ANNEX C - Financial Offer Form SC/RFP/20/028
1Construction of one room (20'x15' )size
having verandah
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 28.26
03-67-cStructural backfill using common material
available at sitem3 17.97
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 7.44
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4)
For Pilnth Protection
m3 6.18
06-07-a-03RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 0.16
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
tonne 0.03
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 25.19
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 15.15
07-30Supplying and filling sand under floor or
plugging in wellsm3 30.68
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 86.08
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 77.52
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 77.52
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 9.62
(13-25-a)+(13-25-
b)
Preparing surface & painting with snowcem /
weathershield paint :1st, 2nd & subsequent
coats
m2 77.52
13-22-aPreparing surface and painting with emulsion
paint : First coatm2 125.14
13-22-bPreparing surface and painting with emulsion
paint : 2nd & each subsequent coat.m2 125.14
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 2.97
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 2.97
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 2.76
10-15-dProvide & lay topping of concrete 1:2:4, including
surface finishing & dividing in panels : 2" thickm2 39.03
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,
polythene, mud, tar
m2 46.46
Site#1: RVA Office Khurasan, Peshawar
Total Cost - Site#1 Page 1 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 8.53
2 SOLAR ELECTRIFICATION
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 50.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 1.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 1.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 4.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 4.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 10.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x2=520Watt)
watt 520.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 520.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 520.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
3 Two new toilets
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 16.32
03-67-cStructural backfill using Common Material
available at site.m3 2.83
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 2.69
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 5.17
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 0.28
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#1 Page 2 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-26-a-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 1
coat bitumen (2" thick)
m2 3.47
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 7.10
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 33.01
11-23-a-01 White washing: New surface : One coat m2 33.01
11-23-a-02 White washing: New surface : One coat m2 33.01
07-30Supplying and filling sand under floor or
plugging in wellsm3 3.93
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 21.54
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 21.54
10-39-a
Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 11.52
10-50-aProviding and Fixing Ceramic Floor Tiles of
approved quality of Size : 12" x 12"m2 10.16
25-39-a-04
Providing and fixing steel windows/ventilator
with openable glazed pannels, using beam
section for frame 1-1/2" x 1" x 5/8" x 1/8", z-
section for leaves 3/4" x 1" x 3/4" x 1/8", T-
section sashes 1"x1"x1/8", glass panes,
wooden screed for glazing embded over a thin
layer of putty duly screwed with leaves, brass
fittings holdfast, duly painted, complete in all
respects, including all cost of material and
labour etc. as per approved design and as
directed by the engineer - in -charge: Glass
pane 4mm thick
sft 5.00
12-70-a
Supply and Fixing MS Sheet 16 guage(10'' x
2'') box type chowkats including fixing in
position with all charges for Hold fast, Hinges
and .Painting etc
m 9.45
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 3.02
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken
mesh, polythene, mud, tar
m2 9.05
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
PLUMBING WORKS
14-03-b
Providing and Fixing glazed earthen ware WC
squatting type with built-in foot rests complete
in all respects : Coloured
each 2.00
14-10-a
Providing and Fixing glazed earthen ware
lowdown flushing cistern 3 gallons (13.63
Liters) capacity including bracket set, copper
connection, etc. complete in all respects:
White
each 2.00
Sub-Total Amount (Rs)
Total Cost - Site#1 Page 3 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
14-13Providing and fixing choricum plated soap
dish complete.Each 1.00
14-15Providing and Fixing CP (chromium plated)
toilet paper holder completeEach 2.00
14-55-eProviding and Fixing GI pipe & including
specials complete 3/4" dia (light)rft 100.00
14-55-fProviding and Fixing GI pipe & including
specials complete 1/2" dia (light)rft 40.00
14-69-b-01
Supplying and Fixing Polyethylene Water
Tank made from food grade FDA Certified
raw material, 3 layers UV stablized, inert with
water, anti-fungus and anti-bacterial and have
a service life of more than 10 years : 200
gallons
(Horizontal)
Each 1.00
14-05-a-07
Providing and Fixing glazed earthen ware
wash hand basin (WHB) complete size 56x40
cm (22"x16"), including bracket set, waste
coupling, complete in all respects: White
without pedestal (Normal Quality)
Each 1.00
14-27-a
Providing and fixing chorimum plated (CP)
mixing valve for wash hand basin (WHB),
sink or shower of approved (Best) quality
Each 1.00
14-24-b
Providing and fixing chromium plated (CP)
bib-cock heavy duty of approved quality : 1.5
cm 1/2"
each 2.00
14-48-bProviding and Fixing brass ball float valve of
approved quality: 3/4" diaEach 2.00
14-33
Providing and Fixing 4" gully trap of approved
quality including cement concrete cost of PVC
grating 6" x6" (150 x 150 mm) and masonry
chamber 12"x12" (300 x 300 mm).
Each 2.00
23-10 Septic Tank (int.Size: 7'x2'x5') complete Each 1.00
14-144-bSupplying and Fixing UPVC soil waste and
vent pipe class B : 4" diaRft 70.00
14-144-cSupplying and Fixing UPVC soil waste and
vent pipe class B : 3" diaRft 20.00
06-07-d-05
Providing manhole size 24" x 18" (inside
dimensions) as per approved design and
specifications complete for 4" to 12" dia pipes
upto 4 ft. (1.2 m) depth with 16" dia.Concrete
Cover fixed in 4" thick RCC 1:2:4 slab (with 5
lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt
brick masonry walls 9" (225 mm) thick set in
1:3 cement sand mortar, 6" thick 1:3:6 cement
concrete in foundation, 4" av. thickness 1:2:4
cement concrete in benching and 1/2" (13mm)
thick cement sand plaster in 1:3 to all inside
wall surfaces, channels and benching
including making requisite number of main
and branch channels but excluding the cost of
excavation, back filling and disposal of
excavated stuff.
Each 2.00
Total Cost - Site#1 Page 4 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
14-37-c
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavey Type) of
approved quality complete: 24" (610 mm) dia
Each 2.00
23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00
14-31-b
Providing and Fixing cast iron (CI) floor trap
approved quality including CI grating &
concrete chamber all round : 4"x3" (100 mm x
75 mm)
Each 2.00
14-37-a
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavy Type) of
approved quality complete: 12" (300 mm) dia
Each 2.00
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
4Solar bore upto 150 ft depth with a
discharge of 1 inch
24-41Conducting Elec: Resistivity survey of the area
and furnishing its reports.No 1.00
24-42Logging of bore hole with electrical
equipment and furnishing reports.Job 1.00
24-05
Collection and submission at approved water
testing laboratory of two water samples in
bottles from each bore hole for testing
Per set 1.00
24-02-a-05
Drilling of Bore holes for tube well in all types
of soil and soft rock except hard rock from
ground level upto 328 ft depth (0m to 100m),
including sinking, collection of 100 % corings
and withdrawing of pipe, complete as per
specifications.: Dia of Bore 8" (200 mm) i/d
RFT 150.00
24-18-a-04
Providing, laying, cutting, jointing, testing and
disinfecting UPVC pressure pipeline in
trenches (conforming to BS 3505
manufactured ) jointed with socket, elbow, tee,
bend and plug bend etc.manufactured by the
respective manufacturer complete as per
specifications. UPVC Pressure Pipes Class B
(6 Bar) 6" Nominal Pipe Size (NPS)
RFT 100.00
24-09-a-01
Providing and installing PVC Strainer BSS
Class "B" of approved make \ quality in
tubewell bore hole, including socket, special
sockets, studs etc. complete as per
specification:- 6" Nominal Pipe
Size (NPS) (150mm)
Rft 50.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x5=1300Watt)
watt 1,300.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,300.00
Total Amount (Rs)
Sub-Total Amount (Rs)
Total Cost - Site#1 Page 5 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
26-01-m-01
Supply and Erection of hot dipped (80
microns
Average) galvanized steel of minimum
thickness of 12 SWG / 2.64 mm Channel /
Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,300.00
24-08-a
Providing and installing M.S. Bail plug of
approved make / quality in tubewell bore hole
complete as per specification:- 6" (150 mm)
i/d 2 ft (450 mm) long.
EACH 1.00
24-18-d-02
Providing, laying, cutting, jointing, testing and
disinfecting UPVC pressure pipeline in
trenches(conforming to BS 3505
manufactured ) jointed with socket, elbow, tee,
bend and plug bend etc.manufactured by the
respective manufacturer complete as per
specifications.
uPVC Pressure Pipes Class E (15 Bar)
1"Nominal Pipe Size (NPS) including
delievery upto water tank.
Rft 180.00
24-14
Shrouding with graded pack gravel 3/8" (10
mm) to 1/8" (3 mm) around tubewell in bore
hole complete as per specification:-
Rft 150.00
C
Providing and fixing Solar Water Pump
Including Converter 22 Watts Mercible Water
Pump Of 1 Inch Discharge, cable & Two
Chain Complete in All Respects
Each 1.00
5
Construction of new boundary wall on
backside and a portion of front
boundary wall
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 24.47
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 2.69
06-26-a-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 1
coat bitumen (2" thick)
m2 6.69
07-04-a-04
1st class brick work in foundation and plinth
in
Cement, sand mortar 1:5
m3 11.57
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 24.08
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 124.87
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 124.87
Sub-Total Amount (Rs)
NSI
Total Amount (Rs)
Sub-Total Amount (Rs)
Total Cost - Site#1 Page 6 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-37Supply & fix broken glasses on court yard
walls, including 1:3:6 cement concrete copingm 29.26
6 Repair of main gate
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-77Removing old paint from woodwork/steel with
paint removem2 13.94
27-04Repairing & re-fixing of steel main gate i/c
hold fast, welding complete in all respectsm2 6.97
27-123
Painting on old G.I. sheet with synthetic
enamel paint of approved quality of required
colour to give an even shade:
m2 13.94
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#1 Page 7 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 WAITING SHED REPAIR (CGI)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-58-a
Providing and fixing of existing CGI Sheet,
tubular pipe frame (heavy) quality and circular
columns excluding cost of foundation.
m2 1.86
2Providing and laying shingle for lawn to
provide slope (to drain off rain water)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
16-04-aGranular Sub Base Course using Pit Run
Gravelm3 12.74
3SOLAR ELECTRIFICATION - 2
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 2.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 1.00
15-22-b S&E button holder /angle holder Brass Each 6.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 7.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 2.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 2.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 4.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x2=520Watt)
watt 520.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 520.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 520.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 2.00
NSI Lead Acid Battery 12 Volt 150AH Each 2.00
NSI Solar Charge Controller Each 2.00
Site#2: BHU Akora, PeshawarMALE SECTION
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#2 Page 8 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
4 ROOF TREATMENT (DOMES)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 3.44
14-97 Supply of Polythene sheet of approved quality KG 0.84
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 42.66
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.17
5BRICK MASONRY
(RELOCATION OF DOOR)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-13Dismantling brick work in lime or cement
mortarm3 0.59
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.59
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 6.51
12-48-a Fixing Door including chowkats each 1.00
6
NEW DRAIN & PCC FLOORING 2"
INCH THICK FOR NOT ALLOWING
WATER FROM TOILET TO ROOMS
.HENCE CUTTING DOORS FROM
DOWNSIDE 2'INCHES .
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-113 Repair of doors/windows complete m2 46.46
03-25-cExcavation in foundation of building, bridges
etc complete : in hard soil or soft murumcft 97.50
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 1.52
PCC Flooring infront of toilets & one room
with providing slope towards new drain.
