ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 1

CAC MEETING #1

ADAMS STREET BRANCH LIBRARYPROGRAMMING STUDY

NADAAA

FOR CITY OF BOSTON BOSTON PUBLIC LIBRARY AND PUBLIC FACILITY DEPARTMENT

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 2

1.0 IntroductIons

2.0 schedule

ReviewofDRaftScheDulewithpReSentationanDDeliveRyDateS

3.0 sIte revIew

SummaRyofmechanical,electRical,plumbing,anDaRchitectuRalReviewS

SiteanalySiS

4.0 dIscussIon, Feedback

pReSentationofDRaftSuRvey

DiScuSSionofcommunitygoalSanDviSionfoRthepRoject

nextStepS:communityoutReachbycacmembeRShipanDthRoughonline/papeR

SuRvey,continueexiStingconDitionSDocumentation,DevelopbplpRogRam.nextcac

next MeetIng: nextcacmeetingtaRgeteDfoReaRlySeptembeRtoDiScuSSDRaftpRogRam#1baSeDonbplRequiRementSanDinitialfeeDbackfRomcommunity.

AGENDA

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 3

ADAMS BRANCH LIBRARY: STUDY SCHEDULE

WORKING GROUP MEETINGS

JUL

CAC MEETINGS

JUN

PROJECT KICK-OFF

PUBLIC PRESENTATION

PROGRAM TEST FITS

EXISTING CONDITIONS ANALYSIS

COMMUNITY SURVEY

DEVELOPMENT OF OPTIONS

COSTING

SUBMISSIONS

SEPTAUG NOVOCT DEC JAN

Process

Working Meeting

Submission

Presentation

Cost-Check$

$

ADAMS BRANCH LIBRARY: STUDY SCHEDULE

WORKING GROUP MEETINGS

JUL

CAC MEETINGS

JUN

PROJECT KICK-OFF

PUBLIC PRESENTATION

PROGRAM TEST FITS

EXISTING CONDITIONS ANALYSIS

COMMUNITY SURVEY

DEVELOPMENT OF OPTIONS

COSTING

SUBMISSIONS

SEPTAUG NOVOCT DEC JAN

Process

Working Meeting

Submission

Presentation

Cost-Check$

$

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 4

ARCHITECT- NADAAA

DESIGN TEAM

STRUCTURE SOUZA TRUE & PARTNERSJEROME A YURKOSKI

PRINCIPAL IN CHARGE

MEPGARCIA CALUSKA DESOUSA

DAVID PEREIRA PRINCIPAL IN CHARGE

COST CONSULTANTVJ ASSOCIATES CLIVE TYSOEPROJECT MANAGER

CODE CONSULTANT R.W. SULLIVAN

KEVIN S. HASTINGSPRINCIPAL IN CHARGE

KATIE FAULKNERPRINCIPAL IN CHARGE

AMIN TADJPROJECT MANAGER

TIM WONG PROJECT DESIGNER

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 5

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 6ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 7

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 8

BOSTON PUBLIC LIBRARY

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 9

1931 2016

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 10

DORCHESTERDEMOGRAPHY

DORCHESTER IS BY FAR THE LARGEST NEIGHBORHOOD, FOLLOWED BY ROXBURY AND BRIGHTON

POPULATION SHARE BY NEIGHBORHOOD 2010:

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 11

15% KIDS

8.5% TEENS

61.5% ADULTS

33% YOUNG ADULTS

5% SENIORS

DORCHESTERDEMOGRAPHY

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 12

ASHMONT

GALLIVAN BLVD

DO

RCH

ESTE

R A

VE

NEPONSET AVE

T

TT

T

ASHMONTT

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 13

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 14

ADAMS BRANCH

1951

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 15

EXTERIOR CONDITION

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 16

EXTERIOR CONDITION

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 17

LANDSCAPE

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 18

LANDSCAPE

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 19

ENTRANCE

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 20

PROGRAM SPACES : ADULT

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 21

PROGRAM SPACES : KIDS AND TEENS

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 22

PROGRAM SPACES : MULTIPURPOSE HALL

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 23

PROGRAM SPACES : STAFF ROOMS

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 24

PROGRAM SPACES : STAFF ROOMS

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 25

POINTS OF SERVICE

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 26

COMPUTER/IT

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 27

COLLECTION: 33,000 BOOKS

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 28

JAMAICA PLAN : 2.24 VOLUMES/SF

MATTAPAN : 1.57 VOLUMES/SF

BRIGHTON : 2.05 VOLUMES/SF

HONAN ALLSTON : 2.50 VOLUMES/SF

EAST BOSTON : 1.79 VOLUMES/SF

ADAMS: 4.58 VOLUMES/SF

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 29

MECHANICAL/ELECTRICAL

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 30

PROJECTOBJECTIVES

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 31

ANALYSIS AND FEEDBACK

SURVEY: 1- HOW OFTEN DO YOU VISIT ADAMS STREET BRANCH

5- WHAT DO YOU LIKE MOST ABOUT ADAMS STREET BRANCH

6- WHAT DO YOU LIKE LEAST ABOUT ADAMS STREET BRANCH

8- THINK BIG: WHAT WOULD MAKE THE ADAMS STREET BRANCH THE STATE OF THE ART 21ST CENTURY BRANCH LIBRARY?

7- HOW WOULD YOU MODIFY THE BUILDING TO IMPROVE THE VISITOR EXPERIENCE?

2- WHAT IS YOUR AGE RANGE? UNDER 12 , 12-17, 18-34, 35-65, +65

3- WHAT ARE YOUR THREE MAIN REASONS FOR COMING TO ADAMS STREET BRANCH?

4- WHAT PROGRAM DO YOU WISH WERE OFFERED BY THE BRANCH?

9- WHICH PART OF LIBRARY DO YOU USE MORE OFTEN?

10- HOW DO YOU USUALLY GET TO LIBRARY?

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 32

PROGRAM

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 33

ADULT 2100

1600

400

1300

1300

1250

CHILDRENTEEN

STAFF

SHAREDSERVICES

ENTRANCE

ADULT 2100

1600

400

1300

1300

1250

CHILDRENTEEN

STAFF

SHAREDSERVICES

ENTRANCE

ADULT 2100

1600

400

1300

1300

1250

CHILDRENTEENTEEN

STAFF

SHAREDSHAREDSHAREDSERVICES

ENTRANCE

BPL PROGRAM REQUIREMENTS

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 34

Page 1

Two-Family Residential Subdistrict

Lot Area, Minimum for Dwell.

Unit(s) Specified(Sq. Ft.)

Additional Lot Area for

Ea. Addt'l Dwell. Unit

(Sq. Ft.)

Lot Width

Minimum (Feet)

Lot Frontage Minimum

(Feet)

Floor Area Ratio

Maximum

Building Height

Maximum(1) Usable Open

Space Minimum Sq. Ft. Per

Dwelling Unit(2)

Front Yard

Minimum Depth

(Feet)(3)

Side Yard Minimum

Width (Feet)(4)

Rear Yard Minimum

by Accessory

Depth(Feet)

Rear Yard Maximum Occupancy

Building (Percent) Stories Feet

2F-5,000(5)

1 Family Detached or Semi-Attached

or 2 family

Detached

5,000 for 1 or 2 units

N/A 40 40 0.5 2½ 35 750 15 10 20 25

Any Other

Dwelling or Use

5,000 N/A 50 50 0.5 2½ 35 none 15 10 30 25

ZONING CODE

LOT SIZE: 23,833 SFMAXIMUM FLOOR AREA: 11,916 SF

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 35

ZONING CODE

OFF-STREET PARKING REQUIREMENT: 1 SPACE PER 1,000 SQUARE FEET OF GROSS FLOOR AREA

13 SPACES INCLUDING 2 ACCESSIBLE PARKING FOR 13,000 SF OF PROGRAM

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 36

RENOVATION WITHIN THE EXISTING ENVELOPE

REORGANIZATION OF SPACE I TO GET MAXIMUM OUT OF EXISTING FOOTPRINT

PROGRAMMING OF OPEN SPACE AND NEW LANDSCAPE

atadj
Rectangle

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 37

RENOVATION + EXTENSION

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 38

ADULT 2100

1600

400

1300

1300

1250 1250

CHILDRENTEENTEEN

STAFF

SHAREDSHAREDSHAREDSERVICES

ENTRANCE ? NEW BUILDING

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 39

KIDS

TEENSADULTS

SENIORS

DIFFERENT AGE GROUPS’ REQUIREMENT

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 40

MAKERSPACES

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 41

CO-WORKING SPACE

ADAMS STREET BRANCH LIBRARY- NADAAA- 2016-06-28 42

NEXT STEPS: 1. MEET LIBRARY STAFF 2. GATHER USER FEEDBACK 3. REFINE THE EXISTING CONDITIONS REPORT 4. DEVELOP PROGRAM AND CONCEPT OPTIONS 5. PHASING ANALYSIS AND COST ESTIMATE