ab produce plc site location map map 1 site location
Post on 15-Dec-2016
235 Views
Preview:
TRANSCRIPT
Map produced by MAGIC on 6 September, 2016.
(c) Crown Copyright and database rights 2016. Ordnance Survey 100022861.
Copyright resides with the data suppliers and the map must not be reproduced without their permission. Some information in MAGIC is a snapshot of the information that is being maintained or continually updated by the
originating organisation. Please refer to the metadata for details as information may be illustrative or representative rather than definitive at this stage.
T:\2
015\
15-0
04 A
B P
rodu
ce (U
K)\0
1 La
gepl
an -
layo
ut p
lan_
Tras
senp
lan
- rou
te p
lan\
15-0
04_3
.LP
00-1
1-LP
_3.L
P26
-06-
AS
P_3
.LP
70-1
1-H
P_3
.LP
40-1
3-TP
_3.E
X10
-06-
ExL
P_3
.BE
00-0
2-B
E_3
.LP
32-0
5-B
SE
_3.L
P38
-04-
KG
P_S
F_re
cove
r.dw
g
Project team:projectmanagement:constructionmanagement:project planning:
call number:
call number:
call number:
changed:
examined:
drawn:
namedate
drawing number:
scale:
kind of the changenamedatenr.
representation:
measure:
owner:
We
poss
es a
cop
yrig
ht a
t our
des
igns
. The
se d
esig
ns m
ay b
e us
edon
ly fo
r the
per
sona
l use
. We
ask
for r
etur
n du
ring
disu
se.
Dup
licat
ion
is n
ot a
llow
ed.
page number
project number
building place:
EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E info@envitec-biogas.deW www.envitec-biogas.de
BGP AB Produce
Construction of biogas plant AB Produce
route plan with electrical sensors
15-004_3.LP40/1-1415-0043.LP401:100
19.01.2015 A. Ising
10.03.2016 A.Ising
F.Hansen +49 (2574) 88 88 159
A. Ising +49 (2574) 88 88 127
Ising, Andreas ISO full bleed A0 (841.00 x 1189.00 mm)
20.0
1.20
15 1
0:42
:36
1 20.01.2015 S.Selzer gas torch, trafo, street
2 26.01.2015 J. Freiberger liquid residue storage tank drawn in; platform+technical building changed
3 27.01.2015 J. Freiberger platform and agitator changed
4 06.02.2015 J. Freiberger street changed
5 24.03.2015 J. Freiberger technical building changed
6 24.03.2015 A.Ising chnage mixer typ storage tank
7 06.05.2015 A.Ising change mixer typ digester and storage tank
8 07.05.2015 J. Freiberger tank changed
9 25.11.2015 A.Ising remove pipes 8, 17, 8, 25
10 07.12.2015 S.Selzer digester updated
11 25.01.2016 Y.El Gamal tanks changed position
12 05.02.2016 Y.El Gamal new technical building
13 23.02.2016 A:Ising general modification
14 10.03.2013 A:Ising add pipe 33
!!!!!! !!! !!!!!!!!
