1 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

I SANITARY AND PLUMBING WORKS1.01 SEWER AND DRAINAGE

1.01.01 PVC STRAIGHT PIPES1.0 PVC pipes 250 mm x 3m 144.00 lm 1.1912% 158,140.80 2.0 PVC pipes 200 mm x 3m 300.00 lm 1.5020% 199,410.00 3.0 PVC pipes 150 mm x 3m 1,275.00 lm 4.1633% 552,712.50 4.0 PVC pipes 100mm x 3m 879.00 lm 1.3394% 177,821.70 5.0 PVC pipes 75mm x 3m 408.00 lm 0.4667% 61,961.60 6.0 PVC pipes 50mm x 3m 825.00 lm 0.4402% 58,437.50

1.01.021.0 200 mm Ø 70.00 pc/s 0.4459% 59,202.50

PVC Bend 90°

2 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.0 150 mm Ø 180.00 pc/s 0.5912% 78,489.00 3.0 100 mm Ø 270.00 pc/s 0.1411% 18,727.20 4.0 75 mm Ø 26.00 pc/s 0.0082% 1,082.90 5.0 50 mm Ø 325.00 pc/s 0.0566% 7,514.00

1.01.021.0 300 mm Ø pc/s2.0 200 mm Ø 25.00 pc/s 0.1224% 16,256.25 3.0 150 mm Ø 165.00 pc/s 0.4310% 57,222.00 4.0 100 mm Ø 195.00 pc/s 0.0780% 10,359.38 5.0 75 mm Ø 25.00 pc/s 0.0063% 837.25 6.0 50 mm Ø 185.00 pc/s 0.0257% 3,412.33

1.01.03 PVC Wye1.0 300 mm Ø pc/s2.0 200 mm Ø pc/s3.0 150 mm Ø 55.00 pc/s 0.3412% 45,300.75 4.0 100 mm Ø 50.00 pc/s 0.0419% 5,567.50 5.0 75 mm Ø pc/s

1.01.04 PVC Wye Reducer1.0 150 x 100 mm Ø 140.00 pc/s 0.6176% 81,991.00 2.0 150 x 75 mm Ø 45.00 pc/s 0.2414% 32,053.50 3.0 150 x 50 mm Ø pc/s4.0 100 x 75 mm Ø 25.00 pc/s 0.0277% 3,676.25 5.0 100 x 50 mm Ø 100.00 pc/s 0.0698% 9,265.00 6.0 75 x 50 mm Ø 45.00 pc/s 0.0303% 4,016.25

PVC Bend 45°

3 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.01.05 PVC Tee1.0 150 mm Ø pc/s2.0 50 mm Ø 320.00 pc/s 0.0781% 10,363.20

1.01.06 PVC Tee Reducer1.0 100 x 75 mm Ø pc/s2.0 100 x 50 mm Ø 40.00 pc/s 0.0292% 3,876.00 3.0 75 x 50 mm Ø pc/s

1.01.07 PVC Reducer

1.0 100 x 50 mm Ø 7.00 pc/s 0.0061% 803.25

2.0 75 x 50 mm Ø 2.00 pc/s 0.0013% 166.60

1.01.08 PVC P-Trap1.0 100 mm Ø pc/s2.0 75 mm Ø 65.00 pc/s 0.0624% 8,287.50 3.0 50 mm Ø 10.00 pc/s 0.0054% 716.55

1.01.09 FCO1.0 150 mm Ø 49.00 pc/s 0.3115% 46,119.29 2.0 100 mm Ø 36.00 pc/s 0.1931% 28,594.80 3.0 75 mm Ø pc/s

1.01.10 Rubber Insulation1.0 100 mm Ø 90.00 pc/s 0.2341% 31,081.50 2.0 75 mm Ø 120.00 pc/s 0.2793% 37,080.00 3.0 32 mm Ø 35.00 pc/s 0.0495% 6,573.70

1.01.11 PVC Endcap

4 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 100 mm Ø 2.00 pc/s 0.0008% 112.80 2.0 75 mm Ø 6.00 pc/s 0.0015% 201.48

1.01.12 CCO1.0 150 mm Ø 20.00 pc/s 0.0801% 10,628.20 2.0 100 mm Ø 8.00 pc/s 0.0038% 507.60

1.01.13 Reinforced Concrete Pipe : Note : Included on Site Dev. Contractor

1.02 WATERLINE1.02.01 PPR Pipes

1.0 150 mm Ø x 4 m lm2.0 100 mm Ø x 4 m 300.00 lm 4.5195% 600,000.00 3.0 90 mm Ø x 4 m 232.00 lm 2.4756% 328,660.48 4.0 75 mm Ø x 4 m 88.00 lm 0.6204% 82,368.00 5.0 50 mm Ø x 4 m 800.00 lm 2.3338% 309,832.00 6.0 40 mm Ø x 4 m 192.00 lm 0.4175% 55,422.72 7.0 32 mm Ø x 4 m 200.00 lm 0.2542% 33,750.00 8.0 20 mm Ø x 4 m 440.00 lm 0.2133% 28,314.00

1.02.021.0 100 mm Ø 25.00 pc/s 0.2938% 39,000.00 2.0 90 mm Ø 33.00 pc/s 0.3231% 42,900.00 3.0 75 mm Ø 5.00 pc/s 0.0196% 2,600.00 4.0 65 mm Ø 20.00 pc/s 0.0490% 6,500.00 5.0 50 mm Ø 65.00 pc/s 0.0793% 10,530.00 6.0 40 mm Ø 85.00 pc/s 0.0321% 4,263.60

PPR Elbow 90°

5 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

7.0 32 mm Ø 110.00 pc/s 0.0252% 3,344.00 8.0 20 mm Ø 245.00 pc/s 0.0408% 5,414.50

1.02.03 PPR Tee Standard1.0 100 mm Ø 2.00 pc/s 0.0245% 3,250.00 2.0 90 mm Ø 3.00 pc/s 0.0169% 2,249.70 3.0 65 mm Ø 4.00 pc/s 0.0110% 1,456.00 4.0 50 mm Ø 5.00 pc/s 0.0050% 669.10 5.0 40 mm Ø 2.00 pc/s 0.0012% 153.40 6.0 32 mm Ø pc/s7.0 20 mm Ø 5.00 pc/s 0.0006% 73.45

1.02.04 PPR Tee Reducer1.0 90 × 75 mm Ø pc/s2.0 100 × 65 mm Ø 1.00 pc/s 0.0049% 646.75 3.0 90 × 20 mm Ø 7.00 pc/s 0.0219% 2,902.90 4.0 40 × 20 mm Ø 50.00 pc/s 0.0255% 3,386.50 5.0 40 × 32 mm Ø 48.00 pc/s 0.0310% 4,112.64 6.0 32 × 20 mm Ø 15.00 pc/s 0.0043% 575.25 7.0 20 × 15 mm Ø 2.00 pc/s 0.0003% 36.40

1.02.05 PPR Reducer1.0 100 × 75 mm Ø 1.00 pc/s 0.0030% 399.02 2.0 90 × 40 mm Ø pc/s3.0 40 × 32 mm Ø 4.00 pc/s 0.0008% 104.44 4.0 32 × 20 mm Ø 1.00 pc/s 0.0001% 14.69 5.0 20 × 15 mm Ø pc/s

6 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.02.06 PPR End Cap1.0 20 mm Ø 110.00 pc/s 0.0061% 807.40

1.02.07 PPR Male Adaptor1.0 32 mm Ø 12.00 pc/s 0.0330% 4,386.84 2.0 15 mm Ø 68.00 pc/s 0.0738% 9,792.00

1.02.08 PPR Female Adaptor1.0 32 mm Ø pc/s2.0 25 mm Ø pc/s3.0 20 mm Ø pc/s4.0 15 mm Ø 2.00 pc/s 0.0016% 215.42

1.02.09 Hose Bibb1.0 15 mm Ø 26.00 pc/s 0.0350% 4,641.00

1.02.10 Gate Valves1.0 150 mm Ø 1.00 pc/s 0.1659% 29,427.00 2.0 100 mm Ø 4.00 pc/s 0.5362% 93,228.00 3.0 90 mm Ø 10.00 pc/s 1.1287% 192,270.00 4.0 75 mm Ø 2.00 pc/s 0.1833% 30,294.00 5.0 65 mm Ø 6.00 pc/s 0.4488% 71,400.00 6.0 50 mm Ø 6.00 pc/s 0.0529% 7,833.60 7.0 40 mm Ø 12.00 pc/s 0.0937% 13,875.24 8.0 32 mm Ø 6.00 pc/s 0.0254% 3,755.22 9.0 25 mm Ø 1.00 pc/s 0.0046% 680.00

10.0 20 mm Ø 14.00 pc/s 0.0520% 7,700.00 1.02.11 Check Valve

7 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 300 mm Ø 1.00 pc/s 0.4597% 85,000.00 2.0 200 mm Ø pc/s3.0 75 mm Ø 2.00 pc/s 0.1964% 32,800.00 4.0 50 mm Ø 2.00 pc/s 0.0326% 4,830.00 5.0 40 mm Ø 1.00 pc/s 0.0142% 2,223.60

1.02.12 Float Valve1.0 100 mm Ø 4.00 pc/s 2.0792% 390,252.00

1.02.13 Pressure Relief Valve1.0 75 mm Ø 2.00 pc/s 0.8052% 150,000.00

1.02.14 Equalizing Valve1.0 150 mm Ø 1.00 pc/s 0.1814% 32,427.00

1.02.15 Drain Valve1.0 65 mm Ø pc/s2.0 50 mm Ø 2.00 pc/s 0.0326% 4,830.00

1.02.16 Y Strainer1.0 100 mm Ø 3.00 pc/s 0.3330% 56,610.00

1.02.17 Water Meter1.0 40 mm Ø 4.00 pc/s 0.2465% 37,454.40 2.0 32 mm Ø 1.00 pc/s 0.0587% 8,790.77 3.0 15 mm Ø 2.00 pc/s 0.0275% 4,075.92

1.02.18 Flexible Connector1.0 75 mm Ø 4.00 pc/s 0.0753% 10,000.00 2.0 50 mm Ø 4.00 pc/s 0.0557% 7,400.00

1.02.19 Union Patente

8 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 65 mm Ø 8.00 pc/s 0.0899% 11,939.68 2.0 50 mm Ø 15.00 pc/s 0.1188% 15,765.15

1.02.20 Pressure Gauge1.0 75 mm Ø 2.00 pc/s 0.0211% 3,000.00

1.03 PUMPS, CONTROLLERS, TANKS & MISCELLANEOUS1.03.01 Domestic and Sanitary Pumps and Controllers

1.0 1.00 unit/s 0.2078% ByOwner

2.0 1.00 unit/s 0.1039% ByOwner

1.03.02 Tanks1.0 2.00 unit/s 6.9619% 1,170,164.50

Constant Pressure System Pump (Potable) 2 Units Duplex End Suction Centrifugal Type Electric Driven 60 GPM each, 130 ft. TDH,3550 RPM, 5HP, 380 Volts 3Ø PHASE 60 Cycle

Booster Pump (Non-Potable for Irrigation) (2 unit Duplex) End Suction Centrifugal Type Electric Driven 50 GPM each, 50 ft. TDH, 3550 RPM, 3HP, 230 V, 1Ø Phase 60 Cycle

Weida Tanks 2990mmØ × 4840mm HIGH Capacity: 7650 Gallons or 29,000 Liters each TOTAL: 15,300 Gallons w/ Complete Accessories

9 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.0 2.00 unit/s 0.1039% ByOwner

1.03.03 Plumbing Fixtures1.0 Water Closet 38.00 pc/s 0.0790% ByOwner 2.0 Urinal 20.00 pc/s 0.0727% ByOwner 3.0 Lavatory 23.00 pc/s 0.0836% ByOwner

1.03.04 Drains1.0 Floor Drain 150mmØ pc/s2.0 Floor Drain 100mmØ 71.00 pc/s 0.4613% 68,302.00 3.0 Floor Drain 75mmØ 86.00 pc/s 0.3871% 57,316.42 4.0 Gutter Drain 200mmØ 22.00 pc/s 0.3331% 49,318.72 5.0 Gutter Drain 150mmØ 28.00 pc/s 0.2864% 42,411.60 6.0 Gutter Drain 100mmØ 40.00 pc/s 0.2455% 36,352.80

1.03.05 Trench Drain1.0 1.00 pc/s 0.0156% 2,315.00

1.03.06 Trench & Grating1.03.07 Stainless Steel Ladder Rung pc/s1.03.08 Area Drain/Catch Basin Note : Included on Site Dev. Contractor

II SUNDRIESItems which the Contractor requires which are not included inItemized Cost Breakdown (ICB) and is required to comply withthe issued Bid Plans, Specifications, Bid Bulletins and OtherRelated Bid Documents.

220 Gallons Capacity Bladder Tanks (pre-wired and pre-pipe) with complete accessories

150 mm Ø

10 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

Each Items are listed below.

SANITARY AND PLUMBING WORKS1.01 SEWER AND DRAINAGE

PVC STRAIGHT PIPESPVC Blue pipes 40mm x 3m 84.00 lm 0.0272% 3,612.00

40 mm Ø PVC Blue Elbow 110.00 pc/s 0.0176% 2,332.00 PVC Reducer

150 x 100 mm Ø 15.00 pc/s 0.0269% 3,570.00 63 x 40 mm Ø PVC Blue Coupling Reducer 30.00 pc/s 0.0104% 1,381.50

Overflow Check Valve, 200 mm Ø 1.00 pc/s 0.1626% 22,841.68 Isolation Check Valve, 150 mm Ø 1.00 pc/s 0.1281% 17,994.64 Excavation & Backfilling Works (for Sewer Line) 350.00 cu.m. 0.7273% -

1.02 WATERLINEPPR Pipes

25 mm Ø x 4 m 120.00 lm 0.0875% 11,618.40 63 mm Ø x 4 m 20.00 lm 0.0857% 11,375.00

25 mm Ø 45.00 pc/s 0.0115% 1,521.00 PPR Tee Standard

75 mm Ø 1.00 pc/s 0.0035% 462.67 PPR Tee Reducer

PVC Bend 90°

PPR Elbow 90°

11 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

100 × 75 mm Ø 1.00 pc/s 0.0049% 646.75 90 × 50 mm Ø 2.00 pc/s 0.0062% 829.40 90 × 40 mm Ø 2.00 pc/s 0.0062% 829.40 90 × 25 mm Ø 2.00 pc/s 0.0108% 1,429.40 75 × 50 mm Ø 2.00 pc/s 0.0037% 487.50 75 × 40 mm Ø 1.00 pc/s 0.0018% 243.75 75 × 32 mm Ø 2.00 pc/s 0.0037% 487.50 75 × 20 mm Ø 1.00 pc/s 0.0018% 243.75 65 × 50 mm Ø 4.00 pc/s 0.0046% 611.00 65 × 32 mm Ø 2.00 pc/s 0.0023% 305.50 65 × 20 mm Ø 2.00 pc/s 0.0023% 305.50 50 × 32 mm Ø 2.00 pc/s 0.0012% 165.10 50 × 20 mm Ø 23.00 pc/s 0.0143% 1,898.65 40 × 25 mm Ø 12.00 pc/s 0.0073% 969.36 32 × 25 mm Ø 3.00 pc/s 0.0010% 137.10

PPR Reducer 90 × 75 mm Ø 1.00 pc/s 0.0020% 260.00 90 × 65 mm Ø 9.00 pc/s 0.0176% 2,340.00 90 × 20 mm Ø 1.00 pc/s 0.0020% 260.00 75 × 20 mm Ø 4.00 pc/s 0.0047% 624.00 65 × 50 mm Ø 12.00 pc/s 0.0088% 1,170.00 50 × 40 mm Ø 2.00 pc/s 0.0009% 117.00 40 × 25 mm Ø 1.00 pc/s 0.0002% 24.48 40 × 20 mm Ø 2.00 pc/s 0.0003% 45.70

12 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

25 × 20 mm Ø 90.00 pc/s 0.0088% 1,170.00 PPR Male Adaptor

65 mm Ø 17.00 pc/s 0.1681% 22,319.98 50 mm Ø 26.00 pc/s 0.1655% 21,970.00 40 mm Ø 26.00 pc/s 0.1387% 18,415.54 25 mm Ø 2.00 pc/s 0.0026% 347.62

Gate Valves (With Padlock)20 mm Ø 21.00 pc/s 0.0839% 12,423.60

Union Patente40 mm Ø 1.00 pc/s 0.0052% 685.44

PPR Coupling Plain100 mm Ø 75.00 pc/s 0.3672% 48,750.00 90 mm Ø 40.00 pc/s 0.1371% 18,200.00 75 mm Ø 16.00 pc/s 0.0313% 4,160.00 65 mm Ø 2.00 pc/s 0.0024% 312.00 50 mm Ø 140.00 pc/s 0.0823% 10,920.00 40 mm Ø 25.00 pc/s 0.0060% 795.50 32 mm Ø 10.00 pc/s 0.0018% 244.80 25 mm Ø 10.00 pc/s 0.0015% 195.00 20 mm Ø 25.00 pc/s 0.0024% 325.00

PPR Flange100 mm Ø 17.00 pc/s 0.0792% 10,515.01 90 mm Ø 38.00 pc/s 0.1350% 17,922.70 75 mm Ø 12.00 pc/s 0.0219% 2,908.20

