[Attached #2 - Drawing List]  

Paper Machine Area

 No. Dwg .No Rev Description Type Issue Date

01 3000B-E103 CCable Tray Route Plan for Distribution Panel Room 1st Floor

For.Con.  2013.05.02

02 3000B-E104 C Cable Tray Route Plan for Distribution Cable Rack Room For.Con.  2013.05.02

03 3000B-E107 CCable Tray Route Plan for Stock Preparation Cable Rack Room 1st Floor.

For.Con. 2013.05.02

04 3000B-E201 CCable Tray Opening & Support Plan for Distribution Panel Room 1st Floor.

For.Con. 2013.05.02

05 3000B-E202 CCable Tray Opening & Support Plan for Distribution Cable Rack Room

For.Con. 2013.05.02

063000B-

E301,305C Typical Installation Detail for Cable Tray Support For.Con. 2013.05.02

07 3000B-E149 C Cable tray Route Plan for LBKP Storage Towerl For.Con. 2013.06.24

083000B-

E306~307C Typical Installation Detail for Cable Tray For.Con. 2013.06.24

09 3000B-E408 CPower Plan for Transformer Room (Paper Machine Area, 1st Floor)

For.Con. 2013.06.24

10 3000B-E409 CPower Plan for LV MCC Room (Paper Machine Area, 2nd Floor)

For.Con. 2013.06.24

11 3000B-E457 CControl Plan for Transformer Room (Paper Machine Area, 1st Floor)

For.Con. 2013.06.24

12 3000B-E811 CElectrical Equipment Layout for 10.5kV Swgr. Room (Paper Machine Area, 1st Floor)

For.Con. 2013.06.24

13 3000B-E812 CPanel Base Support Layout for 10.5kV Swgr. Room (Paper Machine Area, 1st Floor)

For.Con. 2013.06.24

14 3000B-E814 CElectrical Equipment Layout for Transformer Room (Paper Machine Area, 1st Floor)

For.Con. 2013.06.24

Water Supply Treatment Area.

No. Dwg .No Rev Description Type Issue Date

13 3520B-E102 CCable Tray Support & Opening Plan for Raw Water Pumping Station

For.Con. 2013.06.24

14 3520B-E103 CCable Tray Support & Opening Plan for Intermediate Water Basin

For.Con. 2013.06.24

15 3520B-E307 CPower Plan for Water Supply Treatment Utility Room B1st Floor

For.Con. 2013.06.24

16 3520B-E702 CElectrical Equipment Layout for 10.5kV Swgr. & LV MCC & TR Room (Water Supply Treatment Area, 1st Floor)

For.Con. 2013.06.24

17 3520B-E703 CPanel Base Support Layout for 10.5kV Swgr. & LV MCC & TR Room (Water Supply Treatment Area, 1st Floor)

For.Con. 2013.06.24

 

 Waste Water Treatment Area

No. Dwg .No Rev Description Type Issue

Date

18 3600B-E105 CCable Tray Support & Opening Plan Waste Water Treatment Main Section

For.Con. 2013.06.24

19 3600B-E109 CCable Tray Support & Opening Plan Chemical & Dewatering Room

For.Con. 2013.06.24

20 3600B-E110 CCable Tray Support & Opening Plan Drinking Water Treatment

For.Con. 2013.06.24

21 3600B-E201 C Typical Installation Detail for Cable Tray Support For.Con. 2013.06.24

22 3600B-E502 C Grounding Plan for Waste Water Treatment System For.Con. 2013.06.24

23 3600B-E703 CElectrical Equipment Layout for 10.5kV Swgr. & LV MCC ROOM (Wast Water Treatment Area, 2nd Floor)

For.Con. 2013.06.24

24 3600B-E704 CPanel Base Support Layout for 10.5kV Swgr. & LV MCC ROOM (Wast Water Treatment Area, 2nd Floor)

For.Con. 2013.06.24

 