Bored cast-in-placeconcrete piles
The Task
High structuralloads
Difficultgroundconditions
Excavationclose toexistingbuildings
2
In the past the position of a buildingwas generally chosen according to thesuitability of the ground. Nowadaysdifficult ground or the presence of ex-isting buildings close to the siteboundaries are no longer consideredas obstacles. Whether it is a questionof making the most economic use of asite, the need for new traffic routesthrough difficult terrain, the need forthe maximum use of expensive land,design engineers are increasingly con-fronted with one or more of the follow-ing circumstances: - Shallow foundations are ruled out
because settlements will be too great or the subsoil cannot take highloads without lateral yielding.
- Large point loads have to be trans-ferred into the subsoil.
- The subsoil is contaminated from past industrial pollution.
- Deep basements have to be exca-vated close to the existing buildingswhich must be protected against damage.
- The excavation extends below thegroundwater table.
Front cover:Tunnel project in Lugano, Switzerland
Back cover:Top left: Construction of a pile wall for the BMW-Welt,Munich, Germany
Top right: EUROVEA International Trade Centre in Bratislava, Slovakia
Bottom left: Bored pile foundation for the Tampa Museumof Art, USA
Bottom right: Construction of bored piles in rock for a newbuilding of SWR in Stuttgart, Germany Pasing Arcaden, Munich, Germany
The Solution
Deep foun-dations to supportstructures
Bored pile retainingwalls fordeep excavations
Deep foundationsThese are several ways of transferringstructural loads into the subsoil onsites where ground conditions are unfavourable.The bearing capacity of the subsoilcan be increased by ground improve-ment techniques such as:- Replacement of non-load bearing
layers of soil close to the surface- Soil consolidation using pre-loading
or vertical drains- Soil compaction using grout injec-
tion, deep vibration or stone columns.
Alternatively, structural loads can betransferred to stronger competentstrata at depth by the use of- Bored piles- Diaphragm wall elements- Mixed in place (MIP) piles- Piles reinforced by steel bars- Vibrated concrete columns.Technical literature on all these specialalternative construction techniques isavailable on request from BauerSpezialtiefbau.
Retaining wallsThe problem of providing stable re-taining structures close to existingbuildings or of constructing watertightexcavation pits can be solved in anumber of ways. However, the mostappropriate solution is almost alwaysthe installation of a bored pile retainingwall.
Bored pilesIn general bored piles offer the mosteconomical foundation as they can beconstructed in a wide choice of diam-eters, typically ranging from 300 to1,800 mm, and to depths of up to 70 m at rakes of up to 1:4. They canthus be tailored precisely to the partic-ular requirements of the building or ex-cavation. This flexibility means thatbored piles can provide solid founda-tion elements suitable for almost allsite conditions.Bored piles can be classified into twomain groups, according to their loadbearing behaviour: friction piles, whichtransfer load mainly by frictional resist-ance along the shaft; and endbearingpiles in which load is primarily trans-ferred to the surrounding soil ofthrough the pile base. Depending onthe structural requirements, boredpiles may be constructed singly, ingroups or as walls using secant, con-tiguous or king piles, with or withoutinfill.
3
"Friction pile"
Single piles Pile groups
Vertical and raked piles Piled wall
"End bearing pile"
Techniques
Cast-in-place concretepiles
Piling systems differ in respect of thetechniques used (e. g. grab, rotary drill,direct circulation drill); the methodused to support the borehole (with orwithout drill casing, dry, hydrostaticpressure, slurry stabilisation), andmethod of concreting (poured or in-jected). Pile construction comprises
three main steps, drilling, placing rein-forcement and concreting. Some ofthese stages may be carried out si-multaneously. Selection of the mostappropriate piling technique dependson the prevailing soil conditions, thetechnical specifications relating to thesite and the overall cost.
