Pre-Engineered
CIVILAND STEELWORKS FOR COMPLETE METAL BUILDING SOLUTIONS
PEB ENGINEERING & CONSTRUCTIONS.
An ISO 9001 - 2008 Company
TM
GROUP SURYA
Steel Building
Corporate OfficeJai Ganesh Vision Complex, ‘B’ Wing, 2nd Floor, office no.: 264, 265, 266, Akurdi,
Pune-411 035.Maharashtra-India. Factory Address
Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038.Mail-Id:- yogesh.wake@groupsurya.in, groupsuryapeb@groupsurya.in
Website:- www.groupsurya.inContact’s No. +91 7507778565 /7507778559
What is PEB ?TM
Pre-Engineered Buildings (PEBs) Conventional Steel Buildings
Design
Quick and efficient; since PEBs are mainly formed of
standard sections and connections, design time is
significantly reduced. Basic designs are used ove and
over.
Slow: Each conventional steel structure is
designed from scratch by the Consultant, with
fewer design aids available to the Engineer.
Delivery Average 6 to 8 weeks. Average 20 to 26 weeks.
Foundations Simple design, easy to construct and light weight. Extensive, heavy foundations required.
Erection Cost & Time
Both costs & time of erection are minimized.
Typically, they are 20% more expensive than
PEB. In most of the cases, the erection costs
and time are not estimated accurately.
The erection process is easy, fast, step by step and
with hardly any requirement for equipments.
Erection is slow and extensive field labor is
required. Heavy equipment is often needed.
ArchitectureOutstanding architectural design can be achieved at
low cost using standard architectural features and
interface details.
Special architectural design and features must
be developed for each project, which often
require research and thus resulting in much
highter costs.
Future Expansion
PEB Building are designed with future expansion in
mind. It is simple, easy and cost effective. One
supplier can co-ordinate changes.
Future expansion would be more difficult and,
more likely, costlier.
Price Overall price -30% lower Overall price - Higher Price per square meter.
GROUP SURYA PEB BUILDINGS V/S CONVENTIONAL BUILDING
TM
Success Engineers, Bhosari,Industrial Shed in PEB with
civil work (20,000 sq.ft.) (8 month)
Mahindra Logistics, Chakan, Pune Industrial
Shed in PEB with civil work (1,07,000 sq.ft.) 6
month
Mr. Desai, WaghajaiNagar Chakan Industrial
Shed in PEB (10,000 sq.ft.) 3 month
Chavan Industries, WaghjaiNagar, Chakan. Industrial shed with PEB and civil
work.( 34000 sq. ft) 4 months
TM
Arofine
BridgeStone, Near Hyundai, Savardari, Chakan
Rinder India Pvt. Ltd. MIDC Chakan, Pune
Acme Industries Pvt. Ltd. Waghajai Nagar Chakan DTL Ancillaries Pvt. Ltd. MIDC, Chakan
Corporate OfficeJai Ganesh Vision Complex, ‘B’ Wing, 2nd Floor, office no.: 264, 265, 266, Akurdi,
Pune-411 035.Maharashtra-India. Factory Address
Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talawade, Pune-411 038.Mail-Id:- yogesh.wake@groupsurya.in, groupsuryapeb@groupsurya.in
Website:- www.groupsurya.inContact’s No. +91 7507778565 /7507778559