atr front rack - cdn-assets.greatplainsmfg.com

Post on 30-Jan-2022

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

ATR FRONT RACK Installation Instructions

PART NUMBER 701-015A © 2003 LAND PRIDE Version 701-015A.1

A2

1

5

701-015A

ITEM NO. PART NO. QTY. DESCRIPTION1 10428 1 Front Rack2 B516-112BLK 2 5/16" x 1-1/2" Bolt Black3 UCS34BLK 2 3/4" U-clamp Spacer Black4 UC-114BLK 2 U-clamp 1 1/4" Black5 UCS58BLK 2 5/8" U-Clamp Spacer Black

LN516NYBLK 4 5/16" Nylock Nut Black6 CB516-2BLK 2 5/16" x 2" Carriage Bolt Black

DETAIL A

64

3

5

3

ALL DIRECTIONS REFERRING TO THE RIGHT AND LEFT ARE WHEN THE OPERATOR IS IN THE MACHINE.

1. Align the ATR Front Rack (#1) up to the two top tabs on the ATR Brush Guard (701-014A).

Secure the ATR Front Rack (#1) using two 5/16” x 1-1/2” Bolts (#2) and two 5/8” U-Clamp Spacer (#5). See pictures above. Do not fully tighten attaching hardware at this time.

2. Attach the two back tabs on the ATR Front Rack (#1) to the ATR roll cage with two 1-1/4” U-

Clamps (#4), ¾” U-Clamp Spacers (#3), and two 5/16” x 2” Carriage Bolts (#6). See pictures above. Do not fully tighten attaching hardware at this time.

3. Make adjustments at this time. Insure that the ATR Front Rack is level and centered on the

machine.

Fully tighten attaching hardware at this time.

top related