capstone ii group ii critical path analysis on highway expansion u.s. 83 la joya relief route...
Post on 03-Jan-2016
214 Views
Preview:
TRANSCRIPT
Capstone II Group II
CRITICAL PATH ANALYSIS ON HIGHWAY EXPANSIONU.S. 83 LA JOYA RELIEF ROUTE
Presented By:Idalia De HoyosMaria TrevinoRolando CuellarAshley WheelerJohn SandovalGriselda HernandezNelson Aguilar
Slide Presentation Contents
What did we learn…………………………………………..…..3Network Rail Case study………………………………….…..4What is the approach the team will take……………..5Map of the plan…………………………………………….….....6Plan logistics...………………………………………………..….. 7Timeframe…………………………………………………………..8Process………………………………………………………….…....8Information Gathering………………………………………...9Purpose….………………………………………….……….………10Objective……..………………………………………….…….…..11Process……………………………….……………….…………….12Coordination………………………………………….…………..13Advantages…………………………………………….…………. 14Disadvantages………………………………………..…………..15Conclusion……………………………………………….…………16References………………………………………………….….....17
Network Rail Case Study
We learned from the Network Rail Case Study:• Any major engineering project requires planning for activities,
sequencing, timing, and budgeting. • Critical Path Analysis includes:
◦ Purpose◦ Objective◦ Process◦ Coordination◦ Advantages and Disadvantages◦ Conclusion
What did we learn?
• Critical Path Analysis takes planning which require diagrams, graphs, and charts.
• Data needs to be collected in order to plan accordingly.• Roles need to be assigned.• In order to plan a project there has to a purpose.• After purpose is pinpointed, group will find the process,
co-ordination, and everything else will fall into place.
Applying What We Learned Critical Path Analysis on Highway Expansion
*U.S. 83 La Joya Relief Route
Photo Credit: (ProgressTimes, 2011)
Map Of the Plan
Phase I
Phase II
MAP OF THE PROPOSED PLAN
Plan Logistics
• Project Scope◦ Four lane controlled access expressway facility
• Project Limits◦ From: 1.0 miles east of FM 886 to: 0.5 mile west
of Showers Road
Resource: (Pharr District Texas Department of Transportation, 2015)
Photo Credit: (Pharr District Texas Department of Transportation, 2015)
Path Analysis Time Frame
How we went about gathering information
• Interview with John Womack; Expansion Consultant for the City of Peñitas
• Texdot.gov
• The Monitor Newspaper
Purpose/ Advantages:
• Relief traffic flow
• Circumvent the school zones, lower
speed limits and avoid traffic light
• Attract new businesses to the city
Objective:
Creation of/Improvements on:• Construction of four lane
controlled access highway• Reduce traffic congestion• Improve
◦ Traffic Mobility◦ Traffic Safety◦ Corridor Connectivity
Resource: (Pharr District Texas Department of Transportation, 2015)
Process:
• Plan and Design• Court Hearings• Purchasing lands• Local, County, State and Federal
government need to come to agreement on funds
Resource: (Pharr District Texas Department of Transportation, 2015)
Coordination:
• Decision TreeChoosing most appropriate:
○ Plan○ Design
• Engineers created several planned routes the final plan route was the US 83 La Joya Relief Route (Womack, 2015)
Disadvantages
• Gas wells affected (Womack, 2015)• Condemnation process (Womack, 2015)• Unexpectable and intangible aspects of the project
(Womack, 2015)• “Divert some of the 40,000 cars on the stretch of U.S. 83
away from the cities’ cores, potentially costing local businesses a reliable stream of customers” (Janes, 2011)
• Construction time from start to finish
Conclusion:
• Use of Critical Path Analysis on the project of U.S. 83 La Joya Relief Route.
• Expose project details of Relief Route
• Understand how Leadership can be shown in different organizations.
References Janes, J. (2011, July 25). La Joya bypass offers economic promise for western Hidalgo County.
Retrieved from TheMonitor.com: http://www.themonitor.com/news/local/la-joya-bypass-offers-economic-promise-for-western-hidalgo-county/article_f12056f0-9534-53f3-85ff-0f3ad85aeeff.html
Pharr District Texas Department of Transportation . (2015, September 15). US 83 Relief Route. Retrieved from Texdot.gov: http://ftp.dot.state.tx.us/pub/txdot-info/phr/projects/us59-relief/111512_presentation.pdf
ProgressTimes. (2011, July 22). www.progresstimes.net. Retrieved from La Joya bypass using partnership for funding: http://www.progresstimes.net/news/local-news/807-la-joya-bypass-using-partnerships-for-funding.html
Womack, J. (2015, September 16). Expansion Consultant. (I. De Hoyos & N. Aguilar, Interviewers)
top related