Hiap Seng Engineering (thailand) co ltdHiap Seng Engineering (thailand) co.,ltd.Corporate Presentation

BUSINESSBUSINESSPresentationPresentation

Keynote

Our FactoryOur Factory

Formed 30 january 2003Formed 30 january 2003Hiap Seng Engineering from Singapore own 48%Hiap Seng Engineering from Singapore own 48%

Thai Partners own 52% | Capital injection of 125m THB

Restructure 16 May 2012Hiap Seng Engineering increase shares to 85%

Thai Partners reduce shares to 15%Thai Partners reduce shares to 15%

Capital increase to 175m THB

CHANGE NAME1December 2014CHANGE COMPANY NAME TO HIAP SENG ENGINEERING (THAILAND) CO.,LTD.

Our PhilosophyOur Philosophy

T t i f ti i t th h ffi i t ff tTo strive for continuous improvement through efficient effort and business processes to meet client requirements

with safety, quality and schedule as key drivers.

Key DirectorsKey DirectorsThe Directors at Hiap Seng Engineering (Thailand) Co.,Ltd.

Richard TanManaging Director

Mak Chew MingExecutive Director

Tan Hak JinFinance Director

Song TanDirector

Surat Kham-ngernSafety Quality Environment Director

ORGANIZATIONAL Chart

M iManaging Director

Richard Tan

Finance Director

Executive DirectorM k C M

DirectorTan Hak Jin

FinanceChatchai W.

Mak C.M.

SQSQE DirectorSurat Kham-

ngern

Factory Manager

Natthanat J.

LogisticHSE QA/QCProduction Tendering Engineering PurchasingHR

Factory Map & FacilitiesFactory Map & FacilitiesOur Interactive and Informative Map

Interactive Factory Map**Please double click on the area you would like to view

CORPORATE OFFICE:

AREA: 400m2 over two levelsAREA: 400m2 over two levels.

OCCUPANTS: The purchasing, tendering, engineering, accounting, and management teams.

MAP EXIT

WORKSHOP 1:

AREA: 7 200m2AREA: 7,200m2.

DESCRIPTION: Consisting of three bays each 20m x 120m.

EQUIPMENT: 4 x gantry cranes SWL 7.5 tonnes, 6 x gantry cranes SWL 5 tonnesgantry cranes SWL 5 tonnes, 20 x gantry cranes SWL, 1 tonne, 1 x profile pipe cutter, and 70 x welding machines.

MAP EXIT

WORKSHOP 2:

AREA: 7 200m2AREA: 7,200m2.

DESCRIPTION: Consisting of three bays each 20m x 120m.

EQUIPMENT: 2 x gantry cranes SWL 10 tonnes, 4 x gantry cranes SWL 7 5gantry cranes SWL 7.5 tonnes, and 70 x welding machines.

MAP EXIT

WORKSHOP 3:

AREA: 4 535m2AREA: 4,535m2.

DESCRIPTION: Consisting of three bays with a current configuration of one bay being used for an automatic cutting line, one bay being used for a built-up beam line and one baybuilt up beam line, and one bay being used for pro-arc cutting and fabrication.

EQUIPMENT: 12 x gantry cranes SWL 5 tonnes, 2 x high-speed band saws, 1 x CNC punch machine 1 x CNCpunch machine, 1 x CNC drilling machine, 1 x robot coupling cutting machine, 1 x CNC plate pro-arc cutting

hi 1 imachine, 1 x gas cutting machine, and 30 x welding machines.

MAP EXIT

WORKSHOP 4:

AREA: 1 500m2AREA: 1,500m2.

DESCRIPTION: This workshop is used for the fabrication of small components.

EQUIPMENT: 2 x gantry cranes SWL 5 tonnes and 4 xcranes SWL 5 tonnes and 4 x gantry cranes SWL 3 tonnes.

MAP EXIT

LAYDOWN AREA 1:

AREA: 3 850m2AREA: 3,850m2.

EQUIPMENT: 1 x gantry crane SWL 10 tonnes and 1 x gantry crane SWL 5 tonnes.

