all india council for technical...
Post on 16-Apr-2020
8 Views
Preview:
TRANSCRIPT
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 1 of 24
All India Council for Technical Education (An Autonomous Organization, Under Ministry of HRD, Govt. of India)
Nelson Mandela Marg,Vasant Kunj, New Delhi-110067 Website: https://www.aicte-india.org
APPROVAL PROCESS 2018-19
Application Report Part-1
1. Guidelines on submission of documents along with print copy of application/s for New Institute/University Department (Refer annexure 16)
Ensure that all copies are in A4 size only (Land documents/building drawing may be up to A0 sizes). Also, ensure that all copies are attested.
Refer Documents for Approval Process 18-19 (Annexure 16 & 17) uploaded on AICTE Website.
Please number all copies of documents as given below:
Your Regional office code Your Application Id Annexure Number Sr. No. as in Annexure 16 Page Number (3 digits)
E.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 16,
WRO 1-11234567 16.1 02 001WRO 1-11234567 16.1 02 002
The number so generated WRO1-1123456716.1002001 should be written on top of each page with bold pen as shown below
W R O 1 - 1 1 2 3 4 5 6 7 1 6 . 1 0 0 2 0 0 1Note: Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner. This set of knotted documents should be submitted.
Provide index page on top of set of documents as follows,
Region - WRO Application ID : 1-11234567Annexure No. Sr No.as in Annexure 17 (2 digits)of
documents which are being submitted nowPage No. (3 digits)From To
16.10 02 001 00216.10 03 001 005
2. Guidelines on submission of documents along with print copy of application/s for Approvals of Existing Institutes (Refer annexure 17)• Extension of Approval to the existing Institutions/ Continuation of approval after a break in the preceding Academic Year/ Restoration.• Extended EoA• Increase in Intake/ Additional Course(s)• Addition of Integrated/ Dual Degree Course• To Start Diploma in Degree Pharmacy Institutions and vice-versa• Conversion of Management Institutions running PGDM Course into MBA Course• Conversion of Second Shift Course(s) into First Shift Course(s)• Introduction of Fellowship Programme in Management• Introduction of Supernumerary Seats for Foreign Nationals/ Overseas Citizen of India (OCI)/ Persons of Indian Origin (PIO)/ Children of
Indian Workers in Gulf Countries• Introduction of seats for Non Resident Indian(s)• Change in name of the Course(s)/ Reduction in Intake/ Closure of Programme(s) and/ or Course(s)• Change in name of the Institution or Affiliating University/Board
Please number all copies of documents as given below:Your Regional office code Your Application Id Annexure No. Sr No. as in Annexure 17 Page No. (3 digits)
E.g. consider numbering an affidavit (comprising of 2 pages), which is sr. no. 2 in annexure 16,WRO 1-11234567 17.10 02 001WRO 1-11234567 17.10 02 002
The number so generated WRO1-1123456717.1002001 should be written on top of each page with bold pen as shown belowW R O 1 - 1 1 2 3 4 5 6 7 1 7 . 1 0 0 2 0 0 1Please do not bind or staple, as all pages are going to be scanned. All pages should be knotted on the left hand top corner. This set of knotted documents should be submitted.
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 2 of 24
Provide index page on top of set of documents as follows,Region - WRO Application ID : 1-11234567Annexure No. Sr. No. as in annexure 18 (2 digits)of documents
which are being submitted nowPage No. (3 digits)From To
17.10 02 001 00217.10 03 001 005
Regional Office codesEastern ERO North-West NWR South Central SCR South- West SWRNorthern NRO Central CRO Guwahati Camp Office ERO Southern SROWestern WRO Central Camp office
VadodraCRO South West Camp office SWR
Important Note for Payments:
a) Institutions which do not follow the AICTE guidelines shall be responsible for rejection/ delay in updation of their application and neither AICTE nor the Collecting Bank shall be responsible for any such consequence."
b) No DD / Cheque / PO to be sent to either Head Office / Regional Office of AICTE. Such payments shall not be processed and the applications are liable to be rejected.
Note: Please submit the hard copy of this Report to Regional Officer only if Application status is "Submitted" and Application Substatus is "Payment Received" / "Payment Not Applicable" – IN CASE OF GOVT/GOVT. AIDED/ CENTRAL/STATE UNIVERSITY DEPT
**All the Dates in the Report are in dd/mm/yyyy format.
**NA refers to Not Applicable
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 3 of 24
Permanent Institute Id 1-485740861 Current Application No. 1-3512899064
Application Type Extension-Expansion-Closure AICTE File No. NEWInstitute DetailsName of the Institute/University Department
GOVERNMENT POLYTECHNIC AMBALA CITY
Address of the Institute/University Department
OPPOSITE CIVIL HISPITAL, NEAR ARYA CHOWK,
State/UT Haryana District AMBALAPin 134003 AICTE Region North-WestTown/Village AMBALA CITY STD code 171Land Phone No. 2443222 Email gpambala@hry.nic.inCell No. 1111111111 Alternate Email saini.dv80@gmail.comFAX No. 2566008 Website www.gpambala.ac.inInstitute Type Government Women Only Institute NoType Of Minority Data Not Provided by the Institute Name of the Minority NAMinority Institute No Minority Name, if Linguistic NA PAN NOPANGIVEN Primary Bank Account No. NABank Name STATE BANK OF INDIA IFSC No. SBIN0010057Approval Year of First Course
1958 Date of First Approval by AICTE 23/06/1958
Questionnaire for Existing InstitutesSr. No. Particulars Details Provided by Institute
Question 1(i) Do you wish to apply for "Only Extension of Approval (EOA) for 2018-19"? Yes
Question 2(i) Do you have Autonomous Status (Academic Autonomy) as conferred by the Affiliating University? No(ii) Autonomy Issued Date NA(iii) Autonomy Expiry Date NA(iv) Autonomy Conferred by NA(v) Order of Conferment NA
Question 3(i) Do you have a valid NBA Accreditation?
(Course should be accredited by NBA and Validity of Accredited Courses should be on or after 10th Apr,2018)
No
(ii) No of courses against which valid NBA Accreditation is present 0(iii) Do you wish to apply for University Name Change? No(iv) Whether your Institute is Under Submission Scheme? No(v) At the time of 1st Approval where your Institute was located? Data Not Provided by the Institute
Question 4(i) Do you wish to apply for Conversion from Diploma to Degree or Vice-Versa? No(ii) Do you wish to apply for Merger of Courses? No(iii) Do you wish to apply for Restoration?