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 3.54
06-47-d
Erection and removal of Form work with
M.S.Pipe Scaffolding & Plywood Sheet for
RCC or Plain Concrete (Vertical)
m2 9.67
7SOLAR ELECTRIFICATION - 4
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
Total Amount (Rs)
FEMALE SECTION
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#2 Page 9 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 90.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 4.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 4.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 4.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 8.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x3=780Watt)
watt 780.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 780.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 780.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 4.00
NSI Lead Acid Battery 12 Volt 150AH Each 3.00
NSI Solar Charge Controller Each 4.00
8 2 EXHAUST FANS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-67
Making hole in wall with necessary masonry
work for exhaust fan any
size complete
Each 2.00
15-69-a
Supply and Erection best quality exhaust fan
complete with shutter
& regulator : 12"sweep
Each 2.00
9
WHITE WASH OF FEMALE STAFF
HOUSE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 59.48
11-23-b-01 White washing: old surface : Ist coat m2 268.59
11-23-b-01 White washing: old surface : 2nd coats m2 268.59
10 Generator shed
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#2 Page 10 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-58-a
Providing and fixing of Generator shed (in
female section) consisting of CGI Sheet,
tubular pipe frame (heavy) quality and circular
columns excluding cost of foundation.
m2 46.46
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#2 Page 11 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1Flooring of 3 rooms & verandah PCC
Track
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 16.09
2Internal rooms cement plaster upto sill
level (4ft) with nailing
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-48-b Removing from walls: Cement or lime plaster m2 89.62
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 132.67
28-18
Providing and fixing with steel nails and
washers, the chicken wire mesh of approved
quality, at joint of concrete and masonry work
(4" wide strip) before plastering etc complete
m2 132.67
3
Providing and laying one wall of
verandah to make it community
hall/waiting area including doors and
windows of same size as already of
rooms
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 5.84
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 42.92
25-39-b-05
Providing and Fixing steel windows 18
gauge with openable glazed panels With
22 SWG wire gauze : Glass pane 5mm
m2 4.60
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3
coats, complete
m2 4.60
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame
(1.5"x1.5"x1/8"), bolt, hinges, paint etc
complete
m2 4.18
06-07-a-03RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 0.23
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
tonne 0.11
4Windows repair and painting complete
in all respect
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-113 Repair of doors/windows complete m2 5.65
Site#3: PDH Turkaman MCH, Peshawar
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#3 Page 12 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 24.67
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 24.67
5SOLAR ELECTRIFICATION - 5
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 25.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 2.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 5.00
15-22-b S&E button holder /angle holder Brass Each 20.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 20.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 5.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 5.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 5.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x5=1300Watt)
watt 1,300.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,300.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,300.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 10.00
NSI Lead Acid Battery 12 Volt 150AH Each 2.00
NSI Solar Charge Controller Each 4.00
6Chowkidar rooms window
repair,wooden battens
12-62
Provide & fix GI wire gauze 22 SWG, 12x12
mesh per sq. in, fixed to steel window
complete
sft 9.00
04-48-b Removing from walls: Cement or lime plaster sft 500.00
11-01-bMud plaster on walls (excluding gobri
leeping) upto 20' height : 1" thicksft 500.00
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#3 Page 13 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
NSIverandah wooden battens turn over and place
again of chowkidar verandahSFT 150.00
NSIProviding and fixing wooden battens for
chowkidar verandah & new roomeach 10.00
7 ROOF TREATMENT
14-97 Supply of Polythene sheet of approved quality KG 136.98
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 44.51
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 3.16
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 14.63
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 3.70
8 White Wash
04-45-a Scraping : White wash or colour wash m2 425.97
11-23-b-01 White washing: Old surface : One coat m2 425.97
11-23-b-02 White washing: Old surface : Two coats m2 425.97
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#3 Page 14 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 ROOF TREATMENTS (GF)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-54Uprooting sarkanda growth & disposal within
50mm2 34.29
14-97 Supply of Polythene sheet of approved quality KG 26.60
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 17.41
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
09-31 Fixing water spouse or parnala. Each 1.00
2 NEW DOORS/WINDOWS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 2.23
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 2.23
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 2.28
3EXTERNAL DOOR REPAIR NEAR
WATER TANK
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-113 Repair of doors/windows complete m2 2.60
4SOLAR ELECTRIFICATION - 6
FANS 6 LIGHTS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
Site#4: FPHC Zandai MCH, Peshawar
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#4 Page 15 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
5 REPAIR OF STAIR SLAB
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-48-b
MRS-2017Removing from walls: Cement or lime plaster m2 22.30
27-116
Repairs to plaster of thickness 1/2" to 3/4" in
cement sand mortar 1:4 patches of area 27 Sft
and under, including cutting the patch in
proper shape, raking out joints and preparing
and plastering the surface of the walls
complete, including disposal
of rubbish to the dumping ground within 30
metres lead.
m2 22.30
6 REFIXING OF DOOR AT GF
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-113 Refixing of doors/windows complete m2 1.95
7ELECTRIFICATION & MAIN STEEL
AT GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03
S&E PVC patti fitting/pipe fitting for wiring
purpose complete Recessed in walls incl.chase
elc; 1" i/d
Rft 150.00
15-75-a
Supply and Erection cubical type factory
fabricated floor/wall mounting steel main
board comp. : On surface
Each 1.00
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#4 Page 16 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
8 PLASTERING OF SHED (FF)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 17.01
9WHITE WASH OF COMPLETE
BUILDING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 858.99
11-23-b-01 White washing: Old surface : One coat m2 858.99
11-23-b-02 White washing: Old surface : Two coats m2 858.99
10PROVISION OF PRECAST
SLAB/GIRDER FOR 1 ROOM (FF).
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-22-a Dismantling 1st class tile roofing m2 19.93
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30M 4.55
01-01-bCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter30M 4.55
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken
mesh, polythene, mud, tar
m2 19.93
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#4 Page 17 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1ROOF TREATMENT OF KITCHEN
& STORE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 51.40
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 210.17
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 3.55
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 19.51
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.95
2
INTERNAL ROOMS CEMENT
PLASTER UPTO SILL LEVEL (4
FEET) WITH NAILING.
04-48-b Removing from walls: Cement or lime plaster m2 258.18
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 265.61
28-18
Providing and fixing with steel nails and
washers, the chicken wire mesh of approved
quality, at joint of concrete and masonry work
(4" wide strip) before plastering etc complete
m2 265.61
3 White Wash
04-45-a Scraping : White wash or colour wash m2 770.59
11-23-b-01 White washing: Old surface : One coat m2 257.91
11-23-b-02 White washing: Old surface : Two coats m2 257.91
11-21-b-01 Distempering Old surface : One coat m2 428.07
11-21-b-02 Distempering Old surface : two coat m2 428.07
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 25.42
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 25.42
4Mud Leaping on Back Side wall
mentioned in (8)
04-48-b Removing from walls: Cement or lime plaster m2 40.43
11-01-bMud plaster on walls (excluding gobri
leeping) upto 20' height : 1" thickm2 40.43
5 20 Number lights including verandah
Site#5: PDH Khurasan MCH, Peshawar
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#5 Page 18 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 20.00
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#5 Page 19 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1
Verandah & washroom complete slab
removing and replace it with precast
slab /girders
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-24Dismantling roof of wooden planks & battens
from any height (Verandah)m2 66.91
04-22-a Dismantling 1st class tile roofing (Washroom) m2 4.23
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30m 16.25
01-01-bCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter30m 16.25
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken
mesh, polythene, mud, tar
m2 71.14
2ROOF TREATMENT OF KITCHEN
& STORE
14-97 Supply of Polythene sheet of approved quality KG 4.98
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 20.38
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.74
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.81
NSISupplying and fixing Steel Girder 8"x4"x3/16
on existing store .ft 15.00
3 WHITE WASH COMPLETE
04-45-a Scraping : White wash or colour wash m2 772.45
11-23-b-01 White washing: Old surface : One coat m2 772.45
11-23-b-02 White washing: Old surface : Two coats m2 772.45
4 ROOF TREATMENT OF DOMES
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 15.47
14-97 Supply of Polythene sheet of approved quality KG 3.78
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 42.66
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.75
Site#6: FPHC Baghban MCH, Peshawar
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#6 Page 20 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
5SOLAR ELECTRIFICATION - 6
ROOMS
Item. No. Abbreviared Description Unit QtyUnit
Rate
Total
Amount
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#6 Page 21 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1
PCC FLOORING IN VERANDAH &
ALSO PCC 4" THICK IN
COURTYARD INFRONT OF MAIN
GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 5.49
2
ROOF TREATMENTS
(TWO ROOMS AND VERANDAH AS
SHOWN IN DRAWINGS)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 50.00
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and
1"mudplaster
m2 204.46
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 2.27
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 2.65
3
DOORS REPAIRS AND PAINTING
& WINDOW REPAIR IN MCH
CLINIC
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-113 Repair of doors/windows complete m2 3.23
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 6.46
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 6.46
4WHITE WASH OF COMPLETE
BUILDING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 331.78
11-23-b-01 White washing: Old surface : One coat m2 331.78
11-23-b-02 White washing: Old surface : Two coats m2 331.78
5SOLAR ELECTRIFICATION - 6
FANS 6 LIGHTS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
Site#7: PDH Badabair MCH, Peshawar
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#7 Page 22 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-02-b-03
S&E PVC Patti/pipe fittings for wiring
purpose complete Recessed in walls incl.chase
elc; 1" i/d
Rft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
6Wall mud leaping except medical officer
room and MCH Clinic.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-48-b Removing from walls: Mud plaster m2 331.78
11-01-bMud plaster on walls (excluding gobri
leeping) upto 20' height : 1" thickm2 331.78
7 DRAINS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 1.59
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4)m3 0.79
NSIEXTRA WOODEN PLANKS IN
VERANDAH.
10 Wooden planks
(7'x9")(7x25=175ft)@160/ftRft 175.00
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#7 Page 23 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#7 Page 24 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1
REFURNISHING HALL INTO
OFFICE SEPARATED BY
PARTITION WALL WITH DOOR,
SHOULD CONTAINS
VENTILATORS & WINDOWS OF
SIZE MORE THAN STANDARD
SIZE, ALSO STAFF DOOR IN
HALL &DISMANTLING
EXISTING WALL OF LENGTH 2'-
1" AT NEW PROPOSED
FURNISHED OFFICE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-22-a Dismantling 1st class tile roofing m2 72.49
01-01-aCarriage of 100 cft / 5 tonne of all materials
by truck or other means 1st 30 meter30M 16.57
01-01-bCarriage of 100 cft / 5 tonne of all materials
by truck or other means 2nd 30 meter30M 16.57
04-13Dismantling brick work in lime or cement
mortarm3 4.95
01-01-aCarriage of 100 cft / 5 tonne of all materials
by truck or other means 1st 30 meter30M 4.95
01-01-bCarriage of 100 cft / 5 tonne of all materials
by truck or other means 2nd 30 meter30M 4.95
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 32.98
03-67-cStructural backfill using common material
available at sitem3 30.60
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 3.62
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4) For Pilnth Protection
m3 8.97
06-07-a-03RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 0.31
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
tonne 0.07
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 15.91
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 22.05
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 188.98
(13-25-a)+(13-
25-b)
Preparing surface & painting with snowcem
/ weathershield paint :1st, 2nd & subsequent
coats
m2 96.44
Site#8: RVA Office Panian, Haripur
Total Cost - Site#8 Page 25 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene &
2 coats bitumen (2" thick
m2 8.19
13-22-aPreparing surface and painting with
emulsion paint : First coatm2 172.58
13-22-b
Preparing surface and painting with
emulsion paint : 2nd & each subsequent
coat.