MAP EXIT

LAYDOWN AREA 2:

AREA: 1 500m2AREA: 1,500m2.

MAP EXIT

LAYDOWN AREA 3:

AREA: 7 973m2AREA: 7,973m2.

MAP EXIT

LAYDOWN AREA 4 / PAINTING AREA:

AREA: 14,136m2.

DESCRIPTION: A dedicated painting area with a permanent paint shop together with 5 x movable paint sheds and a laydown area for paintedlaydown area for painted products.

MAP EXIT

LAYDOWN AREA 5:

AREA: 12 160 m2AREA: 12,160 m2

DESCRIPTION: A general purpose laydown area that can be used as an extension to the painting yard, for storage of raw materials, or as a pre-assembly areaassembly area.

MAP EXIT

BLASTING CHAMBER AREA:

AREA: 1 200m2AREA: 1,200m2.

EQUIPMENT: 2 x gantry cranes SWL 5 tonnes.

MAP EXIT

BEAM LINE BLASTING AREA:

AREA: 1,200m2.

EQUIPMENT: 2 x gantry cranes SWL 5 tonnes.

MAP EXIT

WELDER QUALIFICATION TEST AREA:

AREA: 500m2.

DESCRIPTION: A dedicated area where our welders are tested and qualified for each project.

EQUIPMENT: 1 x gantry crane SWL 2.5 tonnes.

MAP EXIT

PRODUCTION OFFICE:

AREA: 720m2AREA: 720m2.

OCCUPANTS: The production, Human Resources, Safety, Logistics, and Quality Control teams.

MAP EXIT

CANTEEN BUILDING & CLIENT OFFICES:

AREA: 960m2.

OCCUPANTS: Canteen facilities and spare offices for client use.

MAP EXIT

WAREHOUSE:

AREA: 1 536m2AREA: 1,536m2.

EQUIPMENT: 2 x gantry cranes SWL 2.5 tonnes.

MAP EXIT

Our ServicesOur ServicesThe Range of Services Available

Services PipingServices Piping

Hiap Seng - Thailand has a large and experienced labour force qualified to undertake all kinds of labour force qualified to undertake all kinds of welding to carbon steel, stainless steel, and alloy pipe systems.

We employ all available management tools including QR di t l titi QR coding to process large quantities of components. We have produced up to 90,000 weld diameter inches per month in previous projects weld diameter inches per month in previous projects including export packing into 40’ sea containers for shipping from the nearby Laem ChabangInternational Port.

Services PipingServices Piping

Services PlateServices Plate

Hiap Seng - Thailand’s versatility means that our plate work products range from bodies for tipperplate work products range from bodies for tipper trucks to pressure rated process and utility equipment.q p

Services PlateServices Plate

Services StructureServices Structure

Hiap Seng - Thailand’s large workshops and laydown areas together with our extensive array oflaydown areas together with our extensive array of automatic profile cutting and other machines makes us one of the premier structural steel fabrications in pthe region.

Services StructureServices Structure

Services PaintingServices Painting

Hiap Seng - Thailand has extensive blasting and painting facilities Our auto-blasting chamber canpainting facilities. Our auto-blasting chamber can accommodate sizes up to 30m x 7m and many of our painting sheds are rail mounted to provide p g poptimum versatility.

Services PaintingServices Painting

Case StudiesCase StudiesFour Major Case Studies Revealed

Project Case Studies

Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak

Steel Structure Fabrication and Modularisation for CUEL Limited

Steel Structure Fabrication of Access Jetty &Wharf for John Holland

Power Diverter Fabrication for NEM Power-Systems

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 1Steel Structure Fabrication and Modularisation for CUEL LimitedSteel Structure Fabrication and Modularisation for CUEL Limited

Project DetailsProject DetailsScope:Fabrication of Steel StructuresPre-Assembly of Modules

Output:Output:1,000 Tonnes per month

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 2Tokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn BhdTokuyama Malaysia Piping Fabrication for Chiyoda Sarawak Sdn. Bhd.

