Bars classification Anode load
WEEK 36
El Salvador
-
8/8/2019 Bars Proyect
2/24
P roject Pu rpose
Set the bars to be u se as tooling andanode dimensions.
Detect bars in poor condition and get themou t of prod u ction.
-
8/8/2019 Bars Proyect
3/24
P owder MixingPu rpose
To prepare the tantal u m powder to beprocessed
To increase the flow of tantal u m powder Check the Mechanical properties of thepowder
ConditionsRelative h u midity: 40% - 55%Air extraction
-
8/8/2019 Bars Proyect
4/24
O bservations
Why The powder need a Binder?Beca u se this helps the flow of powder
Aid to l u bricate the tooling
The mixing process consist in add a Binder to the Virgin powder, thefirst mixing is done man u ally on a stainless steel pot.
The binder u sed:
1. Stearic acid ( Tantal u m powder)2. P EG (Niobi u m powder)3. PX (Niobi u m powder)4. PX + Syntamin ( Tantal u m powder)
-
8/8/2019 Bars Proyect
5/24
Why we p u t the powder into a blender ?
Beca u se The V-Blender providehomogeneity to the powder mixt u re.
-
8/8/2019 Bars Proyect
6/24
Mesh: P articles Size distrib u tion inside thepowder.
Scott Density: Determines the ability that hasthe powder to fill a cavity.
Flow : Meas u re the velocity that has thepowder to flow by the action of the gravity .
CRUSH STRENGHT: This test determines thebreakage force (kg-F).
MIXING AQL
-
8/8/2019 Bars Proyect
7/24
2. PRESS ING
Pu rpose:
To P ress the Tantal u m powder in to anode of defined
shape u sing a HABERER press.Give a pressing density to the anode
Conditions
Temperat u re room: 20C to 25CRelative h u midity: 40% to 55%
-
8/8/2019 Bars Proyect
8/24
Description
P ressing P rocessMechanism poweredby an electric Motor.Tooling can give 3anodes per cycle.The Haberer gives 156
anodes per min u te.
-
8/8/2019 Bars Proyect
9/24
O BSERVATI O NSThe low press u re line indicates the zone where the anode
is str u ctu rally weak.
how we can decrease the effects of low
pressu
re line?It mu st be between (50% -75%) of the length of theanode.
To minimize the effects of low-press u re line is necessary toens u re that the wire crossesthe line.
-
8/8/2019 Bars Proyect
10/24
P ressing AQL
Visu al test with a microscope: search s u rface defectsand wire damage.Anode weight ControlVerification of dimensions of anodes with Shadowgraph:Low press u re line u sing Ultraso u nd: Check the Locationof line.
-
8/8/2019 Bars Proyect
11/24
WA SH DE- LUB E
Pu rpose
Remove the stearic acid.
MachinesAUTO WASH DE-LUBE (M O RRIS AUT O MATIO N)
-
8/8/2019 Bars Proyect
12/24
O BSERVATI O NS
The process of WASH de -LUBE consist in sevenwashes.The water m u st be at 85C +/- 5C, the temperat u re aidsto dil u te the binder.
Wash Sol u tion
First and Second Ca u stic soda 32%Third and Fo u rth Des-ionized water Fifth Nitric acid 17%
Sixth and Seventh Des-ionized water
-
8/8/2019 Bars Proyect
13/24
O bservations
Why is necessary to remove the binder?Beca u se the binder isn't a raw material, is an imp u rity tothe process.
Why are the anodes treated with care after washing?Beca u se the anodes are extremely fragile after washing.
-
8/8/2019 Bars Proyect
14/24
Drying ovenPu rpose
Remove the moist u re of the anodes from WASH DE-LUBE
Why is it important to remove moist u re from the anodes?
Beca u se water has oxygen and it wo u ld be extremely
dangero u s by temperat u res inside the sinter, co u ld bein flames.
-
8/8/2019 Bars Proyect
15/24
Description
This process bring to the anodes 120C of temperat u redu ring six and half ho u rs if we u se static oven and 3
hou
rs and 15 minu
tes if weu
se vacuu
m oven.
-
8/8/2019 Bars Proyect
16/24
The stearic acid has carbon in his internal composition,this is why it sho u ld make evidence of carbon to
determine if the levels are in the range of permissible.This test shows u s the effectiveness of o u r wash.
Drying oven AQL
-
8/8/2019 Bars Proyect
17/24
S IN TER
Pu rposesCreate a micro str u ctu re sponge inside the anode.
P rovide a thin oxide s u rface to anodes to protect
against the environment.
Machinery req u iredLinear Sinter ( P yramid Engineer, Centorr)
-
8/8/2019 Bars Proyect
18/24
O bservations
Inside the sinter they a are transported by a metal bandmade of T u ngsten that enters the oven that hastemperat u res ranging between 1600C and 2100C.
-
8/8/2019 Bars Proyect
19/24
Why the sinter need a vac uu m chamber?to remove all the oxygen from the anodes
What is the f u nction of the Argon gas inside theLinear Sinter?create an inert atmosphere inside the f u rnace, and moveimp u rities before the sinter.
P revent flames b u rn in the anodes by the high
temperat u re.
-
8/8/2019 Bars Proyect
20/24
Why is critical the temperatu
re in the sintering?Beca u se a very high temperat u re shrink too the anodeand lose CV
A low-temperat u re will give me Weak sinter- necks anddoes not hold high-voltage
Why is important the passivation?
Beca u se it provides a layer of oxide that protects theanodes of an u ncontrolled oxidation
-
8/8/2019 Bars Proyect
21/24
SINTER AQL
Review anode dimensions( for
determinate the Sinter density)
O xygen test for Sinter effectiveness.
Wetscan to determine CV .
-
8/8/2019 Bars Proyect
22/24
ANO DO S LO AD
Pu rposesWeld anodes to a stainless steel strip.
Machinery req u iredHIMECHAWALDENBURGER
-
8/8/2019 Bars Proyect
23/24
O BSERVATI O NS
-
8/8/2019 Bars Proyect
24/24
Anodos Load AQL
To end the process of anode load, it is necessary to
pass welding test, which consists of an anode bend 90degrees and ret u rn to its original position.
Verification of height and spacing of anodes, this testis done by meas u ring the distance between anode andsteel strip, this test is vital for the following processes,since these meas u res depend on the proper handlingthe anode.