13 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

Tee Female Adaptor 20 mm Ø 110.00 pc/s 0.1616% 21,450.00

Elbow Female Adaptor 32 mm Ø 36.00 pc/s 0.0956% 12,690.36 25 mm Ø 17.00 pc/s 0.0209% 2,774.40 20 mm Ø 7.00 pc/s 0.0082% 1,092.00

Foot Valve 75 mm Ø 3.00 pc/s 0.4324% 75,735.00

G.I. Street Elbow 50 mm Ø 1.00 pc/s 0.0012% 170.34

G.I. Slip-On Flange 150 mm Ø 4.00 pc/s 0.0242% 3,468.00

1.03 PUMPS, CONTROLLERS, TANKS & MISCELLANEOUS1.03.03 Plumbing Fixtures

Shower 4.00 pc/s 0.0073% By Owner Kitchen Sink 2.00 pc/s 0.0073% By Owner Wash Basin 30.00 pc/s 0.1091% By Owner Grease Trap, 5 GPM 2.00 pc/s 0.0083% By Owner

NOTE : Not included on these costs are the following: (Fire Protection Works)III FIRE PROTECTION WORKS Ground Floor : Grid Line B/F - 1/11 & Grid Line P/W -11/16

2.01 BLACK IRON PIPES AND FITTINGS Second Floor : Grid Line B/W - 1/62.01.01 Bl Pipes Schedule 40

14 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 250 mm Ø 1.00 lght 0.1942% 27,688.72 2.0 200 mm Ø 1.00 lght 0.1092% 15,571.12 3.0 150 mm Ø 48.00 lght 2.4400% 347,921.28 4.0 100 mm Ø 190.00 lght 5.7733% 823,228.20 5.0 80 mm Ø 52.00 lght 1.0525% 150,075.12 6.0 65 mm Ø 25.00 lght 0.3744% 53,380.50 7.0 50 mm Ø 60.00 lght 0.6132% 87,436.80 8.0 40 mm Ø 120.00 lght 0.8709% 124,185.60 9.0 32 mm Ø 185.00 lght 1.0823% 154,334.40

10.0 25 mm Ø 485.00 lght 2.2018% 313,959.90 2.01.02 Elbow 90°

1.0 150 mm Ø 18.00 pc/s 0.0962% 13,724.10 2.0 100 mm Ø 33.00 pc/s 0.0998% 14,235.21 3.0 80 mm Ø 18.00 pc/s 0.0489% 6,976.26 4.0 65 mm Ø 22.00 pc/s 0.0249% 3,553.00 5.0 50 mm Ø 10.00 pc/s 0.0094% 1,335.00 6.0 40 mm Ø 15.00 pc/s 0.0093% 1,327.50 7.0 32 mm Ø 36.00 pc/s 0.0168% 2,394.00 8.0 25 mm Ø 1280.00 pc/s 0.3575% 50,982.40

2.01.03 Tee Standard1.0 150 mm Ø 10.00 pc/s 0.0535% 7,624.50 2.0 100 mm Ø 41.00 pc/s 0.1240% 17,686.17 3.0 80 mm Ø 2.00 pc/s 0.0050% 713.00 4.0 65 mm Ø pc/s

15 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

5.0 50 mm Ø 110.00 pc/s 0.1342% 19,140.00 6.0 40 mm Ø 58.00 pc/s 0.0480% 6,844.00 7.0 32 mm Ø 34.00 pc/s 0.0222% 3,162.00 8.0 25 mm Ø 290.00 pc/s 0.1062% 15,138.00

2.01.04 Tee Reducer1.0 250 x 150 mm Ø 1.00 pc/s 0.0251% 3,580.00 2.0 100 x 80 mm Ø 10.00 pc/s 0.0303% 4,313.70 3.0 100 x 65 mm Ø 1.00 pc/s 0.0030% 431.37 4.0 80 x 65 mm Ø 2.00 pc/s 0.0050% 713.00 5.0 80 x 50 mm Ø 2.00 pc/s 0.0050% 713.00 6.0 50 x 25 mm Ø 8.00 pc/s 0.0117% 1,664.00 7.0 40 x 25 mm Ø 250.00 pc/s 0.2481% 35,375.00 8.0 32 x 25 mm Ø 260.00 pc/s 0.1956% 27,885.00 9.0 25 x 15 mm Ø pc/s

2.01.05 Reducer1.0 50 x 40 mm Ø 160.00 pc/s 0.1119% 15,960.00 2.0 50 x 32 mm Ø 80.00 pc/s 0.0560% 7,980.00 3.0 50 x 25 mm Ø 98.00 pc/s 0.0686% 9,775.50 4.0 40 x 32mm Ø 205.00 pc/s 0.0989% 14,099.90 5.0 40 x 25 mm Ø 47.00 pc/s 0.0227% 3,232.66 6.0 32 x 25 mm Ø 250.00 pc/s 0.0934% 13,322.50 7.0 25 x 15 mm Ø pc/s

2.01.06 Flanges1.0 250 mm Ø 8.00 pc/s 0.1143% 16,303.68

16 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.0 150 mm Ø 12.00 pc/s 0.0417% 5,940.00 3.0 100 mm Ø 80.00 pc/s 0.2148% 30,624.00 4.0 80 mm Ø 36.00 pc/s 0.0766% 10,929.60 5.0 65 mm Ø 16.00 pc/s 0.0296% 4,224.00

2.01.07 End Capped1.0 100 mm Ø pc/s2.0 80 mm Ø pc/s3.0 65 mm Ø pc/s4.0 50 mm Ø 44.00 pc/s 0.0659% 9,262.88

2.01.08 Threadolet1.0 50 mm Ø 165.00 pc/s 0.4027% 57,420.00 2.0 40 mm Ø 85.00 pc/s 0.1645% 23,460.00 3.0 32 mm Ø 45.00 pc/s 0.0530% 7,560.00

2.01.09 Elbow 90° (Grooved End Type)1.0 100 mm Ø pc/s

2.01.10 Victaulic Mechanical Tee1.0 150 mm Ø pc/s

2.01.11 Victaulic Flexible Coupling1.0 250 mm Ø 2.00 pc/s 0.0470% 6,606.96 2.0 150 mm Ø 12.00 pc/s 0.0822% 11,550.96 3.0 100 mm Ø 8.00 pc/s 0.0295% 4,149.92 4.0 65 mm Ø 2.00 pc/s 0.0053% 737.86 5.0 25 mm Ø pc/s

2.01.12 Fire Extinguishers

17 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 20 lbs Automatic Wall Type Halogenic Agent PFE (HCFC) 1.00 pc/s 0.1385% 24,235.20 2.0 10 lbs Ceiling Type Halogenic Agent PFE (HCFC) 21.00 pc/s 2.4344% 427,971.60 3.0 10 lbs ABC Dry Chemical Portable Fire Extinguisher 78.00 pc/s 1.2597% 214,812.00

2.02 VALVES AND ACCESSORIES2.02.01 Gate Valve (OS & Y)

1.0 150 mm Ø 2.00 pc/s 0.3211% 56,810.00 2.0 20 mm Ø pc/s

2.02.02 Floor Control Valve1.0 100 mm Ø With Supervisory Switch 6.00 pc/s 0.4987% 81,000.00

2.02.03 Butterfly Valve (Grooved End Type) w/ Supervisory Switch

1.0 150 mm Ø pc/s2.0 100 mm Ø pc/s

2.02.04 Pressure Relief Valve w/ Waste Cone1.0 150 mm Ø pc/s

2.02.05 Check Valve 1.0 250 mm Ø 1.00 pc/s 0.3921% 72,986.51 2.0 150 mm Ø 2.00 pc/s 0.2470% 42,550.00

2.02.06 Alarm Check Valve 1.0 150 mm Ø pc/s

2.02.07 Fire Hose Valve w/ Cap & Chain1.0 65 mm Ø 5.00 pc/s 0.2208% 30,000.00

2.02.08 Sight Glass1.0 25 mm Ø 14.00 pc/s 0.0736% 10,500.00

18 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.02.09

1.0 4 - 65 mm Ø x 150 mm Ø 2.00 pc/s 0.3391% 62,284.90 2.02.10 Globe Valve

1.0 25 mm Ø 8.00 pc/s 0.0899% 13,880.16 2.02.11 Pressure Guage

1.0 25 mm Ø 19.00 pc/s 0.2002% 28,500.00 2.02.12 Victaulic Alarm Test Module

1.0 32 mm Ø pc/s

2.03 PUMPS, CONTROLLERS, SPRINKLERS, CABINETS, ETC.2.03.01 Sprinkler Heads

1.0 Upright Sprinkler Heads pc/s2.0 Upright Sprinkler Heads (20mmØ Large Orifice) 619.00 pc/s 1.8493% 272,075.26

3.0 Pendent Sprinkler Heads (Office) (20mmØ Large Orifice) 385.00 pc/s 1.6345% 240,474.85 2.03.02 Fire Hose Cabinets

1.0 Fire Hose Cabinet (Recessed Type) 12.00 set/s 1.0576% 174,000.00 2.0 Fire Man's Cabinet w/ Complete Accessories 1.00 set/s 0.3299% 58,412.34

3.0 Fire Hydrant2.03.03 Fire Pump & Jockey Pump

1.0 Fire Pump - Vertical Turbine Type Diesel Driven 1500 GPM, 150psi, 1770 RPM 1.00 pc/s 0.3377% By Owner

2.0 Jockey Pump - Vertical Turbine Type

Fire Department Connection (Wet Stand Pipe) w/ Check Snoot, Cap & Chain

19 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

Electric Driven 40GPM, 150psi, 3550 RPM, 10 HP, 380 Volts, 3Ø PHASE, 60 CYCLE 1.00 pc/s 0.2338% By Owner

IV SUNDRIESItems which the Contractor requires which are not included inItemized Cost Breakdown (ICB) and is required to comply withthe issued Bid Plans, Specifications, Bid Bulletins and OtherRelated Bid Documents.Each Items are listed below.

FIRE PROTECTION WORKS2.01 BLACK IRON PIPES AND FITTINGS

Tee ReducerTee Reducer, Standard200 x 150 mm Ø 2.00 pc/s 0.0222% 3,170.00 200 x 65 mm Ø 1.00 pc/s 0.0111% 1,585.00 150 x 100 mm Ø 13.00 pc/s 0.0695% 9,911.85 150 x 65 mm Ø 5.00 pc/s 0.0267% 3,812.25 100 x 50 mm Ø 285.00 pc/s 0.8622% 122,940.45 100 x 40 mm Ø 32.00 pc/s 0.0968% 13,803.84 100 x 32 mm Ø 4.00 pc/s 0.0121% 1,725.48 80 x 50 mm Ø 2.00 pc/s 0.0050% 713.00 80 x 40 mm Ø 55.00 pc/s 0.1375% 19,607.50 80 x 32 mm Ø 24.00 pc/s 0.0600% 8,556.00

20 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

65 x 32 mm Ø 5.00 pc/s 0.0109% 1,550.00 50 x 32 mm Ø 6.00 pc/s 0.0088% 1,248.00

ReducerBell Reducer250 x 200 mm Ø 2.00 pc/s 0.0224% 3,194.64 200 x 150 mm Ø 2.00 pc/s 0.0178% 2,533.68 100 x 80 mm Ø 6.00 pc/s 0.0128% 1,818.18 100 x 50 mm Ø 30.00 pc/s 0.0638% 9,090.90 80 x 50 mm Ø 19.00 pc/s 0.0247% 3,528.87 65 x 50 mm Ø 4.00 pc/s 0.0046% 660.00 Coupling Reducer25 x 20 mm Ø 1095.00 pc/s 0.2803% 39,967.50

Flexible Coupling200 mm Ø 2.00 pc/s 0.0251% 3,575.50

Blind Flange200 mm Ø 1.00 pc/s 0.0112% 1,600.00 150 mm Ø 9.00 pc/s 0.0498% 7,106.85

End Capped200 mm Ø 1.00 pc/s 0.0067% 955.00 150 mm Ø 9.00 pc/s 0.0481% 6,862.50

Union Patente50 mm Ø 20.00 pc/s 0.0515% 7,350.00 32 mm Ø 12.00 pc/s 0.0151% 2,160.00 25 mm Ø 27.00 pc/s 0.0239% 3,402.00

21 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.02 VALVES AND ACCESSORIESGate Valve (OS & Y)

200 mm Ø 1.00 pc/s 0.2533% 46,267.20 65 mm Ø 1.00 pc/s 0.0571% 8,500.00

Check Valve 65 mm Ø 1.00 pc/s 0.0609% 9,219.00

Alarm Check Valve 200 mm Ø 1.00 pc/s 0.4622% 86,475.60

Globe Valve32 mm Ø 12.00 pc/s 0.2247% 34,700.40

Air Release Valve25 mm Ø 6.00 pc/s 0.2922% 45,110.52

Waterflow Detector100 mm Ø 6.00 pc/s 0.2314% 33,000.00

FDC Manfold 2.00 pc/s 0.2379% 42,797.16 2.03 PUMPS, CONTROLLERS, SPRINKLERS, CABINETS, ETC.

2.03.01 Sprinkler HeadsSidewall Type Sprinkler Heads (20mmØ Large Orifice) 1.00 pc/s 0.0053% 786.54

VI MISCELLANEOUS WORKS, ETC3.01 PIPE SLEEVING 1.0 lot 0.4519% 60,000.00

3.02 HANGER'S AND SUPPORTS 1.0 lot 2.1468% 285,000.00

22 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

3.03 FIRE SEALANTS 1.0 lot 0.2636% 35,000.00

3.04 MISCELLANEOUS AND CONSUMABLES 1.0 lot 2.2147% 295,000.00

3.05 TESTING AND COMMISSIONING 1.0 lot 0.9091% 50,000.00

3.06 ELECTRICAL WORKS (including sprinkler alarm control system) 1.0 lot 1.4688% 195,000.00 TOTAL FOR SANITARY, PLUMBING & FIRE PROTECTION WORKS

IV PRELIMINARIES4.01 Mobilization/Demobilization 1.0 lot 0.5195%4.02 Permits and Licences 1.0 lot 0.6753%4.03 Bonds and Insurances

4.03.01 Surety 1.0 lot 0.2338%4.03.02 Performance Bond 1.0 lot 0.3377%4.03.03 Guarantee Bond 1.0 lot 0.2597%4.03.04 CARI 1.0 lot 0.6753%4.03.05 Contractor,s Employees,s Accident Insurance and CGL 1.0 lot 0.7792%

4.04 Temporary Facilities (Site Office, Warehouse, etc) 1.0 lot 1.5065%4.05 Submittals, Shop Drawing's and As - Built 1.0 lot 0.3117%4.06 Safety and Housekeeping 1.0 lot 1.0909%4.07 Site Management 1.0 lot 6.2338%

TOTAL 100.0000% 12,466,695.16

23 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

AAA Plumbing Services, Inc.

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

TOTAL VALUE OF ACCOMPLISHMENT TO DATELess : Ten Percent (10%) Retention 19.2305%

Recoupment of Down Payment(P 1,925,000.00 x Percentage of Accomplishment To Date)Progress Payment No. 1

TOTAL AMOUNT DUE THIS BILLING

Amount in Words : TWO MILION NINE HUNDRED SIXTY ONE THOUSAND FIVE HUNDRED THREE PESOS & 71/100 (P 2,961,503.71) ONLY.

Thank you very much for your usual kind attention.

