condition survey data

Post on 14-Apr-2018

227 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 1/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Sh

attering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

Side Ditch (Y/N)

Drainage Condition

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2

Chainage

(km)

Alignment

Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

247.000 247.050 247.100 247.150 247.200 247.250 247.300 247.350 247.400 247.450 247.500 247.550 247.600 247.650 247.700 247.750 247.800 247.850 247.900 248.000247.950

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 2/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

248.500 248.550 248.600 248.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

248.050 248.100 248.150 248.200 248.250 248.300 248.350

Soft Shoulder (Y/N)

Side Ditch (Y/N)

Drainage Condition

249.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

248.700 248.750 248.800 248.850 248.900 248.950248.400 248.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 3/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

249.500 249.550 249.600 249.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)249.050 249.100 249.150 249.200 249.250 249.300 249.350

Side Ditch (Y/N)

Drainage Condition

250.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

gi

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

249.700 249.750 249.800 249.850 249.900 249.950249.400 249.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 4/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

250.500 250.550 250.600 250.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

250.050 250.100 250.150 250.200 250.250 250.300 250.350

Side Ditch (Y/N)

Drainage Condition

251.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

250.700 250.750 250.800 250.850 250.900 250.950250.400 250.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 5/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

251.500 251.550 251.600 251.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

251.050 251.100 251.150 251.200 251.250 251.300 251.350

Side Ditch (Y/N)

Drainage Condition

252.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

251.700 251.750 251.800 251.850 251.900 251.950251.400 251.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 6/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

252.500 252.550 252.600 252.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

252.050 252.100 252.150 252.200 252.250 252.300 252.350

Side Ditch (Y/N)

Drainage Condition

253.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

252.700 252.750 252.800 252.850 252.900 252.950252.400 252.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 7/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

253.500 253.550 253.600 253.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

253.050 253.100 253.150 253.200 253.250 253.300 253.350

Side Ditch (Y/N)

Drainage Condition

254.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

253.700 253.750 253.800 253.850 253.900 253.950253.400 253.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 8/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

254.500 254.550 254.600 254.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

254.050 254.100 254.150 254.200 254.250 254.300 254.350

Side Ditch (Y/N)

Drainage Condition

255.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

254.700 254.750 254.800 254.850 254.900 254.950254.400 254.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 9/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

255.500 255.550 255.600 255.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)

255.050 255.100 255.150 255.200 255.250 255.300 255.350

Side Ditch (Y/N)

Drainage Condition

256.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

255.700 255.750 255.800 255.850 255.900 255.950255.400 255.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 10/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

256.500 256.550 256.600 256.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)256.050 256.100 256.150 256.200 256.250 256.300 256.350

Side Ditch (Y/N)

Drainage Condition

257.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

256.700 256.750 256.800 256.850 256.900 256.950256.400 256.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 11/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

257.500 257.550 257.600 257.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)257.050 257.100 257.150 257.200 257.250 257.300 257.350

Side Ditch (Y/N)

Drainage Condition

258.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

257.700 257.750 257.800 257.850 257.900 257.950257.400 257.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 12/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

258.500 258.550 258.600 258.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)258.050 258.100 258.150 258.200 258.250 258.300 258.350

Side Ditch (Y/N)

Drainage Condition

259.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

en

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

258.700 258.750 258.800 258.850 258.900 258.950258.400 258.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 13/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

259.500 259.550 259.600 259.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)259.050 259.100 259.150 259.200 259.250 259.300 259.350

Side Ditch (Y/N)

Drainage Condition

260.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

259.700 259.750 259.800 259.850 259.900 259.950259.400 259.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 14/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

260.500 260.550 260.600 260.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)260.050 260.100 260.150 260.200 260.250 260.300 260.350

Side Ditch (Y/N)

Drainage Condition

261.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

260.700 260.750 260.800 260.850 260.900 260.950260.400 260.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 15/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

261.500 261.550 261.600 261.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)261.050 261.100 261.150 261.200 261.250 261.300 261.350

Side Ditch (Y/N)

Drainage Condition

262.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

261.700 261.750 261.800 261.850 261.900 261.950261.400 261.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 16/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