m2 172.58
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 9.01
25-39-b-05
Providing and Fixing steel windows 18
gauge with openable glazed panels With 22
SWG wire gauze : Glass pane 5mm
m2 9.01
12-03-c
1st class teak wood wrought joinery in
doors & windows, panelled or glazed
complete : 1.5" thick
m2 4.55
12-70-a
Supply and Fixing MS Sheet 16 guage
(10'' x 2'')box type chowkats including
fixing in positionwith all charges for Hold
fast, Hinges and Painting etc
m 5.33
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 2.28
10-15-d
Provide & lay topping of concrete 1:2:4,
including surface finishing & dividing in panels :
2" thick
m2 74.35
09-45
P/F Burnt Brick Tile Roofing over Tee Iron
and Steel Girder, in 1:6 c/s mortar (12' max
span)
m2 78.07
15-02-a-08
Supply and Fixing PVC pipe for draining
rain water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
07-30Supplying and filling sand under floor or
plugging in wellsm3 175.54
2SOLAR ELECTRIFICATION OF
NEW PROPOSED HALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03
S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/d Rft 25.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep
with 3/16" thick bakelite sheet top etc
complete; 4"X 4"
Each 2.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep
with 3/16" thick bakelite sheet top etc
complete; 9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 15.00
Total Amount (Rs)
Total Cost - Site#8 Page 26 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-68-c
S&E best quality AC/DC ceiling fan
complete with GI. rod, canopy, blades &
regulator: 56" sweep
Each 4.00
15-25Supply and Erection girder clamp hook,
5/8" dia.for hanging ceiling fansEach 4.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 5.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade
(per Watt) (As per Approved
Specifications)(260x2=520Watt)
watt 520.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 520.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 520.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
3 SOLAR WATER PUMP
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
24-41Conducting Elec: Resistivity survey of the
area and furnishing its reports.No 1.00
24-42Logging of bore hole with electrical
equipment and furnishing reports.Job 1.00
24-05
Collection and submission at approved
water testing laboratory of two water
samples in bottles from each bore hole for
testing
Per set 1.00
24-02-a-05
Drilling of Bore holes for tube well in all
types of soil and soft rock except hard rock
from ground level upto 328 ft depth (0m to
100m), including sinking, collection of 100
% corings and withdrawing of pipe,
complete as per specifications.: Dia of Bore
8" (200 mm) i/d
RFT 150.00
24-18-a-04
Providing, laying, cutting, jointing, testing
and disinfecting UPVC pressure pipeline in
trenches (conforming to BS 3505
manufactured ) jointed with socket, elbow,
tee, bend and plug bend etc.manufactured
by the respective manufacturer complete as
per specifications. UPVC Pressure Pipes
Class B (6 Bar) 6" Nominal Pipe Size (NPS)
RFT 100.00
24-09-a-01
Providing and installing PVC Strainer BSS
Class "B" of approved make \ quality in
tubewell bore hole, including socket, special
sockets, studs etc. complete as per
specification:- 6" Nominal Pipe
Size (NPS) (150mm)
Rft 50.00
Total Amount (Rs)
Total Cost - Site#8 Page 27 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade
(per Watt) (As per Approved
Specifications)(260x5=1300Watt)
watt 1,300.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,300.00
26-01-m-01
Supply and Erection of hot dipped (80
microns
Average) galvanized steel of minimum
thickness of 12 SWG / 2.64 mm Channel /
Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,300.00
24-08-a
Providing and installing M.S. Bail plug of
approved make / quality in tubewell bore
hole complete as per specification:- 6" (150
mm) i/d 2 ft (450 mm) long.
EACH 1.00
24-18-d-02
Providing, laying, cutting, jointing, testing
and disinfecting UPVC pressure pipeline in
trenches(conforming to BS 3505
manufactured ) jointed with socket, elbow,
tee, bend and plug bend etc.manufactured
by the respective manufacturer complete as
per specifications.
uPVC Pressure Pipes Class E (15 Bar)
1"Nominal Pipe Size (NPS) including
delievery upto water tank.
Rft 150.00
24-14
Shrouding with graded pack gravel 3/8" (10
mm) to 1/8" (3 mm) around tubewell in bore
hole complete as per specification:-
Rft 150.00
C
Providing and fixing Solar Water Pump Including
Converter 22 Watts Mercible Water Pump Of 1
Inch Discharge, cable & Two Chain Complete in
All Respects
Each 1.00
4(i)DISMANTLING THREE EXISTING
TOILETS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-22-a Dismantling 1st class tile roofing m2 9.51
04-13Dismantling brick work in lime or cement
mortarm3 9.85
01-01-aCarriage of 100 cft / 5 tonne of all materials
by truck or other means 1st 30 meter30M 9.85
01-01-bCarriage of 100 cft / 5 tonne of all materials
by truck or other means 2nd 30 meter30M 9.85
4(ii)CONSTRUCTION OF 2 NEW
TOILETS
NSI
Total Amount (Rs)
Sub-Total Amount (Rs)
Sub-Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#8 Page 28 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 16.32
03-67-cStructural backfill using Common Material
available at site.m3 2.83
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 2.69
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 5.17
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 0.28
06-26-a-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene &
1 coat bitumen (2" thick)
m2 3.47
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 7.10
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 33.01
11-23-a-01 White washing: New surface : One coat m2 33.01
11-23-a-02 White washing: New surface : One coat m2 33.01
07-30Supplying and filling sand under floor or
plugging in wellsm3 3.93
11-18-bCement pointing struck joints, on walls,
upto 20' height :Ratio 1:3m2 21.54
11-29
Extra cost of labour & material for red
oxide pigment in cement pointing to match
bricks
m2 21.54
10-39-a
Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 11.52
10-55-lProviding and Fixing of Bathroom tiles
10" x 20" of imported approved qualitym2 8.30
10-50-aProviding and Fixing Ceramic Floor Tiles of
approved quality of Size : 12" x 12"m2 10.16
25-39-a-04
Providing and fixing steel
windows/ventilator with openable glazed
pannels, using beam section for frame 1-
1/2" x 1" x 5/8" x 1/8", z-section for leaves
3/4" x 1" x 3/4" x 1/8", T- section sashes
1"x1"x1/8", glass panes, wooden screed for
glazing embded over a thin layer of putty
duly screwed with leaves, brass fittings
holdfast, duly painted, complete in all
respects, including all cost of material and
labour etc. as per approved design and as
directed by the engineer - in -charge: Glass
pane 4mm thick
sft 5.00
12-70-a
Supply and Fixing MS Sheet 16 guage(10'' x
2'') box type chowkats including fixing in
position with all charges for Hold fast,
Hinges and .Painting etc
m 9.45
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 3.02
Total Cost - Site#8 Page 29 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with
chicken mesh, polythene, mud, tar
m2 9.05
PLUMBING WORKS
14-01-b
Providing and Fixing glazed earthen ware
WC European type of approved make/size
excluding cost of seat & cover, complete in
all respects:
Coloured
(FOR UNHCR STAFF)
each 1.00
14-03-b
Providing and Fixing glazed earthen ware
WC squatting type with built-in foot rests
complete in all respects : Coloured
(one in simple toilet +one for UNHCR
STAFF)
each 2.00
14-10-a
Providing and Fixing glazed earthen ware
lowdown flushing cistern 3 gallons (13.63
Liters) capacity including bracket set,
copper connection, etc. complete in all
respects: White
each 3.00
14-13Providing and fixing choricum plated soap
dish complete.Each 2.00
14-15Providing and Fixing CP (chromium plated)
toilet paper holder completeEach 2.00
14-55-eProviding and Fixing GI pipe & including
specials complete 3/4" dia (light)rft 100.00
14-55-fProviding and Fixing GI pipe & including
specials complete 1/2" dia (light)rft 60.00
14-69-b-01
Supplying and Fixing Polyethylene Water
Tank made from food grade FDA Certified
raw material, 3 layers UV stablized, inert
with water, anti-fungus and anti-bacterial
and have a service life of more than 10
years : 200 gallons
(Horizontal)
Each 1.00
14-05-a-07
Providing and Fixing glazed earthen ware
wash hand basin (WHB) complete size
56x40 cm (22"x16"), including bracket set,
waste coupling, complete in all respects:
White without pedestal (Normal Quality)
Each 2.00
14-27-a
Providing and fixing chorimum plated (CP)
mixing valve for wash hand basin (WHB),
sink or shower of approved (Best) quality
Each 2.00
14-24-b
Providing and fixing chromium plated (CP)
bib-cock heavy duty of approved quality :
1.5 cm 1/2"
each 2.00
14-48-bProviding and Fixing brass ball float valve
of approved quality: 3/4" diaEach 2.00
14-33
Providing and Fixing 4" gully trap of
approved quality including cement concrete
cost of PVC grating 6" x6" (150 x 150 mm)
and masonry chamber 12"x12" (300 x 300
mm).
Each 3.00
Sub-Total Amount (Rs)
Total Cost - Site#8 Page 30 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
23-10 Septic Tank (int.Size: 7'x2'x5') complete Each 1.00
14-144-bSupplying and Fixing UPVC soil waste and
vent pipe class B : 4" diaRft 70.00
14-144-cSupplying and Fixing UPVC soil waste and
vent pipe class B : 3" diaRft 20.00
06-07-d-05
Providing manhole size 24" x 18" (inside
dimensions) as per approved design and
specifications complete for 4" to 12" dia pipes
upto 4 ft. (1.2 m) depth with 16" dia.Concrete
Cover fixed in 4" thick RCC 1:2:4 slab (with 5
lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt brick
masonry walls 9" (225 mm) thick set in 1:3
cement sand mortar, 6" thick 1:3:6 cement
concrete in foundation, 4" av. thickness 1:2:4
cement concrete in benching and 1/2" (13mm)
thick cement sand plaster in 1:3 to all inside wall
surfaces, channels and benching including
making requisite number of main and branch
channels but excluding the cost of excavation,
back filling and disposal of excavated stuff.
Each 2.00
14-37-c
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavey Type) of
approved quality complete: 24" (610 mm)
dia
Each 2.00
23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00
14-31-b
Providing and Fixing cast iron (CI) floor
trap approved quality including CI grating
& concrete chamber all round : 4"x3" (100
mm x 75 mm)
Each 2.00
14-37-a
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavy Type) of
approved quality complete: 12" (300 mm)
dia
Each 2.00
5
CONCRETE PATCHING FROM
GATE (INNER SIDES).
PATHWAYS LEADING TO NEW
FURNISHED PROPOSED OFFICE.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 8.15
6 ROOF TREATMENT
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97Supply of Polythene sheet of approved
qualityKG 15.56
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1"
mud plaster
m2 63.64
Sub-Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#8 Page 31 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 1.20
15-02-a-08
Supply and Fixing PVC pipe for draining
rain water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 1.41
09-31 Fixing water spouse or parnala. Each 1.00
7 NEW GATE FOR RVA OFFICE.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-45-b
Supplying and Fixing 18 SWG MS Sheet
Gate with angle iron frame (2"x2"x3/16")
with side window, lock, painting etc
m2 6.69
8WHITE WASHING OF DOMES &
BUILDING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 419.39
11-23-b-01 White washing: Old surface : One coat m2 419.39
11-23-b-02 White washing: Old surface : Two coats m2 419.39
9
NOTED PARKING PLACE
CONCRETE INCLUDING
FILLING.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-58-b
Providing and fixing of parking shed
consisting of CGI Sheet, tubular pipe frame
(heavy) quality and circular columns
excluding cost of foundation.
M2 46.47
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 4.67
10NEW EASTERN BOUNDARY
WALL .
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-13Dismantling brick work in lime or cement
mortarm3 17.99
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 30.83
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 3.39
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene &
2 coats bitumen (2" thick
m2 8.43
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#8 Page 32 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 10.92
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 17.99
11-18-bCement pointing struck joints, on walls,
upto 20' height :Ratio 1:3m2 78.72
11-29
Extra cost of labour & material for red
oxide pigment in cement pointing to match
bricks
m2 78.72
11EXISTING DOORS/WINDOWS
PAINT.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 37.36
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 37.36
12
OPEN DRAINS NEAR EXISTING
HAND PUMP &UNDERGROUND
DRAINLINE FOR DRAINING
WATER OUT.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 21.29
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 5.65
14-31-b
Providing and Fixing cast iron (CI) floor
trap approved quality including CI grating
& concrete chamber all round : 4"x3" (100
mm x 75 mm)
Each 4.00
03-67-cStructural backfill using common material
available at sitem3 3.57
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 0.76
15-02-a-08
Supply and Fixing PVC pipe for draining
rain water (from roof) complete On surface
including clamps etc: 4" i/d
m 51.81
03-60
Clearance of site by cutting, removing all
shrubs, trees, upto 6 inches (152 mm) girth,
etc. and taking out their entire roots and
filling the hollows with earth complete with
dressing, consolidating and watering the
filling including stacking the serviceable
materials and disposal of useless material as
directed, lead to 10 chains, cost of earth
included.
m2 16.73
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#8 Page 33 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
13
PROPOSING NEW SHED (15'X25')
HAVING PRECAST SLAB/GIRDER
ROOF & PILLARS FOR TRAINING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with
chicken
mesh, polythene, mud, tar
m2 34.85
BRICK COLUMNS FOR TRAINING
SHED
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 0.77
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 0.13
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 0.25
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 1.74
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 3.36
(13-25-a
)+(13-25-b)
Preparing surface & painting with snowcem
/ weathershield paint : First coat+2ND
COAT ANY SUBSEQUENT COAT
m2 3.36
14APRON SHAPE (CONCRETE
PATCH) OUTSIDE GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 2.24
15CONSTRUCTION OF 2 NEW
TOILETS ( SIMPLE)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
DISMANTLING WESTEN BOUNDARY
WALL OF LENGTH 14'-3" AND ITS
CONSTRUCTION FOR PARDA.
