contract change order no. 2 redacted
Post on 07-Aug-2018
220 Views
Preview:
TRANSCRIPT
-
8/20/2019 Contract Change Order No. 2 Redacted
1/8
City of
Carmel-by-the-Sea
PUBLIC WORKS DEPARTMENT
POST OFFICE BOX CC CARMEL-BY-THE-SEA, CA 93921
(831) 620-2070
CONTRACT CHANGE ORDER NO. 2
CONTRACT
AWARDED
BY: City Council
DATE OF AWARD Apr
7,
2015
~ R ~ O ~ J ~ E ~ C ~ ~ ~ ~ T ~ h ~ e ~ a ~ t e ~ r ~ ~ e ~ n ~ o ~ v ~ a ~ t i ~ o ~ n ________________________________________
SHEET
____ ~ ~ __
PROJECT ID#: 13-70903
TO: Otto
Construction
Company; 2150 Garden Road, Suite A-1, Monterey, CA 94940 ,CONTRACTOR
You
are
hereby requested to
make
the herein
described chang
es
from
the plans and specifications
or
do the
following described work not included
in
the plans
and
specifications on this contract.
NOTE: THIS UNTIL
Description:
1 CHANGES TO CONTRACT PLANS AND SPECIFICATIONS.
Addition
: Supply all labor and materials necessary to complete the following: Reference
Request for Information #25 by the City
of
Carmel-By-The-Sea and Otto's PCO #13 (their
tracking number, not City's). Work includes demolition of existing concrete curbs, excavation of
soil to 5 below existing finished concrete floor,
com
paction of subgrade, concrete, rebar,
dowels, relocation of existing water lines (per RFI #25) and wood box curb. Excludes
inspections, engineering and testing fees .
Agreed Lump Sum....... .. .
..
..... . ...
..
. ............... .
..
... ........ ....
..
.. ...
.................
.... .
2 CONTRACT PRICE
Total Increase in contract price
3 CONTRACT TIME
No additional days
Net change in Contract Price is
of
the original Con
tr
act Price
4,
638
.
00 Increase
1,
462,236.00
4,898.00
0.7%
We the undersigned contractor have given careful consideration to the change proposed and hereby agree if his proposal is
approved that we will provide all equipment furnish all materials except as may otherwisebe noted above and perform all services
necessary for the work above specified and will accept as full payment therefore the price shown above.
Submitted
By
: Andy
Vanderford
Proj
ec:t
Manager
Contractor: Otto Construction Company
Title: ?r '
.e
c
.A--1 A -'
c
c
Z
his attention is directed to the requiremenfs of t
he
4,638.00
4,638.00
0
Approved:
Is
Publ
ic Works
Direct
or
Rob Mullane
Date /0-/f-/L
Authorized: 0 City Administrator
Doug Schmitz
Authorized:
El
City Council
Attachments: Contractor Proposal (2 pages total)
Request for Information #25
Date
Is
/s
•
-
8/20/2019 Contract Change Order No. 2 Redacted
2/8
Potential Change Order (PCO) Cost Breakdown & Summary
Project
Forest Theater Renovat ion
De
scription
of
Change
Project#
15-3141-00
Below costs are associated with required
work
per "RFI #261ndoor
Theater Exposed Soil
.
Work includes
demolition of existing
concrete
curbs, excavation
of soil
to
5
below
existing finished
concrete
floor
,
compaction of subg
rad
e,
concrete, rebar, dowels, relocation
of
existing
water lines (per RFI #25) and
wood box curb
. Excludes i
nspections
,
engineering and testing fees.
CHANGE ESTIMATE ITEM COST M/U% M/UTOTAL
GC DIRECT COSTS
GC DIRECT LABOR
52,736
GC
DIRECT
MATER
IALS $850
GC
DI
RECT EQUIPMENT
5387
GC OTHERIINDIRECTS
$200
GC MARKUP ON DIRECT COST
GC MAR KUP ON DIRECT LABOR
$2
,736 10.0%
$274
GC MARKUP ON DIRECT MATERIAL $850 10.0% $
85
GC \1ARKuP ON DIRECT EQUIPMENT S387 10.0%
5 9
GC MARKUP ON DIRECT OTHERrlNDIRECTS
$200 10.0%
520
GC SUBCONTRACT(S)
OR
'OTHERS'
GC FEE ON SUBCONTRACT(S)
$0 5.0%
s
ADDITIONAL TIME REQUIRED 0 DAY(S)
FOR
CONTRACT
COMPLETION _ ......