Sincerely yours,

AAA Plumbing Se 4

RENATO T. CABAELV.P. - FinanceDate : May 30, 2015 `

24 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

Previous Present To Date Previous Present To Date

71,163.36 0.0000% 0.0000% - - 89,734.50 40.0000% 40.0000% 12.0000% 12.0000% 79,764.00 10,768.14 248,720.63 51.0000% 51.0000% 10.0000% 10.0000% 281,883.38 24,872.06 80,019.77 51.0000% 51.0000% 18.7700% 18.7700% 90,689.07 15,019.71 27,882.72 73.0000% 73.0000% 18.3800% 18.3800% 45,231.97 5,124.84 26,296.88 58.0000% 58.0000% 24.0000% 24.0000% 33,893.75 6,311.25

26,641.13 47.0000% 47.0000% 12.0000% 12.0000% 27,825.18 3,196.94

25 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

35,320.05 58.0000% 58.0000% 6.6700% 6.6700% 45,523.62 2,355.85 8,427.24 67.0000% 67.0000% 14.4400% 14.4400% 12,547.22 1,216.89 487.31 92.0000% 92.0000% 34.6200% 34.6200% 996.27 168.70 3,381.30 49.2000% 49.2000% 17.2300% 17.2300% 3,696.89 582.60

7,315.31 88.0000% 88.0000% 16.0000% 16.0000% 14,305.50 1,170.45 25,749.90 60.0000% 60.0000% 4.8000% 4.8000% 34,333.20 1,236.00 4,661.72 66.0000% 66.0000% 27.6900% 27.6900% 6,837.19 1,290.83 376.76 80.0000% 80.0000% 80.0000% 80.0000% 669.80 301.41 1,535.55 54.0000% 54.0000% 10.8100% 10.8100% 1,842.66 165.99

20,385.34 98.0000% 98.0000% 12.7300% 12.7300% 44,394.74 2,595.05 2,505.38 94.0000% 94.0000% 82.0000% 82.0000% 5,233.45 2,054.41

36,895.95 71.4000% 71.4000% 35.7100% 35.7100% 58,541.57 13,175.54 14,424.08 82.2000% 82.2000% 15.5600% 15.5600% 26,347.98 2,244.39

1,654.31 92.0000% 92.0000% 80.0000% 80.0000% 3,382.15 1,323.45 4,169.25 76.0000% 76.0000% 7.0000% 7.0000% 7,041.40 291.85 1,807.31 92.0000% 92.0000% 8.8000% 8.8000% 3,694.95 159.04

26 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

4,663.44 62.5000% 62.5000% 11.8800% 11.8800% 6,477.00 554.02

1,744.20 95.0000% 95.0000% 27.5000% 27.5000% 3,682.20 479.66

361.46 100.0000% 100.0000% 100.0000% 100.0000% 803.25 361.46

74.97 100.0000% 100.0000% 100.0000% 100.0000% 166.60 74.97

3,729.38 92.0000% 92.0000% 38.4600% 38.4600% 7,624.50 1,434.32 322.45 92.0000% 92.0000% 659.23 -

13,835.79 - - 8,578.44 - -

13,986.68 - - 16,686.00 - - 2,958.17 - -

27 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

50.76 - - 90.67 - -

4,782.69 - - 228.42 - -

270,000.00 - - 147,897.22 - - 37,065.60 - - 139,424.40 - - 24,940.22 - - 15,187.50 - - 12,741.30 - -

17,550.00 - - 19,305.00 - - 1,170.00 - - 2,925.00 - - 4,738.50 - - 1,918.62 - -

28 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

1,504.80 - - 2,436.53 - -

1,462.50 - - 1,012.37 - - 655.20 - - 301.10 - - 69.03 - -

33.05 - -

291.04 - - 1,306.31 - - 1,523.93 - - 1,850.69 - - 258.86 - - 16.38 - -

179.56 - -

47.00 - - 6.61 - -

29 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

363.33 - -

1,974.08 - - 4,406.40 - -

96.94 - -

2,088.45 - -

2,500.00 - - 10,000.00 - - 25,000.00 - - 5,000.00 - - 15,000.00 - - 2,350.08 - - 4,162.57 - - 1,126.57 - - 204.00 - - 2,310.00 - -

30 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

3,500.00 - -

5,000.00 - - 1,449.00 - - 508.05 - -

10,000.00 - -

5,000.00 - -

2,500.00 - -

1,449.00 - -

7,500.00 - -

10,000.00 - - 2,500.00 - - 1,222.78 - -

4,500.00 - - 3,330.00 - -

31 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

5,372.86 - - 7,094.32 - -

1,056.06 - -

40,000.00 -

20,000.00 -

170,000.00 - -

32 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

20,000.00 -

15,200.00 - 14,000.00 - 16,100.00 -

20,490.60 - - 17,194.93 - - 14,795.62 - - 12,723.48 - - 10,905.84 - -

694.50 - -

33 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

1,625.40 - -

1,049.40 - -

1,606.50 - - 621.68 - - 8,454.56 - - 6,660.49 - - 140,000.00 - -

5,228.28 - - 5,118.75 - -

684.45 - -

208.20 - -

34 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

291.04 - - 373.23 - - 373.23 - - 643.23 - - 219.38 - - 109.69 - - 219.38 - - 109.69 - - 274.95 - - 137.48 - - 137.48 - - 74.30 - - 854.39 - - 436.21 - - 61.70 - -

117.00 - - 1,053.00 - - 117.00 - - 280.80 - - 526.50 - - 52.65 - - 11.02 - - 20.57 - -

35 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

526.50 - -

10,043.99 - - 9,886.50 - - 8,286.99 - - 156.43 - -

3,727.08 - -

308.45 - -

21,937.50 - - 8,190.00 - - 1,872.00 - - 140.40 - - 4,914.00 - - 357.98 - - 110.16 - - 87.75 - - 146.25 - -

4,731.75 - - 8,065.22 - - 1,308.69 - -

36 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

9,652.50 - -

5,710.66 - - 1,248.48 - - 491.40 - -

7,500.00 - -

58.38 - -

1,188.56 - -

1,400.00 - 1,400.00 - 21,000.00 - 1,600.00 -

Not included on these costs are the following: (Fire Protection Works)Ground Floor : Grid Line B/F - 1/11 & Grid Line P/W -11/16

37 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

9,691.05 0.0000% 0.0000% - - 5,449.89 0.0000% 0.0000% - - 121,772.45 62.5000% 62.5000% 2.0800% 2.0800% 217,450.80 2,532.87 288,129.87 42.1000% 42.1000% 13.1600% 13.1600% 346,579.07 37,917.89 52,526.29 57.7000% 57.7000% 3.8000% 3.8000% 86,593.34 1,996.00 18,683.18 64.0000% 64.0000% 12.0000% 12.0000% 34,163.52 2,241.98 30,602.88 50.0000% 50.0000% 5.0000% 5.0000% 43,718.40 1,530.14 43,464.96 50.0000% 50.0000% 8.3300% 8.3300% 62,092.80 3,620.63 54,017.04 35.0000% 35.0000% 5.4000% 5.4000% 54,017.04 2,916.92 109,885.97 51.5500% 51.5500% 6.1800% 6.1800% 161,846.33 6,790.95

0.0000% 4,803.44 55.5500% 55.5500% 5.6000% 5.6000% 7,623.74 268.99 4,982.32 48.4800% 48.4800% 6.0600% 6.0600% 6,901.23 301.93 2,441.69 100.0000% 100.0000% 11.0000% 11.0000% 6,976.26 268.59 1,243.55 86.3600% 86.3600% 9.0900% 9.0900% 3,068.37 113.04 467.25 100.0000% 100.0000% 100.0000% 100.0000% 1,335.00 467.25 464.63 73.3300% 73.3300% 13.0000% 13.0000% 973.46 60.40 837.90 47.2200% 47.2200% 0.0000% 0.0000% 1,130.45 - 17,843.84 25.3900% 25.3900% 2.6500% 2.6500% 12,944.43 472.86

2,668.58 50.0000% 50.0000% 0.0000% 0.0000% 3,812.25 - 6,190.16 29.2600% 29.2600% 9.7600% 9.7600% 5,174.97 604.16 249.55 100.0000% 100.0000% 50.0000% 50.0000% 713.00 124.78

38 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

6,699.00 30.9000% 30.9000% 15.4500% 15.4500% 5,914.26 1,035.00 2,395.40 44.8300% 44.8300% 29.3100% 29.3100% 3,068.17 702.09 1,106.70 50.0000% 50.0000% 0.0000% 0.0000% 1,581.00 - 5,298.30 26.5500% 26.5500% 11.0000% 11.0000% 4,019.14 582.81

1,253.00 0.0000% 0.0000% 0.0000% - - 1,509.80 50.0000% 50.0000% 20.0000% 20.0000% 2,156.85 301.96 150.98 100.0000% 100.0000% 100.0000% 100.0000% 431.37 150.98 249.55 100.0000% 100.0000% 0.0000% 0.0000% 713.00 - 249.55 100.0000% 100.0000% 50.0000% 50.0000% 713.00 124.78 582.40 40.0000% 40.0000% 0.0000% 0.0000% 665.60 - 12,381.25 16.8000% 16.8000% 0.0000% 0.0000% 5,943.00 - 9,759.75 43.4600% 43.4600% 13.0800% 13.0800% 12,118.82 1,276.58

5,586.00 42.5000% 42.5000% 21.2500% 21.2500% 6,783.00 1,187.03 2,793.00 15.0000% 15.0000% 0.0000% 0.0000% 1,197.00 - 3,421.43 48.9000% 48.9000% 17.3500% 17.3500% 4,780.22 593.62 4,934.97 52.6800% 52.6800% 16.5900% 16.5900% 7,427.83 818.71 1,131.43 50.0000% 50.0000% 0.0000% 0.0000% 1,616.33 - 4,662.88 100.0000% 100.0000% 13.6000% 13.6000% 13,322.50 634.15

5,706.29 0.0000% 0.0000% 0.0000% - -

39 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

2,079.00 0.0000% 0.0000% 0.0000% - - 10,718.40 40.0000% 40.0000% 20.0000% 20.0000% 12,249.60 2,143.68 3,825.36 0.0000% 0.0000% 0.0000% - - 1,478.40 0.0000% 0.0000% 0.0000% - -

3,428.48 34.0000% 34.0000% 13.6400% 13.6400% 3,149.38 467.64

20,097.00 42.4200% 42.4200% 20.6100% 20.6100% 24,357.56 4,141.99 8,211.00 30.6000% 30.6000% 0.0000% 0.0000% 7,178.76 - 2,646.00 48.0000% 48.0000% 11.0000% 11.0000% 3,628.80 291.06

2,445.48 - - 4,275.48 - - 1,536.08 - - 273.10 - -

40 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

2,420.40 - - 40,651.59 - - 27,686.88 - -

5,000.00 - -

15,000.00 - -

2,500.00 - - 5,000.00 - -

12,500.00 - -

3,675.00 - -

41 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

3,000.00 - -

3,425.04 - -

10,032.57 - -

83,917.83 - -

74,174.10 - -

29,591.16 - - 5,083.98 - -

65,000.00 -

42 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

45,000.00 -

1,109.50 0.0000% 0.0000% 0.0000% - - 554.75 0.0000% 0.0000% 0.0000% - - 3,469.15 0.0000% 0.0000% 0.0000% - - 1,334.29 60.0000% 60.0000% 0.0000% 0.0000% 2,287.35 - 43,029.16 22.0000% 22.0000% 11.9200% 11.9200% 27,046.90 5,129.08 4,831.34 0.0000% 0.0000% 0.0000% - - 603.92 0.0000% 0.0000% 0.0000% - - 249.55 0.0000% 0.0000% 0.0000% - - 6,862.63 0.0000% 0.0000% 0.0000% - - 2,994.60 0.0000% 0.0000% 0.0000% - -

43 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

542.50 100.0000% 100.0000% 100.0000% 100.0000% 1,550.00 542.50 436.80 0.0000% 0.0000% 0.0000% - -

1,118.12 0.0000% 0.0000% 0.0000% - - 886.79 0.0000% 0.0000% 0.0000% - - 636.36 0.0000% 0.0000% 0.0000% - - 3,181.82 26.0000% 26.0000% 13.0000% 13.0000% 2,363.63 413.64 1,235.10 0.0000% 0.0000% 0.0000% - - 231.00 50.0000% 50.0000% 50.0000% 50.0000% 330.00 115.50

13,988.63 - -

1,251.43 - -

560.00 - - 2,487.40 - -

334.25 - - 2,401.88 - -

2,572.50 - - 756.00 - - 1,190.70 - -

44 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

2,500.00 - - 2,500.00 - -

2,500.00 - -

2,500.00 - -

8,562.60 - -

11,131.38 - -

11,550.00 - - 3,000.00 - -

242.61 - -

27,000.00 90.0000% 90.0000% 90.0000% 90.0000% 54,000.00 24,300.00

128,250.00 30.0000% 30.0000% 30.0000% 30.0000% 85,500.00 38,475.00

45 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

15,750.00 - -

131,321.49 30.0000% 30.0000% 30.0000% 30.0000% 88,500.00 39,396.45

125,000.00 - -

87,750.00 - -

100,000.00 48.0000% 48.0000% - 48,000.00 130,000.00 43.0000% 43.0000% - 55,900.00

45,000.00 100.0000% 100.0000% - 45,000.00 65,000.00 100.0000% 100.0000% - 65,000.00 50,000.00 - - 130,000.00 100.0000% 100.0000% - 130,000.00 150,000.00 - - 290,000.00 44.0000% 44.0000% - 127,600.00 60,000.00 67.0000% 67.0000% - 40,200.00 210,000.00 48.0000% 48.0000% - 100,800.00 1,200,000.00 43.0000% 43.0000% - 516,000.00

6,783,304.84 11.8950% 7.3355% 2,289,796.22 1,412,083.42

46 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

Total Amount Due >>>>

TOTAL COST PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS LABOR

19,250,000.00

TWO MILION NINE HUNDRED SIXTY ONE THOUSAND FIVE HUNDRED THREE PESOS & 71/100 (P 2,961,503.71) ONLY.

47 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- 90,532.14 306,755.44 105,708.78 50,356.81 40,205.00

31,022.11

48 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

47,879.47 13,764.12 1,164.97 4,279.49

15,475.95 35,569.20 8,128.02 971.21 2,008.65

46,989.79 7,287.86

71,717.12 28,592.36

4,705.60 7,333.25 3,853.99

49 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

7,031.02

4,161.86

1,164.71

241.57

9,058.82 659.23

- -

- - -

50 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- -

- -

- - - - - - -

- - - - - -

51 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- -

- - - - -

-

- - - - - -

-

- -

52 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

- -

-

-

- - - - - - - - - -

53 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

- - -

-

-

-

-

-

- - -

- -

54 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- -

-

-

-

-

55 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

- - -

- - - - -

-

56 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

-

- - - - -

- -

-

-

57 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- - - - - - - - - - - - - - -

- - - - - - - -

58 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

- - - -

-

-

- - - - - - - - -

- - -

59 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

- - -

-

-

-

- - - -

60 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- - 219,983.67 384,496.96 88,589.34 36,405.50 45,248.54 65,713.43 56,933.96 168,637.28

7,892.73 7,203.16 7,244.85 3,181.41 1,802.25 1,033.86 1,130.45 13,417.29

3,812.25 5,779.13 837.78

61 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

6,949.26 3,770.26 1,581.00 4,601.95

- 2,458.81 582.35 713.00 837.78 665.60 5,943.00 13,395.40

7,970.03 1,197.00 5,373.84 8,246.54 1,616.33 13,956.65

-

62 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- 14,393.28 - -

3,617.02

28,499.56 7,178.76 3,919.86

- - - -

63 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- - -

-

-

- -

-

-

64 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

-

-

-

-

- -

-

65 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

- - - 2,287.35 32,175.97 - - - - -

66 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

2,092.50 -

- - - 2,777.27 - 445.50

-

-

- -

- -

- - -

67 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

- -

-

-

-

-

- -

-

78,300.00

123,975.00

68 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

-

127,896.45

-

-

48,000.00 55,900.00

45,000.00 65,000.00 - 130,000.00 - 127,600.00 40,200.00 100,800.00 516,000.00

3,701,879.64

69 of 267 PROGRESS BILLING (APSI)

PROJECT NEOCP - 03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

PROGRESS BILLING NO. 1

2,961,503.71

TOTAL AMOUNT

3,701,879.64 (370,187.96)

(370,187.96)

2,961,503.71

70 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

I SANITARY AND PLUMBING WORKS1.01 SEWER AND DRAINAGE

1.01.01 PVC STRAIGHT PIPES1.0 PVC pipes 250 mm x 3m 144.00 lm 1.1912% 158,140.80 2.0 PVC pipes 200 mm x 3m 300.00 lm 1.5020% 199,410.00 3.0 PVC pipes 150 mm x 3m 1,275.00 lm 4.1633% 552,712.50 4.0 PVC pipes 100mm x 3m 879.00 lm 1.3394% 177,821.70 5.0 PVC pipes 75mm x 3m 408.00 lm 0.4667% 61,961.60 6.0 PVC pipes 50mm x 3m 825.00 lm 0.4402% 58,437.50

1.01.021.0 200 mm Ø 70.00 pc/s 0.4459% 59,202.50 2.0 150 mm Ø 180.00 pc/s 0.5912% 78,489.00 3.0 100 mm Ø 270.00 pc/s 0.1411% 18,727.20

PVC Bend 90°

71 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

4.0 75 mm Ø 26.00 pc/s 0.0082% 1,082.90 5.0 50 mm Ø 325.00 pc/s 0.0566% 7,514.00

1.01.021.0 300 mm Ø pc/s2.0 200 mm Ø 25.00 pc/s 0.1224% 16,256.25 3.0 150 mm Ø 165.00 pc/s 0.4310% 57,222.00 4.0 100 mm Ø 195.00 pc/s 0.0780% 10,359.38 5.0 75 mm Ø 25.00 pc/s 0.0063% 837.25 6.0 50 mm Ø 185.00 pc/s 0.0257% 3,412.33

1.01.03 PVC Wye1.0 300 mm Ø pc/s2.0 200 mm Ø pc/s3.0 150 mm Ø 55.00 pc/s 0.3412% 45,300.75 4.0 100 mm Ø 50.00 pc/s 0.0419% 5,567.50 5.0 75 mm Ø pc/s

1.01.04 PVC Wye Reducer1.0 150 x 100 mm Ø 140.00 pc/s 0.6176% 81,991.00 2.0 150 x 75 mm Ø 45.00 pc/s 0.2414% 32,053.50 3.0 150 x 50 mm Ø pc/s4.0 100 x 75 mm Ø 25.00 pc/s 0.0277% 3,676.25 5.0 100 x 50 mm Ø 100.00 pc/s 0.0698% 9,265.00 6.0 75 x 50 mm Ø 45.00 pc/s 0.0303% 4,016.25

1.01.05 PVC Tee1.0 150 mm Ø pc/s2.0 50 mm Ø 320.00 pc/s 0.0781% 10,363.20

PVC Bend 45°

72 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.01.06 PVC Tee Reducer1.0 100 x 75 mm Ø pc/s2.0 100 x 50 mm Ø 40.00 pc/s 0.0292% 3,876.00 3.0 75 x 50 mm Ø pc/s