(Applicable ONLY to the Institutes where EoA for 2016-17/2017-18 granted with Punitive Action. No Admission issued Institutes need not have to answer this question.)
No
(iv) Do you wish to add New Course at Diploma level under existing UG Pharmacy Program or Vice-Versa?
No
(v) Whether your Institute wishes to apply for Change of Shift from Second to First? No(vi) Whether your Institute wishes to apply for conversion from PGDM to MBA ('MANAGEMENT'
ONLY)?No
(vii) Whether your Institute have the approval from PCI for Pharm.D or/and Pharm.D (Post Batch)? No(viii) Whether your Institution has introduced online Aadhar linked Biometric attendance for regular faculty
members?Yes
(ix) Whether your Institute wishes to apply for Course Name Change? YesQuestionnaire
Sr. No. Particulars Details Provided by Institute(i) Any Unaided Course(In case of Government Aided Institute)? No(ii) Number of teaching faculty approved by University/Government? 89(iii) Are all approved teaching faculty being paid as per VI pay commission? Yes(iv) Are all the teaching faculty, as per AICTE qualification? Yes(v) Do you wish to apply closure of Institute? No(vi) Type of Institute Closure Requested? NA(vii) Percentage Grant/Funds Received from Government? 100(viii) Whether Institute is operating from Permanent Site/Temporary Site? Permanent Site(ix) Whether mandatory disclosure is uploaded in Institute's website? Yes
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 4 of 24
(x) Whether the Institute following ICAI(Institute of Chartered Accountants of India) Accounting Formats?
No
(xi) Fees to be charged, Reservation policy, Admission policy and Document retention policy are duly approved by State Govt?
Yes
(xii) Fees to be charged, Reservation policy, Admission policy and Document retention policy are duly approved by Affiliating Board/University?:
Yes
(xiii) Fees to be charged, Reservation policy, Admission policy and Document retention policy are uploaded in Institute's Website?
Yes
(xiv) Whether List of faculty along with details and other data uploaded/updated on the institute web Portal?
Yes
(xv) Courses/Approved Intake displayed at the entrance of the Institute? Yes(xvi) Is the Cafeteria shared among other Institutes? No(xvii) Is Library and Reading Room shared among other Institutes? No(xviii) Is the Computer Centre shared among other Institutes? No
Application DetailsSr. No. Particulars Details Provided by Institute
(i) Change of Institute Site No(ii) Increase in Intake / Application for New Course No(iii) Closure of Course / Reduction in Intake Yes(iv) PIO/FN/Gulf quota Approval status/OCI No(v) NRI No(vi) Change of Name of the Institute No(vii) Old Name of the Institute NA(viii) New Institute Name NA(ix) Conversion of Women's Institution into Co-Ed Institution No(x) Conversion of Co-ed Institution into Women Institution No(xi) Introducing a Twining Program with an AICTE approved Indian Institution No(xii) Introduction of New/Integrated Course No
Payment Details
Data not Entered by InstituteDetails about Parent Organization(Trust/Company)Name of the Parent organization
HARYANA STATE BOARD OF TECHNICAL EDUCATION
Address TAKNIKI SIKSHA SADAN, SECTOR-4, PANCHKULA
Town/Village PANCHKULA State/UT HaryanaDistrict PANCHKULA Pin Code 134112Website www.techeduhry.nic.in Type of the Organization GovernmentRegistered with TECHNICAL EDUCATION HARYANA Registration Date 07/05/2007
Details about Contact PersonTitle Mr. First Name MUNISH Last Name GUPTAAddress HOD COMPUTER, GOVT. POLYTECHNIC,
AMBALA CITYTown/Village AMBALA CITY
State/UT Haryana District AMBALAPin Code 134003 Designation HOD COMPUTERCell No. 9416279254 Alternate Cell No. Data Not Provided by the Institute Email munish.gupta72@yahoo.in Alternate Email Address gpambala@hry.nic.inSTD Code 171 Land Phone No. 2443222 Fax No. 2443222Land DetailsLocation Urban North Eastern States/Land in
Hilly AreaNo
No. of pieces of Land 2 Max distance in farthest pieces Less than or equal to one Km
Land registered with 24.6
Land Piece Area 1 in acres 11.3
Land ownership details Government Land Land Piece Area 2 in acres 13.3
Total area in acres 24.6 Land Piece Area 3 in acres NALand Registration Date 10/06/1928 Land Use Certificate issued by GOVT.OF HARYANALand Use Certificate date 10/09/1928 Latitude and Longitude Latitude - 30, 22, 41
Longitude - 76, 46, 50Mortgage Details(if any) No Purpose of Mortgage No FSI Data Not Provided by the Institute Build Up Area(Sqm) Data Not Provided by the InstituteOther Land Details
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 5 of 24
Sr. No. 1 Land Registration No. 2Date of Registration 10/06/1928 Area of Land (acres) 11.3
Khasra Number Govt Plot Number, Survey Number, etc
Govt Polytechnic
Land Situated At ambala city Land Registered in the name Of govt of haryanaOwnership or Govt Lease Ownership Land Use Certificate Issued YesLand Use Certificate Issuing Authority
govt of haryana Is the Land Mortgaged No
Details of Land If the Land is Mortgaged
Data Not Provided by the Institute
Land required at the time of First AICTE approval(In Acres)
10
Land available at the time of First AICTE approval(In Acres) 11.3
Sr. No. 2 Land Registration No. 3Date of Registration 16/06/1928 Area of Land (acres) 13.3
Khasra Number govt Plot Number, Survey Number, etc
gpa
Land Situated At ambala city Land Registered in the name Of govt.of haryanaOwnership or Govt Lease Ownership Land Use Certificate Issued YesLand Use Certificate Issuing Authority
govt of haryana Is the Land Mortgaged No
Details of Land If the Land is Mortgaged
Data Not Provided by the Institute
Land required at the time of First AICTE approval(In Acres)
10
Land available at the time of First AICTE approval(In Acres) 13.3
Building DetailsBuilding Status Available Total built up Area(Sqm)
Planned20909
Total built up Area(Sqm) ready
19540 Total Carpet Area(Sqm)-Instructional-ready
7708
Total Carpet Area(Sqm) Administrative-ready
1046 Total Carpet Area (Sqm)-Amenities-ready
13394
Access and Circulation Area (Sqm)
12565 Activities in the building other than courses approved by AICTE
1
Whether Toilet Area is maintained as per NationalBuilding Code (NBC) Norms?
Yes Whether Access and CirculationArea is maintained as per National Building Code (NBC) Norms?