(COVERED IN CONSTRUCTION OF
TOILETS)
04-12 Dismantling brick work in mud mortar m3 0.76
04-13Dismantling brick work in lime or cement
mortarm3 2.32
01-01-aCarriage of 100 cft / 5 tonne of all materials
by truck or other means 1st 30 meter30M 3.93
01-01-bCarriage of 100 cft / 5 tonne of all materials
by truck or other means 2nd 30 meter30M 3.93
CONSTRUCTION OF TWO SIMPLE
TOILETS AS ASHOWN IN DRAWING
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#8 Page 34 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 16.32
03-67-cStructural backfill using Common Material
available at site.m3 2.83
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 2.69
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 5.17
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 0.28
06-26-a-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene &
1 coat bitumen (2" thick)
m2 3.47
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 7.10
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 33.01
11-23-a-01 White washing: New surface : One coat m2 33.01
11-23-a-02 White washing: New surface : One coat m2 33.01
07-30Supplying and filling sand under floor or
plugging in wellsm3 3.93
11-18-bCement pointing struck joints, on walls,
upto 20' height :Ratio 1:3m2 21.54
11-29
Extra cost of labour & material for red
oxide pigment in cement pointing to match
bricks
m2 21.54
10-39-a
Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 11.52
10-50-aProviding and Fixing Ceramic Floor Tiles of
approved quality of Size : 12" x 12"m2 10.16
25-39-a-04
Providing and fixing steel
windows/ventilator with openable glazed
pannels, using beam section for frame 1-
1/2" x 1" x 5/8" x 1/8", z-section for leaves
3/4" x 1" x 3/4" x 1/8", T- section sashes
1"x1"x1/8", glass panes, wooden screed for
glazing embded over a thin layer of putty
duly screwed with leaves, brass fittings
holdfast, duly painted, complete in all
respects, including all cost of material and
labour etc. as per approved design and as
directed by the engineer - in -charge: Glass
pane 4mm thick
sft 5.00
12-70-a
Supply and Fixing MS Sheet 16 guage(10'' x
2'') box type chowkats including fixing in
position with all charges for Hold fast,
Hinges and .Painting etc
m 9.45
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 3.02
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with
chicken mesh, polythene, mud, tar
m2 9.05
Total Cost - Site#8 Page 35 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
PLUMBING WORKS
14-03-b
Providing and Fixing glazed earthen ware
WC squatting type with built-in foot rests
complete in all respects : Coloured
each 2.00
14-10-a
Providing and Fixing glazed earthen ware
lowdown flushing cistern 3 gallons (13.63
Liters) capacity including bracket set,
copper connection, etc. complete in all
respects: White
each 2.00
14-13Providing and fixing choricum plated soap
dish complete.Each 1.00
14-15Providing and Fixing CP (chromium plated)
toilet paper holder completeEach 2.00
14-55-eProviding and Fixing GI pipe & including
specials complete 3/4" dia (light)rft 100.00
14-55-fProviding and Fixing GI pipe & including
specials complete 1/2" dia (light)rft 40.00
14-69-b-01
Supplying and Fixing Polyethylene Water
Tank made from food grade FDA Certified
raw material, 3 layers UV stablized, inert
with water, anti-fungus and anti-bacterial
and have a service life of more than 10
years : 200 gallons
(Horizontal)
Each 1.00
14-05-a-07
Providing and Fixing glazed earthen ware
wash hand basin (WHB) complete size
56x40 cm (22"x16"), including bracket set,
waste coupling, complete in all respects:
White without pedestal (Normal Quality)
Each 1.00
14-27-a
Providing and fixing chorimum plated (CP)
mixing valve for wash hand basin (WHB),
sink or shower of approved (Best) quality
Each 1.00
14-24-b
Providing and fixing chromium plated (CP)
bib-cock heavy duty of approved quality :
1.5 cm 1/2"
each 2.00
14-48-bProviding and Fixing brass ball float valve
of approved quality: 3/4" diaEach 2.00
14-33
Providing and Fixing 4" gully trap of
approved quality including cement concrete
cost of PVC grating 6" x6" (150 x 150 mm)
and masonry chamber 12"x12" (300 x 300
mm).
Each 2.00
23-10 Septic Tank (int.Size: 7'x2'x5') complete Each 1.00
14-144-bSupplying and Fixing UPVC soil waste and
vent pipe class B : 4" diaRft 70.00
14-144-cSupplying and Fixing UPVC soil waste and
vent pipe class B : 3" diaRft 20.00
Sub-Total Amount (Rs)
Total Cost - Site#8 Page 36 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-07-d-05
Providing manhole size 24" x 18" (inside
dimensions) as per approved design and
specifications complete for 4" to 12" dia pipes
upto 4 ft. (1.2 m) depth with 16" dia.Concrete
Cover fixed in 4" thick RCC 1:2:4 slab (with 5
lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt brick
masonry walls 9" (225 mm) thick set in 1:3
cement sand mortar, 6" thick 1:3:6 cement
concrete in foundation, 4" av. thickness 1:2:4
cement concrete in benching and 1/2" (13mm)
thick cement sand plaster in 1:3 to all inside wall
surfaces, channels and benching including
making requisite number of main and branch
channels but excluding the cost of excavation,
back filling and disposal of excavated stuff.
Each 2.00
14-37-c
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavey Type) of
approved quality complete: 24" (610 mm)
dia
Each 2.00
23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00
14-31-b
Providing and Fixing cast iron (CI) floor
trap approved quality including CI grating
& concrete chamber all round : 4"x3" (100
mm x 75 mm)
Each 2.00
14-37-a
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavy Type) of
approved quality complete: 12" (300 mm)
dia
Each 2.00
Sub-Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#8 Page 37 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 ROOF TREATMENT
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97Supply of Polythene sheet of approved
qualityKG 24.41
06-05-f
Plain Cement Concrete including
placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 5.42
15-02-a-08
Supply and Fixing PVC pipe for draining
rain water (from roof) complete On
surface including clamps etc: 4" i/d
m 7.31
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 2.26
2 WATER PUMP 2 HP
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-80-a
Supply and fixing of 2.0 HP Monoblock
water pump 1.5"x1.25" 3 stage model DE-
S3 (Deen Pump) single phase for 150 ft
head with all accessories
EACH 1.00
15-05-c
S&E single core PVC insulated copper
conductor 250/440V grade cable;
7/0.029"
m 35.00
3WHITE WASH OF BUILDING
COMPLETE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 571.38
11-23-b-01 White washing: Old surface : One coat m2 571.38
11-23-b-02 White washing: Old surface : Two coats m2 571.38
4
CONSTRUCTION OF NEW
BOUNDARY WALL OF 4.5"
HAVING 9"X9" COLUMNS AT
EVERY 10FT SEPARATING
COMMUNITY CENTER FROM
SCHOOL.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 13.93
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 2.30
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (2" thick
m2 8.57
Site#9: Community Centre Panian, Haripur
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#9 Page 38 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 8.93
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 8.25
11-18-bCement pointing struck joints, on walls,
upto 20' height :Ratio 1:3m2 142.61
11-29
Extra cost of labour & material for red
oxide pigment in cement pointing to
match bricks
m2 142.61
5
REMOVING,CLEANING,
CUTTING OF TREES FOR
PATHWAYS & CLEANING OF
AREAS.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-60
Clearance of site by cutting, removing all
shrubs, trees, upto 6 inches (152 mm)
girth, etc. and taking out their entire roots
and filling the hollows with earth
complete with dressing, consolidating
and watering the filling including
stacking the serviceable materials and
disposal of useless material as directed,
lead to 10 chains, cost of earth included.
m2 192.10
6
ELECTRIFICATION i-e FANS,
LIGHTS 4 FOR CLASSROOMS
AND 2 FOR VERANDAH (AC)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03
S&E PVC pipe/patti fitting for wiring
purpose complete Recessed in walls
incl.chase elc; 1" i/d
m 20.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep
with 3/16" thick bakelite sheet top etc
complete; 4"X 4"
Each 3.00
15-09-b
S&E MS sheet box of 16 SWG. 4 ;deep
with 3/16" thick bakelite sheet top etc
complete; 7"X 4"
Each 3.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep
with 3/16" thick bakelite sheet top etc
complete; 9"X 4"
Each 1.00
15-22-b S&E button holder /angle holder Brass Each 10.00
15-24-a
S&E tube light. incl. Rod choke etc.
complete single rod (40 Watts) with 1
chock& starter
Set 4.00
15-41
Earthing of iron clad aluminium swtches
etc with Gl. Wire # 8SWG in Gl. plpe 0
5' dia
job 1.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in
PVC pipe recesssed
Each 10.00
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#9 Page 39 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-68-c
S&E best quality AC ceiling fan
complete with GI. rod, canopy, blades &
regulator: 56" sweep
Each 4.00
15-25Supply and Erection girder clamp hook,
5/8" dia.for hanging ceiling fansEach 4.00
15-62
Supply and Erection Varanda & outside
room -light fitting round/square type with
gallery ,holder & 40 W bulb
Each 2.00
15-71-cSupply and Erection single phase
imported auto circuit breaker 20 Amp.Each 4.00
7
WALK WAYS FOR TOILETS
FROM ENTRANCE GATE AND
CLASSROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-f
Plain Cement Concrete including
placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 3.36
8
REPAIR OF CEMENT PLASTER
OF AFFECTED AREAS AS
DISCUSSED AND NOTED
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-48-bRemoving from walls: Cement or lime
plasterm2 2.97
27-116
Repairs to plaster of thickness 1/2" to
3/4" in cement sand mortar 1:4 patches
of area 27 Sft and under, including
cutting the patch in proper shape, raking
out joints and preparing and plastering
the surface of the walls complete,
including nailing mesh on walls &
disposal
of rubbish to the dumping ground within
30
metres lead.
m2 2.97
9 NEW GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-13Dismantling brick work in lime or
cement mortarm3 1.02
25-45-b
Supplying and Fixing 18 SWG MS Sheet
Gate with angle iron frame (2"x2"x3/16")
with side window, lock, painting etc
m2 4.46
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#9 Page 40 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
10
CONSTRUCTION OF 2 NEW
TOILETS AT COMMUNITY
CENTER
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building.
bridges etc complete : In ordinary soilm3 12.04
03-67-c
Structural backfill using Common
Material
available at site.
m3 2.83
06-05-i
Plain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 3.97
07-04-a-041st class brick work in foundation and
plinth in Cement, sand mortar 1:5m3 4.01
06-05-f
Plain Cement Concrete including
placing, compacting finishing & curing
(Ratio 1:2:4)
m3 0.28
06-26-a-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 1 coat bitumen (2" thick)
m2 2.43
07-05-a-041st class brick work in ground floor
Cement, sand mortar 1:5m3 5.04
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 23.27
11-23-a-01 White washing: New surface : One coat m2 26.99
11-23-a-02 White washing: New surface : One coat m2 26.99
07-30Supplying and filling sand under floor or
plugging in wellsm3 1.70
11-18-bCement pointing struck joints, on walls,
upto 20' height :Ratio 1:3m2 12.50
11-29
Extra cost of labour & material for red
oxide pigment in cement pointing to
match bricks
m2 12.50
10-39-a
Glazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 11.52
10-50-a
Providing and Fixing Ceramic Floor
Tiles of
approved quality of Size : 12" x 12"
m2 3.72
25-39-a-04
Providing and fixing steel
windows/ventilator with openable glazed
pannels, using beam section for frame 1-
1/2" x 1" x 5/8" x 1/8", z-section for
leaves 3/4" x 1" x 3/4" x 1/8", T- section
sashes 1"x1"x1/8", glass panes, wooden
screed for glazing embded over a thin
layer of putty duly screwed with leaves,
brass fittings holdfast, duly painted,
complete in all respects, including all
cost of material and labour etc. as per
approved design and as directed by the
engineer - in -charge: Glass pane 4mm
thick
sft 5.00
Total Cost - Site#9 Page 41 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
12-70-a
Supply and Fixing MS Sheet 16
guage(10'' x 2'') box type chowkats
including fixing in position with all
charges for Hold fast, Hinges and
.Painting etc
m 9.45
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame
(1.5"x1.5"x1/8"), bolt, hinges, paint etc
complete
m2 3.02
09-46
Providing and Laying Prestressed Roof
of Slab/Girder, 2" thick PCC 1:2:4 with
chicken mesh, polythene, mud, tar
m2 6.04
PLUMBING WORKS
14-03-b
Providing and Fixing glazed earthen
ware WC squatting type with built-in
foot rests complete in all respects :
Coloured
each 2.00
14-10-a
Providing and Fixing glazed earthen
ware lowdown flushing cistern 3 gallons
(13.63 Liters) capacity including bracket
set, copper connection, etc. complete in
all respects: White
each 2.00
14-13Providing and fixing choricum plated
soap dish complete.Each 1.00
14-15Providing and Fixing CP (chromium
plated) toilet paper holder completeEach 2.00
14-55-e
Providing and Fixing GI pipe &
including specials complete 3/4" dia
(light)
rft 100.00
14-55-f
Providing and Fixing GI pipe &
including specials complete 1/2" dia
(light)
rft 40.00
14-69-b-01
Supplying and Fixing Polyethylene
Water Tank made from food grade FDA
Certified raw material, 3 layers UV
stablized, inert with water, anti-fungus
and anti-bacterial and have a service life
of more than 10 years : 200 gallons
(Horizontal)
Each 1.00
14-05-a-07
Providing and Fixing glazed earthen
ware wash hand basin (WHB) complete
size 56x40 cm (22"x16"), including
bracket set, waste coupling, complete in
all respects: White without pedestal
(Normal Quality)
Each 1.00
14-27-a
Providing and fixing chorimum plated
(CP) mixing valve for wash hand basin
(WHB), sink or shower of approved
(Best) quality
Each 1.00
14-24-b
Providing and fixing chromium plated
(CP) bib-cock heavy duty of approved
quality : 1.5 cm 1/2"
each 2.00
Sub-Total Amount (Rs)
Total Cost - Site#9 Page 42 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
14-48-bProviding and Fixing brass ball float
valve of approved quality: 3/4" diaEach 2.00
14-33
Providing and Fixing 4" gully trap of
approved quality including cement
concrete cost of PVC grating 6" x6" (150
x 150 mm) and masonry chamber
12"x12" (300 x 300 mm).