4
Reichenbachbrücke, Munich, Germany
Airport Wien, Austria
Wedding Towers, Moskau, Russia
5
Main applications:
All types of soilWhere site conditions are restricted
Standard cast-in-place pile
Install casing tubesby rotating andcrowding using rotary drive
Remove spoil withdrilling tools attachedto kelly bar with bore-hole stabilisation bytemporary casing
Insert reinforcingcage into borehole
Place concrete bytremie and with-draw casing usingrotary drive
Completed pile
Rotary dril-ling with kellya) Cased
Special features:
Vibration free drillingHigh output with casings installed byrotary driveCasing oscillator can be used for larger pile diameters and greater depthsPile diameter generally 600 - 1,800 mmDepths generally up to 40 m but grea-ter depths are possible
Concrete
b) Borehole supported by hydrostatic pressure
Main applications:
In all kinds of soil, for large pile diameters and pile depths
Standard cast-in-place pile
Rotate starter casing to depth
Remove drilling spoilwith bucket attachedto kelly bar with bore-hole supported byslurry
Recycle slurry toremove soil and ins-ert reinforcing cage
Place concretesimultaneously displacing slurry
Completed pile
Special features:
Vibration free drilling No casing requiredStarter casing used for top section only Wall of borehole supported by ben-tonite or polymer slurryBorehole dia. generally 400 - 2,400 mmDepth generally up to 40 m, but greater depths possibleVertical piles only
Concrete
6
Main applications:
All types of soilRestricted sites
Auger cast-in-situ pile (SOB-pile)
Rotate continuousflight auger to required depth
Inject concretethrough hollow stem,simultaneously withdrawing augerwithout rotation
Vibrate into place orpush reinforcementcage fitted withspacers into freshconcrete
Completed pile
Special features:
Vibration freeReinforcement can be pushed or vibrated into the fresh concretePile bore diameters from 400 - 1,000 mmDepths generally up to 18 m,bigger drilling depths are possible
Main applications:
All types of soilOn restricted sites
Drilling with double rotary head
Install casing and continu-ous flight auger to requireddepth using counter-rotat-ing drives
Inject concretethrough hollow stemauger, simultaneouslywithdrawing augerand casing
Insert reinforce-ment cage intoconcreted borehole
Completed pile
Special features
Vibration freeContinuous flight auger and casing installed simultaneously by counter rotating twin rotary drivesCan be installed against existing wallsDepth generally up to 15 mDrilling diameter 620 - 880 mm (DKS)
Rotary drillingusing twin rotary head
Vibrator
Vibrator
Auger cast-in-situ pile
Concrete Pump
7
Main applications:
Contaminated soils to avoid dispo-sal of drill spoil Limited space, e. g. track con-structionSoft soils
Displacement pile
Set up at drilling point
Turning in and pressing of drilling tools
Following up kellyextension. Drillingup to final depth
Continued pullingand turning duringthe concreting process
Subsequent installation of reinforcement cagewith additional crane
Special features:
High bearing capacity throughhighly compacted skin areaAvoiding drill spoilHigh performanceDrilling diameter 420, 510, 610 mmDrilling without tremorsDrilling depth up to 34 mReduced concrete consumptioncompared to auger cast-in-situ piles
Displace-ment pile
Pump
Grab constructionCased
Main applications:
Soil such as sand and gravels withhigh demands on casing technologyWhere it is economically viable to use chisels to break up bedrock andboulders
Special features:
Minimum distance to existing buil-dings is requiredPile diameters generally ranging from620 - 2,000 mmDepths generally up to 50 m
Using crawler crane and casing oscillator
Install casing usingcasing oscillator
Simultaneouslyremove drill spoilwith grab
Insert reinforce-ment cage intocased borehole
Place concrete bytremie and with-draw casing usingoscillator
Completedpile
Concrete
Planning considera-tions
SubsoilBefore starting piling operations thesubsoil must be fully investigated inaccordance with the appropriate stan-dards such as DIN 1054. The stratifi-cation of the subsoil and groundwaterconditions should be determined byexploratory boreholes and soundings.It is recommended that site investiga-tions are taken to about 6 m below theproposed foundation levels in deepfoundations. Based on the results ofthe site investigations the most suit-able type of pile can be selected andthe detailed design carried out.