262.500 262.550 262.600 262.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)262.050 262.100 262.150 262.200 262.250 262.300 262.350

Side Ditch (Y/N)

Drainage Condition

263.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

262.700 262.750 262.800 262.850 262.900 262.950262.400 262.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 17/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

263.500 263.550 263.600 263.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)263.050 263.100 263.150 263.200 263.250 263.300 263.350

Side Ditch (Y/N)

Drainage Condition

264.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

263.700 263.750 263.800 263.850 263.900 263.950263.400 263.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 18/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

264.500 264.550 264.600 264.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)264.050 264.100 264.150 264.200 264.250 264.300 264.350

Side Ditch (Y/N)

Drainage Condition

265.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

264.700 264.750 264.800 264.850 264.900 264.950264.400 264.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 19/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

265.500 265.550 265.600 265.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)265.050 265.100 265.150 265.200 265.250 265.300 265.350

Side Ditch (Y/N)

Drainage Condition

266.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

265.700 265.750 265.800 265.850 265.900 265.950265.400 265.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 20/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

266.500 266.550 266.600 266.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)266.050 266.100 266.150 266.200 266.250 266.300 266.350

Side Ditch (Y/N)

Drainage Condition

267.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

266.700 266.750 266.800 266.850 266.900 266.950266.400 266.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 21/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

267.500 267.550 267.600 267.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)267.050 267.100 267.150 267.200 267.250 267.300 267.350

Side Ditch (Y/N)

Drainage Condition

268.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

267.700 267.750 267.800 267.850 267.900 267.950267.400 267.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 22/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

268.500 268.550 268.600 268.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)268.050 268.100 268.150 268.200 268.250 268.300 268.350

Side Ditch (Y/N)

Drainage Condition

269.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

268.700 268.750 268.800 268.850 268.900 268.950268.400 268.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 23/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

269.500 269.550 269.600 269.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)269.050 269.100 269.150 269.200 269.250 269.300 269.350

Side Ditch (Y/N)

Drainage Condition

270.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

269.700 269.750 269.800 269.850 269.900 269.950269.400 269.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 24/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

270.500 270.550 270.600 270.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)270.050 270.100 270.150 270.200 270.250 270.300 270.350

Side Ditch (Y/N)

Drainage Condition

271.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

270.700 270.750 270.800 270.850 270.900 270.950270.400 270.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 25/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

271.500 271.550 271.600 271.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)271.050 271.100 271.150 271.200 271.250 271.300 271.350

Side Ditch (Y/N)

Drainage Condition

272.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

271.700 271.750 271.800 271.850 271.900 271.950271.400 271.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 26/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

272.500 272.550 272.600 272.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)272.050 272.100 272.150 272.200 272.250 272.300 272.350

Side Ditch (Y/N)

Drainage Condition

273.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

272.700 272.750 272.800 272.850 272.900 272.950272.400 272.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 27/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

273.500 273.550 273.600 273.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)273.050 273.100 273.150 273.200 273.250 273.300 273.350

Side Ditch (Y/N)

Drainage Condition

274.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

273.700 273.750 273.800 273.850 273.900 273.950273.400 273.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 28/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

274.500 274.550 274.600 274.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)274.050 274.100 274.150 274.200 274.250 274.300 274.350

Side Ditch (Y/N)

Drainage Condition

275.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

274.700 274.750 274.800 274.850 274.900 274.950274.400 274.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 29/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

275.500 275.550 275.600 275.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)275.050 275.100 275.150 275.200 275.250 275.300 275.350

Side Ditch (Y/N)

Drainage Condition

276.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

275.700 275.750 275.800 275.850 275.900 275.950275.400 275.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 30/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

276.500 276.550 276.600 276.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)276.050 276.100 276.150 276.200 276.250 276.300 276.350

Side Ditch (Y/N)

Drainage Condition

277.000

Alignment

Cross Section

Height (m), Crossfall(%)

Ri

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

276.700 276.750 276.800 276.850 276.900 276.950276.400 276.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 31/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

277.500 277.550 277.600 277.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)277.050 277.100 277.150 277.200 277.250 277.300 277.350

Side Ditch (Y/N)

Drainage Condition

278.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

277.700 277.750 277.800 277.850 277.900 277.950277.400 277.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 32/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