Each 2.00
23-10Septic Tank (int.Size: 7'x2'x5')
completeEach 1.00
14-144-bSupplying and Fixing UPVC soil waste
and vent pipe class B : 4" diaRft 70.00
14-144-cSupplying and Fixing UPVC soil waste
and vent pipe class B : 3" diaRft 20.00
06-07-d-05
Providing manhole size 24" x 18" (inside
dimensions) as per approved design and
specifications complete for 4" to 12" dia pipes
upto 4 ft. (1.2 m) depth with 16" dia.Concrete
Cover fixed in 4" thick RCC 1:2:4 slab (with
5 lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt
brick masonry walls 9" (225 mm) thick set in
1:3 cement sand mortar, 6" thick 1:3:6 cement
concrete in foundation, 4" av. thickness 1:2:4
cement concrete in benching and 1/2" (13mm)
thick cement sand plaster in 1:3 to all inside
wall surfaces, channels and benching
including making requisite number of main
and branch channels but excluding the cost of
excavation, back filling and disposal of
excavated stuff.
Each 2.00
14-37-c
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavey Type) of
approved quality complete: 24" (610
mm) dia
Each 2.00
23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00
14-31-b
Providing and Fixing cast iron (CI) floor
trap approved quality including CI
grating & concrete chamber all round :
4"x3" (100 mm x 75 mm)
Each 2.00
14-37-a
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavy Type) of
approved quality complete: 12" (300
mm) dia
Each 2.00
Sub-Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#9 Page 43 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 FLOORING OF DOOM 10 MUD
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
10-15-dProvide & lay topping of concrete 1:2:4, including
surface finishing & dividing in panels : 2" thickm2 1.32
2DISMANTLING OF MUD
BOUNDARY WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-12 Dismantling brick work in mud mortar m3 24.49
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30M 24.49
01-01-bCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter30M 24.49
3CONSTRUCTION OF NEW
BOUNDARY WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 19.59
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 3.23
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 12.06
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 12.56
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 22.04
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 192.94
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 192.94
4ROOF TREATMENT OF
DISPENSARY
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 2.73
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 11.15
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.40
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 3.66
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.47
Total Amount (Rs)
Site#10: FPHC Basoomera MCH, Haripur
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#10 Page 44 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
5 ELECTRIFICATION FOR DOMES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 8.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 4.00
15-22-b S&E button holder /angle holder Brass Each 16.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 16.00
15-69-a
Supply and Erection best quality exhaust fan
complete with shutter & regulator : 12"sweep Each 1.00
6
EXAHAST FAN & 4 NUMBER
GLASSES OF WINDOW &
VENTILATOR & water filter
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-67
Making hole in wall with necessary masonry
work for exhaust fan any
size complete
each 1.00
NSISupplying and installation of 5mm glass in
existing windowsm2 2.97
NSI Supplying and installation of water filter each 1.00
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#10 Page 45 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 ROOF TREATMENT OF EPI ROOM
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 4.14
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 16.91
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.49
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 3.66
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.57
2ROOF TREATMENT OF DOME
(Adjacent to EPI ROOM)
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 6.88
14-97 Supply of Polythene sheet of approved quality KG 1.68
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 7.11
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.34
3
CUTTING OF EXISTING PCC
DRAIN & TO PROVIDE PROPER
SLOPE TO DRAIN RAIN WATER.
03-25-cExcavation in foundation of building, bridges
etc complete : in hard soil or soft murumm3 2.86
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 2.15
4
RAISING OF BOUNDARY WALL
UPTO 1 FEET & 2 FEET AS
MENTIONED IN DRAWING.
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 3.10
5CGI SHEET /LEAKAGE OF
WAITING SHED
25-58-bSupply and Fixing of CGI sheets complete in
all respectm2 48.61
Site#11: BHU-4 Padana, Haripur
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#11 Page 46 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
Total Amount (Rs)
Total Cost - Site#11 Page 47 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 WHITE WASH COMPLETE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 857.15
11-23-b-01 White washing: Old surface : One coat m2 857.15
11-23-b-02 White washing: Old surface : Two coats m2 857.15
2 ROOF TREATMENT OF DOMES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 8.60
14-97 Supply of Polythene sheet of approved quality KG 2.10
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 49.77
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.42
3DOOM ELECTRIFICATION I-E
BOARD & PATTI/PIPE FITTING.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 20.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 8.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 4.00
15-22-b S&E button holder /angle holder Brass Each 16.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 16.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 5.00
4 REPAIRING OF 4 DOORS OF
DOMES.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-04Repairing & re-fixing of steel main gate i/c
hold fast, welding complete in all respectsm2 6.69
5EXTENSION OF CGI SHED UPTO
4'WIDE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-58-b
Providing and fixing of parking shed
consisting of CGI Sheet, tubular pipe frame
(heavy) quality and circular columns
excluding cost of foundation.
m2 11.52
Site#12: BHU Deendah MCH, Haripur
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#12 Page 48 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#12 Page 49 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 WHITE WASH COMPLETE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 732.22
11-23-b-01 White washing: Old surface : One coat m2 732.22
11-23-b-02 White washing: Old surface : Two coats m2 732.22
2 ROOF TREATMENT OF DOMES
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 17.19
14-97 Supply of Polythene sheet of approved quality KG 4.20
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 49.77
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.75
3 ROOF TREATMENT OF TOILETS
3 Supply of Polythene sheet of approved quality KG 1.16
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 4.76
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.37
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.44
4 REPAIR OF MAIN GATE
27-77Removing old paint from woodwork/steel with
paint removem2 4.46
27-04Repairing & re-fixing of steel main gate i/c
hold fast, welding complete in all respectsm2 4.46
27-123
Painting on old G.I. sheet with synthetic
enamel paint of approved quality of required
colour to give an even shade:
m2 8.92
Total Amount (Rs)
Site#13: BHU-2 MCH, Haripur
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#13 Page 50 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1ROOF TREATMENT OF EXISTING
ROOMS & TOILETS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 25.26
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and
1"mudplaster
m2 103.30
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 5.74
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 7.31
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 6.73
2
NEW PRECAST SLAB/GIRDER
INCLUDING DISMANTLING OF
OLD ROOM'S VERANDAH ROOF
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-24Dismantling roof of wooden planks & battens
from any heightm2 94.80
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30 Meter 21.66
01-01-BCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter31 Meter 21.66
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken
mesh, polythene, mud, tar
m2 111.38
3NEW DOORS/WINDOWS FOR OLD
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 6.69
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 6.69
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 8.46
4VERANDAH COLUMNS (BRICK
MASONRY)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 3.06
Site#14: BHU Ghulam Banda, Kohat
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#14 Page 51 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 0.34
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 0.51
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 0.84
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 2.29
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 1.72
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 22.58
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 22.58
5 SOLAR ELECTRIFICATION
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#14 Page 52 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
6
PCC FLOORING IN FRONT OF
ROOMS (OLD & NEW ) ALSO FROM
GATE PORTION
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 6.97
7BOUNDARY WALL REPAIR I-E
PLASTER, BRICK MASONRY
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-48-b
MRS-2017Removing from walls: Cement or lime plaster m2 181.69
27-116
Repairs to plaster of thickness 1/2" to 3/4" in
cement sand mortar 1:4 patches of area 27 Sft
and under, including cutting the patch in
proper shape, raking out joints and preparing
and plastering the surface of the walls
complete, including disposal
of rubbish to the dumping ground within 30
metres lead.