Yes
Funds Position for Building Construction(Rs in Lakhs) Loans: 0 Own Share: 0 Funds allocated: 0Other Building Details
Data not entered by Institute Programme and Courses
Sr. No. 1 Course Unique Id 1-1412802738 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course CIVIL ENGINEERING Shift 1st Shift
FT/PT FULL TIME Started In 1958 Applying For EoA Only
Course Duration 3 Current Intake (2017-18)
120 Applied for Intake(2018-19)
120
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 2 Course Unique Id 1-1412802751 Programme ARCHITECTURELevel DIPLOMA Course ARCHITECTURE
ASSISTANTSHIPShift 1st Shift
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 6 of 24
FT/PT FULL TIME Started In 1982 Applying For EoA Only
Course Duration 3 Current Intake (2017-18)
60 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 3 Course Unique Id 1-1412802753 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course AUTOMOBILE ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1963 Applying For EoA Only
Course Duration 3 Current Intake (2017-18)
60 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 4 Course Unique Id 1-1412802755 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course COMPUTER ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 2006 Applying For EoA Only
Course Duration 3 Current Intake (2017-18)
60 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 5 Course Unique Id 1-1412802757 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course ELECTRICAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1958 Applying For EoA with Closure of Div
Course Duration 3 Current Intake (2017-18)
120 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 6 Course Unique Id 1-1412802759 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course ELECTRONICS AND COMMUNICATIONS ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1985 Applying For EoA with Closure of Div
Course Duration 3 Current Intake (2017-18)
120 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of PIO / FN / Gulf Quota Not interested
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 7 of 24
Technical Education Approval status OCI
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 7 Course Unique Id 1-1412802761 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course MECHANICAL ENGINEERING
Shift 1st Shift
FT/PT FULL TIME Started In 1958 Applying For EoA Only
Course Duration 3 Current Intake (2017-18)
120 Applied for Intake(2018-19)
120
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 8 Course Unique Id 1-1412802763 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course PLASTIC TECHNOLOGY
Shift 1st Shift
FT/PT FULL TIME Started In 1997 Applying For EoA Only
Course Duration 3 Current Intake (2017-18)
60 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 9 Course Unique Id 1-1412802765 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course ELECTRICAL ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 1995 Applying For EoA Only
Course Duration 4 Current Intake (2017-18)
90 Applied for Intake(2018-19)
90
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Sr. No. 10 Course Unique Id 1-1412802767 Programme ENGINEERING AND TECHNOLOGY
Level DIPLOMA Course MECHANICAL ENGINEERING
Shift 1st Shift
FT/PT PART TIME Started In 1995 Applying For EoA with Closure of Div
Course Duration 4 Current Intake (2017-18)
120 Applied for Intake(2018-19)
60
NRI Not interested University/ Board Directorate of Technical Education
PIO / FN / Gulf QuotaApproval status OCI
Not interested
Twining Program Request Not interested NBA Accreditation status (As on 10th April, 2018)
No
Dual Degree/Integrated Course Details
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 8 of 24
Data not entered by InstituteVocational Course Details
Data not entered by InstituteInstructional Area
Sr. No.
Programme Level BuildingNo.
Building Name
Room Type
Room No.
Average Carpet Area (Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture & Fixtures
1 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Classroom A-12 99.6 Ready Ready Ready Ready
2 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Classroom A-4 98 Ready Ready Ready Ready
3 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Workshop AD FTG
48.75 Ready Ready Ready Ready
4 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory AD MP
116.5 Ready Ready Ready Ready
5 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Tutorial Room
AD-11
69.6 Ready Ready Ready Ready
6 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Studio / Material Museum
AD-12
119.6 Ready Ready Ready Ready
7 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Studio / Material Museum
AD-13
121.5 Ready Ready Ready Ready
8 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Studio / Material Museum
AD-14
119.4 Ready Ready Ready Ready
9 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Workshop ADFTG2
48.75 Ready Ready Ready Ready
10 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory ADV MP
68.4 Ready Ready Ready Ready
11 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory AE 97.9 Ready Ready Ready Ready
12 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop CARP
190.4 Ready Ready Ready Ready
13 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop CARPEN
112.5 Ready Ready Ready Ready
14 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
AUTO SHOP
Laboratory CHASIS
342.6 Ready Ready Ready Ready
15 ENGINEERING DIPLOMA Data Not APPLIED Laboratory CHE 96.3 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 9 of 24
AND TECHNOLOGY
Provided by the Institute
SC. BLOCK
M
16 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop CNC1
65 Ready Ready Ready Ready
17 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop CNC2
60 Ready Ready Ready Ready
18 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory COMM.