GHSCE AB Produce plc Present Waste Water Flow Sheets
FRESH WATER
Washers Peelers PrepRoom
Soil
ClassifierScreen
PackHouse
ScrewPress
Animal FeedCentrifuge
Transfer Pump & Line
LAGOONS
To Land ThroughSpray Bar <45,000 cu.m./annum
Fig 1 EXISTING SYSTEM
Treatment
GHSCE AB Produce plc Present Waste Water Flow Sheets
HoldingTanks
Pasteurisers
DIGESTER
To Export
Solids Return
Centrifuge
Digestate Tank
Existing Transfer Line with Meters Added
PAS110: 2014 Fertiliser
Fig 2 SYSTEM WITH DIGESTER
To Land and Export40/48,000 cu.m./annum
Macerator
Condenser
Gas to EngineSystem
Condensate
Vegetable Trimming
Contra Flow Heat Exchanger
To Digester 35/40oC
Transfer Pump
From Feedstock TanksAmbient Temperature
Hot Cooling WaterFrom CHP Plant
Return ToCHP Plant
To PasteuriserTanks >70oC
From Pasteuriser Tanks >70oC
Pasteuriser Tanks With Agitators
Fig 3 PASTEURISATION SYSTEM AB Produce Plc AD Plant
T:\2
015\
15-0
04 A
B P
rodu
ce (U
K)\0
1 La
gepl
an -
layo
ut p
lan_
Tras
senp
lan
- rou
te p
lan\
15-0
04_3
.LP
00-1
1-LP
_3.L
P26
-06-
AS
P_3
.LP
70-1
1-H
P_3
.LP
40-1
3-TP
_3.E
X10
-06-
ExL
P_3
.BE
00-0
2-B
E_3
.LP
32-0
5-B
SE
_3.L
P38
-04-
KG
P_S
F.dw
g
Project team:projectmanagement:constructionmanagement:project planning:
call number:
call number:
call number:
changed:
examined:
drawn:
namedate
drawing number:
scale:
kind of the changenamedatenr.
representation:
measure:
owner:
We
poss
es a
cop
yrig
ht a
t our
des
igns
. The
se d
esig
ns m
ay b
e us
edon
ly fo
r the
per
sona
l use
. We
ask
for r
etur
n du
ring
disu
se.
Dup
licat
ion
is n
ot a
llow
ed.
page number
project number
building place:
EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E info@envitec-biogas.deW www.envitec-biogas.de
BGP AB Produce
Construction of biogas plant AB Produce
route plan with electrical sensors
15-004_3.LP40/1-1415-0043.LP401:100
19.01.2015 A. Ising
10.03.2016 A.Ising
F.Hansen +49 (2574) 88 88 159
A. Ising +49 (2574) 88 88 127
Ising, Andreas ISO full bleed A0 (841.00 x 1189.00 mm)
20.0
1.20
15 1
0:42
:36
1 20.01.2015 S.Selzer gas torch, trafo, street
2 26.01.2015 J. Freiberger liquid residue storage tank drawn in; platform+technical building changed
3 27.01.2015 J. Freiberger platform and agitator changed
4 06.02.2015 J. Freiberger street changed
5 24.03.2015 J. Freiberger technical building changed
6 24.03.2015 A.Ising chnage mixer typ storage tank
7 06.05.2015 A.Ising change mixer typ digester and storage tank
8 07.05.2015 J. Freiberger tank changed
9 25.11.2015 A.Ising remove pipes 8, 17, 8, 25
10 07.12.2015 S.Selzer digester updated
11 25.01.2016 Y.El Gamal tanks changed position
12 05.02.2016 Y.El Gamal new technical building
13 23.02.2016 A:Ising general modification
14 10.03.2013 A:Ising add pipe 33
T:\2
015\
15-0
04 A
B P
rodu
ce (U
K)\0
3 Te
chni
kgeb
äude
- te
chni
cal b
uild
ing\
15-0
04_3
.TG
00-0
9-TG
_3.T
G01
-12-
AS
P_3
.TG
02-0
0_A
I.dw
g
Project team:projectmanagement:constructionmanagement:project planning:
call number:
call number:
call number:
changed:
examined:
drawn:
namedate
drawing number:
scale:
kind of the changenamedatenr.
representation:
measure:
owner:
We
poss
es a
cop
yrig
ht a
t our
des
igns
. The
se d
esig
ns m
ay b
e us
edon
ly fo
r the
per
sona
l use
. We
ask
for r
etur
n du
ring
disu
se.