m2 93.40
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 88.29
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 88.29
8
DISMANTLING & ITS NEW
CONSTRUCTION OF WALL AS
MENTION IN DRAWING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-13Dismantling brick work in lime or cement
mortarm3 7.17
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 34.19
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 3.22
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 8.02
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 12.82
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 12.21
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 53.44
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 53.44
9BARBED WIRE ON BOUNDARY
WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#14 Page 53 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
28-17-b
Providing and Fixing barbed wire fencing with
4 horizontal & 2 cross wires : With PCC 1:4:8
base 12"x12"x21"
M 154.93
10WHITE WASH OF COMPLETE
BUILDING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 1,041.17
11-23-b-01 White washing: Old surface : One coat m2 1,041.17
11-23-b-02 White washing: Old surface : Two coats m2 1,041.17
11 MAIN GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-77Removing old paint from woodwork/steel with
paint removem2 8.68
27-04Repairing & re-fixing of steel main gate i/c
hold fast, welding complete in all respectsm2 6.04
25-58-aSupply and Fixing of CGI sheets on existing
frame complete in all respect.m2 3.07
27-123
Painting on old G.I. sheet with synthetic
enamel paint of approved quality of required
colour to give an even shade:
m2 6.13
12ACCESSIBILITY TO BHU
(CONCRETE ROAD)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
16-04-aGranular Sub Base Course using Pit Run
Gravelm3 47.42
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 23.81
14-144-aSupplying and Fixing UPVC soil waste and
vent pipe class B : 6" diaRFT 14.63
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#14 Page 54 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1DISMANTLING OF EXISTING
TOILETS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-22-a Dismantling 1st class tile roofing m2 6.26
04-12 Dismantling brick work in mud mortar m3 6.99
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30 Meter 6.99
01-01-BCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter31 Meter 6.99
2 ROOF TREATMENT OF 8 DOMES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 24.07
14-97 Supply of Polythene sheet of approved quality KG 5.89
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 56.88
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 1.17
3 White Wash
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 499.75
11-23-b-01 White washing: Old surface : One coat m2 499.75
11-23-b-02 White washing: Old surface : Two coats m2 499.75
4SOLAR ELECTRIFICATION FOR 8
DOMES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 3.00
15-22-b S&E button holder /angle holder Brass Each 16.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 16.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 8.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 8.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 16.00
Site#15: BHU Oblan, Kohat
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#15 Page 55 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x5=780Watt)
watt 1,300.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,300.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,300.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 8.00
NSI Lead Acid Battery 12 Volt 150AH Each 2.00
NSI Solar Charge Controller Each 2.00
5PCC FLOORING AND PLINTH
PROTECTION OF DOMES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-19-c Dismantling : Plain Cement Concrete 1:2:4 m3 3.53
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 9.66
6DRAINS UNDERGROUND & PIPE
OUTSIDE GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 1.60
03-67-cStructural backfill using common material
available at sitem3 1.60
23-01-c
Providing and laying R.C.C. pipe, moulded
with cement concrete 1:1-1/2:3, with spigot,
socket or collar joint, etc. including cost of
reinforcement,conforming to B.S. 5911: Part-
I, 1981 Class "L"including carriage, lowering
in trenches to correct alignment and grade,
jointing, cutting pipe where necessary,
finishing and testing, etc. complete:- 9"
dia:
M 25.30
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.08
14-31-b
Providing and Fixing cast iron (CI) floor trap
approved quality including CI grating &
concrete chamber all round : 4"x3" (100 mm x
75 mm)
Each 4.00
14-37-a
Supply and Fixing cast iron (CI) Floor trap
cover with frame etc (Heavy Type) of
approved quality complete: 12" (300 mm) dia
Each 4.00
7 DOORS/WINDOWS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#15 Page 56 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 17.96
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 17.96
8MAIN GATE AND TWO DOMES
DOORS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-77Removing old paint from woodwork/steel with
paint removem2 5.02
27-04Repairing & re-fixing of steel main gate i/c
hold fast, welding complete in all respectsm2 8.02
27-123
Painting on old G.I. sheet with synthetic
enamel paint of approved quality of required
colour to give an even shade:
m2 5.02
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#15 Page 57 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1ROOF TREATMENT OF EXISTING
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 32.95
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 134.76
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 1.63
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 3.66
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 1.91
2SOLAR ELECTRIFICATION OF 3
FANS 3 LIGHTS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 6.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 6.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 3.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 3.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x2=520Watt)
watt 520.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 520.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 520.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 3.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
Site#16: BHU Ghamkol-2, Kohat
Total Amount (Rs)
Total Cost - Site#16 Page 58 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
3WHITE WASH OF COMPLETE
BUILDING.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 546.04
11-23-a-03 White washing: New surface : Three coats m2 546.04
4 PCC FLOORING IN FRONT OF
VERANDAH
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 3.05
5 DOORS/WINDOWS PAINTING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 19.33
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 19.33
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#16 Page 59 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1DISMANTLING OF MUD
BOUNDARY WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-12 Dismantling brick work in mud mortar m3 5.52
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30M 5.52
01-01-bCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter30M 5.52
2
CONSTRUCTION OF NEW
BOUNDARY WALL ONE SIDE TILL
MAIN GATE.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 7.36
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 1.21
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 4.53
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 4.72
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 9.66
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 84.57
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 84.57
3SOLAR ELECTRIFICATION - 6
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
Site#17: FPHC Zangal Pataiy MCH, Mardan
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#17 Page 60 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
4INTERNAL SIDE
(DOMES)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-b
Scraping : Ordinary distemper, oil bound
distemper or paint off wall M2 291.87
11-21-b-01 Distempering Old surface : One coat m2 291.87
11-21-b-02 Distempering Old surface : Two coats m2 291.87
5EXTERNAL SIDE
(COMPLETE BUILDING)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 99.54
11-23-b-01 White washing: Old surface : One coat m2 99.54
11-23-b-02 White washing: Old surface : Two coats m2 99.54
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#17 Page 61 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 UNDERGROUND WATER TANK
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
Already taken with Wash hand facility.
2
RAISING OF BOUNDARY WALL
UPTO 2 FEET AND COLUMNS AT
EVERY 10'
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 2.51
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 39.35
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 39.35
3WHITE WASH OF BOUNDARY
WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 193.25
11-23-b-01 White washing: old surface : Ist coat #N/A 193.25
11-23-b-01 White washing: old surface : 2nd coats #N/A 193.25
4
ROOF TREATMENT DOOM (THREE
PATCHES FOR PHARMACY ROOM
(ROOF LEAKAGE.)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 5.16
14-97 Supply of Polythene sheet of approved quality KG 1.26
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 9.48
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.25
5REPLACING WINDOWS GLASSES
IN OPD ROOM AND RECEPTION.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
NSISupplying and installation of 5mm glass in
existing windowsm2 2.97
Total Amount (Rs)
Site#18: FPHC Barakai MCH, Mardan
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#18 Page 62 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1DISMANTLING OF EXISTING
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-24Dismantling roof of wooden planks & battens
from any heightm2 113.75
04-12 Dismantling brick work in mud mortar m3 41.63
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30M 67.62
01-01-bCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter30M 67.62
2CONSTRUCTION OF THREE
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-07-a-03RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 0.32
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
tonne 0.07
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 30.55
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 235.71
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 70.61
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 70.61
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 10.59
(13-25-a)+(13-25-
b)
Preparing surface & painting with snowcem /
weathershield paint :1st, 2nd & subsequent
coats
m2 70.61
13-22-aPreparing surface and painting with emulsion
paint : First coatm2 294.33
13-22-bPreparing surface and painting with emulsion
paint : 2nd & each subsequent coat.m2 294.33
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 4.46
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 4.46
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 6.83
10-15-dProvide & lay topping of concrete 1:2:4, including
surface finishing & dividing in panels : 2" thickm2 94.24
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,
polythene, mud, tar
m2 104.83
Site#19: BHU Taimergarah, Taimergarah
Total Amount (Rs)
Total Cost - Site#19 Page 63 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 10.06
3 FOUR NEW MANHOLES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-07-d-05
Providing manhole size 24" x 18" (inside
dimensions) as per approved design and
specifications complete for 4" to 12" dia pipes upto
4 ft. (1.2 m) depth with 16" dia.Concrete Cover
fixed in 4" thick RCC 1:2:4 slab (with 5 lbs per
Cu.ft. or 80 kg/Cu.m of steel), burnt brick masonry
walls 9" (225 mm) thick set in 1:3 cement sand
mortar, 6" thick 1:3:6 cement concrete in
foundation, 4" av. thickness 1:2:4 cement concrete
in benching and 1/2" (13mm) thick cement sand
plaster in 1:3 to all inside wall surfaces, channels
and benching including making requisite number of
main and branch channels but excluding the cost of
excavation, back filling and disposal of excavated
stuff.
Each 4.00
14-37-c
Supply and Fixing cast iron (CI) manhole
cover with frame etc (Heavey Type) of
approved quality complete: 24" (610 mm) dia
Each 4.00
4 Drain
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 0.82
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 0.64
06-07-a-03 RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 2.21
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
Ton 0.20
5SOLAR ELECTRIFICATION NEW
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 20.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 2.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 1.00
15-22-b S&E button holder /angle holder Brass Each 10.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 10.00
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#19 Page 64 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 3.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 3.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x2=520Watt)
watt 520.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 520.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 520.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 3.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
6New Boundary wall for damaged
portion.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 3.49
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 7.43
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 32.53
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 32.53
7WHITE WASH OF COMPLETE
BUILDING
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 409.12
11-23-b-01 White washing: Old surface : One coat m2 409.12
11-23-b-02 White washing: Old surface : Two coats m2 409.12
8 ROOF TREATMENT
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 5.16
14-97 Supply of Polythene sheet of approved quality KG 1.26
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 35.54
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#19 Page 65 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.25
9 PCC TRACK FROM MAIN GATE.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 7.20
10 MAIN GATE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
27-77Removing old paint from woodwork/steel with
paint removem2 4.46
27-123
Painting on old G.I. sheet with synthetic
enamel paint of approved quality of required
colour to give an even shade:
m2 4.46
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#19 Page 66 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1DISMANTLING OF MUD
BOUNDARY WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-12 Dismantling brick work in mud mortar m3 16.65
01-01-aCarriage of 100 cft / 5 tonne of all materials by
truck or other means 1st 30 meter30M 16.65
01-01-bCarriage of 100 cft / 5 tonne of all materials by
truck or other means 2nd 30 meter30M 16.65
2CONSTRUCTION OF NEW
BOUNDARY WALL
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 11.10
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 2.77
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 6.83
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 7.12
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 12.49
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 109.29
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 109.29
3
PROVIDING CHAIN LINK FENCE
WITH CIRCULAR PIPE HAVING
HEIGHT OF 6 FT.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
NSI
Providing and fixing chain link fence
including 3" GI Pipe (cutting , fixing, welding)
at 10 feet c/c distance and fence complete in
all respect also includes excavation and pcc
1:2:4 in foundation.
SFT 660.00
4
CLEANING OF OLD PLASTER AND
APPLYING NEW PLASTER TO THE
ROOF OF DOMES.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-48-b Removing from walls: Cement or lime plaster m2 86.79
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 86.79
5 PCC TRACK FROM MAIN GATE.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
Total Amount (Rs)
Site#20: BHU Toor Camp Munda, Taimergarah
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#20 Page 67 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 13.85
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 10.97
6SOLAR ELECTRIFICATION 6FANS
6 LIGHTS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
7 Drain
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 3.53
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 2.20
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#20 Page 68 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
8FILLING FOR THE SAKE OF
LEVELLING GROUND.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
07-30Supplying and filling sand under floor or
plugging in wellsm3 3.11
9
RECONSTRUCTION OF THE
COLUMNS OF MAIN GATE AND
PAINTING THE EXISTING GATE.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 0.45
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 0.07
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 1.01
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.42
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 3.72
27-77Removing old paint from woodwork/steel with
paint removem2 6.69
27-123
Painting on old G.I. sheet with synthetic
enamel paint of approved quality of required
colour to give an even shade:
m2 6.69
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#20 Page 69 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1DISMANTLING OF EXISTING
ROOF
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-22-aDismantling of existing precast slab/girder
roof m2 319.70
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,
polythene, mud, tar
m2 319.70
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 14.63
2
REMOVAL AND
RECONSTRUCTION OF COMPLETE
WALL.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-13Dismantling brick work in lime or cement
mortarm3 8.03
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 3.76
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 7.07
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 35.13
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 35.13
15-67
Making hole in wall with necessary masonry
work for exhaust fan any
size complete
each 3.00
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 2.23
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 2.23
3 ELECTRIFICATION
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 50.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 10.00
15-22-b S&E button holder /angle holder Brass Each 20.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 20.00
15-68-c
S&E best quality AC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 2.00
Site#21: BHU Chakdara, Chakdara
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#21 Page 70 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 2.00
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 5.00
4
Dismantling of existing floor and laying
of PCC floor of verandah of female
section
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-19-c Dismantling : Plain Cement Concrete 1:2:4 m3 3.19
10-15-dProvide & lay topping of concrete 1:2:4, including
surface finishing & dividing in panels : 2" thickm2 4.98
5SAFETY GRILL FOR BACKSIDE
VERANDAH
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 17.98
6REPLACEMENT OF GLASSES IN
EXISTING WINDOWS.
