TRANSCRIPT

Application of BIM and GIS for

Dutch Infrastructure assets.

together with a contractor

Daan Alsem projectmanager Royal HaskoningDHV GeoBIM Amsterdam november 24th, 2016

GeoBIM Amsterdam , november 24th, 2016

The project: Rebuilding of the junction Joure, NL

2

Amsterdam

Hamburg Germany

Junction Joure

E22

A7

A6

A7

E22

GeoBIM Amsterdam , november 24th, 2016

Junction Joure: E22/A7 & A6

3

E22 E22

A6

A7 A7

Junction Joure

GeoBIM Amsterdam , november 24th, 2016

From roundabout……

4

A6

A7

A7

E22

E22

Joure

GeoBIM Amsterdam , november 24th, 2016

.. to the new junction Joure 2018

5

E22 A7

A6

E22 A7

Exit Joure

New junction

GeoBIM Amsterdam , november 24th, 2016 6

A7

A7

A6

E22

E22

Former roundabout

GeoBIM Amsterdam , november 24th, 2016

Client

Client:

o Province Fryslân

o in coöperation with the municipality Joure (De Fryske Marren) and

o Rijkswaterstaat (National Road Authority)

Contractor Design & Construct:

o Gebr. VAN DER LEE Hagestein (head office), Lelystad en Dordrecht

7

GeoBIM Amsterdam , november 24th, 2016

Open BIM: Life-cycle asset information using BIM

Object Type Library (OTL)

Exchange open standard (COINS)

Information Delivery Manual requirements (IDM)

Configuration Management DataBase (CMDB)

GIS integration Database SE

8

GeoBIM Amsterdam , november 24th, 2016

Fragmented information exchange during life-cycle

9

GeoBIM Amsterdam , november 24th, 2016

Information exchange D&C-phase

10

GeoBIM Amsterdam , november 24th, 2016

Open-BIM exchange

11

Contractor

Project

Asset

Manager District

OTL

BIM BIM BIM BIM

IDS IDS IDS

Rijkswaterstaat

GeoBIM Amsterdam , november 24th, 2016

Linked data

12

SBS system breakdown <- > OTL object Types < - > RWS-OTL (CB-NL)

GeoBIM Amsterdam , november 24th, 2016

OTL – Object Type Library principles

13

Describes the types of physical (bridge, road) and also spatial objects (junction)

Apply to the entire lifecycle Include construction, groundwork, road and hydraulic engineering and

spatial (geo-)environment.

GeoBIM Amsterdam , november 24th, 2016

OTL

Linked to the CB-NL Concept Library Rijkswaterstaat

Object type data (and not the Object data) Data-structure NEN 2767-4:

Asset objects

Elements

Building parts

Materials Defects/damage

14

GeoBIM Amsterdam , november 24th, 2016

Object Type “Fly-over”

15

GeoBIM Amsterdam , november 24th, 2016

Exchange open standard COINS

open exchange standard for all life cycle phases, for all parties and

all disciplines.

Abbreviation: Constructive Objects and the INtegration of

processes and Systems

COINS builds on:

Geometry standards (IFC, DWG)

GIS standards (GML, CityGML)

Process standards (IDM part 2)

COINS supports:

Systems Engineering SE

Object type libraries OTL

Combination of different data structures

16

GeoBIM Amsterdam , november 24th, 2016

17

COINS data exchange

GIS data

CAD/BIM data Systems Engineering

Data

Object (type) information

Ext. Document

17

GeoBIM Amsterdam , november 24th, 2016 18

Systems Engineering information

18

System

….subsystem

Sub-subsystem

subsystem

………..

System Breakdown Structure SBS

GeoBIM Amsterdam , november 24th, 2016 19

Data exchange IDM Information Delivery Manual

SAA needs

Client Project

organization

Asset Manager Contractor

Object Type

Library

Information

model

Process

model

Open standards:

COINS, IDM, IFC, GML, CityGML

IDM

GeoBIM Amsterdam , november 24th, 2016 20

COINS container

COINS-container (= zip file)

BIM directory

o OWL based information

Window of Authorisation directory

o not used so far in Joure

Documents directory

o File-based geometry (drawings),

certificates, documents, reports

COINS-container (*.ccr)

BIM

*.owl

WOA

woa.xml

Doc

*.doc

*.xls

*.pdf

*.jpg *.bmp*.png *.gif….

*.ifc

*.rvt

*.dwg

*.nwd

*.gml

GeoBIM Amsterdam , november 24th, 2016 21

Configuration Management DataBase

21

Documents

Geometry

OTL specifications

Configuration Management Database

GeoBIM Amsterdam , november 24th, 2016

GIS/CMDB integration

22

GeoBIM Amsterdam , november 24th, 2016

BIM Joure today:

Finalize BIM model (3000 objects)….

First delivery COINS container…

23

GeoBIM Amsterdam , november 24th, 2016

Evaluation of approach

1. Currently only as a contractual duty, not beneficial in the

project construction phase

2. BIM protocol should have been used from the project start

3. The OTL and COINS use of the client is not yet mature

4. Tooling developed for the project, no standard tooling

available yet

5. It is possible to exchange the information at each delivery

6. while using your own BIM

24

GeoBIM Amsterdam , november 24th, 2016

Developments:

TC/TF 442 “BIM” CEN

CEDR research programme: “Asset Information

using BIM” since september 2016 by the

consortium INTERLINK

25

GeoBIM Amsterdam , november 24th, 2016

CEDR & INTERLINK

Research study to the development of an European Road

OTL and open exchange standard (2016-2018)

On three pillars:

o Technical Specs

o Standardisation body

o Acceptance in practice

Based on:

o Reliable data

o Proper datastructure

26

GeoBIM Amsterdam , november 24th, 2016

Consortium :

Research institute TNO (The Netherlands)

Engineering and asset management consultants

o Roughan & O’Donovan Consulting Engineers ROD (Ireland)

o Royal HaskoningDHV (The Netherlands)

ICT consultants and software companies

o AEC3 (Germany)

o Vianova Systems (Norway)

o interactive instruments (Germany)

o Semmtech (The Netherlands)

o planen-bauen 4.0 (Germany) national BIM implementation body

27

GeoBIM Amsterdam , november 24th, 2016

… junction Joure work in progress…..

28