COMPLETED BY: John Garayalde
PCOII:
Re lated ASI II:
Related BU L II:
Re
lated
RFJ
DATE:
TOTAL L, M, & E DIRECT COST
TOTAL MARKUP ON DIRECT COST
TOTAL SUBCONTRACT COST
TOTAL GC FEE ON SUBCONTRACT(Si
TOTAL UNAVO IDABLE DELAY COSTS
TOTAL CONSTRUCTION COSTS
BOND AND INSURANCE 1
TOTAL COST OF CHANGE ORDER
13
N/
A
N/A
25
08 05/15
$4,173
$417
0
s
0
4,590
$48
$4,638
-
8/20/2019 Contract Change Order No. 2 Redacted
3/8
OI'ISTIWCHON
Otto Construction
2150 Garden Road, Sui1e A 1
Monterey, CA 93940
TEL
83
1.657.9805 FAX 831.657.9820
License #178809
OTTO ESTI TE SUMM RY SHEET
ID
Below costs are associated with required work per RFI #26
Indoor
Theater Exposed
Soil .
Work
includes
demolition
of
existing
conc rete curbs, excavation of so i l
to
5
below existing
finished concrete floor, compaction of subgrade, concrete, rebar,
dowels, relocation of
exist
i
ng
water lines {per RFI #25)
and
wood
box curb. Excludes inspections, engineering and testing fees.
Description Hrs Rate Labor
1 Labor
er
36.0 76 2,736
2 Demo, excavate, off-haul & concrete 0
4 0
5 Shortload (potential credit back) 0
6 0
7 0
8 0
9 0
10 0
11
0
12
0
13 0
14
0
15 0
16 0
17
0
18 0
19
0
20 0
21
0
22 0
23 0
24 0
25 0
26 0
27 0
28
0
29
0
30 0
31 0
32 0
33 0
34 0
Totals
36.0 2,736
CHECK
L
M,E,S : 4,173
Notes:
Job No
.:
15-31
41
·00
Project : Forest Theater Renovation
PCO# 13
Date: 8/5/2015
Matt Equip
Sub
/Mise
TOTAL
850 387
50
4,023
150
150
-
850
387 200
4,173
-
8/20/2019 Contract Change Order No. 2 Redacted
4/8
OTTO
ONSTRU TION
2150 GARDEN ROAD, SUITE A-1
MONTEREY, CA 93940
Ph:
831 657-9805
To :
Andrew Vanderford
CITY OF CARMEL BY THE SEA
P.O.
Bo
x CC
Carmel By the Sea, CA 93921
Ph:
831-620-2078
R I
I
RFI : 25
Date: 7f7/2015
Job
: 15-3141-00 FOREST THEATER RENOVATIONS
Phone: 831 )620-2078
CC: Jilian Cadouri (Cody Anderson Wasney), Monique Wood (Cody Anderson Wasney), Oscar Cisneros (Otto Construction),
John Garayalde (Otto Construction)
Subject: Indoor Theater Exposed Soil
Drawing: A2.4
Spec Section:
Cost Impact: TBD Schedule Impact: TBD
Request: Date Required: 7/17/2015
The
re
is existing soil that was exposed during the removal
of
the existing indoor stage. There is a drain line and water lines located
where the new stage ledger is
to
be installed for the new indoor stage. Location of existing lines is between grid lines 1 and 2 on the
back side
of
the dressing room wall (see photos).
Please advise.
Requested by : Matt Wetmore
OTIO CONSTRUCTION
Response:
Demo (e) concrete curbs at gridline G and
just
south of gridline 2 to
be
level with adjacent concrete floor. Reroute
pipe south of gridline 2
to
run along gridline G
Where soil occurs, excavate, and pour new 5
th1ck
slab with rebar per 1/A6.5 Install 4 epoxy dowels at edges at
18 o.c. wi
th
4 min. embed depth New slab to be level with (e) concrete slab.
For new landing, Install ledger on either side
of
pipes and notch new plywood landing where (e) drain and water
lines extend above landing level. Construct wood box curb to enclose pipes above landing level.
See also comments on photos.
~ ~
REVIEWE
By Andy Vanderford at 11:10 am Ju 21 2015
J.Cadouri
Answered by
C W Architects
07/21/15
Company Date
Page 1
of
1
-
8/20/2019 Contract Change Order No. 2 Redacted
5/8
s - --- --- -
...
..:..03
s
==
.
:;R Z.SS·
G F l O '
. . . .
S F
_
r \
-rl G X S T ~ G R ~ I N
J - WATE L I N E ( ~ ) I
~ r ___T __ __ __ _
PROPOSED INDOOR
THE TER PL N
----- 8
-- ----8
-
8/20/2019 Contract Change Order No. 2 Redacted
6/8
-
8/20/2019 Contract Change Order No. 2 Redacted
7/8
-
8/20/2019 Contract Change Order No. 2 Redacted
8/8
lines to remain in place New
crete slab to run below. Install
ledger on either side notch new
lywood landing t pipes constru ct
u rb to enclose lines at landing
top related