91.63 Ready Ready Ready Ready
19 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory COMM1
98.6 Ready Ready Ready Ready
20 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory COMP 1
45.91 Ready Ready Ready Ready
21 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Laboratory COMP 2
52.91 Ready Ready Ready Ready
22 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory COMP C
72.32 Ready Ready Ready Ready
23 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory COMP E
68.4 Ready Ready Ready Ready
24 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Seminar Hall
CONFRM
140 Ready Ready Ready Ready
25 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Laboratory CT LAB
68.06 Ready Ready Ready Ready
26 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Drawing Hall
D-14 62 Ready Ready Ready Ready
27 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Drawing Hall
D-15 158.3 Ready Ready Ready Ready
28 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Drawing Hall
D-16 62 Ready Ready Ready Ready
29 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
AUTO SHOP
Drawing Hall
DRGAU
91 Ready Ready Ready Ready
30 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ADMN BLOCK
Seminar Hall
EDUSAT
142.2 Ready Ready Ready Ready
31 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Workshop ELC PL
60 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 10 of 24
32 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Laboratory ELTX L
68 Ready Ready Ready Ready
33 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Laboratory EM 65.3 Ready Ready Ready Ready
34 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Laboratory EMCS
238 Ready Ready Ready Ready
35 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Laboratory EMM 96 Ready Ready Ready Ready
36 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
AUTO SHOP
Laboratory ENGINE
193.5 Ready Ready Ready Ready
37 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Laboratory EW SHP
65 Ready Ready Ready Ready
38 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop FITING
71.25 Ready Ready Ready Ready
39 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ADMN BLOCK
Laboratory FLUID
127.46 Ready Ready Ready Ready
40 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop FOUNDR
140 Ready Ready Ready Ready
41 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop GRNDG
121.5 Ready Ready Ready Ready
42 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Laboratory HGHWAY
68.6 Ready Ready Ready Ready
43 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Tutorial Room
L-1 59.7 Ready Ready Ready Ready
44 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Classroom L-13 198.01 Ready Ready Ready Ready
45 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Tutorial Room
L-2 59.7 Ready Ready Ready Ready
46 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
APPLIEDSC. BLOCK
Classroom L-20 69 Ready Ready Ready Ready
47 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
APPLIEDSC. BLOCK
Classroom L-21 69 Ready Ready Ready Ready
48 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the
OLD TEACHING
Tutorial Room
L-3 59.7 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 11 of 24
Institute BLOCK 49 ENGINEERING
AND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Classroom L-4 83.33 Ready Ready Ready Ready
50 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Classroom L-5 192 Ready Ready Ready Not Ready
51 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Classroom L13 105.43 Ready Ready Ready Ready
52 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ADMN BLOCK
Laboratory LANG L
126.5 Ready Ready Ready Ready
53 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
AUTO SHOP
Classroom LEC AU
84.75 Ready Ready Ready Ready
54 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Laboratory M/C 97.5 Ready Ready Ready Ready
55 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
ARCH BLOCK
Studio / Material Museum
MAT MU
297 Ready Ready Ready Ready
56 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Laboratory MM 98.55 Ready Ready Ready Ready
57 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop MM SHP
35.91 Ready Ready Ready Ready
58 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Other MODEL
90.52 Ready Ready Ready Ready
59 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
AUTO SHOP
Laboratory MP 59 Ready Ready Ready Ready
60 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
AUTO SHOP
Other MPAAU
210.7 Ready Ready Ready Ready
61 ARCHITECTURE
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Laboratory MPH 233.6 Ready Ready Ready Ready
62 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Laboratory O/S 97.51 Ready Ready Ready Ready
63 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Tutorial Room
P-1 61 Ready Ready Ready Ready
64 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Classroom P-2 61 Ready Ready Ready Ready
65 ENGINEERINGAND
DIPLOMA Data Not Provided
WORKSHOP
Workshop PAINT
71.5 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 12 of 24
TECHNOLOGY by the Institute
BLOCK
66 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop PATTRN
71.25 Ready Ready Ready Ready
67 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
APPLIEDSC. BLOCK
Laboratory PHY 86.3 Ready Ready Ready Ready
68 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S-101
98.55 Ready Ready Ready Ready
69 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S-102
97.51 Ready Ready Ready Ready
70 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S-201
98.3 Ready Ready Ready Ready
71 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S-202
98.65 Ready Ready Ready Ready
72 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Laboratory S/W 59.59 Ready Ready Ready Ready
73 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S1 99.22 Ready Ready Ready Ready
74 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S2 99.22 Ready Ready Ready Ready
75 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S3 99.22 Ready Ready Ready Ready
76 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Classroom S4 99.22 Ready Ready Ready Ready
77 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
SARASWATI BLOCK
Seminar Hall
SMART
100.3 Ready Ready Ready Ready
78 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop SMITHY
90 Ready Ready Ready Ready
79 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ADMN BLOCK
Classroom SMRT
136 Ready Ready Ready Ready
80 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
OLD TEACHING BLOCK
Laboratory SOIL 78.28 Ready Ready Ready Ready
81 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ADMN BLOCK
Laboratory SURVEY
62.72 Ready Ready Ready Ready
82 ENGINEERING DIPLOMA Data Not WORKS Workshop TUR 121.5 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 13 of 24
AND TECHNOLOGY
Provided by the Institute
HOP BLOCK
NG
83 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Tutorial Room
W-21 67 Ready Ready Ready Ready
84 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Classroom W-22 62 Ready Ready Ready Ready
85 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Other WASH R
9 Ready Ready Ready Ready
86 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
WORKSHOP BLOCK
Workshop WELDNG
87.75 Ready Ready Ready Ready