1.01.07 PVC Reducer

1.0 100 x 50 mm Ø 7.00 pc/s 0.0061% 803.25

2.0 75 x 50 mm Ø 2.00 pc/s 0.0013% 166.60

1.01.08 PVC P-Trap1.0 100 mm Ø pc/s2.0 75 mm Ø 65.00 pc/s 0.0624% 8,287.50 3.0 50 mm Ø 10.00 pc/s 0.0054% 716.55

1.01.09 FCO1.0 150 mm Ø 49.00 pc/s 0.3115% 46,119.29 2.0 100 mm Ø 36.00 pc/s 0.1931% 28,594.80 3.0 75 mm Ø pc/s

1.01.10 Rubber Insulation1.0 100 mm Ø 90.00 pc/s 0.2341% 31,081.50 2.0 75 mm Ø 120.00 pc/s 0.2793% 37,080.00 3.0 32 mm Ø 35.00 pc/s 0.0495% 6,573.70

1.01.11 PVC Endcap1.0 100 mm Ø 2.00 pc/s 0.0008% 112.80 2.0 75 mm Ø 6.00 pc/s 0.0015% 201.48

1.01.12 CCO1.0 150 mm Ø 20.00 pc/s 0.0801% 10,628.20 2.0 100 mm Ø 8.00 pc/s 0.0038% 507.60

73 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.01.13 Reinforced Concrete Pipe : Note : Included on Site Dev. Contractor

1.02 WATERLINE1.02.01 PPR Pipes

1.0 150 mm Ø x 4 m lm2.0 100 mm Ø x 4 m 300.00 lm 4.5195% 600,000.00 3.0 90 mm Ø x 4 m 232.00 lm 2.4756% 328,660.48 4.0 75 mm Ø x 4 m 88.00 lm 0.6204% 82,368.00 5.0 50 mm Ø x 4 m 800.00 lm 2.3338% 309,832.00 6.0 40 mm Ø x 4 m 192.00 lm 0.4175% 55,422.72 7.0 32 mm Ø x 4 m 200.00 lm 0.2542% 33,750.00 8.0 20 mm Ø x 4 m 440.00 lm 0.2133% 28,314.00

1.02.021.0 100 mm Ø 25.00 pc/s 0.2938% 39,000.00 2.0 90 mm Ø 33.00 pc/s 0.3231% 42,900.00 3.0 75 mm Ø 5.00 pc/s 0.0196% 2,600.00 4.0 65 mm Ø 20.00 pc/s 0.0490% 6,500.00 5.0 50 mm Ø 65.00 pc/s 0.0793% 10,530.00 6.0 40 mm Ø 85.00 pc/s 0.0321% 4,263.60 7.0 32 mm Ø 110.00 pc/s 0.0252% 3,344.00 8.0 20 mm Ø 245.00 pc/s 0.0408% 5,414.50

1.02.03 PPR Tee Standard1.0 100 mm Ø 2.00 pc/s 0.0245% 3,250.00 2.0 90 mm Ø 3.00 pc/s 0.0169% 2,249.70 3.0 65 mm Ø 4.00 pc/s 0.0110% 1,456.00

PPR Elbow 90°

74 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

4.0 50 mm Ø 5.00 pc/s 0.0050% 669.10 5.0 40 mm Ø 2.00 pc/s 0.0012% 153.40 6.0 32 mm Ø pc/s7.0 20 mm Ø 5.00 pc/s 0.0006% 73.45

1.02.04 PPR Tee Reducer1.0 90 × 75 mm Ø pc/s2.0 100 × 65 mm Ø 1.00 pc/s 0.0049% 646.75 3.0 90 × 20 mm Ø 7.00 pc/s 0.0219% 2,902.90 4.0 40 × 20 mm Ø 50.00 pc/s 0.0255% 3,386.50 5.0 40 × 32 mm Ø 48.00 pc/s 0.0310% 4,112.64 6.0 32 × 20 mm Ø 15.00 pc/s 0.0043% 575.25 7.0 20 × 15 mm Ø 2.00 pc/s 0.0003% 36.40

1.02.05 PPR Reducer1.0 100 × 75 mm Ø 1.00 pc/s 0.0030% 399.02 2.0 90 × 40 mm Ø pc/s3.0 40 × 32 mm Ø 4.00 pc/s 0.0008% 104.44 4.0 32 × 20 mm Ø 1.00 pc/s 0.0001% 14.69 5.0 20 × 15 mm Ø pc/s

1.02.06 PPR End Cap1.0 20 mm Ø 110.00 pc/s 0.0061% 807.40

1.02.07 PPR Male Adaptor1.0 32 mm Ø 12.00 pc/s 0.0330% 4,386.84 2.0 15 mm Ø 68.00 pc/s 0.0738% 9,792.00

1.02.08 PPR Female Adaptor1.0 32 mm Ø pc/s

75 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.0 25 mm Ø pc/s3.0 20 mm Ø pc/s4.0 15 mm Ø 2.00 pc/s 0.0016% 215.42

1.02.09 Hose Bibb1.0 15 mm Ø 26.00 pc/s 0.0350% 4,641.00

1.02.10 Gate Valves1.0 150 mm Ø 1.00 pc/s 0.1659% 29,427.00 2.0 100 mm Ø 4.00 pc/s 0.5362% 93,228.00 3.0 90 mm Ø 10.00 pc/s 1.1287% 192,270.00 4.0 75 mm Ø 2.00 pc/s 0.1833% 30,294.00 5.0 65 mm Ø 6.00 pc/s 0.4488% 71,400.00 6.0 50 mm Ø 6.00 pc/s 0.0529% 7,833.60 7.0 40 mm Ø 12.00 pc/s 0.0937% 13,875.24 8.0 32 mm Ø 6.00 pc/s 0.0254% 3,755.22 9.0 25 mm Ø 1.00 pc/s 0.0046% 680.00

10.0 20 mm Ø 14.00 pc/s 0.0520% 7,700.00 1.02.11 Check Valve

1.0 300 mm Ø 1.00 pc/s 0.4597% 85,000.00 2.0 200 mm Ø pc/s3.0 75 mm Ø 2.00 pc/s 0.1964% 32,800.00 4.0 50 mm Ø 2.00 pc/s 0.0326% 4,830.00 5.0 40 mm Ø 1.00 pc/s 0.0142% 2,223.60

1.02.12 Float Valve1.0 100 mm Ø 4.00 pc/s 2.0792% 390,252.00

1.02.13 Pressure Relief Valve

76 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 75 mm Ø 2.00 pc/s 0.8052% 150,000.00 1.02.14 Equalizing Valve

1.0 150 mm Ø 1.00 pc/s 0.1814% 32,427.00 1.02.15 Drain Valve

1.0 65 mm Ø pc/s2.0 50 mm Ø 2.00 pc/s 0.0326% 4,830.00

1.02.16 Y Strainer1.0 100 mm Ø 3.00 pc/s 0.3330% 56,610.00

1.02.17 Water Meter1.0 40 mm Ø 4.00 pc/s 0.2465% 37,454.40 2.0 32 mm Ø 1.00 pc/s 0.0587% 8,790.77 3.0 15 mm Ø 2.00 pc/s 0.0275% 4,075.92

1.02.18 Flexible Connector1.0 75 mm Ø 4.00 pc/s 0.0753% 10,000.00 2.0 50 mm Ø 4.00 pc/s 0.0557% 7,400.00

1.02.19 Union Patente1.0 65 mm Ø 8.00 pc/s 0.0899% 11,939.68 2.0 50 mm Ø 15.00 pc/s 0.1188% 15,765.15

1.02.20 Pressure Gauge1.0 75 mm Ø 2.00 pc/s 0.0211% 3,000.00

1.03 PUMPS, CONTROLLERS, TANKS & MISCELLANEOUS1.03.01 Domestic and Sanitary Pumps and Controllers

77 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.0 1.00 unit/s 0.2078% ByOwner

2.0 1.00 unit/s 0.1039% ByOwner

1.03.02 Tanks1.0 2.00 unit/s 6.9619% 1,170,164.50

2.0 2.00 unit/s 0.1039% ByOwner

1.03.03 Plumbing Fixtures1.0 Water Closet 38.00 pc/s 0.0790% ByOwner 2.0 Urinal 20.00 pc/s 0.0727% ByOwner 3.0 Lavatory 23.00 pc/s 0.0836% ByOwner

1.03.04 Drains1.0 Floor Drain 150mmØ pc/s2.0 Floor Drain 100mmØ 71.00 pc/s 0.4613% 68,302.00

Constant Pressure System Pump (Potable) 2 Units Duplex End Suction Centrifugal Type Electric Driven 60 GPM each, 130 ft. TDH,3550 RPM, 5HP, 380 Volts 3Ø PHASE 60 Cycle

Booster Pump (Non-Potable for Irrigation) (2 unit Duplex) End Suction Centrifugal Type Electric Driven 50 GPM each, 50 ft. TDH, 3550 RPM, 3HP, 230 V, 1Ø Phase 60 Cycle

Weida Tanks 2990mmØ × 4840mm HIGH Capacity: 7650 Gallons or 29,000 Liters each TOTAL: 15,300 Gallons w/ Complete Accessories

220 Gallons Capacity Bladder Tanks (pre-wired and pre-pipe) with complete accessories

78 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

3.0 Floor Drain 75mmØ 86.00 pc/s 0.3871% 57,316.42 4.0 Gutter Drain 200mmØ 22.00 pc/s 0.3331% 49,318.72 5.0 Gutter Drain 150mmØ 28.00 pc/s 0.2864% 42,411.60 6.0 Gutter Drain 100mmØ 40.00 pc/s 0.2455% 36,352.80

1.03.05 Trench Drain1.0 1.00 pc/s 0.0156% 2,315.00

1.03.06 Trench & Grating1.03.07 Stainless Steel Ladder Rung pc/s1.03.08 Area Drain/Catch Basin Note : Included on Site Dev. Contractor

II SUNDRIESItems which the Contractor requires which are not included inItemized Cost Breakdown (ICB) and is required to comply withthe issued Bid Plans, Specifications, Bid Bulletins and OtherRelated Bid Documents.Each Items are listed below.

SANITARY AND PLUMBING WORKS1.01 SEWER AND DRAINAGE

PVC STRAIGHT PIPESPVC Blue pipes 40mm x 3m 84.00 lm 0.0272% 3,612.00

40 mm Ø PVC Blue Elbow 110.00 pc/s 0.0176% 2,332.00 PVC Reducer

150 x 100 mm Ø 15.00 pc/s 0.0269% 3,570.00 63 x 40 mm Ø PVC Blue Coupling Reducer 30.00 pc/s 0.0104% 1,381.50

150 mm Ø

PVC Bend 90°

79 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

Overflow Check Valve, 200 mm Ø 1.00 pc/s 0.1626% 22,841.68 Isolation Check Valve, 150 mm Ø 1.00 pc/s 0.1281% 17,994.64 Excavation & Backfilling Works (for Sewer Line) 350.00 cu.m. 0.7273% -

1.02 WATERLINEPPR Pipes

25 mm Ø x 4 m 120.00 lm 0.0875% 11,618.40 63 mm Ø x 4 m 20.00 lm 0.0857% 11,375.00

25 mm Ø 45.00 pc/s 0.0115% 1,521.00 PPR Tee Standard

75 mm Ø 1.00 pc/s 0.0035% 462.67 PPR Tee Reducer

100 × 75 mm Ø 1.00 pc/s 0.0049% 646.75 90 × 50 mm Ø 2.00 pc/s 0.0062% 829.40 90 × 40 mm Ø 2.00 pc/s 0.0062% 829.40 90 × 25 mm Ø 2.00 pc/s 0.0108% 1,429.40 75 × 50 mm Ø 2.00 pc/s 0.0037% 487.50 75 × 40 mm Ø 1.00 pc/s 0.0018% 243.75 75 × 32 mm Ø 2.00 pc/s 0.0037% 487.50 75 × 20 mm Ø 1.00 pc/s 0.0018% 243.75 65 × 50 mm Ø 4.00 pc/s 0.0046% 611.00 65 × 32 mm Ø 2.00 pc/s 0.0023% 305.50 65 × 20 mm Ø 2.00 pc/s 0.0023% 305.50 50 × 32 mm Ø 2.00 pc/s 0.0012% 165.10

PPR Elbow 90°

80 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

50 × 20 mm Ø 23.00 pc/s 0.0143% 1,898.65 40 × 25 mm Ø 12.00 pc/s 0.0073% 969.36 32 × 25 mm Ø 3.00 pc/s 0.0010% 137.10

PPR Reducer 90 × 75 mm Ø 1.00 pc/s 0.0020% 260.00 90 × 65 mm Ø 9.00 pc/s 0.0176% 2,340.00 90 × 20 mm Ø 1.00 pc/s 0.0020% 260.00 75 × 20 mm Ø 4.00 pc/s 0.0047% 624.00 65 × 50 mm Ø 12.00 pc/s 0.0088% 1,170.00 50 × 40 mm Ø 2.00 pc/s 0.0009% 117.00 40 × 25 mm Ø 1.00 pc/s 0.0002% 24.48 40 × 20 mm Ø 2.00 pc/s 0.0003% 45.70 25 × 20 mm Ø 90.00 pc/s 0.0088% 1,170.00

PPR Male Adaptor65 mm Ø 17.00 pc/s 0.1681% 22,319.98 50 mm Ø 26.00 pc/s 0.1655% 21,970.00 40 mm Ø 26.00 pc/s 0.1387% 18,415.54 25 mm Ø 2.00 pc/s 0.0026% 347.62

Gate Valves (With Padlock)20 mm Ø 21.00 pc/s 0.0839% 12,423.60

Union Patente40 mm Ø 1.00 pc/s 0.0052% 685.44

PPR Coupling Plain100 mm Ø 75.00 pc/s 0.3672% 48,750.00 90 mm Ø 40.00 pc/s 0.1371% 18,200.00

81 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

75 mm Ø 16.00 pc/s 0.0313% 4,160.00 65 mm Ø 2.00 pc/s 0.0024% 312.00 50 mm Ø 140.00 pc/s 0.0823% 10,920.00 40 mm Ø 25.00 pc/s 0.0060% 795.50 32 mm Ø 10.00 pc/s 0.0018% 244.80 25 mm Ø 10.00 pc/s 0.0015% 195.00 20 mm Ø 25.00 pc/s 0.0024% 325.00

PPR Flange100 mm Ø 17.00 pc/s 0.0792% 10,515.01 90 mm Ø 38.00 pc/s 0.1350% 17,922.70 75 mm Ø 12.00 pc/s 0.0219% 2,908.20

Tee Female Adaptor 20 mm Ø 110.00 pc/s 0.1616% 21,450.00

Elbow Female Adaptor 32 mm Ø 36.00 pc/s 0.0956% 12,690.36 25 mm Ø 17.00 pc/s 0.0209% 2,774.40 20 mm Ø 7.00 pc/s 0.0082% 1,092.00

Foot Valve 75 mm Ø 3.00 pc/s 0.4324% 75,735.00

G.I. Street Elbow 50 mm Ø 1.00 pc/s 0.0012% 170.34

G.I. Slip-On Flange 150 mm Ø 4.00 pc/s 0.0242% 3,468.00

1.03 PUMPS, CONTROLLERS, TANKS & MISCELLANEOUS

82 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

1.03.03 Plumbing FixturesShower 4.00 pc/s 0.0073% By Owner Kitchen Sink 2.00 pc/s 0.0073% By Owner Wash Basin 30.00 pc/s 0.1091% By Owner Grease Trap, 5 GPM 2.00 pc/s 0.0083% By Owner

NOTE : Not included on these costs are the following: (Fire Protection Works)III FIRE PROTECTION WORKS Ground Floor : Grid Line B/F - 1/11 & Grid Line P/W -11/16

2.01 BLACK IRON PIPES AND FITTINGS Second Floor : Grid Line B/W - 1/62.01.01 Bl Pipes Schedule 40

1.0 250 mm Ø 1.00 lght 0.1942% 27,688.72 2.0 200 mm Ø 1.00 lght 0.1092% 15,571.12 3.0 150 mm Ø 48.00 lght 2.4400% 347,921.28 4.0 100 mm Ø 190.00 lght 5.7733% 823,228.20 5.0 80 mm Ø 52.00 lght 1.0525% 150,075.12 6.0 65 mm Ø 25.00 lght 0.3744% 53,380.50 7.0 50 mm Ø 60.00 lght 0.6132% 87,436.80 8.0 40 mm Ø 120.00 lght 0.8709% 124,185.60 9.0 32 mm Ø 185.00 lght 1.0823% 154,334.40

10.0 25 mm Ø 485.00 lght 2.2018% 313,959.90 2.01.02 Elbow 90°

1.0 150 mm Ø 18.00 pc/s 0.0962% 13,724.10 2.0 100 mm Ø 33.00 pc/s 0.0998% 14,235.21 3.0 80 mm Ø 18.00 pc/s 0.0489% 6,976.26 4.0 65 mm Ø 22.00 pc/s 0.0249% 3,553.00

83 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

5.0 50 mm Ø 10.00 pc/s 0.0094% 1,335.00 6.0 40 mm Ø 15.00 pc/s 0.0093% 1,327.50 7.0 32 mm Ø 36.00 pc/s 0.0168% 2,394.00 8.0 25 mm Ø 1280.00 pc/s 0.3575% 50,982.40

2.01.03 Tee Standard1.0 150 mm Ø 10.00 pc/s 0.0535% 7,624.50 2.0 100 mm Ø 41.00 pc/s 0.1240% 17,686.17 3.0 80 mm Ø 2.00 pc/s 0.0050% 713.00 4.0 65 mm Ø pc/s5.0 50 mm Ø 110.00 pc/s 0.1342% 19,140.00 6.0 40 mm Ø 58.00 pc/s 0.0480% 6,844.00 7.0 32 mm Ø 34.00 pc/s 0.0222% 3,162.00 8.0 25 mm Ø 290.00 pc/s 0.1062% 15,138.00