Project DetailsProject DetailsFeature 1:Administration of the importation of raw material and re-exportation of fabrication pipe spools in accordance with the Thailand Boardaccordance with the Thailand Board of Investment rules allowing exemption from export tax

Feature 2:The use of a QR Code (‘barcode’)The use of a QR Code ( barcode ) labeling system to administer the fabrication, testing, packing, shipment, warehousing, and installation (by others) of the pipe spools.

Scope:Receiving of free issued materials, fabrication, testing, grit blasting, painting, export packing, and shipping.

Output:60,000 weld diameter inches per month.

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 3Steel Structure Fabrication of Access Jetty & Wharf for John HollandSteel Structure Fabrication of Access Jetty & Wharf for John Holland

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Steel Structures•Pre-Assembly of Structures•Blasting and PaintingBlasting and Painting•Export Packing

Output:•1,800 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Case Study 4Power Diverter Fabrication for NEM Power SystemsPower Diverter Fabrication for NEM Power-Systems

Project DetailsProject DetailsScope:•Material Supply•Fabrication of Casings/ Blades/ Seal Air Ducts/ Shafts and Toggle Arms/ Cladding PlateArms/ Cladding Plate•Assembly of Diverters•Blasting and Painting•Functional Testing•Export Packing and Shipping

Output:•One Diverter Every 6 weeks•400 Tonnes per month

EXIT

Our RevenueOur RevenueSubstantial and Continual Growth

Turnover history

552m508m345m

332m445m

332m

2008508

2009332

2010345

2011445

2012332

2013508m 332m 345m 445m 332m 552m

Revenue since 2008 2,500m THB

Sales DistributionSales DistributionInternational & National Performance

Sales Distribution

25% Average overseas sales for the past 5 years25%

85% Overseas sales Increase since 201285% Overseas sales Increase since 2012

Our WorkforceOur WorkforceThe Cornerstone to our Success

Overall Workforce

Direct Workforce 1000+ Office Staff 100+

250+ Indirect Supervision

1 76 Office1

200+ Welders2 35 QC2

480+ Other Trade

3 20 Safety3

90% 10%

Special MachinerySpecial MachineryCutting-Edge Hardware

Machinery That Delivers results

1 Daito CNC Coping Robot1

2

p g

Automatic H-Beam Drilling Machine2 Automatic H-Beam Drilling Machine

H B B d S P i Li3 H-Beam Band Saw Processing Line

4 Built Up Beam Fabrication Line

5 Plasma Plate Cutting Machine

6 Pipe Coaster Profile Cutting Machine

Our ClientsOur ClientsDelivering Beyond Expectations

Our Clients

Client Name

Theiss

John Holland

Country

Australia

Australia

Nature of Work

Module Structure / Piping

False works - Cape LambertJohn Holland

United Group

Nems Power Systems

Chiyoda

Australia

Germany

Japan

False works Cape Lambert

Piping

Diverter / Damper / Plate Work

PipingChiyoda

JGC Corporation

Samsung Engineering

GS Engineering & Construction

Japan

Japan

Korea

Korea

Piping

Diverter / Damper / Plate Work

Structure

StructureGS Engineering & Construction

CTCI

CUEL

UOP LLC

Korea

Taiwan

Thailand

USA

Structure

Structure / Piping

Structure / Piping

Module Structure / Piping

Experience working with global and regional clients

UOP LLC USA Module Structure / Piping

Safety recordSafety recordOutstanding Statistics

Past 5 years accumulated Man hours 8.1m

LTI 0LTI = 0

Our CertificatesOur CertificatesStandards, Certificates & Awards

Our CertificatesThe company achieved ISO 9001 Registered certification in 2008. The company

holds Thailand Board of Investment Certification and is registered with the Department of Foreign Trade.

Our LocationOur LocationOnly 15km from Laem Chabang International Port

Our LocationOur LocationWe are located 15km from Laem Chabang International Port

allowing easy export of fabricated metals

THANK YOUTHANK YOUPresentationPresentation