278.500 278.550 278.600 278.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)278.050 278.100 278.150 278.200 278.250 278.300 278.350

Side Ditch (Y/N)

Drainage Condition

279.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

278.700 278.750 278.800 278.850 278.900 278.950278.400 278.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 33/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

279.500 279.550 279.600 279.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)279.050 279.100 279.150 279.200 279.250 279.300 279.350

Side Ditch (Y/N)

Drainage Condition

280.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

279.700 279.750 279.800 279.850 279.900 279.950279.400 279.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 34/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

280.500 280.550 280.600 280.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)280.050 280.100 280.150 280.200 280.250 280.300 280.350

Side Ditch (Y/N)

Drainage Condition

281.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

280.700 280.750 280.800 280.850 280.900 280.950280.400 280.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 35/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

281.500 281.550 281.600 281.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)281.050 281.100 281.150 281.200 281.250 281.300 281.350

Side Ditch (Y/N)

Drainage Condition

282.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

281.700 281.750 281.800 281.850 281.900 281.950281.400 281.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 36/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

282.500 282.550 282.600 282.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)282.050 282.100 282.150 282.200 282.250 282.300 282.350

Side Ditch (Y/N)

Drainage Condition

283.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

282.700 282.750 282.800 282.850 282.900 282.950282.400 282.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 37/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

283.500 283.550 283.600 283.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)283.050 283.100 283.150 283.200 283.250 283.300 283.350

Side Ditch (Y/N)

Drainage Condition

284.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

283.700 283.750 283.800 283.850 283.900 283.950283.400 283.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 38/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

284.500 284.550 284.600 284.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)284.050 284.100 284.150 284.200 284.250 284.300 284.350

Side Ditch (Y/N)

Drainage Condition

285.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

284.700 284.750 284.800 284.850 284.900 284.950284.400 284.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 39/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

285.500 285.550 285.600 285.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)285.050 285.100 285.150 285.200 285.250 285.300 285.350

Side Ditch (Y/N)

Drainage Condition

286.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

285.700 285.750 285.800 285.850 285.900 285.950285.400 285.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 40/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

286.500 286.550 286.600 286.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)286.050 286.100 286.150 286.200 286.250 286.300 286.350

Side Ditch (Y/N)

Drainage Condition

287.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

286.700 286.750 286.800 286.850 286.900 286.950286.400 286.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 41/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

287.500 287.550 287.600 287.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)287.050 287.100 287.150 287.200 287.250 287.300 287.350

Side Ditch (Y/N)

Drainage Condition

288.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

287.700 287.750 287.800 287.850 287.900 287.950287.400 287.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 42/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

288.500 288.550 288.600 288.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)288.050 288.100 288.150 288.200 288.250 288.300 288.350

Side Ditch (Y/N)

Drainage Condition

289.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

288.700 288.750 288.800 288.850 288.900 288.950288.400 288.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 43/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

289.500 289.550 289.600 289.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)289.050 289.100 289.150 289.200 289.250 289.300 289.350

Side Ditch (Y/N)

Drainage Condition

290.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

289.700 289.750 289.800 289.850 289.900 289.950289.400 289.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 44/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

290.500 290.550 290.600 290.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)290.050 290.100 290.150 290.200 290.250 290.300 290.350

Side Ditch (Y/N)

Drainage Condition

291.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

290.700 290.750 290.800 290.850 290.900 290.950290.400 290.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 45/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

291.500 291.550 291.600 291.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)291.050 291.100 291.150 291.200 291.250 291.300 291.350

Side Ditch (Y/N)

Drainage Condition

292.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

291.700 291.750 291.800 291.850 291.900 291.950291.400 291.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 46/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

292.500 292.550 292.600 292.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)292.050 292.100 292.150 292.200 292.250 292.300 292.350

Side Ditch (Y/N)

Drainage Condition

293.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

292.700 292.750 292.800 292.850 292.900 292.950292.400 292.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 47/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

293.500 293.550 293.600 293.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)293.050 293.100 293.150 293.200 293.250 293.300 293.350

Side Ditch (Y/N)

Drainage Condition

294.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

nt

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

293.700 293.750 293.800 293.850 293.900 293.950293.400 293.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 48/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