87 ENGINEERINGAND TECHNOLOGY
DIPLOMA Data Not Provided by the Institute
ELECT WORKSHOP
Laboratory WIRING
58.5 Ready Ready Ready Ready
Instructional Area Common FacilitiesSr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture &Fixtures
1 ADMIN BLOCK
ADMIN BLOCK Computer Center
BITLAB 180 Ready Ready Ready Ready
2 WORKSHOP BLOCK
WORKSHOP BLOCK Library&Reading Room
LIB RR 318 Ready Ready Ready Ready
Administrative Area
Sr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture &Fixtures
1 Data Not Provided by the Institute
Data Not Provided by the Institute
Other ADM 42.27 Ready Ready Ready Ready
2 Data Not Provided by the Institute
Data Not Provided by the Institute
Security CHWKDR 11.1 Ready Ready Ready Ready
3 Data Not Provided by the Institute
Data Not Provided by the Institute
Department Office
COMP 20.46 Ready Ready Ready Ready
4 Data Not Provided by the Institute
Data Not Provided by the Institute
Board Room CONFRN 63.43 Ready Ready Ready Ready
5 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room CS F-1 21.45 Ready Ready Ready Ready
6 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room CS F-2 20.46 Ready Ready Ready Ready
7 Data Not Provided by the Institute
Data Not Provided by the Institute
Housekeeping CS STR 5.17 Ready Ready Ready Ready
8 Data Not Provided
Data Not Provided by the Institute
Exam Control Office
EXAM 32.12 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 14 of 24
by the Institute
9 Data Not Provided by the Institute
Data Not Provided by the Institute
Housekeeping EXM ST 5.05 Ready Ready Ready Ready
10 Data Not Provided by the Institute
Data Not Provided by the Institute
Cabin for Head of Dept
HOD AR 26.84 Ready Ready Ready Ready
11 Data Not Provided by the Institute
Data Not Provided by the Institute
Department Office
HOD AS 19.93 Ready Ready Ready Ready
12 Data Not Provided by the Institute
Data Not Provided by the Institute
Department Office
HOD AU 26.85 Ready Ready Ready Ready
13 Data Not Provided by the Institute
Data Not Provided by the Institute
Cabin for Head of Dept
HOD CV 17.98 Ready Ready Ready Ready
14 Data Not Provided by the Institute
Data Not Provided by the Institute
Cabin for Head of Dept
HOD EC 37.41 Ready Ready Ready Ready
15 Data Not Provided by the Institute
Data Not Provided by the Institute
Department Office
HOD EL 36 Ready Ready Ready Ready
16 Data Not Provided by the Institute
Data Not Provided by the Institute
Cabin for Head of Dept
HOD ME 42 Ready Ready Ready Ready
17 Data Not Provided by the Institute
Data Not Provided by the Institute
Department Office
HOD PL 21.78 Ready Ready Ready Ready
18 Data Not Provided by the Institute
Data Not Provided by the Institute
Placement Office
IIIC 96 Ready Ready Ready Ready
19 Data Not Provided by the Institute
Data Not Provided by the Institute
Maintenance MAINT 10.2 Ready Ready Ready Ready
20 Data Not Provided by the Institute
Data Not Provided by the Institute
Office All Inclusive
MN OFF 305.21 Ready Ready Ready Ready
21 Data Not Provided by the Institute
Data Not Provided by the Institute
Department Office
PL STF 19.75 Ready Ready Ready Ready
22 Data Not Provided by the Institute
Data Not Provided by the Institute
Principal Directors Office
PRINCP 62.6 Ready Ready Ready Ready
23 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room STAFF 22.44 Ready Ready Ready Ready
24 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room STF AR 9.73 Ready Ready Ready Ready
25 Data Not Data Not Provided by Faculty Room STF EC 21.54 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 15 of 24
Provided by the Institute
the Institute
26 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room STF R1 22.4 Ready Ready Ready Ready
27 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room STF R2 22.4 Ready Ready Ready Ready
28 Data Not Provided by the Institute
Data Not Provided by the Institute
Faculty Room STF2 E 13.12 Ready Ready Ready Ready
29 Data Not Provided by the Institute
Data Not Provided by the Institute
Central Store STORE 40.27 Ready Ready Ready Ready
30 Data Not Provided by the Institute
Data Not Provided by the Institute
Other Office W/S OF 71.25 Ready Ready Ready Ready
Amenities Area
Sr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture & Fixtures
1 Data Not Provided by the Institute
Data Not Provided by the Institute
Principal's Quarter
A1 206 Ready Ready Ready Ready
2 Data Not Provided by the Institute
Data Not Provided by the Institute
Boys Common Room
CR-B 127 Ready Ready Ready Ready
3 Data Not Provided by the Institute
Data Not Provided by the Institute
Girls CommonRoom
CR-G 110 Ready Ready Ready Ready
4 Data Not Provided by the Institute
Data Not Provided by the Institute
Guest House GR-1 50 Ready Ready Ready Ready
5 Data Not Provided by the Institute
Data Not Provided by the Institute
Sports Club GYM 70 Ready Ready Ready Ready
6 Data Not Provided by the Institute
Data Not Provided by the Institute
Girls' Hostel IG HOS 1146 Ready Ready Ready Ready
7 Data Not Provided by the Institute
Data Not Provided by the Institute
First aid cum Sick Room
MEDR 10.2 Ready Ready Ready Ready
8 Data Not Provided by the Institute
Data Not Provided by the Institute
Auditorium MPH 328 Ready Ready Ready Ready
9 Data Not Provided by the Institute
Data Not Provided by the Institute
Girls' Hostel SC HOS 4369 Ready Ready Ready Not Ready
10 Data Not Provided
Data Not Provided by the Institute
Stationery Store
STR-1 30 Ready Ready Ready Ready
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 16 of 24
by the Institute
11 Data Not Provided by the Institute
Data Not Provided by the Institute
Boys' Hostel SV HOS 6510 Ready Ready Ready Ready
12 Data Not Provided by the Institute
Data Not Provided by the Institute
Toilet T 1-20 715 Ready Ready Ready Ready
Circulation Area
Sr.No.
BuildingNo.
Building Name Room Type Room Id Area(Sqm)
Flooring Wall & Painting
Elec & lighting
Furniture & Fixtures
1 Data Not Provided by the Institute
Data Not Provided by the Institute
Corridors 1958 Yes Ready Ready Ready Y
2 Data Not Provided by the Institute
Data Not Provided by the Institute
Other Areas (in Sq m)
72161 No Not Ready Not Ready Not Ready Data Not Provided by the Institute
3 Data Not Provided by the Institute
Data Not Provided by the Institute
Other Common Area (in Sq m)
6510 Yes Ready Ready Ready Y
Laboratory Details
Sr. No.
Programme Level Course Building No.
Building Name
Name of Lab Yearly Budget(E) (Rs)
Yearly Budget(C)(Rs)
Investment till Date (Rs)
Research Lab?
1 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
ADVANCE WELDING SHOP
10000 100000 1000000
No
2 ENGINEERINGAND TECHNOLOGY
DIPLOMA AUTOMOBILE ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
AE LAB 5000 2000 653000
No
3 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRONICS &COMMUNICATION ENGG
Data Not Provided by the Institute
Data Not Provided by the Institute
ANALOG/POWER LAB
30000 15000 700000
No
4 ENGINEERINGAND TECHNOLOGY
DIPLOMA PLASTIC TECHNOLOGY
Data Not Provided by the Institute
Data Not Provided by the Institute
CADD LAB 10000 5000 1000000
No
5 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
CARPENTRY SHOP
10000 100000 300000
No
6 ENGINEERINGAND TECHNOLOGY
DIPLOMA AUTOMOBILE ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
CBT LAB 5000 2000 800000