2.01.04 Tee Reducer1.0 250 x 150 mm Ø 1.00 pc/s 0.0251% 3,580.00 2.0 100 x 80 mm Ø 10.00 pc/s 0.0303% 4,313.70 3.0 100 x 65 mm Ø 1.00 pc/s 0.0030% 431.37 4.0 80 x 65 mm Ø 2.00 pc/s 0.0050% 713.00 5.0 80 x 50 mm Ø 2.00 pc/s 0.0050% 713.00 6.0 50 x 25 mm Ø 8.00 pc/s 0.0117% 1,664.00 7.0 40 x 25 mm Ø 250.00 pc/s 0.2481% 35,375.00 8.0 32 x 25 mm Ø 260.00 pc/s 0.1956% 27,885.00 9.0 25 x 15 mm Ø pc/s

2.01.05 Reducer1.0 50 x 40 mm Ø 160.00 pc/s 0.1119% 15,960.00

84 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.0 50 x 32 mm Ø 80.00 pc/s 0.0560% 7,980.00 3.0 50 x 25 mm Ø 98.00 pc/s 0.0686% 9,775.50 4.0 40 x 32mm Ø 205.00 pc/s 0.0989% 14,099.90 5.0 40 x 25 mm Ø 47.00 pc/s 0.0227% 3,232.66 6.0 32 x 25 mm Ø 250.00 pc/s 0.0934% 13,322.50 7.0 25 x 15 mm Ø pc/s

2.01.06 Flanges1.0 250 mm Ø 8.00 pc/s 0.1143% 16,303.68 2.0 150 mm Ø 12.00 pc/s 0.0417% 5,940.00 3.0 100 mm Ø 80.00 pc/s 0.2148% 30,624.00 4.0 80 mm Ø 36.00 pc/s 0.0766% 10,929.60 5.0 65 mm Ø 16.00 pc/s 0.0296% 4,224.00

2.01.07 End Capped1.0 100 mm Ø pc/s2.0 80 mm Ø pc/s3.0 65 mm Ø pc/s4.0 50 mm Ø 44.00 pc/s 0.0659% 9,262.88

2.01.08 Threadolet1.0 50 mm Ø 165.00 pc/s 0.4027% 57,420.00 2.0 40 mm Ø 85.00 pc/s 0.1645% 23,460.00 3.0 32 mm Ø 45.00 pc/s 0.0530% 7,560.00

2.01.09 Elbow 90° (Grooved End Type)1.0 100 mm Ø pc/s

2.01.10 Victaulic Mechanical Tee1.0 150 mm Ø pc/s

85 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.01.11 Victaulic Flexible Coupling1.0 250 mm Ø 2.00 pc/s 0.0470% 6,606.96 2.0 150 mm Ø 12.00 pc/s 0.0822% 11,550.96 3.0 100 mm Ø 8.00 pc/s 0.0295% 4,149.92 4.0 65 mm Ø 2.00 pc/s 0.0053% 737.86 5.0 25 mm Ø pc/s

2.01.12 Fire Extinguishers1.0 20 lbs Automatic Wall Type Halogenic Agent PFE (HCFC) 1.00 pc/s 0.1385% 24,235.20 2.0 10 lbs Ceiling Type Halogenic Agent PFE (HCFC) 21.00 pc/s 2.4344% 427,971.60 3.0 10 lbs ABC Dry Chemical Portable Fire Extinguisher 78.00 pc/s 1.2597% 214,812.00

2.02 VALVES AND ACCESSORIES2.02.01 Gate Valve (OS & Y)

1.0 150 mm Ø 2.00 pc/s 0.3211% 56,810.00 2.0 20 mm Ø pc/s

2.02.02 Floor Control Valve1.0 100 mm Ø With Supervisory Switch 6.00 pc/s 0.4987% 81,000.00

2.02.03 Butterfly Valve (Grooved End Type) w/ Supervisory Switch

1.0 150 mm Ø pc/s2.0 100 mm Ø pc/s

2.02.04 Pressure Relief Valve w/ Waste Cone1.0 150 mm Ø pc/s

2.02.05 Check Valve 1.0 250 mm Ø 1.00 pc/s 0.3921% 72,986.51 2.0 150 mm Ø 2.00 pc/s 0.2470% 42,550.00

86 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

2.02.06 Alarm Check Valve 1.0 150 mm Ø pc/s

2.02.07 Fire Hose Valve w/ Cap & Chain1.0 65 mm Ø 5.00 pc/s 0.2208% 30,000.00

2.02.08 Sight Glass1.0 25 mm Ø 14.00 pc/s 0.0736% 10,500.00

2.02.09

1.0 4 - 65 mm Ø x 150 mm Ø 2.00 pc/s 0.3391% 62,284.90 2.02.10 Globe Valve

1.0 25 mm Ø 8.00 pc/s 0.0899% 13,880.16 2.02.11 Pressure Guage

1.0 25 mm Ø 19.00 pc/s 0.2002% 28,500.00 2.02.12 Victaulic Alarm Test Module

1.0 32 mm Ø pc/s

2.03 PUMPS, CONTROLLERS, SPRINKLERS, CABINETS, ETC.2.03.01 Sprinkler Heads

1.0 Upright Sprinkler Heads pc/s2.0 Upright Sprinkler Heads (20mmØ Large Orifice) 619.00 pc/s 1.8493% 272,075.26

3.0 Pendent Sprinkler Heads (Office) (20mmØ Large Orifice) 385.00 pc/s 1.6345% 240,474.85 2.03.02 Fire Hose Cabinets

1.0 Fire Hose Cabinet (Recessed Type) 12.00 set/s 1.0576% 174,000.00 2.0 Fire Man's Cabinet w/ Complete Accessories 1.00 set/s 0.3299% 58,412.34

Fire Department Connection (Wet Stand Pipe) w/ Check Snoot, Cap & Chain

87 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

3.0 Fire Hydrant2.03.03 Fire Pump & Jockey Pump

1.0 Fire Pump - Vertical Turbine Type Diesel Driven 1500 GPM, 150psi, 1770 RPM 1.00 pc/s 0.3377% By Owner

2.0 Jockey Pump - Vertical Turbine Type Electric Driven 40GPM, 150psi, 3550 RPM, 10 HP, 380 Volts, 3Ø PHASE, 60 CYCLE 1.00 pc/s 0.2338% By Owner

IV SUNDRIESItems which the Contractor requires which are not included inItemized Cost Breakdown (ICB) and is required to comply withthe issued Bid Plans, Specifications, Bid Bulletins and OtherRelated Bid Documents.Each Items are listed below.

FIRE PROTECTION WORKS2.01 BLACK IRON PIPES AND FITTINGS

Tee ReducerTee Reducer, Standard200 x 150 mm Ø 2.00 pc/s 0.0222% 3,170.00 200 x 65 mm Ø 1.00 pc/s 0.0111% 1,585.00 150 x 100 mm Ø 13.00 pc/s 0.0695% 9,911.85 150 x 65 mm Ø 5.00 pc/s 0.0267% 3,812.25 100 x 50 mm Ø 285.00 pc/s 0.8622% 122,940.45 100 x 40 mm Ø 32.00 pc/s 0.0968% 13,803.84

88 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

100 x 32 mm Ø 4.00 pc/s 0.0121% 1,725.48 80 x 50 mm Ø 2.00 pc/s 0.0050% 713.00 80 x 40 mm Ø 55.00 pc/s 0.1375% 19,607.50 80 x 32 mm Ø 24.00 pc/s 0.0600% 8,556.00 65 x 32 mm Ø 5.00 pc/s 0.0109% 1,550.00 50 x 32 mm Ø 6.00 pc/s 0.0088% 1,248.00

ReducerBell Reducer250 x 200 mm Ø 2.00 pc/s 0.0224% 3,194.64 200 x 150 mm Ø 2.00 pc/s 0.0178% 2,533.68 100 x 80 mm Ø 6.00 pc/s 0.0128% 1,818.18 100 x 50 mm Ø 30.00 pc/s 0.0638% 9,090.90 80 x 50 mm Ø 19.00 pc/s 0.0247% 3,528.87 65 x 50 mm Ø 4.00 pc/s 0.0046% 660.00 Coupling Reducer25 x 20 mm Ø 1095.00 pc/s 0.2803% 39,967.50

Flexible Coupling200 mm Ø 2.00 pc/s 0.0251% 3,575.50

Blind Flange200 mm Ø 1.00 pc/s 0.0112% 1,600.00 150 mm Ø 9.00 pc/s 0.0498% 7,106.85

End Capped200 mm Ø 1.00 pc/s 0.0067% 955.00 150 mm Ø 9.00 pc/s 0.0481% 6,862.50

Union Patente

89 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

50 mm Ø 20.00 pc/s 0.0515% 7,350.00 32 mm Ø 12.00 pc/s 0.0151% 2,160.00 25 mm Ø 27.00 pc/s 0.0239% 3,402.00

2.02 VALVES AND ACCESSORIESGate Valve (OS & Y)

200 mm Ø 1.00 pc/s 0.2533% 46,267.20 65 mm Ø 1.00 pc/s 0.0571% 8,500.00

Check Valve 65 mm Ø 1.00 pc/s 0.0609% 9,219.00

Alarm Check Valve 200 mm Ø 1.00 pc/s 0.4622% 86,475.60

Globe Valve32 mm Ø 12.00 pc/s 0.2247% 34,700.40

Air Release Valve25 mm Ø 6.00 pc/s 0.2922% 45,110.52

Waterflow Detector100 mm Ø 6.00 pc/s 0.2314% 33,000.00

FDC Manfold 2.00 pc/s 0.2379% 42,797.16 2.03 PUMPS, CONTROLLERS, SPRINKLERS, CABINETS, ETC.

2.03.01 Sprinkler HeadsSidewall Type Sprinkler Heads (20mmØ Large Orifice) 1.00 pc/s 0.0053% 786.54

VI MISCELLANEOUS WORKS, ETC3.01 PIPE SLEEVING 1.0 lot 0.4519% 60,000.00

90 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

3.02 HANGER'S AND SUPPORTS 1.0 lot 2.1468% 285,000.00

3.03 FIRE SEALANTS 1.0 lot 0.2636% 35,000.00

3.04 MISCELLANEOUS AND CONSUMABLES 1.0 lot 2.2147% 295,000.00

3.05 TESTING AND COMMISSIONING 1.0 lot 0.9091% 50,000.00

3.06 ELECTRICAL WORKS (including sprinkler alarm control system) 1.0 lot 1.4688% 195,000.00 TOTAL FOR SANITARY, PLUMBING & FIRE PROTECTION WORKS

IV PRELIMINARIES4.01 Mobilization/Demobilization 1.0 lot 0.5195%4.02 Permits and Licences 1.0 lot 0.6753%4.03 Bonds and Insurances

4.03.01 Surety 1.0 lot 0.2338%4.03.02 Performance Bond 1.0 lot 0.3377%4.03.03 Guarantee Bond 1.0 lot 0.2597%4.03.04 CARI 1.0 lot 0.6753%4.03.05 Contractor,s Employees,s Accident Insurance and CGL 1.0 lot 0.7792%

4.04 Temporary Facilities (Site Office, Warehouse, etc) 1.0 lot 1.5065%4.05 Submittals, Shop Drawing's and As - Built 1.0 lot 0.3117%4.06 Safety and Housekeeping 1.0 lot 1.0909%4.07 Site Management 1.0 lot 6.2338%

91 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.

Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015

Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted TOTAL COST

% MATERIALSITEM NO.

TOTAL 100.0000% 12,466,695.16

TOTAL VALUE OF ACCOMPLISHMENT TO DATELess : Ten Percent (10%) Retention 14.3130%

Recoupment of Down Payment(P 1,925,000.00 x Percentage of Accomplishment To Date)Progress Payment No. 1

TOTAL AMOUNT DUE THIS BILLING

Amount in Words : TWO MILION NINE HUNDRED SIXTY ONE THOUSAND FIVE HUNDRED THREE PESOS & 71/100 (P 2,961,503.71) ONLY.

Thank you very much for your usual kind attention.

Sincerely yours,

AAA Plumbing Se 4

RENATO T. CABAELV.P. - FinanceDate : May 30, 2015 `

92 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

Previous Present To Date Previous Present To Date

71,163.36 229,304.16 0.0000% 0.0000% 0.0000% - 89,734.50 289,144.50 40.0000% 0.0000% 40.0000% 12.0000% 0.0000% 12.0000% 79,764.00 248,720.63 801,433.13 51.0000% 0.0000% 51.0000% 10.0000% 0.0000% 10.0000% 281,883.38 80,019.77 257,841.47 51.0000% 0.0000% 51.0000% 18.0000% 0.0000% 18.0000% 90,689.07 27,882.72 89,844.32 73.0000% 0.0000% 73.0000% 18.3800% 0.0000% 18.3800% 45,231.97 26,296.88 84,734.38 58.0000% 0.0000% 58.0000% 24.0000% 0.0000% 24.0000% 33,893.75

26,641.13 85,843.63 47.0000% 47.0000% 12.0000% 12.0000% 27,825.18 35,320.05 113,809.05 58.0000% 58.0000% 6.6700% 6.6700% 45,523.62 8,427.24 27,154.44 67.0000% 67.0000% 14.4400% 14.4400% 12,547.22

93 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

487.31 1,570.21 92.0000% 92.0000% 34.6200% 34.6200% 996.27 3,381.30 10,895.30 49.2000% 49.2000% 17.2300% 17.2300% 3,696.89

7,315.31 23,571.56 88.0000% 88.0000% 16.0000% 16.0000% 14,305.50 25,749.90 82,971.90 60.0000% 60.0000% 4.8000% 4.8000% 34,333.20 4,661.72 15,021.09 66.0000% 66.0000% 27.6900% 27.6900% 6,837.19 376.76 1,214.01 80.0000% 80.0000% 80.0000% 80.0000% 669.80 1,535.55 4,947.87 54.0000% 54.0000% 10.8100% 10.8100% 1,842.66

20,385.34 65,686.09 98.0000% 98.0000% 12.7300% 12.7300% 44,394.74 2,505.38 94.0000% 94.0000% 82.0000% 82.0000% 5,233.45

36,895.95 71.4000% 71.4000% 35.7100% 35.7100% 58,541.57 14,424.08 82.2000% 82.2000% 15.5600% 15.5600% 26,347.98

1,654.31 92.0000% 92.0000% 80.0000% 80.0000% 3,382.15 4,169.25 76.0000% 76.0000% 7.0000% 7.0000% 7,041.40 1,807.31 92.0000% 92.0000% 8.8000% 8.8000% 3,694.95

4,663.44 62.5000% 62.5000% 11.8800% 11.8800% 6,477.00

94 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

1,744.20 95.0000% 95.0000% 27.5000% 27.5000% 3,682.20

361.46 100.0000% 100.0000% 100.0000% 100.0000% 803.25

74.97 100.0000% 100.0000% 100.0000% 100.0000% 166.60

3,729.38 92.0000% 92.0000% 38.4600% 38.4600% 7,624.50 322.45 92.0000% 92.0000% 659.23

13,835.79 - 8,578.44 -

13,986.68 - 16,686.00 - 2,958.17 -

50.76 - 90.67 -

4,782.69 - 228.42 -

95 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

270,000.00 - 147,897.22 - 37,065.60 - 139,424.40 - 24,940.22 - 15,187.50 - 12,741.30 -

17,550.00 - 19,305.00 - 1,170.00 - 2,925.00 - 4,738.50 - 1,918.62 - 1,504.80 - 2,436.53 -

1,462.50 - 1,012.37 - 655.20 -

96 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

301.10 - 69.03 -

33.05 -

291.04 - 1,306.31 - 1,523.93 - 1,850.69 - 258.86 - 16.38 -

179.56 -

47.00 - 6.61 -

363.33 -

1,974.08 - 4,406.40 -

97 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

96.94 -

2,088.45 -

2,500.00 - 10,000.00 - 25,000.00 - 5,000.00 - 15,000.00 - 2,350.08 - 4,162.57 - 1,126.57 - 204.00 - 2,310.00 -

3,500.00 -

5,000.00 - 1,449.00 - 508.05 -

10,000.00 -

98 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

5,000.00 -

2,500.00 -

1,449.00 -

7,500.00 -

10,000.00 - 2,500.00 - 1,222.78 -

4,500.00 - 3,330.00 -

5,372.86 - 7,094.32 -

1,056.06 -

99 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

40,000.00

20,000.00

170,000.00 -

20,000.00

15,200.00 14,000.00 16,100.00

20,490.60 -

100 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

17,194.93 - 14,795.62 - 12,723.48 - 10,905.84 -

694.50 -

1,625.40 -

1,049.40 -

1,606.50 - 621.68 -

101 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

8,454.56 - 6,660.49 - 140,000.00 -

5,228.28 - 5,118.75 -

684.45 -

208.20 -

291.04 - 373.23 - 373.23 - 643.23 - 219.38 - 109.69 - 219.38 - 109.69 - 274.95 - 137.48 - 137.48 - 74.30 -

102 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

854.39 - 436.21 - 61.70 -

117.00 - 1,053.00 - 117.00 - 280.80 - 526.50 - 52.65 - 11.02 - 20.57 - 526.50 -

10,043.99 - 9,886.50 - 8,286.99 - 156.43 -

3,727.08 -

308.45 -

21,937.50 - 8,190.00 -

103 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

1,872.00 - 140.40 - 4,914.00 - 357.98 - 110.16 - 87.75 - 146.25 -

4,731.75 - 8,065.22 - 1,308.69 -

9,652.50 -

5,710.66 - 1,248.48 - 491.40 -

7,500.00 -

58.38 -

1,188.56 -

104 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

1,400.00 1,400.00 21,000.00 1,600.00

Not included on these costs are the following: (Fire Protection Works)Ground Floor : Grid Line B/F - 1/11 & Grid Line P/W -11/16