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
NSISupplying and installation of 5mm glass in
existing windowsm2 17.84
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#21 Page 71 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
1
ROOF TREATMENT OF EXISTING
TOILET WILL BECOME FEMAL
TOILET
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
14-97 Supply of Polythene sheet of approved quality KG 1.45
09-11-b
Earth filling over roof including watering,
ramming etc 4" thick earth filling and 1" mud
plaster
m2 5.95
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.29
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 3.05
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.34
2ROOF TREATMENT OF DOMES (5
Nos)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 13.75
14-97 Supply of Polythene sheet of approved quality KG 3.36
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 35.55
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.67
3SOLAR ELECTRIFICATION - 6
ROOMS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
15-02-b-03S&E PVC pipe for wiring purpose complete
Recessed in walls incl.chase elc; 1" i/dRft 30.00
15-09-a
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
4"X 4"
Each 6.00
15-09-c
S&E MS sheet box of 16 SWG. 4 ;deep with
3/16" thick bakelite sheet top etc complete;
9"X 4"
Each 2.00
15-22-b S&E button holder /angle holder Brass Each 12.00
15-50
Wiring of light/ Fan/ Call bell point in
3/0.029" PVC insulated bare cable in PVC
pipe recesssed
Each 12.00
15-68-c
S&E best quality AC/DC ceiling fan complete
with GI. rod, canopy, blades & regulator: 56"
sweep
Each 6.00
15-25Supply and Erection girder clamp hook, 5/8"
dia.for hanging ceiling fansEach 6.00
Site#22: PDH BHU Pusha Pul Dik, DI Khan
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#22 Page 72 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
15-71-cSupply and Erection single phase imported
auto circuit breaker 20 Amp.Each 6.00
26-01-d-01
Supply and Erection of Solar PV Module
(Solar Panel) Mono-crystalline A-Grade (per
Watt) (As per Approved
Specifications)(260x4=1040Watt)
watt 1,040.00
26-01-n-03Supply and Erection of Stainless Steel Nuts
and Boltswatt 1,040.00
26-01-m-01
Supply and Erection of hot dipped (80
microns Average) galvanized steel of
minimum thickness of 12 SWG / 2.64 mm
Channel / Pipe or 8 SWG / 4.06 mm Angle
Per Watt 1,040.00
NSISupply and Fixing LED light Bulb Fixture
(12 watts)Each 6.00
NSI Lead Acid Battery 12 Volt 150AH Each 1.00
NSI Solar Charge Controller Each 1.00
4CONSTRUCTION OF ONE ROOM
WITH VERANDAH
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 28.26
03-67-cStructural backfill using common material
available at sitem3 17.97
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 7.44
06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4)
For Pilnth Protection
m3 6.18
06-07-a-03RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 0.16
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
tonne 0.03
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 25.19
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 15.15
07-30Supplying and filling sand under floor or
plugging in wellsm3 30.68
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 86.08
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 77.52
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 77.52
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 9.62
(13-25-a)+(13-25-
b)
Preparing surface & painting with snowcem /
weathershield paint :1st, 2nd & subsequent
coats
m2 77.52
13-22-aPreparing surface and painting with emulsion
paint : First coatm2 125.14
Total Amount (Rs)
Total Cost - Site#22 Page 73 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
13-22-bPreparing surface and painting with emulsion
paint : 2nd & each subsequent coat.m2 125.14
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 2.97
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 2.97
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 2.76
10-15-dProvide & lay topping of concrete 1:2:4, including
surface finishing & dividing in panels : 2" thickm2 39.03
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,
polythene, mud, tar
m2 46.46
15-02-a-08
Supply and Fixing PVC pipe for draining rain
water (from roof) complete On surface
including clamps etc: 4" i/d
m 8.53
5 WAITING SHED 15'X20'
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-58-b
Providing and fixing of parking shed
consisting of CGI Sheet, tubular pipe frame
(heavy) quality and circular columns
excluding cost of foundation.
M2 27.88
6NEW GATE AND PATHWAYS
INNER AND OUTSIDE GATES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
25-45-b
Supplying and Fixing 18 SWG MS Sheet Gate
with angle iron frame (2"x2"x3/16") with side
window, lock, painting etc
m2 5.95
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4)m3 5.69
7 FLOORING OF ALL DOMES
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
10-15-dProvide & lay topping of concrete 1:2:4, including
surface finishing & dividing in panels : 2" thickm2 4.23
REPAIR OF CEMENT PLASTER OF
AFFECTED AREAS AS DISCUSSED AND
NOTED
27-116
Repairs to plaster of thickness 1/2" to 3/4" in
cement sand mortar 1:4 patches of area 27 Sft
and under, including cutting the patch in
proper shape, raking out joints and preparing
and plastering the surface of the walls
complete, including nailing mesh on walls &
disposal
of rubbish to the dumping ground within 30
metres lead.
m2 47.58
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#22 Page 74 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
8 WHITE WASH COMPLETE
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-45-a Scraping : White wash or colour wash m2 456.46
11-23-b-01 White washing: Old surface : One coat m2 456.46
11-23-b-02 White washing: Old surface : Two coats m2 456.46
9 NEW DOORS/WINDOWS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 3.72
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 3.72
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 8.36
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#22 Page 75 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 NEW GATE WITH COLUMNS
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
04-13Dismantling brick work in lime or cement
mortarm3 1.02
25-45-b
Supplying and Fixing 18 SWG MS Sheet
Gate with angle iron frame (2"x2"x3/16")
with side window, lock, painting etc
m2 4.46
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 0.57
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 2.37
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 0.22
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.62
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 6.51
2 NEW DOORS/WINDOWS
12-61
MS flat 1/2"x1/8" grill in windows of
approved design including painting 3 coats,
complete
m2 3.72
25-39-b-05
Providing and Fixing steel windows 18 gauge
with openable glazed panels With 22 SWG
wire gauze : Glass pane 5mm
m2 3.72
25-45-a
Supplying and Fixing 18 SWG MS Sheet
Door with angleiron frame (1.5"x1.5"x1/8"),
bolt, hinges, paint etc complete
m2 8.36
3 DOORS/WINDOWS REPAIR
27-113 Repair of doors/windows complete m2 14.50
13-02-c-01Painting old surfaces : Doors / windows any
type First coatm2 29.00
13-02-c-02Painting old surfaces : Doors / windows any
type Each subsequent coatm2 29.00
4
CONSTRUCTION OF NEW WALL,
NEW BOUNDARY WALL & 2
DOMES WALLS
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 24.30
Site#23: PDH BHU Gambela, Lakki Marwat
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#23 Page 76 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
06-05-iPlain Cement Concrete incl. Placing,
compacting, finishing & curing (Ratio 1:4:8)m3 3.21
06-26-b-02
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene & 2
coats bitumen (2" thick
m2 9.57
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 10.94
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 20.41
11-18-bCement pointing struck joints, on walls, upto
20' height :Ratio 1:3m2 93.55
11-29Extra cost of labour & material for red oxide
pigment in cement pointing to match bricksm2 93.55
5ROOF TREATMENT OF DOMES &
RELOCATION OF DOME DOOR
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft
per % sft
m2 48.14
14-97 Supply of Polythene sheet of approved quality KG 11.77
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 78.21
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 2.35
04-22-a Dismantling 1st class tile roofing m2 17.36
09-46
Providing and Laying Prestressed Roof of
Slab/Girder, 2" thick PCC 1:2:4 with chicken
mesh, polythene, mud, tar
m2 17.36
RELOCATION OF DOOM DOOR
04-13Dismantling brick work in lime or cement
mortarm3 0.35
07-05-a-041st class brick work in ground floor Cement,
sand mortar 1:5m3 0.35
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 3.90
6 WHITE WASH COMPLETE
04-45-a Scraping : White wash or colour wash m2 904.52
11-23-b-01 White washing: Old surface : One coat m2 904.52
11-23-b-02 White washing: Old surface : Two coats m2 904.52
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#23 Page 77 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
7
REPAIR OF CEMENT PLASTER OF
AFFECTED AREAS AS DISCUSSED
AND NOTED
27-116
Repairs to plaster of thickness 1/2" to 3/4" in
cement sand mortar 1:4 patches of area 27 Sft
and under, including cutting the patch in
proper shape, raking out joints and preparing
and plastering the surface of the walls
complete, including nailing mesh on walls &
disposal
of rubbish to the dumping ground within 30
metres lead.
m2 14.87
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#23 Page 78 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
1 ROOF TREATMENT (DOMES)
S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT
09-13
2 coats of bitumen laid hot using 34 lbs. for
%sft over roof & blinded with sand at 1 cft per
% sft
m2 15.47
14-97 Supply of Polythene sheet of approved quality KG 3.78
11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 42.66
06-05-fPlain Cement Concrete including placing,
compacting, finishing & curing (Ratio 1:2:4) m3 0.75
2PROPERLY RE-FIX OF CGI SHEET
OF VERANDAH
25-58-a
Providing and fixing of existing CGI Sheet,
tubular pipe frame (heavy) quality and circular
columns excluding cost of foundation.
m2 15.06
3EXTERNAL SIDE DRAIN TO
PROTECT SEEPAGE DURING RAIN
03-25-bExcavation in foundation of building. bridges
etc complete : In ordinary soilm3 67.96
06-05-fPlain Cement Concrete including placing,
compacting finishing & curing (Ratio 1:2:4)m3 11.33
07-04-a-041st class brick work in foundation and plinth
in Cement, sand mortar 1:5m3 31.86
11-09-c Cement plaster 1:4 upto 20' height:
3/4" thickm2 134.91
06-07-a-03 RCC in roof slab, beam, column & other
structural members, insitu or precast. (1:2:4)m3 0.57
06-08-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed bars
Grade 40)
Ton 0.05
06-47-d
Erection and removal of Form work with
M.S.Pipe Scaffolding & Plywood Sheet for
RCC or Plain Concrete (Vertical)
m2 92.91
4
PROVIDING, LAYING AND
COMPACTING SHINGLE IN FRONT
OF MAIN GATE UPTO LENGTH 115
FT.
16-04-aGranular Sub Base Course using Pit Run
Gravelm3 16.99
Total Amount (Rs)
Site#24: FPHC MCH, Khaki
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Amount (Rs)
Total Cost - Site#24 Page 79 of 90
ANNEX C - Financial Offer Form SC/RFP/20/028
S.NO DESCRIPTION AMOUNT (RS)
1 Construction of one room (20'x15' )size having verandah
2 SOLAR ELECTRIFICATION
3 Two new toilets
4 Solar bore upto 150 ft depth with a discharge of 1 inch
5
Construction of new boundary wall on backside and a portion of front
boundary wall.
6 Repair of main gate.
S.NO DESCRIPTION AMOUNT (RS)
MALE SECTION
1 Waiting shed leakage
2
Providing and laying shingle for lawn to provide slope (to drain off rain
water)
3 Solararization for 2 rooms
FEMALE SECTION
1 ROOF TREATMENT (DOMES)
2
BRICK MASONRY
(RELOCATION OF DOOR)
3 NEW DRAIN & PCC FLOORING IN FRONT OF EXISTING TOILETS
4
SOLAR ELECTRIFICATION FOR 4 ROOMS i-e 4 FANS AND 4
LIGHTS
5 2 EXHAUST FANS
6 WHITE WASH OF FEMALE STAFF HOUSE
Site#1: RVA Office Khurasan, Peshawar
Site#2: BHU Akora, Peshawar
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 80 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
7 Generator shed
S.NO DESCRIPTION AMOUNT (RS)
1 Flooring of 3 rooms & verandah PCC Track
2 Internal rooms cement plaster upto sill level (4ft) with nailing
3
Providing and laying one wall of verandah to make it community
hall/waiting area including doors and windows of same size as already of
rooms.
4 Windows repair and painting complete in all respect
5 Solarization for 05 rooms
6 Chowkidar rooms window repair,wooden battens
7 Roof treatment
8 white washing
S.NO DESCRIPTION AMOUNT (RS)
1 ROOF TREATMENTS (GF)
2 NEW DOORS/WINDOWS
3 EXTERNAL DOOR REPAIR NEAR WATER TANK
4 SOLAR ELECTRIFICATION 6 FANS 6 LIGHTS
5 REPAIR OF STAIR SLAB
6 REFIXING OF DOOR AT GF
7 ELECTRIFICATION
Site#3: PDH Turkaman MCH, Peshawar
Site#4: FPHC Zandai MCH, Peshawar
TOTAL AMOUNT (RS)
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 81 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
8 PLASTERING OF SHED (FF)
9 WHITE WASH OF COMPLETE BUILDING
10 PROVISION OF PRECAST SLAB/GIRDER FOR 1 ROOM (FF).
S.NO DESCRIPTION AMOUNT (RS)
1 Roof treatment of Main building and toliets/store
2 Internal rooms Cement plaster upto sill level (4 feet) with nailing.
3 white washing of complete building
4 Mud Leaping on Back Side wall mentioned in (8).
5 20 Number lights including verandah
S.NO DESCRIPTION AMOUNT (RS)
1
VERANDAH & WASHROOM COMPLETE SLAB REMOVING AND
REPLACE WITH PRECAST SLAB /GIRDERS
2 ROOF TREATMENT OF KITCHEN & STORE
3 WHITE WASH COMPLETE
4 ROOF TREATMENT OF DOMES
5 SOLAR ELECTRIFICATION FOR 6 ROOMS
S.NO DESCRIPTION AMOUNT (RS)
Site#7: PDH Badabair MCH, Peshawar
Site#6: FPHC Baghban MCH, Peshawar
TOTAL AMOUNT (RS)
Site#5: PDH Khurasan MCH, Peshawar
TOTAL AMOUNT (RS)
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 82 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
1
PCC FLOORING IN VERANDAH & ALSO PCC 4" THICK IN
COURTYARD INFRONT OF MAIN GATE
2
ROOF TREATMENTS
(TWO ROOMS AND VERANDAH AS SHOWN IN DRAWINGS)
3
DOORS REPAIRS AND PAINTING & WINDOW REPAIR IN MCH
CLINIC
4 WHITE WASH OF COMPLETE BUILDING
5 SOLAR ELECTRIFICATION 6 FANS 6 LIGHTS
6 Wall mud leaping except medical officer room and MCH Clinic.
7 DRAINS
S.NO DESCRIPTION AMOUNT (RS)
1
REFURNISHING HALL INTO OFFICE SEPARATED BY PARTITION
WALL WITH DOOR , SHOULD CONTAINS VENTILATORS &
WINDOWS OF SIZE MORE THAN STANDARD SIZE , ALSO STAFF
2 SOLAR ELECTRIFICATION OF NEW PROPOSED HALL
3 SOLAR WATER PUMP
4 (i)
DISMANTLING THREE EXISTING TOILETS , 2 NEW TOILETS (1
SIMPLE TOILET + 1 FURNISHED TOILET FOR UNHCR STAFF).