No
7 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
CHEMISTRY LAB
10000 6000 1300000
No
8 ENGINEERINGAND TECHNOLOGY
DIPLOMA COMPUTER ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
COMMUNICATION LAB
6000 12000 637000
No
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 17 of 24
9 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRONICS &COMMUNICATION ENGG
Data Not Provided by the Institute
Data Not Provided by the Institute
COMMUNICATIONN LAB
30000 5000 1400000
No
10 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRONICS &COMMUNICATION ENGG
Data Not Provided by the Institute
Data Not Provided by the Institute
COMPUTER LAB
50000 50000 1400000
No
11 ARCHITECTURE
DIPLOMA ARCHITECTURE ASSITANTSHIP
Data Not Provided by the Institute
Data Not Provided by the Institute
COMPUTER LAB ARCHITECUTRE DEPARTMENT
20000 5000 700000
No
12 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
COMPUTER LAB CIVIL
3000 2000 272782
No
13 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
COMPUTER NUMERICAL CONTROL
100000 25000 1000000
No
14 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
CONCRETE TECHNOLOGY LAB
5000 4000 50000 No
15 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRONICS &COMMUNICATION ENGG
Data Not Provided by the Institute
Data Not Provided by the Institute
CONSUMER LAB
50000 15000 1000000
No
16 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRONICS &COMMUNICATION ENGG
Data Not Provided by the Institute
Data Not Provided by the Institute
DIGITAL & MICROPROCESSOR LAB
30000 5000 900000
No
17 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
ELECTRICAL WORKSHOP
50000 30000 300000
No
18 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
ELECTRONICS LAB
30000 5000 200000
No
19 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
EMCS LAB 30000 5000 500000
No
20 ENGINEERINGAND TECHNOLOGY
DIPLOMA ELECTRICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
EMMI LAB 30000 5000 1000000
No
21 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
ENGINEERING MATERIAL LAB
5000 3000 54000 No
22 ENGINEERINGAND TECHNOLOGY
DIPLOMA PLASTIC TECHNOLOGY
Data Not Provided by the Institute
Data Not Provided by the Institute
FABRICATION LAB
20000 5000 6000000
No
23 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
FITTING SHOP
20000 30000 600000
No
24 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
FOUNDRY SHOP
5000 20000 500000
No
25 ENGINEERING DIPLOMA AUTOMOBILE Data Not Data Not GENERAL 15000 75000 75000 No
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 18 of 24
AND TECHNOLOGY
ENGINEERING Provided by the Institute
Provided by the Institute
AUTOSHOP 0
26 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
GRINDING SHOP
100000 40000 3000000
No
27 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
HIGHWAY ENGINEERING LAB
15000 3000 172000
No
28 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
HYDRAULIC LAB
5000 4000 400000
No
29 ENGINEERINGAND TECHNOLOGY
DIPLOMA MECHANICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
IQC LAB 200000 40000 700000
No
30 ENGINEERINGAND TECHNOLOGY
DIPLOMA MECHANICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
ITM LAB 50000 10000 10000 No
31 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
MACHINE SHOP
50000 30000 4500000
No
32 ENGINEERINGAND TECHNOLOGY
DIPLOMA COMPUTER ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
MICROPROCESSOR AND HARDWARE LAB
10000 10000 418600
No
33 ENGINEERINGAND TECHNOLOGY
DIPLOMA COMPUTER ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
MULTIMEDIA LAB
15000 11000 919599
No
34 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
PAINTING SHOP
6000 60000 400000
No
35 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
PATTERN SHOP
20000 30000 500000
No
36 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
PHYSICS LAB
12000 5000 190000
No
37 ENGINEERINGAND TECHNOLOGY
DIPLOMA PLASTIC TECHNOLOGY
Data Not Provided by the Institute
Data Not Provided by the Institute
PLASTIC TESTING & QUALITY CONTROL LAB
10000 3000 2000000
No
38 ENGINEERINGAND TECHNOLOGY
DIPLOMA PLASTIC TECHNOLOGY
Data Not Provided by the Institute
Data Not Provided by the Institute
POLYMER PROCESSING TECHNIQUES LAB1
30000 50000 6000000
No
39 ENGINEERINGAND TECHNOLOGY
DIPLOMA MECHANICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
RAC LAB 150000 40000 1500000
No
40 ENGINEERINGAND TECHNOLOGY
DIPLOMA COMPUTER ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
SMART ROOM
0 2000 479200
No
41 ENGINEERINGAND
DIPLOMA FIRST YEAR/OTHER
Data Not Provided
Data Not Provided
SMITHY SHOP
16000 30000 500000
No
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 19 of 24
TECHNOLOGY by the Institute
by the Institute
42 ENGINEERINGAND TECHNOLOGY
DIPLOMA COMPUTER ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
SOFTWARE AND NETWORKING LAB
25000 15000 1545076
No
43 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
SOIL & FOUNDATION ENGINEERING
4000 3000 260000
No
44 ENGINEERINGAND TECHNOLOGY
DIPLOMA MECHANICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
SOM LAB 50000 5000 190000
No
45 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
SURVEY LAB 10000 2000 1082700
No
46 ENGINEERINGAND TECHNOLOGY
DIPLOMA MECHANICAL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
THERMAL ENGG LAB
10000 10000 547077
No
47 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
TURNING SHOP
20000 30000 2500000
No
48 ENGINEERINGAND TECHNOLOGY
DIPLOMA PLASTIC TECHNOLOGY
Data Not Provided by the Institute
Data Not Provided by the Institute
UNIT OPERATIONS
10000 2000 1300000
No
49 ENGINEERINGAND TECHNOLOGY
DIPLOMA CIVIL ENGINEERING
Data Not Provided by the Institute
Data Not Provided by the Institute
WATER SUPPLY WASTE WATER ENGINEERING LAB
5000 3000 1180000
No
50 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
WELDING SHOP
10000 50000 500000
No
51 ENGINEERINGAND TECHNOLOGY
DIPLOMA FIRST YEAR/OTHER
Data Not Provided by the Institute
Data Not Provided by the Institute
WIRING SHOP
20000 32000 200000
No
Library Books
Sr. No.
Programme Titles Volumes International Journals National Journals No. of e-BookTitles
No. of e-Book Volumes
1 ARCHITECTURE 42 1108 0 2 0 02 ENGINEERING AND
TECHNOLOGY3813 58840 1 8 0 0
Library Facilities
Sr. No
Working Hrs. E journal Subscription
Annual Budget (Rs)
Area in Sqm Library Management Software
Bar Code or RF Tab book handling
ReprographicFacility
Reading Room Capacity (No. of Students)
1 9AM to 5 PM NIL Data Not Provided by the Institute
298 No No N 320
e-Journal Declaration Status of declaration checkbox
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 20 of 24
BY CLICKING THIS CHECK BOX THE INSTITUTE HEREBY DECLARES THAT IT HAS SUBSCRIBED FOR ALL THE REQUIRED E-JOURNALS AS MENTIONED IN APPROVAL PROCESS HANDBOOK 2018-2019.
No
Computational Facility
S
r. N
o
Leg
al S
yste
m S
oft
war
e
Leg
al A
pp
licat
ion
S
oft
war
e
Inte
rnet
Ban
dw
idth
in
Mb
ps
Inte
rnet
Co
nte
nti
on
R
atio
PC
s/L
apto
p
excl
usi
vely
ava
ilab
le t
ost
ud
ents
PC
s/L
apto
p a
vaila
ble
in
Ad
min
istr
ativ
e O
ffic
e
No
. of
PC
s/L
apto
p
avai
lab
le
in L
ibra
ry
No
. of
PC
s/L
apto
p in
la
ng
uag
e la
b
PC
s/L
apto
p a
vaila
ble
to
Fac
ult
y M
emb
ers
Pri
nte
rs a
vaila
ble
to
st
ud
ent
1 2 7 40 1:4 151 25 2 50 25 19
Hostel Facility
Sr
No
.