9,691.05 0.0000% 0.0000% - 5,449.89 0.0000% 0.0000% - 121,772.45 62.5000% 62.5000% 2.0800% 2.0800% 217,450.80 288,129.87 42.1000% 42.1000% 13.1600% 13.1600% 346,579.07 52,526.29 57.7000% 57.7000% 3.8000% 3.8000% 86,593.34 18,683.18 64.0000% 64.0000% 12.0000% 12.0000% 34,163.52 30,602.88 50.0000% 50.0000% 5.0000% 5.0000% 43,718.40 43,464.96 50.0000% 50.0000% 8.3300% 8.3300% 62,092.80 54,017.04 35.0000% 35.0000% 5.4000% 5.4000% 54,017.04 109,885.97 51.5500% 51.5500% 6.1800% 6.1800% 161,846.33

0.0000% 4,803.44 55.5500% 55.5500% 5.6000% 5.6000% 7,623.74 4,982.32 48.4800% 48.4800% 6.0600% 6.0600% 6,901.23 2,441.69 100.0000% 100.0000% 11.0000% 11.0000% 6,976.26 1,243.55 86.3600% 86.3600% 9.0900% 9.0900% 3,068.37

105 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

467.25 100.0000% 100.0000% 100.0000% 100.0000% 1,335.00 464.63 73.3300% 73.3300% 13.0000% 13.0000% 973.46 837.90 47.2200% 47.2200% 0.0000% 0.0000% 1,130.45 17,843.84 25.3900% 25.3900% 2.6500% 2.6500% 12,944.43

2,668.58 50.0000% 50.0000% 0.0000% 0.0000% 3,812.25 6,190.16 29.2600% 29.2600% 9.7600% 9.7600% 5,174.97 249.55 100.0000% 100.0000% 50.0000% 50.0000% 713.00

6,699.00 30.9000% 30.9000% 15.4500% 15.4500% 5,914.26 2,395.40 44.8300% 44.8300% 29.3100% 29.3100% 3,068.17 1,106.70 50.0000% 50.0000% 0.0000% 0.0000% 1,581.00 5,298.30 26.5500% 26.5500% 11.0000% 11.0000% 4,019.14

1,253.00 0.0000% 0.0000% 0.0000% - 1,509.80 50.0000% 50.0000% 20.0000% 20.0000% 2,156.85 150.98 100.0000% 100.0000% 100.0000% 100.0000% 431.37 249.55 100.0000% 100.0000% 0.0000% 0.0000% 713.00 249.55 100.0000% 100.0000% 50.0000% 50.0000% 713.00 582.40 40.0000% 40.0000% 0.0000% 0.0000% 665.60 12,381.25 16.8000% 16.8000% 0.0000% 0.0000% 5,943.00 9,759.75 43.4600% 43.4600% 13.0800% 13.0800% 12,118.82

5,586.00 42.5000% 42.5000% 21.2500% 21.2500% 6,783.00

106 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

2,793.00 15.0000% 15.0000% 0.0000% 0.0000% 1,197.00 3,421.43 48.9000% 48.9000% 17.3500% 17.3500% 4,780.22 4,934.97 52.6800% 52.6800% 16.5900% 16.5900% 7,427.83 1,131.43 50.0000% 50.0000% 0.0000% 0.0000% 1,616.33 4,662.88 100.0000% 100.0000% 13.6000% 13.6000% 13,322.50

5,706.29 0.0000% 0.0000% 0.0000% - 2,079.00 0.0000% 0.0000% 0.0000% - 10,718.40 40.0000% 40.0000% 20.0000% 20.0000% 12,249.60 3,825.36 0.0000% 0.0000% 0.0000% - 1,478.40 0.0000% 0.0000% 0.0000% -

3,428.48 34.0000% 34.0000% 13.6400% 13.6400% 3,149.38

20,097.00 42.4200% 42.4200% 20.6100% 20.6100% 24,357.56 8,211.00 30.6000% 30.6000% 0.0000% 0.0000% 7,178.76 2,646.00 48.0000% 48.0000% 11.0000% 11.0000% 3,628.80

107 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

2,445.48 - 4,275.48 - 1,536.08 - 273.10 -

2,420.40 - 40,651.59 - 27,686.88 -

5,000.00 -

15,000.00 -

2,500.00 - 5,000.00 -

108 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

12,500.00 -

3,675.00 -

3,000.00 -

3,425.04 -

10,032.57 -

83,917.83 -

74,174.10 -

29,591.16 - 5,083.98 -

109 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

65,000.00

45,000.00

1,109.50 0.0000% 0.0000% 0.0000% - 554.75 0.0000% 0.0000% 0.0000% - 3,469.15 0.0000% 0.0000% 0.0000% - 1,334.29 60.0000% 60.0000% 0.0000% 0.0000% 2,287.35 43,029.16 22.0000% 22.0000% 11.9200% 11.9200% 27,046.90 4,831.34 0.0000% 0.0000% 0.0000% -

110 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

603.92 0.0000% 0.0000% 0.0000% - 249.55 0.0000% 0.0000% 0.0000% - 6,862.63 0.0000% 0.0000% 0.0000% - 2,994.60 0.0000% 0.0000% 0.0000% - 542.50 100.0000% 100.0000% 100.0000% 100.0000% 1,550.00 436.80 0.0000% 0.0000% 0.0000% -

1,118.12 0.0000% 0.0000% 0.0000% - 886.79 0.0000% 0.0000% 0.0000% - 636.36 0.0000% 0.0000% 0.0000% - 3,181.82 26.0000% 26.0000% 13.0000% 13.0000% 2,363.63 1,235.10 0.0000% 0.0000% 0.0000% - 231.00 50.0000% 50.0000% 50.0000% 50.0000% 330.00

13,988.63 -

1,251.43 -

560.00 - 2,487.40 -

334.25 - 2,401.88 -

111 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

2,572.50 - 756.00 - 1,190.70 -

2,500.00 - 2,500.00 -

2,500.00 -

2,500.00 -

8,562.60 -

11,131.38 -

11,550.00 - 3,000.00 -

242.61 -

27,000.00 90.0000% 90.0000% 90.0000% 90.0000% 54,000.00

112 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

128,250.00 30.0000% 30.0000% 30.0000% 30.0000% 85,500.00

15,750.00 -

131,321.49 30.0000% 30.0000% 30.0000% 30.0000% 88,500.00

125,000.00 -

87,750.00 -

100,000.00 48.0000% 48.0000% - 130,000.00 43.0000% 43.0000% -

45,000.00 100.0000% 100.0000% - 65,000.00 100.0000% 100.0000% - 50,000.00 - 130,000.00 100.0000% 100.0000% - 150,000.00 - 290,000.00 44.0000% 44.0000% - 60,000.00 67.0000% 67.0000% - 210,000.00 48.0000% 48.0000% - 1,200,000.00 43.0000% 43.0000% -

113 of 267 PROGRESS BILLING (APSI)

TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To DateLABOR MATERIALS LABOR MATERIALS

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

6,783,304.84 11.8950% 7.3323% 2,289,796.22 19,250,000.00

TWO MILION NINE HUNDRED SIXTY ONE THOUSAND FIVE HUNDRED THREE PESOS & 71/100 (P 2,961,503.71) ONLY.

114 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- 10,768.14 24,872.06 14,403.56 5,124.84 6,311.25

3,196.94 2,355.85 1,216.89

115 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

168.70 582.60

1,170.45 1,236.00 1,290.83 301.41 165.99

2,595.05 2,054.41

13,175.54 2,244.39

1,323.45 291.85 159.04

554.02

116 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

479.66

361.46

74.97

1,434.32 -

- -

- - -

- -

- -

117 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - - - - - -

- - - - - - - -

- - -

118 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- -

-

- - - - - -

-

- -

-

- -

119 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

-

-

- - - - - - - - - -

-

- - -

-

120 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

-

-

-

-

- - -

- -

- -

-

121 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

-

-

-

-

- - -

-

122 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - - -

-

-

-

- -

123 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - -

- -

-

-

- - - - - - - - - - - -

124 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - -

- - - - - - - - -

- - - -

-

-

- -

125 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - - - - - -

- - -

-

- - -

-

-

-

126 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - - -

- - 2,532.87 37,917.89 1,996.00 2,241.98 1,530.14 3,620.63 2,916.92 6,790.95

268.99 301.93 268.59 113.04

127 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

467.25 60.40 - 472.86

- 604.16 124.78

1,035.00 702.09 - 582.81

- 301.96 150.98 - 124.78 - - 1,276.58

1,187.03

128 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- 593.62 818.71 - 634.15

- - 2,143.68 - -

467.64

4,141.99 - 291.06

129 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - - -

- - -

-

-

- -

130 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

-

-

-

-

-

-

-

- -

131 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

-

-

- - - - 5,129.08 -

132 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - - - 542.50 -

- - - 413.64 - 115.50

-

-

- -

- -

133 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

- - -

- -

-

-

-

-

- -

-

24,300.00

134 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

38,475.00

-

39,396.45

-

-

48,000.00 55,900.00

45,000.00 65,000.00 - 130,000.00 - 127,600.00 40,200.00 100,800.00 516,000.00

135 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To DateLABOR

1,411,467.27

136 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

90,532.14 31.31% - 0.00% 306,755.44 38.28% - 0.00% 105,092.62 40.76% - 0.00% 50,356.81 56.05% - 0.00% 40,205.00 47.45% - 0.00%

137 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

138 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

139 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

140 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

141 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

142 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

143 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

144 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

145 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

146 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

147 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

148 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

149 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

150 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

151 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

152 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

153 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

154 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

155 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

156 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

157 of 267 PROGRESS BILLING (APSI)

Value of Accomplishment To Date PresentTOTAL AMOUNT % Prog. Present Amount % Prog.

158 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

0.00% - - 0.47% 31.31% 90,532.14 0.00% 0.00% - 0.47% 31.31% 90,532.14 1.59% 38.28% 306,755.44 0.00% 0.00% - 1.59% 38.28% 306,755.44 0.55% 41.00% 105,708.78 0.00% 0.00% - 0.55% 41.00% 105,708.78 0.26% 56.05% 50,356.81 0.00% 0.00% - 0.26% 56.05% 50,356.81 0.21% 47.45% 40,205.00 0.00% 0.00% - 0.21% 47.45% 40,205.00

- - - -

159 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - -

- - - - -

-

- - - -

- - - - - -

-

160 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

-

-

-

- -

- -

- - -

- - -

- - - -

161 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - - - - - - - - - -

- - - - - - - - - - - - - - - -

- - - - - -

162 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - -

- -

- - - - - - - - - - - -

- -

- - - -

- -

- - - -

163 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- -

- -

- - - - - - - - - - - - - - - - - - - -

- -

- - - - - -

- -

164 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- -

- -

- -

- -

- - - - - -

- - - -

- - - -

- -

165 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- -

- -

- -

- -

- - - - - -

- -

166 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - - - -

- -

- -

- -

- - - -

167 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - -

- - - -

- -

- -

- - - - - - - - - - - - - - - - - - - - - - - -

168 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - -

- - - - - - - - - - - - - - - - - -

- - - - - - - -

- -

- -

- - - -

169 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - - - - - - - - - -

- - - - - -

- -

- - - - - -

- -

- -

- -

170 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - - - -

- - - - 219,983.67 - 384,496.96 - 88,589.34 - 36,405.50 - 45,248.54 - 65,713.43 - 56,933.96 - 168,637.28 -

7,892.73 - 7,203.16 - 7,244.85 - 3,181.41 -

171 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

1,802.25 - 1,033.86 - 1,130.45 - 13,417.29 -

3,812.25 - 5,779.13 - 837.78 -

6,949.26 - 3,770.26 - 1,581.00 - 4,601.95 -

- - 2,458.81 - 582.35 - 713.00 - 837.78 - 665.60 - 5,943.00 - 13,395.40 -

7,970.03 -

172 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

1,197.00 - 5,373.84 - 8,246.54 - 1,616.33 - 13,956.65 -

- - - - 14,393.28 - - - - -

3,617.02 -

28,499.56 - 7,178.76 - 3,919.86 -

173 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - - - -

- - - - - -

- -

- -

- - - -

174 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- -

- -

- -

- -

- -

- -

- -

- - - -

175 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- -

- -

- - - - - - 2,287.35 - 32,175.97 - - -

176 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - - - - 2,092.50 - - -

- - - - - - 2,777.27 - - - 445.50 -

- -

- -

- - - -

- - - -

177 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

- - - - - -

- - - -

- -

- -

- -

- -

- - - -

- -

78,300.00 -

178 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

123,975.00 -

- -

127,896.45 -

- -

- -

48,000.00 - 55,900.00 -

45,000.00 - 65,000.00 - - - 130,000.00 - - - 127,600.00 - 40,200.00 - 100,800.00 - 516,000.00 -

179 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

2,755,261.14 593,558.17

2,755,261.14 593,558.17 (275,526.11) (59,355.82)

(275,526.11) -

2,204,208.91 534,202.35

180 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

I SANITARY AND PLUMBING WORKS1.01 SEWER AND DRAINAGE

1.01.01 PVC STRAIGHT PIPES1.0 PVC pipes 250 mm x 3m 144.00 lm 1.1912% 1,098.20 2.0 PVC pipes 200 mm x 3m 300.00 lm 1.5020% 664.70 3.0 PVC pipes 150 mm x 3m 1,275.00 lm 4.1633% 433.50 4.0 PVC pipes 100mm x 3m 879.00 lm 1.3394% 202.30 5.0 PVC pipes 75mm x 3m 408.00 lm 0.4667% 151.87 6.0 PVC pipes 50mm x 3m 825.00 lm 0.4402% 70.83

1.01.021.0 200 mm Ø 70.00 pc/s 0.4459% 845.75 2.0 150 mm Ø 180.00 pc/s 0.5912% 436.05 3.0 100 mm Ø 270.00 pc/s 0.1411% 69.36 4.0 75 mm Ø 26.00 pc/s 0.0082% 41.65

PVC Bend 90°

181 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

5.0 50 mm Ø 325.00 pc/s 0.0566% 23.12 1.01.02

1.0 300 mm Ø pc/s2.0 200 mm Ø 25.00 pc/s 0.1224% 650.25 3.0 150 mm Ø 165.00 pc/s 0.4310% 346.80 4.0 100 mm Ø 195.00 pc/s 0.0780% 53.13 5.0 75 mm Ø 25.00 pc/s 0.0063% 33.49 6.0 50 mm Ø 185.00 pc/s 0.0257% 18.45

1.01.03 PVC Wye1.0 300 mm Ø pc/s2.0 200 mm Ø pc/s3.0 150 mm Ø 55.00 pc/s 0.3412% 823.65 4.0 100 mm Ø 50.00 pc/s 0.0419% 111.35 5.0 75 mm Ø pc/s

1.01.04 PVC Wye Reducer1.0 150 x 100 mm Ø 140.00 pc/s 0.6176% 585.65 2.0 150 x 75 mm Ø 45.00 pc/s 0.2414% 712.30 3.0 150 x 50 mm Ø pc/s4.0 100 x 75 mm Ø 25.00 pc/s 0.0277% 147.05 5.0 100 x 50 mm Ø 100.00 pc/s 0.0698% 92.65 6.0 75 x 50 mm Ø 45.00 pc/s 0.0303% 89.25

1.01.05 PVC Tee1.0 150 mm Ø pc/s2.0 50 mm Ø 320.00 pc/s 0.0781% 32.39

1.01.06 PVC Tee Reducer1.0 100 x 75 mm Ø pc/s

PVC Bend 45°

182 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

2.0 100 x 50 mm Ø 40.00 pc/s 0.0292% 96.90 3.0 75 x 50 mm Ø pc/s

1.01.07 PVC Reducer

1.0 100 x 50 mm Ø 7.00 pc/s 0.0061% 114.75

2.0 75 x 50 mm Ø 2.00 pc/s 0.0013% 83.30

1.01.08 PVC P-Trap1.0 100 mm Ø pc/s2.0 75 mm Ø 65.00 pc/s 0.0624% 127.50 3.0 50 mm Ø 10.00 pc/s 0.0054% 71.66

1.01.09 FCO1.0 150 mm Ø 49.00 pc/s 0.3115% 941.21 2.0 100 mm Ø 36.00 pc/s 0.1931% 794.30 3.0 75 mm Ø pc/s

1.01.10 Rubber Insulation1.0 100 mm Ø 90.00 pc/s 0.2341% 345.35 2.0 75 mm Ø 120.00 pc/s 0.2793% 309.00 3.0 32 mm Ø 35.00 pc/s 0.0495% 187.82