Pile designThe pile design is based on two ele-ments: internal and external bearingcapacity. The minimum diameter re-sults from the proof of the inner bear-ing capacity as stated in the standardDIN 1045. The inner bearing capacitydepends on the concrete cross sec-tion and the reinforcement content. On the basis of the standard EN 1536(previously: DIN 4014) the proof of theexternal bearing capacity results fromthe minimum embedment length in thebearing soil, taking the loads, the pilediameter and the soil specific bearingparameters (skin friction, pressurepeak).
8
Underground car park StrasbourgPassages de l'Etoile, France
Project Mixed-Use-Development in Abu Dhabi, UAE
Increasingthe bearingcapacity ofpiles
Shaft groutingPressure grouting along the shaft ofthe pile compresses the soil aroundthe shaft, producing stronger adhesionbetween the concrete of the pile andthe soil. Depending on the type of soil this can result in a considerableincrease in shaft friction which en-hances the bearing capacity and thusthe performance of the pile.
Base groutingThe end-bearing resistance of the pilecan also be increased by injecting cement grout under pressure into thecontact zone between the toe of thepile and the underlying soil. Basegrouting not only offsets the almost inevitable softening of the material atthe borehole toe but also reducessome of the early settlement.
Preparatory works for pilingPiled foundations and piled walls re-quire planning approval. The clearedsite should be made available in rea-sonable time before piling starts. Typical preparations would involvesearching for underground channels,services, cable ducts and other sub-surface installations, remains of exist-ing foundations, archaeologicalartifacts, and unexploded bombs orother war material. Authorization foraccess can be given by utilities,clients, national institutions for theprotection of ancient monuments orbomb disposal services. In additionstable and leveled work platformsmust be provided where piling rigs willbe operating.
9
Injection hoses for skin grouting Bauer Lift-Cell to pre-stress the pile bottom
100 % end-bearing resistance maximum endbe-aring resistance of an ungrouted pile in sand with a settlement s = d/10 where (d = pile diameter)
100 % skin friction resistance maximum skinfriction resistance of an ungrouted pile in sand
End bearing resisteance (%)
Pressure grouted pile
Pile without pressure grouting
Set
tlem
ent
(mm
)
Skin friction resistance (%)
Pressure grouted pile
Pile without Pressure grouting
Set
tlem
ent
(mm
)
Pile load testsThe most cost-effective bored pile de-signs are those based on load tests onsite. They are generally only economicfor large construction projects. As aresult of the large number of pile loadtests we have carried out over manyyears we are able to design boredpiles for all types of ground conditionsso as to achieve the greatest possibleeconomy. The diagrams below illus-trate typical pile test results.
10
Pile test below tent at Daun upon Eifel
Pile test in Rotterdam-Maasvlakte, Netherlands for E.ON power station
Distribution of force and skin friction versus settlement chart of a pile diameter 1,180 mm in stiff marine clay, 5 m socketed in moraine
Axial load distribution over depth Skin friction-settlement graphs
Pile shaftpressure grouted
Pile basepressure grouted
Load cell
Set
tlem
ent
Marine clay
Skin friction
Moraine shaft pressure grouted
Quality-assurance
Pile installation is carried out by quali-fied personnel whose technical experi-ence is constantly monitored andimproved by in-house seminars andquality audits. To ensure both sitesafety and optimum production levels,all drilling rigs and tools are regularlytested. All construction materials areselected on the basis of the specifiedstructural and process criteria to main-tain quality to the standards required.The pile production is documented ac-cording to EN 1536 (previously: DIN 4014). During construction of cast
in place continuous flight auger (CFA),Front of wall (FOW) or mixed in place(MIP) piles, all the parameters relatingto construction are displayed for therig operator on a monitor and arestored in a data logger developed byBauer Spezialtiefbau. The stored dataare computer processed, evaluated fortechnical content and plotted out in a standardised format. All other pro-cesses are recorded by the piling su-pervisor in accordance with standardprocedures.
11
12 905.
015.
2
11/
2011
BAUER Spezialtiefbau GmbHBAUER-Straße 186529 Schrobenhausen, GermanyTelephone: +49 8252 97-0Telefax: +49 8252 97-1496BST@bauer.dewww.bauer.de