4 (ii)
2 NEW TOILETS (1 SIMPLE TOILET + 1 FURNISHED TOILET FOR
UNHCR STAFF).
5
CONCRETE PATCHING FROM GATE (INNER SIDES). PATHWAYS
LEADING TO NEW FURNISHED PROPOSED OFFICE.
6 ROOF TREATMENT OF EXISTING ROOMS
7 NEW GATE FOR RVA OFFICE.
8 WHITE WASHING OF DOMES & BUILDING
9 NOTED PARKING PLACE CONCRETE INCLUDING FILLING.
10 NEW EASTERN BOUNDARY WALL .
11 EXISTING DOORS/WINDOWS PAINT.
Site#8: RVA Office Panian, Haripur
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 83 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
12
OPEN DRAINS NEAR EXISTING HAND PUMP &UNDERGROUND
DRAINLINE FOR DRAINING WATER OUT.
13
PROPOSING NEW SHED (15'X25') HAVING PRECAST SLAB/GIRDER
ROOF & PILLARS FOR TRAINING
14 APRON SHAPE (CONCRETE PATCH) OUTSIDE GATE
15 TWO NEW TOILETS (SIMPLE)
S.NO DESCRIPTION AMOUNT (RS)
1 ROOF TREATMENT
2 WATER PUMP 2 HP
3 WHITE WASH OF BUILDING COMPLETE
4
CONSTRUCTION OF NEW BOUNDARY WALL OF 4.5" HAVING
9"X9" COLUMNS AT EVERY 10FT SEPARATING COMMUNITY
CENTER FROM SCHOOL.
5
REMOVING,CLEANING, CUTTING OF TREES FOR PATHWAYS &
CLEANING OF AREAS.
6
ELECTRIFICATION i-e FANS, LIGHTS 4 FOR CLASSROOMS AND 2
FOR VERANDAH (AC)
7
WALK WAYS FOR TOILETS FROM ENTRANCE GATE AND
CLASSROOMS
8
REPAIR OF CEMENT PLASTER OF AFFECTED AREAS AS
DISCUSSED AND NOTED
9 NEW GATE
10 2 NEW WASHROOMS
S.NO DESCRIPTION AMOUNT (RS)
1 FLOORING OF DOOM 10 MUD
2 DISMANTLING OF MUD BOUNDARY WALL
TOTAL AMOUNT (RS)
Site#9: Community Centre Panian, Haripur
TOTAL AMOUNT (RS)
Site#10: FPHC Basoomera MCH, Haripur
Summary of Total Cost - All 24 Sites Page 84 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
3 CONSTRUCTION OF NEW BOUNDARY WALL
4 ROOF TREATMENT OF DISPENSARY
5 ELECTRIFICATION FOR DOMES
6
EXAHAST FAN & 4 NUMBER GLASSES OF WINDOW &
VENTILATOR & water filter
S.NO DESCRIPTION AMOUNT (RS)
1 ROOF TREATMENT OF EPI ROOM
2
ROOF TREATMENT OF DOME
(Adjacent to EPI ROOM)
3
CUTTING OF EXISTING PCC DRAIN & TO PROVIDE PROPER
SLOPE TO DRAIN RAIN WATER.
4
RAISING OF BOUNDARY WALL UPTO 1 FEET & 2 FEET AS
MENTIONED IN DRAWING.
5 CGI SHEET /LEAKAGE OF WAITING SHED
S.NO DESCRIPTION AMOUNT (RS)
1 WHITE WASH COMPLETE
2 ROOF TREATMENT OF DOMES
3 DOOM ELECTRIFICATION I-E BOARD & PATTI/PIPE FITTING.
4 REPAIRING OF 4 DOORS OF DOMES.
5 EXTENSION OF CGI SHED UPTO 4'WIDE
Site#12: BHU Deendah MCH, Haripur
TOTAL AMOUNT (RS)
Site#11: BHU-4 Padana, Haripur
TOTAL AMOUNT (RS)
TOTAL AMOUNT (RS)
Site#13: BHU-2 MCH, Haripur
Summary of Total Cost - All 24 Sites Page 85 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
S.NO DESCRIPTION AMOUNT (RS)
1 WHITE WASH COMPLETE
2 ROOF TREATMENT OF DOMES
3 ROOF TREATMENT OF TOILETS
4 REPAIR OF MAIN GATE
S.NO DESCRIPTION AMOUNT (RS)
1 ROOF TREATMENT OF EXISTING ROOMS & TOILETS
2
NEW PRECAST SLAB/GIRDER INCLUDING DISMANTLING OF
OLD ROOM'S VERANDAH ROOF
3 NEW DOORS/WINDOWS FOR OLD ROOMS
4 VERANDAH COLUMNS (BRICK MASONRY)
5 SOLAR ELECTRIFICATION
6
PCC FLOORING IN FRONT OF ROOMS (OLD & NEW ) ALSO FROM
GATE PORTION
7 BOUNDARY WALL REPAIR I-E PLASTERING, POINTING
8
DISMANTLING & ITS NEW CONSTRUCTION OF WALL AS
MENTION IN DRAWING
9 BARBED WIRE ON BOUNDARY WALL
10 WHITE WASH OF COMPLETE BUILDING
11 MAIN GATE
12 ACCESSIBILITY TO BHU (CONCRETE ROAD)
Site#15: BHU Oblan, Kohat
Site#14: BHU Ghulam Banda, Kohat
TOTAL AMOUNT (RS)
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 86 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
S.NO DESCRIPTION AMOUNT (RS)
1 DISMANTLING OF EXISTING TOILETS
2 ROOF TREATMENT OF 8 DOMES
3 White Wash
4 SOLAR ELECTRIFICATION FOR 8 DOMES
5 PCC FLOORING AND PLINTH PROTECTION OF DOMES
6 DRAINS UNDERGROUND & PIPE OUTSIDE GATE
7 DOORS/WINDOWS
8 MAIN GATE AND TWO DOMES DOORS
S.NO DESCRIPTION AMOUNT (RS)
1 ROOF TREATMENT OF EXISTING ROOMS
2 SOLAR ELECTRIFICATION OF 3 FANS 3 LIGHTS
3 WHITE WASH OF COMPLETE BUILDING.
4 PCC FLOORING IN FRONT OF VERANDAH
5 DOORS/WINDOWS PAINTING
S.NO DESCRIPTION AMOUNT (RS)
1 DISMANTLING OF MUD BOUNDARY WALL
2
CONSTRUCTION OF NEW BOUNDARY WALL ONE SIDE TILL
MAIN GATE.
TOTAL AMOUNT (RS)
Site#17: FPHC Zangal Pataiy MCH, Mardan
Site#16: BHU Ghamkol-2, Kohat
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 87 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
3 SOLAR ELECTRIFICATION FOR 6 ROOMS
4
INTERNAL SIDE
(DOMES)
5
EXTERNAL SIDE
(COMPLETE BUILDING)
Site#18: FPHC Barakai MCH, Mardan
S.NO DESCRIPTION AMOUNT (RS)
1 UNDERGROUND WATER TANK Already taken with Wash
hand facility.
2
RAISING OF BOUNDARY WALL UPTO 2 FEET AND COLUMNS AT
EVERY 10'
3 WHITE WASH OF BOUNDARY WALL
4
ROOF TREATMENT DOOM (THREE PATCHES FOR PHARMACY
ROOM (ROOF LEAKAGE.)
5 REPLACING WINDOWS GLASSES IN OPD ROOM AND RECEPTION.
S.NO DESCRIPTION AMOUNT (RS)
1 DISMANTLING OF EXISTING ROOMS
2 CONSTRUCTION OF THREE ROOMS
3 FOUR NEW MANHOLES
4 Drain
5 SOLAR ELECTRIFICATION NEW ROOMS
6 New Boundary wall for damaged portion.
7 WHITE WASH OF COMPLETE BUILDING
8 ROOF TREATMENT
Site#19: BHU Taimergarah, Taimergarah
TOTAL AMOUNT (RS)
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 88 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
9 PCC TRACK FROM MAIN GATE.
10 MAIN GATE
TOTAL AMOUNT (RS)
S.NO DESCRIPTION AMOUNT (RS)
1 DISMANTLING OF MUD BOUNDARY WALL
2 CONSTRUCTION OF NEW BOUNDARY WALL
3
PROVIDING CHAIN LINK FENCE WITH CIRCULAR PIPE HAVING
HEIGHT OF 6 FT.
4
CLEANING OF OLD PLASTER AND APPLYING NEW PLASTER TO
THE ROOF OF DOMES.
5 PCC TRACK FROM MAIN GATE.
6 SOLAR ELECTRIFICATION 6FANS 6 LIGHTS
7 Drain
8 FILLING FOR THE SAKE OF LEVELLING GROUND.
9
RECONSTRUCTION OF THE COLUMNS OF MAIN GATE AND
PAINTING THE EXISTING GATE.
S.NO DESCRIPTION AMOUNT (RS)
1 DISMANTLING OF EXISTING ROOF
2
REMOVAL AND RECONSTRUCTION OF COMPLETE WALL.
3 ELECTRIFICATION
4
Dismantling of existing floor and laying of PCC floor of verandah of
female section
5 SAFETY GRILL FOR BACKSIDE VERANDAH
Site#20: BHU Toor Camp Munda, Taimergarah
Site#21: BHU Chakdara, Chakdara
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 89 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
6 REPLACEMENT OF GLASSES IN EXISTING WINDOWS.
S.NO DESCRIPTION AMOUNT (RS)
1
ROOF TREATMENT OF EXISTING TOILET WILL BECOME FEMAL
TOILET
2 ROOF TREATMENT OF DOMES (5 Nos)
3 SOLAR ELECTRIFICATION FOR 6 ROOMS
4 CONSTRUCTION OF ONE ROOM WITH VERANDAH
5 WAITING SHED 15'X20'
6 NEW GATE AND PATHWAYS INNER AND OUTSIDE GATES
7 FLOORING OF ALL DOMES
8 WHITE WASH COMPLETE
9 NEW DOORS/WINDOWS
S.NO DESCRIPTION AMOUNT (RS)
1 NEW GATE WITH COLUMNS
2 NEW DOORS/WINDOWS
3 DOORS/WINDOWS REPAIR
4
CONSTRUCTION OF NEW WALL, NEW BOUNDARY WALL & 2
DOMES WALLS
5 ROOF TREATMENT OF DOMES
6 WHITE WASH COMPLETE
Site#23: PDH BHU Gambela, Lakki Marwat
TOTAL AMOUNT (RS)
Site#22: PDH BHU Pusha Pul Dik, DI Khan
TOTAL AMOUNT (RS)
Summary of Total Cost - All 24 Sites Page 90 of 91
ANNEX C - Financial Offer Form SC/RFP/20/028
7
REPAIR OF CEMENT PLASTER OF AFFECTED AREAS AS
DISCUSSED AND NOTED
S.NO DESCRIPTION AMOUNT (RS)
1
ROOF TREATMENT (DOMES)
2
Properly Re-fix of CGI sheet of verandah
3
External side drain to protect seepage during rain
4
Providing, laying and compacting Shingle in front of main Gate upto length
115 ft.
YES NO
YES NO
Delivery/Completion time: ____ Days
Name: ____________________________________________________
Date: _____________________________________________________
Signature: _________________________________________________
Designation: _______________________________________________
TOTAL AMOUNT (RS)
Site#24: FPHC MCH, Khaki
TOTAL AMOUNT (RS)
GRAND TOTAL AMOUNT (RS)
Payment terms: Acceptance of UN payment terms (i.e. 30 days net from receipt of
documents)
Bid Validity: 180 Days
Summary of Total Cost - All 24 Sites Page 91 of 91