Dup
licat
ion
is n
ot a
llow
ed.
page number
project number
building place:
EnviTec Anlagenbau GmbH & Co. KGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E info@envitec-biogas.deW www.envitec-biogas.de
BGP AB Produce
construction of a biogas plant
technical buildinginstallation planground floor plan and section A-A
15-004_3.TG01/1-1215-0043.TG011:50
13.01.2015 J. Freiberger
16.03.2016 A.Ising
A. Ising +49 (2574) 88 88 127
Ising, Andreas ISO expand A0 (841.00 x 1189.00 mm)
13.0
1.20
15 1
5:49
:21
1 26.01.2015 J. Freiberger complete revision
2 27.01.2015 J. Freiberger ceiling height changed
3 30.01.2015 J. Freiberger block out and air-conzept drawn in
4 24.03.2015 J. Freiberger walls and foundation changed; concrete column drawn in
5 08.10.2015 Y.El Gamal block outs changed, datail A, B , C
6 13.10.2015 S.Selzer block outs and details changed
8 17.11.2015 S. Herbert door and window changed
9 05.02.2016 Y.El Gamal complete revison
10 11.03.2016 A.Ising add gascooling system and pipes
11 16.03.2016 A.Ising modification ventilation hygenisation
12 16.03.2016 A.Ising changing EMSR numbers CHP A & B
el
el
el
el
el
el
el
el
el
el
el
el
el
el
elel
el
el
el
el
K:\P
roje
ktab
wic
klun
g\P
roje
kte\
2015
\15-
004
AB
Pro
duce
(UK
)\11
Zeic
hnun
gen\
08 R
+I _
F-M
atrix
\15-
004_
3.V
T01-
13_A
I__.
dwg
Project team:projectmanagement:constructionmanagement:project planning:
call number:
call number:
call number:
changed:
examined:
drawn:
namedate
drawing number:
scale:
kind of the changenamedatenr.
representation:
measure:
owner:
We
poss
es a
cop
yrig
ht a
t our
des
igns
. The
se d
esig
ns m
ay b
e us
edon
ly fo
r the
per
sona
l use
. We
ask
for r
etur
n du
ring
disu
se.
Dup
licat
ion
is n
ot a
llow
ed.
page number
project number
building place:
EnviTec Biogas AGBoschstr. 2 - 48369 SaerbeckT +49 25 74 / 88 88-0F +49 25 74 / 88 88-800E info@envitec-biogas.deW www.envitec-biogas.de
FO 14 KP 02.4 AB Produce R+I
Construction of abiogas plant AB Produce
R + I
15-004_3.VT01/0-1315-0043.VT01without
12.01.2015 A.Ising
19.07.2016 A.Ising
Frank Hansen +49 (172) 4596408
+49 (172)
Andreas Ising +49 (2574)8888-127
Ising, Andreas ISO full bleed A0 (841.00 x 1189.00 mm)
09.0
8.20
12 1
2:54
:21
1 09.02.2015 A.Ising general changes
2 24.03.2015 A.Ising add transmitter ch4 & h2s in hyg. room/condensat from technical building
3 06.05.2015 A.Ising add bull eyes and ex lamp storage tank
4 19.11.2015 A.Ising general changes
5 25.11.2015 A.Ising remove pipes 8,17,25,26
6 09.12.2015 A.Ising modification pneumatik compressor
7 08.02.2016 A.Ising add second chp (B)
8 23.02.2016 A.Ising remove pump P4106 & P1715
9 09.03.2016 A.Ising V2106 now Mapro CL 220HS
10 14.03.2016 A.Ising modification separtion and lagoon
11 16.03.2016 A.Ising modification ventilation hygenisation
12 04.04.2016 A.Ising add A_171404 ,B_171404, A171508,B_170408, B_170409
13 19.07.2016 A.Ising modification heating system
CombustionAir
Gas1192 kW
Gas Engine
HeatExchanger
ExhaustStack
Generator
EngineCooler
499kW toGrid
EmergencyCooler
516 kWto DigesterPasteurisersEtc
Exhaust Gas
Fig 5 Combined Heat & Power Plant Flow Sheet
AB Produce PLC AD Plant
Pump ControlLevels
Condensate
Liquid Seal
Intermittent condensate Discharge to Digestate System from Submersible Pump
Fig 6 Condensate Collection ! & Disposal System
AB Produce PLC AD Plant