ben lomond shelter + stage 2 multipurpose building. …
Post on 13-Jan-2022
3 Views
Preview:
TRANSCRIPT
summit
bass
village
buildings
road
path
vegetation
ski lift run
toilets
previous shelter site
previous alpine hotel site
development zone
temporary shelter
development site
snow play area
stage 1. public shelter
stage 2. multipurpose facilities
EXISTING
PROPOSED
N
PROPOSED LOCATION
VILLAGE PLAN1:2000 AT A3
MULTIPLE LOCATION OPTIONS HAVE BEEN EXPLORED AND ANALYSED FOR THE LOCATION OF STAGE 1 PUBLICSHELTER + STAGE 2 MULTIPURPOSE BUILDING.
KEY LOCATION CONSIDERATIONS :
. BUILT OVER PREVIOUSLY DISRUPTED SITE VEGETATION
. IN CLOSE PROXIMITY TO EXISTING SERVICES
. WITHIN PERMITTED DEVELOPMENT ZONE
. CONNECTION TO SOUTH - WEST SNOW PLAY AREA AND SKI FIELDS BEYOND
. POTENTIAL TO CAPTURE VIEWS OF STONJEKS PEAK, THE MEADOW VALE, GIBLIN AND LEGGES TOR
. ALTERATIONS TO EXISTING CAR PARK NOT REQUIRED (LOCATED OUTSIDE OF POTENTIAL FLOOD INUNDATION AREA)
. ENOUGH SITE AREA TO ALLOW FOR STAGE 1 + 2 TO BE CLUSTERED ALONG WITH SPACE FOR FUTURE EXPANSION
BEN LOMONDPUBLIC
SHELTERINITIAL
CONCEPTSEPTEMBER 2020
PROJECT ARCHITECTPIPPA JENSEN
pippa@cumulus.studio03 6333 0930
IN CONSULTATION WITH TASMANIAPARKS AND WILDLIFE SERVICE
PROJECT MANAGERDEREK LE MARCHANT
Derek.LeMarchant@parks.tas.gov.au0436 857 609
STUDIOCUMULUS
PAGE 1 / 4
existinggas bullet
existingtemporary
shelter
120m2 publicheated space
deck
airlock
dda
change
urinal
store
gradedpathway
bus + vehicle pick
up / drop off
deck
village road
existingboardwalk
services cavity
storage
storage
cleaners cupboard
NINITIAL CONCEPT PLAN1:200 AT A3
STUDIOCUMULUS
PAGE 2 / 4
BEN LOMONDPUBLICSHELTERINITIALCONCEPT
SEPTEMBER 2020
stage 1. public shelter
120m2 publicheated space
deck
airlock
dda
change
urinal
store
gradedpathway
bus + vehicle pick
up / drop off
ramp
40m2 +storageunder
stai
rs
400m2
commercialtenancies
and principaloffice
additionaltoilets and
storage
deck
stairs
stage 2airlock
ramp
ram
p
deck
village road
gas bullet
stage 2airlock services cavity
storage
storage
cleaners cupboard
lift
N
STUDIOCUMULUS
PAGE 3 / 4
BEN LOMONDPUBLICSHELTERINITIALCONCEPT
SEPTEMBER 2020
INITIAL CONCEPT PLAN1:200 AT A3
stage 1. public shelter
stage 2. multipurpose facilities
view to snow play +ski fields (Giblin +Legges Tor)
stage 1. public shelterstage 2. multipurpose facilities (beyond)
view to Stonjeks +Meadow Vale
STUDIOCUMULUS
PAGE 4 / 4
BEN LOMONDPUBLICSHELTERINITIALCONCEPT
SEPTEMBER 2020
RELATIONSHIP TO SITE CONTOURS + VIEWS1:200 AT A3
CONNECTION TO PLACE
REFERENCE OF LOCAL GEOLOGY /DOLERITE PLATEAU THROUGH THEBUILDINGS AESTHETIC, FORM +MATERIALITY
MATERIALITY
NATURAL + RECESSIVEMATERIALS WILL BE USEDEXTERNALLY TO REDUCE THEBUILDINGS VISUAL IMPACT
top related