New Processes and Interoperability

Andrew Bellerby, Managing Director, Tekla UK

OpenBIM Learning Xchange/ 15th May 2012 / Andrew Bellerby

Tekla BIM software

Accurate and data-rich 3D environment

Highly detailed as-built building information

models providing constructible data.

Specialized solutions and configurations for:

– Main contractors

– Structural engineers

– Steel detailers and fabricators

– Precast and cast in-situ concrete

detailers and manufacturers

New FREE application for model-based

project collaboration and communication

between all project disciplines

Structural

Steel

Structural

Engineering

Concrete

Construction

Management

Comprehensive BIM solution

CHANGE

MANAGEMENT

SITE AND DELIVERY

SCHEDULING

CONSTRUCTION

SIMULATION

TENDER

QUANTITIES

SUBCONTRACTOR

COORDINATION

INSTALLATION - DELIVERY

COORDINATION

A&D MODELS

SALES MODELS,

VISUALIZATIONS

DETAILING &

DRAWINGS

REPORTS & BENDING

SCHEDULES

PRODUCTION

INTEGRATION

Trimble Corporate Overview

Founded in 1978

Market Focus

– Construction & Surveying

– Agriculture, Mapping & GIS

– Mobile Workers

Leader in positioning, alignment and control technologies

– GPS positioning technology

– Robotic optical total stations

– Task focused field software

– 3D machine control

Annual Revenue >$1.5B

Number of Employees ~5300 in 26 countries

Track record of consistent financial performance

Publicly traded on Nasdaq (TRMB)

Trimble’s Vertical Construction Portfolio

…. And the Latest Acquisition

Design BIM vs Construction BIM

OpenBIM Learning Xchange / 15th May 2012 / Andrew Bellerby

Planning

Architectural Design

Engineering

Bidding Construction

Planning

Operation

Construction

Execution

Integrating design with construction

Construction

Sub-

contracting

Detailing

OWNER

ARCHITECT

ENG. CONSULTANT

GENERAL

CONTRACTOR

SUBCONTRACTOR

END-USER

DETAILER

Design Construction

Building the Model Building with Models

We transform work process for A-E-C workflow

Design BIM vs Construction BIM

New Processes & Interoperability

OpenBIM Learning Xchange / 15th May 2012 / Andrew Bellerby

From drawing based process

17

Inconsistent,

ambigous, only

human readable

information

CHANGE MGMT

PROJECT MGMT

COST ESTIMATION

SUBCONTRACTOR

COORDINATION

SITE EXECUTION

DESIGN & DETAILING

RESOURCE PLANNNING

The building =

drawings

12.04.2011

QUANTITY MGMT

PROCUREMENT

to BIM process

18

CHANGE MGMT

QUANTITY MGMT

PROJECT MGMT

PROCUREMENT

COST ESTIMATION

SUBCONTRACTOR

COORDINATION

SITE EXECUTION

DESIGN & DETAILING

RESOURCE PLANNNING

12.04.2011

Construction

Detailing

Structural

Architectural

Actually

9.6.2010

19 Tekla Structures Future Directions / Ville

Rousu

OpenBIM Concept

Basic assumptions:

• Master data in applications (native proprietary

format)

• Applications publish a part of their data as IFC

• Only the application that has created and owns data

can change it (No roundtrip)

• IFC model is a collection (combination) of discipline

specific models that coexist throughout the project

BIM software

Native data

(Master)

BIM software

Native data

(Master) BIM software

Native data

(Master)

The ”Cloud”

BuildingSMART International Conference 2011

Integrated Construction for Sustainable Build

DRUM - Distributed information

management

IFC Read only

IFC Read only

IFC Read only

OpenBIM Concept

Document Management

Native data

(Master)

Estimation

Native data

(Master) Planning and scheduling

Native data

(Master)

The ”Cloud”

BIM Modeller(s)

Native data

(Master)

Progress Control

Native data

(Master)

BIM Viewer

Native data

(Master)

”Cloud” functionality

• Transaction based communication

– Subscribing to published IFC datasets with incremental updates

• Any client can subscribe to any data published by another application,

current situation transferred initially and then changes only, as they are

published

– Workflow type of action transactions with (semi)automatic routing

• Eg MEP engineer needs penetrations through structures and requests

these from architect and/or structural engineer.

• Managing and publishing metadata of and from participating

models

• Creating, Managing and publishing relationships between objects

in the participating models

DRUM - Distributed information management BuildingSMART International Conference 2011

Integrated Construction for Sustainable Build

BIM process Example – Penetration Request

Mechanical designer and structural designer can see their local and all foreign models

– MEP local + Structural IFC

– Structural local + MEP IFC

Penetration request

– MEP designer creates request = reservation object + status information

– Structural designer approves request and creates penetration with reservation object

– MEP designer adds a pipeline

– Modifies the penetration request

– Structural designer recognizes the changed request, adjusts the penetration to suit and approves the request

24

Fabricator

12.04.2011

Detailer

Contractor

Architect

MEP designer

Structural Engineer

MEP detailer

Owner

Best in class

Partnering Open BIM

IFC for combining BIM data

[Date]

25

New Processes at The

Construction Site

OpenBIM Learning Xchange / 15th May 2012 / Andrew Bellerby

Use The Model on Site

A computer’s view of a jobsite…..

Then the Reality…..

“Hey, hold

the end of

this tape for

me….”

DR or Prism Lay Out To The Deck

$25K Savings from Panel

Arrangement Analysis

Vertical Horizontal

DPR Construction - Formwork

5/18/2012

32

Formwork Layout Drawings and

Bills of Material

DPR Construction - Formwork

5/18/2012

33

Crusellin Bridge – BIM Partners

City of Helsinki – Owner

Skanska Infra – Contractor

WSP - Structural engineer

Ruukki - Subcontractor,

Steel structures

Celsa - Subcontractor,

Rebars

5/18/2012

34

WSP - Crusellin Bridge, Helsinki, Finland

5/18/2012

35 Amy Farrell, Technical Consultant

Reinforcements

and coastal

structures

modelled

Design drawings

produced from

Tekla Model

WSP - Crusellin Bridge, Helsinki, Finland

5/18/2012

36 Amy Farrell, Technical Consultant

Taking The Design BIM Through

To Construction

Case Study – Leadenhall Building

BIM Show Live / 10th May 2012 / Andrew Bellerby

Leadenhall Tower – The Cheesegrater

Design for Constructability

To Finish With …..

BIM Show Live / 10th May 2012 / Andrew Bellerby

Thank you!