1.01.11 PVC Endcap1.0 100 mm Ø 2.00 pc/s 0.0008% 56.40 2.0 75 mm Ø 6.00 pc/s 0.0015% 33.58

1.01.12 CCO1.0 150 mm Ø 20.00 pc/s 0.0801% 531.41 2.0 100 mm Ø 8.00 pc/s 0.0038% 63.45

1.01.13 Reinforced Concrete Pipe : Note : Included on Site Dev. Contractor

1.02 WATERLINE

183 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.02.01 PPR Pipes1.0 150 mm Ø x 4 m lm2.0 100 mm Ø x 4 m 300.00 lm 4.5195% 2,000.00 3.0 90 mm Ø x 4 m 232.00 lm 2.4756% 1,416.64 4.0 75 mm Ø x 4 m 88.00 lm 0.6204% 936.00 5.0 50 mm Ø x 4 m 800.00 lm 2.3338% 387.29 6.0 40 mm Ø x 4 m 192.00 lm 0.4175% 288.66 7.0 32 mm Ø x 4 m 200.00 lm 0.2542% 168.75 8.0 20 mm Ø x 4 m 440.00 lm 0.2133% 64.35

1.02.021.0 100 mm Ø 25.00 pc/s 0.2938% 1,560.00 2.0 90 mm Ø 33.00 pc/s 0.3231% 1,300.00 3.0 75 mm Ø 5.00 pc/s 0.0196% 520.00 4.0 65 mm Ø 20.00 pc/s 0.0490% 325.00 5.0 50 mm Ø 65.00 pc/s 0.0793% 162.00 6.0 40 mm Ø 85.00 pc/s 0.0321% 50.16 7.0 32 mm Ø 110.00 pc/s 0.0252% 30.40 8.0 20 mm Ø 245.00 pc/s 0.0408% 22.10

1.02.03 PPR Tee Standard1.0 100 mm Ø 2.00 pc/s 0.0245% 1,625.00 2.0 90 mm Ø 3.00 pc/s 0.0169% 749.90 3.0 65 mm Ø 4.00 pc/s 0.0110% 364.00 4.0 50 mm Ø 5.00 pc/s 0.0050% 133.82 5.0 40 mm Ø 2.00 pc/s 0.0012% 76.70 6.0 32 mm Ø pc/s7.0 20 mm Ø 5.00 pc/s 0.0006% 14.69

PPR Elbow 90°

184 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.02.04 PPR Tee Reducer1.0 90 × 75 mm Ø pc/s2.0 100 × 65 mm Ø 1.00 pc/s 0.0049% 646.75 3.0 90 × 20 mm Ø 7.00 pc/s 0.0219% 414.70 4.0 40 × 20 mm Ø 50.00 pc/s 0.0255% 67.73 5.0 40 × 32 mm Ø 48.00 pc/s 0.0310% 85.68 6.0 32 × 20 mm Ø 15.00 pc/s 0.0043% 38.35 7.0 20 × 15 mm Ø 2.00 pc/s 0.0003% 18.20

1.02.05 PPR Reducer1.0 100 × 75 mm Ø 1.00 pc/s 0.0030% 399.02 2.0 90 × 40 mm Ø pc/s3.0 40 × 32 mm Ø 4.00 pc/s 0.0008% 26.11 4.0 32 × 20 mm Ø 1.00 pc/s 0.0001% 14.69 5.0 20 × 15 mm Ø pc/s

1.02.06 PPR End Cap1.0 20 mm Ø 110.00 pc/s 0.0061% 7.34

1.02.07 PPR Male Adaptor1.0 32 mm Ø 12.00 pc/s 0.0330% 365.57 2.0 15 mm Ø 68.00 pc/s 0.0738% 144.00

1.02.08 PPR Female Adaptor1.0 32 mm Ø pc/s2.0 25 mm Ø pc/s3.0 20 mm Ø pc/s4.0 15 mm Ø 2.00 pc/s 0.0016% 107.71

1.02.09 Hose Bibb1.0 15 mm Ø 26.00 pc/s 0.0350% 178.50

185 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.02.10 Gate Valves1.0 150 mm Ø 1.00 pc/s 0.1659% 29,427.00 2.0 100 mm Ø 4.00 pc/s 0.5362% 23,307.00 3.0 90 mm Ø 10.00 pc/s 1.1287% 19,227.00 4.0 75 mm Ø 2.00 pc/s 0.1833% 15,147.00 5.0 65 mm Ø 6.00 pc/s 0.4488% 11,900.00 6.0 50 mm Ø 6.00 pc/s 0.0529% 1,305.60 7.0 40 mm Ø 12.00 pc/s 0.0937% 1,156.27 8.0 32 mm Ø 6.00 pc/s 0.0254% 625.87 9.0 25 mm Ø 1.00 pc/s 0.0046% 680.00

10.0 20 mm Ø 14.00 pc/s 0.0520% 550.00 1.02.11 Check Valve

1.0 300 mm Ø 1.00 pc/s 0.4597% 85,000.00 2.0 200 mm Ø pc/s3.0 75 mm Ø 2.00 pc/s 0.1964% 16,400.00 4.0 50 mm Ø 2.00 pc/s 0.0326% 2,415.00 5.0 40 mm Ø 1.00 pc/s 0.0142% 2,223.60

1.02.12 Float Valve1.0 100 mm Ø 4.00 pc/s 2.0792% 97,563.00

1.02.13 Pressure Relief Valve1.0 75 mm Ø 2.00 pc/s 0.8052% 75,000.00

1.02.14 Equalizing Valve1.0 150 mm Ø 1.00 pc/s 0.1814% 32,427.00

1.02.15 Drain Valve1.0 65 mm Ø pc/s2.0 50 mm Ø 2.00 pc/s 0.0326% 2,415.00

186 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.02.16 Y Strainer1.0 100 mm Ø 3.00 pc/s 0.3330% 18,870.00

1.02.17 Water Meter1.0 40 mm Ø 4.00 pc/s 0.2465% 9,363.60 2.0 32 mm Ø 1.00 pc/s 0.0587% 8,790.77 3.0 15 mm Ø 2.00 pc/s 0.0275% 2,037.96

1.02.18 Flexible Connector1.0 75 mm Ø 4.00 pc/s 0.0753% 2,500.00 2.0 50 mm Ø 4.00 pc/s 0.0557% 1,850.00

1.02.19 Union Patente1.0 65 mm Ø 8.00 pc/s 0.0899% 1,492.46 2.0 50 mm Ø 15.00 pc/s 0.1188% 1,051.01

1.02.20 Pressure Gauge1.0 75 mm Ø 2.00 pc/s 0.0211% 1,500.00

1.03 PUMPS, CONTROLLERS, TANKS & MISCELLANEOUS1.03.01 Domestic and Sanitary Pumps and Controllers

1.0 1.00 unit/s 0.2078% ByOwner Constant Pressure System Pump (Potable) 2 Units Duplex End Suction Centrifugal Type Electric Driven 60 GPM each, 130 ft. TDH,3550 RPM, 5HP, 380 Volts 3Ø PHASE 60 Cycle

187 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

2.0 1.00 unit/s 0.1039% By Owner

1.03.02 Tanks1.0 2.00 unit/s 6.9619% 585,082.25

2.0 2.00 unit/s 0.1039% By Owner

1.03.03 Plumbing Fixtures1.0 Water Closet 38.00 pc/s 0.0790% By Owner 2.0 Urinal 20.00 pc/s 0.0727% By Owner 3.0 Lavatory 23.00 pc/s 0.0836% By Owner

1.03.04 Drains1.0 Floor Drain 150mmØ pc/s2.0 Floor Drain 100mmØ 71.00 pc/s 0.4613% 962.00 3.0 Floor Drain 75mmØ 86.00 pc/s 0.3871% 666.47 4.0 Gutter Drain 200mmØ 22.00 pc/s 0.3331% 2,241.76 5.0 Gutter Drain 150mmØ 28.00 pc/s 0.2864% 1,514.70 6.0 Gutter Drain 100mmØ 40.00 pc/s 0.2455% 908.82

1.03.05 Trench Drain1.0 1.00 pc/s 0.0156% 2,315.00

Booster Pump (Non-Potable for Irrigation) (2 unit Duplex) End Suction Centrifugal Type Electric Driven 50 GPM each, 50 ft. TDH, 3550 RPM, 3HP, 230 V, 1Ø Phase 60 Cycle

Weida Tanks 2990mmØ × 4840mm HIGH Capacity: 7650 Gallons or 29,000 Liters each TOTAL: 15,300 Gallons w/ Complete Accessories

220 Gallons Capacity Bladder Tanks (pre-wired and pre-pipe) with complete accessories

150 mm Ø

188 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.03.06 Trench & Grating1.03.07 Stainless Steel Ladder Rung pc/s By Others 1.03.08 Area Drain/Catch Basin Note : Included on Site Dev. Contractor

SUNDRIESItems which the Contractor requires which are not included inItemized Cost Breakdown (ICB) and is required to comply withthe issued Bid Plans, Specifications, Bid Bulletins and OtherRelated Bid Documents.Each Items are listed below.

SANITARY AND PLUMBING WORKS1.01 SEWER AND DRAINAGE

PVC STRAIGHT PIPESPVC Blue pipes 40mm x 3m 84.00 lm 0.0272% 43.00

40 mm Ø PVC Blue Elbow 110.00 pc/s 0.0176% 21.20 PVC Reducer

150 x 100 mm Ø 15.00 pc/s 0.0269% 238.00 63 x 40 mm Ø PVC Blue Coupling Reducer 30.00 pc/s 0.0104% 46.05

Overflow Check Valve, 200 mm Ø 1.00 pc/s 0.1626% 22,841.68 Isolation Check Valve, 150 mm Ø 1.00 pc/s 0.1281% 17,994.64 Excavation & Backfilling Works (for Sewer Line) 350.00 cu.m. 0.7273%

1.02 WATERLINEPPR Pipes

25 mm Ø x 4 m 120.00 lm 0.0875% 96.82

PVC Bend 90°

189 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

63 mm Ø x 4 m 20.00 lm 0.0857% 568.75

25 mm Ø 45.00 pc/s 0.0115% 33.80 PPR Tee Standard

75 mm Ø 1.00 pc/s 0.0035% 462.67 PPR Tee Reducer

100 × 75 mm Ø 1.00 pc/s 0.0049% 646.75 90 × 50 mm Ø 2.00 pc/s 0.0062% 414.70 90 × 40 mm Ø 2.00 pc/s 0.0062% 414.70 90 × 25 mm Ø 2.00 pc/s 0.0108% 714.70 75 × 50 mm Ø 2.00 pc/s 0.0037% 243.75 75 × 40 mm Ø 1.00 pc/s 0.0018% 243.75 75 × 32 mm Ø 2.00 pc/s 0.0037% 243.75 75 × 20 mm Ø 1.00 pc/s 0.0018% 243.75 65 × 50 mm Ø 4.00 pc/s 0.0046% 152.75 65 × 32 mm Ø 2.00 pc/s 0.0023% 152.75 65 × 20 mm Ø 2.00 pc/s 0.0023% 152.75 50 × 32 mm Ø 2.00 pc/s 0.0012% 82.55 50 × 20 mm Ø 23.00 pc/s 0.0143% 82.55 40 × 25 mm Ø 12.00 pc/s 0.0073% 80.78 32 × 25 mm Ø 3.00 pc/s 0.0010% 45.70

PPR Reducer 90 × 75 mm Ø 1.00 pc/s 0.0020% 260.00 90 × 65 mm Ø 9.00 pc/s 0.0176% 260.00 90 × 20 mm Ø 1.00 pc/s 0.0020% 260.00 75 × 20 mm Ø 4.00 pc/s 0.0047% 156.00

PPR Elbow 90°

190 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

65 × 50 mm Ø 12.00 pc/s 0.0088% 97.50 50 × 40 mm Ø 2.00 pc/s 0.0009% 58.50 40 × 25 mm Ø 1.00 pc/s 0.0002% 24.48 40 × 20 mm Ø 2.00 pc/s 0.0003% 22.85 25 × 20 mm Ø 90.00 pc/s 0.0088% 13.00

PPR Male Adaptor65 mm Ø 17.00 pc/s 0.1681% 1,312.94 50 mm Ø 26.00 pc/s 0.1655% 845.00 40 mm Ø 26.00 pc/s 0.1387% 708.29 25 mm Ø 2.00 pc/s 0.0026% 173.81

Gate Valves (With Padlock)20 mm Ø 21.00 pc/s 0.0839% 591.60

Union Patente40 mm Ø 1.00 pc/s 0.0052% 685.44

PPR Coupling Plain100 mm Ø 75.00 pc/s 0.3672% 650.00 90 mm Ø 40.00 pc/s 0.1371% 455.00 75 mm Ø 16.00 pc/s 0.0313% 260.00 65 mm Ø 2.00 pc/s 0.0024% 156.00 50 mm Ø 140.00 pc/s 0.0823% 78.00 40 mm Ø 25.00 pc/s 0.0060% 31.82 32 mm Ø 10.00 pc/s 0.0018% 24.48 25 mm Ø 10.00 pc/s 0.0015% 19.50 20 mm Ø 25.00 pc/s 0.0024% 13.00

PPR Flange100 mm Ø 17.00 pc/s 0.0792% 618.53

191 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

90 mm Ø 38.00 pc/s 0.1350% 471.65 75 mm Ø 12.00 pc/s 0.0219% 242.35

Tee Female Adaptor 20 mm Ø 110.00 pc/s 0.1616% 195.00

Elbow Female Adaptor 32 mm Ø 36.00 pc/s 0.0956% 352.51 25 mm Ø 17.00 pc/s 0.0209% 163.20 20 mm Ø 7.00 pc/s 0.0082% 156.00

Foot Valve 75 mm Ø 3.00 pc/s 0.4324% 25,245.00

G.I. Street Elbow 50 mm Ø 1.00 pc/s 0.0012% 170.34

G.I. Slip-On Flange 150 mm Ø 4.00 pc/s 0.0242% 867.00

1.03 PUMPS, CONTROLLERS, TANKS & MISCELLANEOUS1.03.03 Plumbing Fixtures

Shower 4.00 pc/s 0.0073% By Owner Kitchen Sink 2.00 pc/s 0.0073% By Owner Wash Basin 30.00 pc/s 0.1091% By Owner Grease Trap, 5 GPM 2.00 pc/s 0.0083% By Owner

NOTE : Not included on these costs are the following: (Fire Protection Works)II FIRE PROTECTION WORKS Ground Floor : Grid Line B/F - 1/11 & Grid Line P/W -11/16

2.01 BLACK IRON PIPES AND FITTINGS Second Floor : Grid Line B/W - 1/62.01.01 Bl Pipes Schedule 40

192 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.0 250 mm Ø 1.00 lght 0.1942% 27,688.72 2.0 200 mm Ø 1.00 lght 0.1092% 15,571.12 3.0 150 mm Ø 48.00 lght 2.4400% 7,248.36 4.0 100 mm Ø 190.00 lght 5.7733% 4,332.78 5.0 80 mm Ø 52.00 lght 1.0525% 2,886.06 6.0 65 mm Ø 25.00 lght 0.3744% 2,135.22 7.0 50 mm Ø 60.00 lght 0.6132% 1,457.28 8.0 40 mm Ø 120.00 lght 0.8709% 1,034.88 9.0 32 mm Ø 185.00 lght 1.0823% 834.24

10.0 25 mm Ø 485.00 lght 2.2018% 647.34 2.01.02 Elbow 90°

1.0 150 mm Ø 18.00 pc/s 0.0962% 762.45 2.0 100 mm Ø 33.00 pc/s 0.0998% 431.37 3.0 80 mm Ø 18.00 pc/s 0.0489% 387.57 4.0 65 mm Ø 22.00 pc/s 0.0249% 161.50 5.0 50 mm Ø 10.00 pc/s 0.0094% 133.50 6.0 40 mm Ø 15.00 pc/s 0.0093% 88.50 7.0 32 mm Ø 36.00 pc/s 0.0168% 66.50 8.0 25 mm Ø 1280.00 pc/s 0.3575% 39.83

2.01.03 Tee Standard1.0 150 mm Ø 10.00 pc/s 0.0535% 762.45 2.0 100 mm Ø 41.00 pc/s 0.1240% 431.37 3.0 80 mm Ø 2.00 pc/s 0.0050% 356.50 4.0 65 mm Ø pc/s5.0 50 mm Ø 110.00 pc/s 0.1342% 174.00 6.0 40 mm Ø 58.00 pc/s 0.0480% 118.00

193 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

7.0 32 mm Ø 34.00 pc/s 0.0222% 93.00 8.0 25 mm Ø 290.00 pc/s 0.1062% 52.20

2.01.04 Tee Reducer1.0 250 x 150 mm Ø 1.00 pc/s 0.0251% 3,580.00 2.0 100 x 80 mm Ø 10.00 pc/s 0.0303% 431.37 3.0 100 x 65 mm Ø 1.00 pc/s 0.0030% 431.37 4.0 80 x 65 mm Ø 2.00 pc/s 0.0050% 356.50 5.0 80 x 50 mm Ø 2.00 pc/s 0.0050% 356.50 6.0 50 x 25 mm Ø 8.00 pc/s 0.0117% 208.00 7.0 40 x 25 mm Ø 250.00 pc/s 0.2481% 141.50 8.0 32 x 25 mm Ø 260.00 pc/s 0.1956% 107.25 9.0 25 x 15 mm Ø pc/s

2.01.05 Reducer1.0 50 x 40 mm Ø 160.00 pc/s 0.1119% 99.75 2.0 50 x 32 mm Ø 80.00 pc/s 0.0560% 99.75 3.0 50 x 25 mm Ø 98.00 pc/s 0.0686% 99.75 4.0 40 x 32mm Ø 205.00 pc/s 0.0989% 68.78 5.0 40 x 25 mm Ø 47.00 pc/s 0.0227% 68.78 6.0 32 x 25 mm Ø 250.00 pc/s 0.0934% 53.29 7.0 25 x 15 mm Ø pc/s

