:Project

Planning

Executive

Review

ExecutiveReview

Executive

Review

ProjectPlan

BusinessRequirements

AssessTechnological

Readiness

AssessCurrent

Capabilities

Analysis Findings

andConclusions

Design High-Level

Learning & Development

System Architecture

3-5 Year Implemen-

tationPlanand

BusinessCase

Phase 3:Analysis

Phase 6:Business Case

10©2012 RAY SVENSON CONSULTING, INC.

PROJECT APPROACH (cont.) Business Needs Analysis

Assess Current L&D Capabilities

Research Best Practices and Competitors’ L&D Practices

11©2012 RAY SVENSON CONSULTING, INC.

PROJECT APPROACH (cont.) Develop Population Forecast

Analysis Findings and Conclusions

12©2012 RAY SVENSON CONSULTING, INC.

PROJECT APPROACH (cont.) Design High-level L&D System Architecture

Develop Specifications and Design Details

13©2012 RAY SVENSON CONSULTING, INC.

PROJECT APPROACH (cont.) 3-5 Year Implementation Plan and Business Case

14©2012 RAY SVENSON CONSULTING, INC.

BUSINESS CASE TO GO FORWARD

top related