LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Brooklyn College Performing Arts Center AdditionCUNY/Brooklyn College/Pfeiffer Partners Architects Inc.
29 November 2010
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Project Overview Implementing the College’s 1995 Facilities Master Plan
1995 Campus Master Plan
Expansion LaGuardia Library Future Expansion of the Performing ArtsNew West Quad Building
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Project Overview
• Features an extremely flexible200 seat performance spacewith adjustable acoustics for music/theater
• Enhances entire Brooklyn community byproviding a new performance venue, large rehearsal/special events room, lobby and music instruction/practice space
• Creates a new front door and entryto the Brooklyn College campus and a much friendlier and welcoming edge along Campus Drive
• Demolishes the existing Gershwin wing ofthe Brooklyn College Performing ArtsCenter. Whitman Hall to remain openthroughout.
Project Components
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
• Gershwin building badly in need of repair andupgrade
• Repair costs would likely be commensurate with new construction and still not meet needs
• Building lacks: proper scene shop, acousticalseparation between spaces, appropriatetechnology, contemporary teaching spaces
• Spaces not appropriate for the usesand functions they serve
• Negative impression in recruiting students and faculty
• Negative impression to the neighborhood
Project Overview Rational for Demolition of Gershwin Hall
Existing Gershwin Building
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Existing Deficiencies Classrooms, Rehearsal Spaces, Practice Rooms
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Existing Deficiencies Support Spaces, Training Facilities
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Shared Spaces for Music and Theater• Performance hall – 200 seats• Lobby and warming kitchen• Recording studio• Ticket booth
Instructional Spaces – Music• Music ensemble/rehearsal• Choral/Opera rehearsal room• PIMA/Center for Computer Music• Practice rooms• Studios
Instructional Spaces – Theater• Theater rehearsal• Scene shop/set construction
Total Gross Square Feet – 62,000
Proposed Facilities Program Summary
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept The Site
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Entering the Campus – Entering the Arts
Security Booth
Campus Road @ Hillel Place
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Floor Plans – Level One
Security Booth
LobbyPortal Performance Stage
Scene Shop
Pima Sound Lab
Campus Road
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept The Lobby
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Floor Plans – Level One
Security Booth
LobbyPortal Performance Stage
Scene Shop
Pima Sound Lab
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Performance Hall – A Room for Music and Theater
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Floor Plans – Level Two
Lobby
Music Rehearsal Hall
MechanicalRecordingStudio
Terrace
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Floor Plans – Level Three
Large Studio
Choral
Practice Rooms
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Floor Plans – Lower Level
Theater Rehearsal
Studios, Practice Rooms
Lower Lobby
Storage
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Building Cross Section
Section Along Campus Road
New Campus Entry
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Transforming the College and Community Interface
Campus Road Elevation - Existing
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Transforming the College and Community Interface
Campus Road Elevation - Existing
Campus Road Elevation - Proposed
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Creating a New Entrance to the Campus
Campus Entry - Existing
Campus Entry - Proposed
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Activating Campus Road
Campus Road - Existing Campus Road - Proposed
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Architectural Approach – “Telegraphing” the Arts
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Architectural Approach – “Telegraphing” the Arts
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept
Rendering of PAC from Campus Side
Activating the Campus
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept Telegraphing the Arts – Day & Night
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Overall Design Concept
Landscape Elements• New gateway entrance• Exterior fencing• Special paving• Improved pathways• Exterior lighting• Outdoor seating areas
Creating a New Arts Quad
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Schedule Schedule for Moving Forward
Swing Space _ Begin Fall 2010• Renovation of Roosevelt Hall for Music• Theater remains in Whitman/”knuckle”
Swing Space _ Winter Recess 2010/2011• Relocate Music into Roosevelt• Relocate BCBC offices into trailers• Spring 2011 Classes in Roosevelt
New Performing Arts Center –Demolition _ Begins Winter/Spring 2011• Asbestos abatement (evening hours)• Demolition of Gershwin Hall wing• Retain stage tower for new building• Entry to campus from Campus Road
relocated
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Schedule Schedule for Moving Forward
New Performing Arts Center –Construction _ Begins Summer 2011• Site infrastructure/relocations• Building construction• Site and Landscape construction• Building furniture and fit out• Relocate Music back to building
Approximate construction time – 2 ½ yearsFall 2013/Spring 2014 Completion
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Brooklyn College The New Leonard and Claire Tow Performing Arts Center
LEONARD AND CLAIRE TOW PERFORMING ARTS CENTER Brooklyn College CUNY
Brooklyn College Performing Arts Center AdditionCUNY/Brooklyn College/Pfeiffer Partners Architects Inc.
29 November 2010