RIGGING DEPARTMENT

ANALYZE AND PLANED ACTIVITY FOR LIFTING AND ERECTION WORK

RIGGING DEPARTMENT LOGO

LIFTSWINGMOVEDOWN

In safety corridor

THINK SAFEDO SAFELY

SAFETY FIRST

START

DATA MATERIAL1. DIMENSION2. WEIGHT

REFERENCE1. RIGGING BOOK 2. EQUIP. MANUAL3. Standard Rigging

NEED DUO CRANE

TAILING DESIGN

MONO CRANE

No

Yes

JSA

Risk

RIGGING PLAN

STOP

CONTROL

REPORT

ACTION

Rigging Engineer Responsibility

Prepare Rigging Procedures:

(1) Method Of Work, sequence of activities

(2) Job Safety Assessment Procedures,Sequence and criterion for safely condition

(3) Safe Work Method Statements,Metode kerja yang aman

(4) Risk Management Safe Work Method Statement (SWMS),

(5) Rigging Plans,

(6) Rigging Tools,

(7) Critical Lift Worksheet,

(8) Lift Study,

(9) Crane Lift Study,

(10) General Scaffolding Safety Checklists).

Definition of RiggingRigging is part of the lifting

operation which forms the link between the crane and the load

Lifting Plan

Displacement

Safety Factor

RIGGING PLAN LIFTING FOR

POWER CONTROL CENTERS

LiftingProcedure

STEP 1

LIFTING TOOLS IN SPECIAL CONDITION

STEP 2

LIFTING TOOLS IN SPECIAL CONDITION

STEP 3

LIFTING TOOLS IN SPECIAL CONDITION

STEP 4

LIFTING TOOLS IN SPECIAL CONDITION

Displacement Frame Analysis

Displacement Stress Analysis