294.500 294.550 294.600 294.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)294.050 294.100 294.150 294.200 294.250 294.300 294.350

Side Ditch (Y/N)

Drainage Condition

295.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

294.700 294.750 294.800 294.850 294.900 294.950294.400 294.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 49/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

295.500 295.550 295.600 295.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)295.050 295.100 295.150 295.200 295.250 295.300 295.350

Side Ditch (Y/N)

Drainage Condition

296.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

295.700 295.750 295.800 295.850 295.900 295.950295.400 295.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 50/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

296.500 296.550 296.600 296.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)296.050 296.100 296.150 296.200 296.250 296.300 296.350

Side Ditch (Y/N)

Drainage Condition

297.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

296.700 296.750 296.800 296.850 296.900 296.950296.400 296.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 51/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

297.500 297.550 297.600 297.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)297.050 297.100 297.150 297.200 297.250 297.300 297.350

Side Ditch (Y/N)

Drainage Condition

298.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

297.700 297.750 297.800 297.850 297.900 297.950297.400 297.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 52/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

298.500 298.550 298.600 298.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)298.050 298.100 298.150 298.200 298.250 298.300 298.350

Side Ditch (Y/N)

Drainage Condition

299.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

298.700 298.750 298.800 298.850 298.900 298.950298.400 298.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 53/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

299.500 299.550 299.600 299.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)299.050 299.100 299.150 299.200 299.250 299.300 299.350

Side Ditch (Y/N)

Drainage Condition

300.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

299.700 299.750 299.800 299.850 299.900 299.950299.400 299.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 54/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

300.500 300.550 300.600 300.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)300.050 300.100 300.150 300.200 300.250 300.300 300.350

Side Ditch (Y/N)

Drainage Condition

301.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

300.700 300.750 300.800 300.850 300.900 300.950300.400 300.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 55/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

301.500 301.550 301.600 301.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)301.050 301.100 301.150 301.200 301.250 301.300 301.350

Side Ditch (Y/N)

Drainage Condition

302.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

301.700 301.750 301.800 301.850 301.900 301.950301.400 301.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 56/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

302.500 302.550 302.600 302.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)302.050 302.100 302.150 302.200 302.250 302.300 302.350

Side Ditch (Y/N)

Drainage Condition

303.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

302.700 302.750 302.800 302.850 302.900 302.950302.400 302.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 57/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

303.500 303.550 303.600 303.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)303.050 303.100 303.150 303.200 303.250 303.300 303.350

Side Ditch (Y/N)

Drainage Condition

304.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

303.700 303.750 303.800 303.850 303.900 303.950303.400 303.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 58/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

304.500 304.550 304.600 304.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)304.050 304.100 304.150 304.200 304.250 304.300 304.350

Side Ditch (Y/N)

Drainage Condition

305.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

304.700 304.750 304.800 304.850 304.900 304.950304.400 304.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 59/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

305.500 305.550 305.600 305.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)305.050 305.100 305.150 305.200 305.250 305.300 305.350

Side Ditch (Y/N)

Drainage Condition

306.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

305.700 305.750 305.800 305.850 305.900 305.950305.400 305.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 60/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

306.500 306.550 306.600 306.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)306.050 306.100 306.150 306.200 306.250 306.300 306.350

Side Ditch (Y/N)

Drainage Condition

307.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

306.700 306.750 306.800 306.850 306.900 306.950306.400 306.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 61/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

307.500 307.550 307.600 307.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)307.050 307.100 307.150 307.200 307.250 307.300 307.350

Side Ditch (Y/N)

Drainage Condition

308.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

307.700 307.750 307.800 307.850 307.900 307.950307.400 307.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 62/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

308.500 308.550 308.600 308.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)308.050 308.100 308.150 308.200 308.250 308.300 308.350

Side Ditch (Y/N)

Drainage Condition

309.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

308.700 308.750 308.800 308.850 308.900 308.950308.400 308.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 63/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

309.500 309.550 309.600 309.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)309.050 309.100 309.150 309.200 309.250 309.300 309.350

Side Ditch (Y/N)