No
. of
roo
ms
hav
ing
Sin
gle
b
ed/r
oo
m &
Are
a o
f ro
om
in s
q.m
.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
No
. of
roo
ms
hav
ing
Do
ub
le/T
wo
bed
/ro
om
& A
rea
of
roo
m in
sq
.m.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
No
. of
roo
ms
hav
ing
T
rip
le/T
hre
e b
ed/r
oo
m &
Are
a o
f ro
om
in s
q.m
.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
No
. of
roo
ms
hav
ing
Fo
ur
bed
/ro
om
& A
rea
of
roo
m in
sq
.m.
Bu
ildin
g N
o.
Nam
e o
f B
uild
ing
1 Boys SWAMI
VIVEKANAN
D CHHATRAWAS OldBuildin
g
0&0
499 &
22.8
S.V. HOSTEL (BOYS)
OLD BLDG
Boys 0& 0
0&0
2 Girls 12 &18
Girls Hostel
15&
21.63
SWAMI
VIVEKANAND CHHATRAWAS Old
Building
Girls Hostel
Girls & 0
&0
Operational FundsBank Name Account No. Bank Statement Date Cash BalanceState Bank of India, Govt.Polytechnic Branch,Ambala City
10487903491 Data Not Provided by the Institute 24638355
State Bank of India, Govt.Polytechnic Branch,Ambala City
30912392567 Data Not Provided by the Institute 2180
State Bank of India, Govt.Polytechnic Branch,Ambala City
31183750033 Data Not Provided by the Institute 983798
State Bank of India, Govt.Polytechnic Branch,Ambala City
30944358357 Data Not Provided by the Institute 45586
Corporation Bank, Hissar Road, Ambala City 0496/SB/01/007393 Data Not Provided by the Institute 563679State Bank of India, Govt.Polytechnic Branch,Ambala City
30912395502 Data Not Provided by the Institute 2132974
Financial Details(in Rs)
Funds/ Grants from Central Government 0 Funds/ Grants from UGC 0Funds/ Grants from Student Fees 5238500 Funds/ Grants from Donations 0Funds/ Grants from State Government 159450000 Funds/ Grants from Other Bodies 0
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 21 of 24
Funds/ Grants raised from Other Sources/ Internal Revenue
923007 Salary to the Teaching Staff 74183740
Remuneration to Visiting/Guest Faculty 3421628 Salary to Non-teaching Staff: 31793000 Library (Investments) 0 Equipment (Investments) 0Building Maintenance Expenses 0 Other Expenditure (if any) 130178218 Company/Industry DetailsAre you a Company/Industry wishing to set up a new Institute?: NoType of Company/Industry: NA Is the company having Minimum
100 Cr Turnover for the last 3 years? (Attach supporting documents):
NA
Company/Industry PAN No.: NA Company/Industry TAN No.: NA Company/Industry Registered Address: NA Company/Industry Year of
Registration: NA
Ombudsman/Grievance DetailsGrievance Committee Appointment Yes OMBUDSMAN Appointment NoOmbudsman Appointment/Grievance Committee Details
Sr.
No
.
Co
mm
itte
e T
ype
Ap
po
intm
ent
Ord
er R
efer
ence
No
.
Dat
e o
f A
pp
oin
tmen
t
Nam
e o
f th
e C
om
mit
tee
Mem
ber
Pro
fess
ion
Ad
dre
ss
Ass
oci
ated
Wit
h
Mo
bile
No
.
E-M
ail A
dd
ress
Fax
No
.
1 Grievance Redressal
GPA/914 04/07/2017 DIPENDER GILL LECTURER
GOVT. POLYTECHNIC,AMBALA CITY
HOD OF CONCERNED DEPTT
1712443222
gpambala@hry.nic.in
1712556008
2 Grievance Redressal
GPA/914 04/07/2017 JASVEER KAUR LETURER
GOVT. POLYTECHNIC,AMBALA CITY
HOD OF CONCERNED DEPTT
1712443222
gpambala@hry.nic.in
1712556008
3 Grievance Redressal
GPA/914 04/07/2017 ARCHANA SHARMA
LECTURER
GOVT.POLYTECHNIC, AMBALA CITY
HOD OF CONCERNED DEPTT.
1712443222
gpambala@hry.nic.in
1712556008
4 Grievance Redressal
GPA/914 04/07/2017 DR. SUNITA RANI
LECTURER
GOVT.POLYTECHNIC, AMBALA CITY
HOD OF CONCERNED DEPTT.
1712443222
gpambala@hry.nic.in
1712443222
5 Grievance Redressal
GPA/914 04/07/2017 MONIKA AGGARWAL
LECTURER
GOVT.POLYTECHNIC, AMBALA CITY
HOD OF CONCERNED DEPTT.
1712443222
gpambala@hry.nic.in
1712443222
Anti-Ragging Related Details Provided by the Institute1 Constitution of Anti-Ragging Committee Yes2 Constitution of Anti-Ragging Squad Yes3 Undertaking obtained from all Students Yes4 Appointment of Counselors Yes5 Undertaking obtained from parents of all the students Yes6 Undertaking obtained from students staying in Hostel Yes7 Undertaking obtained from parents of students staying in Hostel Yes
Anti-Ragging Committee/Squad Details
Sr.
No
.
Co
mm
itte
e T
ype
Ap
po
intm
ent
Ord
er r
efer
ence
No
.
Dat
e o
f A
pp
oin
tmen
t
Nam
e o
f th
e C
om
mit
tee
Mem
ber
Pro
fess
ion
Ad
dre
ss
Ass
oci
ated
W
ith
Mo
bile
No
.
E-M
ail A
dd
ress
Fax
No
.
