Architect Drawing of New Entrance

LocationLocation of Phase II Construction Project – Old tennis courts west of the existing building.

LocationView from the bus barn.

LocationFenced in with temporary access road constructed on old track.

BuildingFootings are poured for new addition.

UtilitiesSanitary sewer line connected.

UtilitiesElectrical lines connected.

UtilitiesWater line installed.

ParkingHouse being moved to provide more parking.

ParkingAdditional parking will be located east of the maintenance building and existing tennis courts.

BuildingConstruction begins on new band room walls.

BuildingBand room walls and hallway to existing building.

BuildingPre-cast walls for new gym arrive and are unloaded.

BuildingPre-cast walls being installed.

BuildingPre-cast walls being installed.

BuildingPre-cast walls.

BuildingPre-cast walls viewed from the north.

BuildingColumns for front entrance being installed.

BuildingRoof trusses being installed.

BuildingRoof trusses being installed.

BuildingRoof trusses being installed.

BuildingRoof trusses installed.

BuildingView from the west on July 15th.

New Tennis Court LocationThree new tennis courts will be constructed west of the existing tennis courts.

4 Stall Garage4 stall garage needs to be moved for construction of 3 new tennis courts west of existing courts.

4 Stall GarageSite cleaned up and prepared for paving of new slab and return of 4 stall.

4 Stall GarageSite prepared and ready for concrete.

New HS RestroomsThe existing art room demo in preparation for new restrooms in the ninth grade hallway.

Hallway to New Addition and Storage RoomWall constructed in old chorus room to divide into hallway and storage space.