cardno tbe - mydocs

Post on 16-Oct-2021

6 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Cardno TBE

SURVEY CONTROL PACKAGE

VERSION NO: 1 DATE: 5-07-2013

P.I. NUMBER:

CARDNO PROJECT

NUMBER:

PI# 0011682

GA06900200

DESCRIPTION:

SURVEY

DATA:

LENGTH:

COUNTY:

SR299 BRIDGE IMPROVEMENT PROJECT AT

I-24 INTERCHANGE.

HORIZONTAL DATUM: NAD83(94)

VERTICAL DATUM: NAVD88

GEORGIA WEST ZONE

APPROXIMATELY 1 MILE

DADE

6649 PEACHTREE IND. BLVD.

Suite J

NORCROSS, GA, 30092

678-421-0080

www.cardno.com

Cardno TBE

SURVEY CONTROL PACKAGE

PI #: 0011682 Final Coordinates Georgia State Plane West Zone (1002)

NAVD 88

Northing (m) Easting (m) Elevation (m) Northing (ft) Easting (ft) Elevation (ft)

SD1 552074.889 585473.03 238.098 1811265.698 1920839.433 781.16

SD2 552601.412 585806.757 229.333 1812993.133 1921934.335 752.40

SD3 552744.797 585914.599 233.368 1813463.555 1922288.147 765.64

Convergence Point Scale Factor Combined Scale Factor

SD1 -0.7189814 1.00006161 1.00002883

SD2 -0.71701323 1.00006067 1.00002927

SD3 -0.71637065 1.00006036 1.00002832

SURVEY NOTES:

SURVEY CONTROL POINT LOCATIONS DERIVED FROM OPUS OBSRVATIONS ON MARCH 18, 2013 AND

PROCESSED ON APRIL 18, 2013.

ELEVATIONS FOR THIS CONTROL DERIVED FROM A 3-WIRE LEVEL LOOP TIED TO NGS MONUMENT C-392.

Survey Control Points are 5/8” Rebar, center punched, and set 0.5’ below the natural ground surface.

PROJECT LOCATION

SURVEY CONTROL LOCATIONS

Closure Precision: 1 in 36860

SD1 OPUS Solution

SD2 OPUS Solution

SD3 OPUS Solution

top related