Accounts Chamber of the Russian Federation

Approaches to comprehensive

project and program auditin the Accounts Chamberof the Russian Federation

Main problems for project implementations

• Incompleteness and inconsistencyof information.

• Irrelevance and lack of coordinationin management decisions.

• Poor resource management.

2

Information technology improvements in management and audit

3

Structure of this talk

• Methodology:

– comprehensive audit;

– architecture and capabilities evaluation;

– scenario evaluation.

• Tools:

– resource and schedule audit;

– interval-based evaluations.

4

METHODOLOGY

5

The architecture of comprehensive audit

6

Indicators for comprehensive evaluation

7

The practice of comprehensive audit

8

Some approaches to activity management

• Classic project management.

• Business performance management (BPM).

• Architecture management.

• Capability management.

• Net-centricity.

9

The scheme of the methodical and IT infrastructure

10

Evaluating architecture

• Coherence of the architecture withthe goals and budgets.

• Interaction of stakeholders.

• Cost of ownership.

• Dynamics of architectural change.

112

According to ANSI/IEEE 1471-2000:

Architecture is the fundamental organization of a system embodied in its components*, their relationships to each other and to the

environment, and the principles guiding its design and evolution

* - information, financing, materials, products …..

Using the capabilities approach fora comprehensive evaluation of an information system

12

Capability: property of a system, probability that the system will succeed in achieving the goal of its functioning.

The correspondence between required and predicted state sets in the functioning of a system can be represented as the probability of the following binary predicate being true:

1,

дk k

k K

Poss Y Y

, 1, ;kY k K прогнозные значения

, 1, .дkY k K требуемые значения

predicted state set

required state set

Methodical basis for comprehensive scenario evaluation

13

TOOLS

14

Information technology for assessment of large projects

15

Audit of programs and projects (software package)

Interval-based assessment of investment projects

16

Estimating capabilities with an interval analysis system

17

Capability indicator at a high level

18

19

The capability level requires detailed analysis

Capability indicator at a critically low level

20

Conclusion

The application of these methods and tools will allow to formulate recommendations on:

• improving the feasibility of projects and programs,

• minimizing negative consequences of projects,

• reducing risks in project implementations,

• and generally improving efficiency of projects.

21