1 Anti- GPA/912 04/07/2017 D S RANA VEI GOVT.POLYTE 17124 gpambala
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 22 of 24
Ragging Committee
CHNIC, AMBALA CITY
43222 @hry.nic.in
2 Anti-Ragging Committee
GPA/912 04/07/2017 SATPAL SR.LECTURER
GOVT.POLYTECHNIC, AMBALA CITY
1712443222
gpambala@hry.nic.in
3 Anti-Ragging Committee
GPA/912 04/07/2017 ARCHANA SHARMA
LECTURER
GOVT.POLYTECHNIC, AMBALA CITY
1712443222
gpambala@hry.nic.in
4 Anti-Ragging Squad
GPA/912 04/07/2017 HOD ARCH HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
5 Anti-Ragging Squad
GPA/912 04/07/2017 HOD AUTO HOD GOVT. POLYTECHNIC,AMBALA CITY
1712433222
gpambala@hry.nic.in
6 Anti-Ragging Squad
GPA/912 04/07/2017 HOD CIVIL HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
7 Anti-Ragging Squad
GPA/912 04/07/2017 HOD COMP HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
8 Anti-Ragging Squad
GPA/912 04/07/2017 HOD ELECT HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
9 Anti-Ragging Squad
GPA/912 04/07/2017 HOD ECE HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
10 Anti-Ragging Squad
GPA/912 04/07/2017 HOD MECH HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
11 Anti-Ragging Squad
GPA/912 04/07/2017 HOD PLASTIC HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
12 Anti-Ragging Squad
GPA/912 04/07/2017 HOD APP. SC. HOD GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
13 Anti-Ragging Committee
GPA/912 04/07/2017 PUSHPINDER PARTAP SINGH
LECTURER
GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
14 Anti-Ragging Committee
GPA/912 04/07/2017 PANKAJ GARG
SR. LECTURER
GOVT. POLYTECHNIC,AMBALA CITY
1712443222
gpambala@hry.nic.in
Renewable Energy Related Details/Conservation of Energy DetailsSr. No. Particulars Details Provided by Institute
1 Total land available (in Sqm.) 802682 No. of buildings with roof tops 73 Annual electricity consumption (No. of units) during previous financial year 495864 Electricity Bill-Average rate per unit paid during previous financial year (Rs. / unit) & No. of units used 48.615 Renewable Energy, if any, used at present Yes6 Land available for placing solar photovoltaic panels (in Sqm.) 07 Total approximate roof- top area available for placing solar photovoltaic panel (in Sqm.) 20008 Whether a policy has been adopted to use only LED lamps ? No9 Remarks Average rate/unit is inclusive of all
taxes. Policy of installing solar photovoltaic panels on rooftop is underconsideration with the govt.
Other FacilitiesAll Weather Approach (Motorized Road)
Yes Backup Electric Supply Yes
Barrier free Environment Yes CCTV Security YesERP Software No Electric Supply YesGeneral Insurance Yes Group Insurance Yes
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 23 of 24
Institution Web Site Yes Insurance for Students YesMedical & Counseling facilities Yes Notice Boards YesPublic Announcement System Yes Potable Water Supply YesPost & Banking/ATM Yes Projectors in Classrooms YesSewage Disposal System Yes Staff Quarters YesTelephone & FAX Yes Transport Facility YesVehicle Parking Facility Yes First Aid Facility YesRain Water Harvesting Yes Solar Power Systems YesAppointment Of Student Counselor Yes Establishment Of Anti Ragging
CommitteeYes
Establishment Of Committee For SC/ST
Yes Provision to watch MOOCS Courses through Swayam
No
Implementation of Unnat Bharath Abhiyan:
No Institution-Industry Cell: Yes
Stand Alone Language Laboratory (Minimum 25 PCs/Laptop up to total intake of 1000.Further additional 25PCs/Laptop per intake of 1000):
Yes
Safety Provisions including fire and other calamities YesEstablishment of Internal Complaint Committee (ICC) Committee As per section 4 of Sexual Harassment of Women at Workplace(Prevention, Prohibition and Redressal) Act, 2013
Yes
Establishment of Grievance Redressal Committee in the Institute and Appointment of OMBUDSMAN by theUniversity
Yes
Digital Payment for all Financial Transactions as per MHRD Directives YesCompliance of the National Academic Depository(NAD) as per MHRD Directives NoDisplay Board within the premises as well as in the Website of the Institution Indicating the Feedback Facility of Students and Faculty Available in the AICTE Web Portal
Yes
Implementing Food Safety and Standard Act,2006 in the Institution YesImplementation of Schemes Announced by MHRD YesOffering of Skill Development Courses Approved by the Council YesParticipation in the National Institutional Ranking Framework(NIRF) NoFabrication Facility Laboratory(FABLAB) Tinkering Laboratory/Innovation Laboratory YesWaste Management and Environment Improvement Measures to Ensure a Sustainable Green Campus YesCopies of AICTE Approvals (LOA and EOA of subsequent years)obtained since Inception of Institution till date shall be placed in the Website of the Institution
Yes
Applied for Membership of National Digital Library NoEstablishment of Online Grievance Rederssal Mechanism YesWhether the institution has implemented Safety and Security measures in the Campus? YesAvailability of quality sanitary napkins through sanitary napkin vending machines and ensuring safe and environment friendly disposal of used sanitary napkin through sanitary napkin incinerator
Yes
In the Class Rooms available, at least ONE shall be a Smart Class Room per Department Yes
Application Report - Part 1
Application Status: SubmittedApplication Sub-Status: Payment Not Applicable
Report Generated on :-15/02/2018
Date of Signature(dd/mm/yyyy) Seal of Institute Name & Signature of Director/Principal
Printed By : aic004354 Page 24 of 24
DECLARATIONBY THE PRINCIPAL/DIRECTOR/REGISTRAR OF THE INSTITUTE/UNIVERSITY DEPARTMENT
I, as the Head of the Institution, hereby declare that:
a) I have carefully gone through the AICTE Regulations Notification dated on 30th November, 2016, published in the Gazette of India -Extraordinary Part III, Section- 4 and its amendment 05th December 2017 also the various provisions mentioned in the Approval ProcessHand Book 2018-19.
b) I am fully aware of the data uploaded by me in respect of my institute on the web portal.
c) I am aware that there is no provision for correction of data, alteration of data, subsequent editing and appeal etc. for the online applicationonce uploaded on the web portal.
d) I am also aware that application for seeking Extension of Approval(EOA), Increase/Reduction of intake, Addition of new courses, Change ofsite, Closure of course, Supernumerary Seats under PIO/FN/Gulf quota Approval status/OCI, NRI, Change of name, and Conversion of womeninstitute into Co-ed institute and vice versa (as applicable), shall be processed as per relevant provisions enumerated in the ApprovalProcess Hand Book 2018-19.
e) I am aware of the Deficiencies (if any) pointed out in the Report generated online, based on the factual data uploaded by my institute on theportal.
f) I am also aware that Institute is eligible for grant ofExtension of Approval to the Existing Institutions,Extended EoA(if Applicable as per APH 2018-19),Change in name of the Course(s)/ Reduction in Intake/ Closure of Programme(s) and/ or Course(s),only on fulfillment of prescribed norms & requirements as mentioned in the Approval Process Hand Book 2018-19.
Signature of Principal/Director/Registrar
Name :
Seal/Stamp of the Institute/University Department
top related