Drainage Condition

310.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

309.700 309.750 309.800 309.850 309.900 309.950309.400 309.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 64/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

310.500 310.550 310.600 310.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)310.050 310.100 310.150 310.200 310.250 310.300 310.350

Side Ditch (Y/N)

Drainage Condition

311.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

310.700 310.750 310.800 310.850 310.900 310.950310.400 310.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 65/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

311.500 311.550 311.600 311.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)311.050 311.100 311.150 311.200 311.250 311.300 311.350

Side Ditch (Y/N)

Drainage Condition

312.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

ig

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

311.700 311.750 311.800 311.850 311.900 311.950311.400 311.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 66/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

312.500 312.550 312.600 312.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)312.050 312.100 312.150 312.200 312.250 312.300 312.350

Side Ditch (Y/N)

Drainage Condition

313.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

312.700 312.750 312.800 312.850 312.900 312.950312.400 312.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 67/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

313.500 313.550 313.600 313.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)313.050 313.100 313.150 313.200 313.250 313.300 313.350

Side Ditch (Y/N)

Drainage Condition

314.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

313.700 313.750 313.800 313.850 313.900 313.950313.400 313.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 68/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

314.500 314.550 314.600 314.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)314.050 314.100 314.150 314.200 314.250 314.300 314.350

Side Ditch (Y/N)

Drainage Condition

315.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

314.700 314.750 314.800 314.850 314.900 314.950314.400 314.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 69/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

315.500 315.550 315.600 315.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)315.050 315.100 315.150 315.200 315.250 315.300 315.350

Side Ditch (Y/N)

Drainage Condition

316.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

315.700 315.750 315.800 315.850 315.900 315.950315.400 315.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 70/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

316.500 316.550 316.600 316.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)316.050 316.100 316.150 316.200 316.250 316.300 316.350

Side Ditch (Y/N)

Drainage Condition

317.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

316.700 316.750 316.800 316.850 316.900 316.950316.400 316.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 71/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

317.500 317.550 317.600 317.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)317.050 317.100 317.150 317.200 317.250 317.300 317.350

Side Ditch (Y/N)

Drainage Condition

318.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

317.700 317.750 317.800 317.850 317.900 317.950317.400 317.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 72/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

318.500 318.550 318.600 318.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)318.050 318.100 318.150 318.200 318.250 318.300 318.350

Side Ditch (Y/N)

Drainage Condition

319.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

318.700 318.750 318.800 318.850 318.900 318.950318.400 318.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 73/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

319.500 319.550 319.600 319.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)319.050 319.100 319.150 319.200 319.250 319.300 319.350

Side Ditch (Y/N)

Drainage Condition

320.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

319.700 319.750 319.800 319.850 319.900 319.950319.400 319.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 74/75

Road

Section

Linear Sketch

LayoutLong. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

320.500 320.550 320.600 320.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)320.050 320.100 320.150 320.200 320.250 320.300 320.350

Side Ditch (Y/N)

Drainage Condition

321.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

320.700 320.750 320.800 320.850 320.900 320.950320.400 320.450

7/29/2019 Condition Survey Data

http://slidepdf.com/reader/full/condition-survey-data 75/75

Road

Section

Linear Sketch

Layout

Long. Align Grade

Faulting/Stepping

Bump

Blowup/Bulking/Shatt

ering

Transverse Crack

Diagonal Crack

Longitudinal Crack

Corner Break

Multiple Cracks

Ravelling

ScalingPopout

Potholes

Joint Spalling

Joint Damage

Loss of Surface

Texture

Slab/Edge Punchout

Pumping

321.500 321.550 321.600 321.650

Design Consultancy Services for 6 Laning of Aurangabad Barwa Adda Section of NH-2Rigid Pavement……………………………. Condition Survey and Distress Rating……………………………………..

Chainage

(km)321.050 321.100 321.150 321.200 321.250 321.300 321.350

Side Ditch (Y/N)

Drainage Condition

322.000

Alignment

Cross Section

Height (m), Crossfall(%)

R

i

g

i

d

 

P

a

v

e

m

e

n

t

Rigid Shoulder (Y/N)

Soft Shoulder (Y/N)

321.700 321.750 321.800 321.850 321.900 321.950321.400 321.450