2.01.06 Flanges1.0 250 mm Ø 8.00 pc/s 0.1143% 2,037.96 2.0 150 mm Ø 12.00 pc/s 0.0417% 495.00 3.0 100 mm Ø 80.00 pc/s 0.2148% 382.80 4.0 80 mm Ø 36.00 pc/s 0.0766% 303.60 5.0 65 mm Ø 16.00 pc/s 0.0296% 264.00

194 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

2.01.07 End Capped1.0 100 mm Ø pc/s2.0 80 mm Ø pc/s3.0 65 mm Ø pc/s4.0 50 mm Ø 44.00 pc/s 0.0659% 210.52

2.01.08 Threadolet1.0 50 mm Ø 165.00 pc/s 0.4027% 348.00 2.0 40 mm Ø 85.00 pc/s 0.1645% 276.00 3.0 32 mm Ø 45.00 pc/s 0.0530% 168.00

2.01.09 Elbow 90° (Grooved End Type)1.0 100 mm Ø pc/s

2.01.10 Victaulic Mechanical Tee1.0 150 mm Ø pc/s

2.01.11 Victaulic Flexible Coupling1.0 250 mm Ø 2.00 pc/s 0.0470% 3,303.48 2.0 150 mm Ø 12.00 pc/s 0.0822% 962.58 3.0 100 mm Ø 8.00 pc/s 0.0295% 518.74 4.0 65 mm Ø 2.00 pc/s 0.0053% 368.93 5.0 25 mm Ø pc/s

2.01.12 Fire Extinguishers1.0 20 lbs Automatic Wall Type Halogenic Agent PFE (HCFC) 1.00 pc/s 0.1385% 24,235.20 2.0 10 lbs Ceiling Type Halogenic Agent PFE (HCFC) 21.00 pc/s 2.4344% 20,379.60 3.0 10 lbs ABC Dry Chemical Portable Fire Extinguisher 78.00 pc/s 1.2597% 2,754.00

2.02 VALVES AND ACCESSORIES2.02.01 Gate Valve (OS & Y)

195 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.0 150 mm Ø 2.00 pc/s 0.3211% 28,405.00 2.0 20 mm Ø pc/s

2.02.02 Floor Control Valve1.0 100 mm Ø With Supervisory Switch 6.00 pc/s 0.4987% 13,500.00

2.02.03 Butterfly Valve (Grooved End Type) w/ Supervisory Switch

1.0 150 mm Ø pc/s2.0 100 mm Ø pc/s

2.02.04 Pressure Relief Valve w/ Waste Cone1.0 150 mm Ø pc/s

2.02.05 Check Valve 1.0 250 mm Ø 1.00 pc/s 0.3921% 72,986.51 2.0 150 mm Ø 2.00 pc/s 0.2470% 21,275.00

2.02.06 Alarm Check Valve 1.0 150 mm Ø pc/s

2.02.07 Fire Hose Valve w/ Cap & Chain1.0 65 mm Ø 5.00 pc/s 0.2208% 6,000.00

2.02.08 Sight Glass1.0 25 mm Ø 14.00 pc/s 0.0736% 750.00

2.02.09

1.0 4 - 65 mm Ø x 150 mm Ø 2.00 pc/s 0.3391% 31,142.45 2.02.10 Globe Valve

1.0 25 mm Ø 8.00 pc/s 0.0899% 1,735.02 2.02.11 Pressure Guage

1.0 25 mm Ø 19.00 pc/s 0.2002% 1,500.00 2.02.12 Victaulic Alarm Test Module

Fire Department Connection (Wet Stand Pipe) w/ Check Snoot, Cap & Chain

196 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

1.0 32 mm Ø pc/s

2.03 PUMPS, CONTROLLERS, SPRINKLERS, CABINETS, ETC.2.03.01 Sprinkler Heads

1.0 Upright Sprinkler Heads pc/s2.0 Upright Sprinkler Heads (20mmØ Large Orifice) 619.00 pc/s 1.8493% 439.54

3.0 Pendent Sprinkler Heads (Office) (20mmØ Large Orifice) 385.00 pc/s 1.6345% 624.61 2.03.02 Fire Hose Cabinets

1.0 Fire Hose Cabinet (Recessed Type) 12.00 set/s 1.0576% 14,500.00 2.0 Fire Man's Cabinet w/ Complete Accessories 1.00 set/s 0.3299% 58,412.34

3.0 Fire Hydrant2.03.03 Fire Pump & Jockey Pump

1.0 Fire Pump - Vertical Turbine Type Diesel Driven 1500 GPM, 150psi, 1770 RPM 1.00 pc/s 0.3377% By Owner

2.0 Jockey Pump - Vertical Turbine Type Electric Driven 40GPM, 150psi, 3550 RPM, 10 HP, 380 Volts, 3Ø PHASE, 60 CYCLE 1.00 pc/s 0.2338% By Owner

SUNDRIESItems which the Contractor requires which are not included inItemized Cost Breakdown (ICB) and is required to comply withthe issued Bid Plans, Specifications, Bid Bulletins and OtherRelated Bid Documents.Each Items are listed below.

197 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

FIRE PROTECTION WORKS2.01 BLACK IRON PIPES AND FITTINGS

Tee ReducerTee Reducer, Standard200 x 150 mm Ø 2.00 pc/s 0.0222% 1,585.00 200 x 65 mm Ø 1.00 pc/s 0.0111% 1,585.00 150 x 100 mm Ø 13.00 pc/s 0.0695% 762.45 150 x 65 mm Ø 5.00 pc/s 0.0267% 762.45 100 x 50 mm Ø 285.00 pc/s 0.8622% 431.37 100 x 40 mm Ø 32.00 pc/s 0.0968% 431.37 100 x 32 mm Ø 4.00 pc/s 0.0121% 431.37 80 x 50 mm Ø 2.00 pc/s 0.0050% 356.50 80 x 40 mm Ø 55.00 pc/s 0.1375% 356.50 80 x 32 mm Ø 24.00 pc/s 0.0600% 356.50 65 x 32 mm Ø 5.00 pc/s 0.0109% 310.00 50 x 32 mm Ø 6.00 pc/s 0.0088% 208.00

ReducerBell Reducer250 x 200 mm Ø 2.00 pc/s 0.0224% 1,597.32 200 x 150 mm Ø 2.00 pc/s 0.0178% 1,266.84 100 x 80 mm Ø 6.00 pc/s 0.0128% 303.03 100 x 50 mm Ø 30.00 pc/s 0.0638% 303.03 80 x 50 mm Ø 19.00 pc/s 0.0247% 185.73 65 x 50 mm Ø 4.00 pc/s 0.0046% 165.00 Coupling Reducer25 x 20 mm Ø 1095.00 pc/s 0.2803% 36.50

198 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

Flexible Coupling200 mm Ø 2.00 pc/s 0.0251% 1,787.75

Blind Flange200 mm Ø 1.00 pc/s 0.0112% 1,600.00 150 mm Ø 9.00 pc/s 0.0498% 789.65

End Capped200 mm Ø 1.00 pc/s 0.0067% 955.00 150 mm Ø 9.00 pc/s 0.0481% 762.50

Union Patente50 mm Ø 20.00 pc/s 0.0515% 367.50 32 mm Ø 12.00 pc/s 0.0151% 180.00 25 mm Ø 27.00 pc/s 0.0239% 126.00

2.02 VALVES AND ACCESSORIESGate Valve (OS & Y)

200 mm Ø 1.00 pc/s 0.2533% 46,267.20 65 mm Ø 1.00 pc/s 0.0571% 8,500.00

Check Valve 65 mm Ø 1.00 pc/s 0.0609% 9,219.00

Alarm Check Valve 200 mm Ø 1.00 pc/s 0.4622% 86,475.60

Globe Valve32 mm Ø 12.00 pc/s 0.2247% 2,891.70

Air Release Valve25 mm Ø 6.00 pc/s 0.2922% 7,518.42

Waterflow Detector

199 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

100 mm Ø 6.00 pc/s 0.2314% 5,500.00 FDC Manfold 2.00 pc/s 0.2379% 21,398.58

2.03 PUMPS, CONTROLLERS, SPRINKLERS, CABINETS, ETC.2.03.01 Sprinkler Heads

Sidewall Type Sprinkler Heads (20mmØ Large Orifice) 1.00 pc/s 0.0053% 786.54

III MISCELLANEOUS WORKS, ETC3.01 PIPE SLEEVING 1.0 lot 0.4519% 60,000.00

3.02 HANGER'S AND SUPPORTS 1.0 lot 2.1468% 285,000.00

3.03 FIRE SEALANTS 1.0 lot 0.2636% 35,000.00

3.04 MISCELLANEOUS AND CONSUMABLES 1.0 lot 2.2147% 295,000.00

3.05 TESTING AND COMMISSIONING 1.0 lot 0.9091% 50,000.00

3.06 ELECTRICAL WORKS (including sprinkler alarm control system) 1.0 lot 1.4688% 195,000.00 TOTAL FOR SANITARY, PLUMBING & FIRE PROTECTION WORKS

IV PRELIMINARIES4.01 Mobilization/Demobilization 1.0 lot 0.5195%4.02 Permits and Licences 1.0 lot 0.6753%4.03 Bonds and Insurances

4.03.01 Surety 1.0 lot 0.2338%4.03.02 Performance Bond 1.0 lot 0.3377%4.03.03 Guarantee Bond 1.0 lot 0.2597%

200 of 267 PROGRESS BILLING (APSI)

Project : PROJECT NEO

Location : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan Laguna

Contractor : AAA Plumbing Services, Inc.Scope of work : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKS

Subject : PROGRESS BILLING NO. 1

Period Covered : March 16 to May 23, 2015Contracted Amount : Php 19,250,000.00

DESCRIPTION QTY UNITWeighted UNIT COST

% MATERIALSITEM NO.

4.03.04 CARI 1.0 lot 0.6753%4.03.05 Contractor,s Employees,s Accident Insurance and CGL 1.0 lot 0.7792%

4.04 Temporary Facilities (Site Office, Warehouse, etc) 1.0 lot 1.5065%4.05 Submittals, Shop Drawing's and As - Built 1.0 lot 0.3117%4.06 Safety and Housekeeping 1.0 lot 1.0909%4.07 Site Management 1.0 lot 6.2338%

TOTAL 100.0000%

Evaluated & Endorsed By:Prompt Managers & Construction Services, Inc.

Prepared By: Noted By:

Engr. Wilson Falculan Jr. Engr. Rolando PolicarpioOIC/Project Engineer Project Manager

201 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

Previous Present To Date Previous Present

494.19 158,140.80 71,163.36 229,304.16 0.0000% 0.0000% 0.0000% 299.12 199,410.00 89,734.50 289,144.50 38.0000% 38.0000% 12.0000% 195.08 552,712.50 248,720.63 801,433.13 51.0000% 51.0000% 10.0000% 91.04 177,821.70 80,019.77 257,841.47 51.0000% 51.0000% 18.7700% 68.34 61,961.60 27,882.72 89,844.32 73.0000% 73.0000% 18.3800% 31.88 58,437.50 26,296.88 84,734.38 58.0000% 58.0000% 24.0000%

380.59 59,202.50 26,641.13 85,843.63 47.0000% 47.0000% 12.0000% 196.22 78,489.00 35,320.05 113,809.05 58.0000% 58.0000% 6.6700% 31.21 18,727.20 8,427.24 27,154.44 67.0000% 67.0000% 14.4400% 18.74 1,082.90 487.31 1,570.21 92.0000% 92.0000% 34.6200%

202 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

10.40 7,514.00 3,381.30 10,895.30 49.2000% 49.2000% 17.2300%

292.61 16,256.25 7,315.31 23,571.56 88.0000% 88.0000% 16.0000% 156.06 57,222.00 25,749.90 82,971.90 60.0000% 60.0000% 4.8000% 23.91 10,359.38 4,661.72 15,021.09 66.0000% 66.0000% 27.6900% 15.07 837.25 376.76 1,214.01 80.0000% 80.0000% 80.0000% 8.30 3,412.33 1,535.55 4,947.87 54.0000% 54.0000% 10.8100%

370.64 45,300.75 20,385.34 65,686.09 98.0000% 98.0000% 12.7300% 50.11 5,567.50 2,505.38 8,072.88 94.0000% 94.0000% 82.0000%

263.54 81,991.00 36,895.95 118,886.95 71.4000% 71.4000% 35.7100% 320.54 32,053.50 14,424.08 46,477.58 82.2000% 82.2000% 15.5600%

66.17 3,676.25 1,654.31 5,330.56 92.0000% 92.0000% 80.0000% 41.69 9,265.00 4,169.25 13,434.25 76.0000% 76.0000% 7.0000% 40.16 4,016.25 1,807.31 5,823.56 92.0000% 92.0000% 8.8000%

14.57 10,363.20 4,663.44 15,026.64 62.5000% 62.5000% 11.8800%

203 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

43.61 3,876.00 1,744.20 5,620.20 95.0000% 95.0000% 27.5000%

51.64 803.25 361.46 1,164.71 100.0000% 100.0000% 100.0000%

37.49 166.60 74.97 241.57 100.0000% 100.0000% 100.0000%

57.38 8,287.50 3,729.38 12,016.88 92.0000% 92.0000% 38.4600% 32.24 716.55 322.45 1,039.00 92.0000% 92.0000%

282.36 46,119.29 13,835.79 59,955.08 238.29 28,594.80 8,578.44 37,173.24

155.41 31,081.50 13,986.68 45,068.18 139.05 37,080.00 16,686.00 53,766.00 84.52 6,573.70 2,958.17 9,531.87

25.38 112.80 50.76 163.56 15.11 201.48 90.67 292.15

239.13 10,628.20 4,782.69 15,410.89 28.55 507.60 228.42 736.02

204 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

900.00 600,000.00 270,000.00 870,000.00 637.49 328,660.48 147,897.22 476,557.70 421.20 82,368.00 37,065.60 119,433.60 174.28 309,832.00 139,424.40 449,256.40 129.90 55,422.72 24,940.22 80,362.94 75.94 33,750.00 15,187.50 48,937.50 28.96 28,314.00 12,741.30 41,055.30

702.00 39,000.00 17,550.00 56,550.00 585.00 42,900.00 19,305.00 62,205.00 234.00 2,600.00 1,170.00 3,770.00 146.25 6,500.00 2,925.00 9,425.00 72.90 10,530.00 4,738.50 15,268.50 22.57 4,263.60 1,918.62 6,182.22 13.68 3,344.00 1,504.80 4,848.80 9.95 5,414.50 2,436.53 7,851.03

731.25 3,250.00 1,462.50 4,712.50 337.46 2,249.70 1,012.37 3,262.07 163.80 1,456.00 655.20 2,111.20 60.22 669.10 301.10 970.20 34.52 153.40 69.03 222.43

6.61 73.45 33.05 106.50

205 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

291.04 646.75 291.04 937.79 186.62 2,902.90 1,306.31 4,209.21 30.48 3,386.50 1,523.93 4,910.43 38.56 4,112.64 1,850.69 5,963.33 17.26 575.25 258.86 834.11 8.19 36.40 16.38 52.78

179.56 399.02 179.56 578.58

11.75 104.44 47.00 151.44 6.61 14.69 6.61 21.30

3.30 807.40 363.33 1,170.73

164.51 4,386.84 1,974.08 6,360.92 64.80 9,792.00 4,406.40 14,198.40

48.47 215.42 96.94 312.36

80.33 4,641.00 2,088.45 6,729.45

206 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

2,500.00 29,427.00 2,500.00 31,927.00 2,500.00 93,228.00 10,000.00 103,228.00 2,500.00 192,270.00 25,000.00 217,270.00 2,500.00 30,294.00 5,000.00 35,294.00 2,500.00 71,400.00 15,000.00 86,400.00 391.68 7,833.60 2,350.08 10,183.68 346.88 13,875.24 4,162.57 18,037.81 187.76 3,755.22 1,126.57 4,881.79 204.00 680.00 204.00 884.00 165.00 7,700.00 2,310.00 10,010.00

3,500.00 85,000.00 3,500.00 88,500.00

2,500.00 32,800.00 5,000.00 37,800.00 724.50 4,830.00 1,449.00 6,279.00 508.05 2,223.60 508.05 2,731.65

2,500.00 390,252.00 10,000.00 400,252.00

2,500.00 150,000.00 5,000.00 155,000.00

2,500.00 32,427.00 2,500.00 34,927.00

724.50 4,830.00 1,449.00 6,279.00

207 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

2,500.00 56,610.00 7,500.00 64,110.00

2,500.00 37,454.40 10,000.00 47,454.40 2,500.00 8,790.77 2,500.00 11,290.77 611.39 4,075.92 1,222.78 5,298.70

1,125.00 10,000.00 4,500.00 14,500.00 832.50 7,400.00 3,330.00 10,730.00

671.61 11,939.68 5,372.86 17,312.54 472.95 15,765.15 7,094.32 22,859.47

528.03 3,000.00 1,056.06 4,056.06

40,000.00 ByOwner 40,000.00 40,000.00

208 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

20,000.00 ByOwner 20,000.00 20,000.00

85,000.00 1,170,164.50 170,000.00 1,340,164.50

10,000.00 ByOwner 20,000.00 20,000.00

400.00 ByOwner 15,200.00 15,200.00 700.00 ByOwner 14,000.00 14,000.00 700.00 ByOwner 16,100.00 16,100.00

288.60 68,302.00 20,490.60 88,792.60 199.94 57,316.42 17,194.93 74,511.35 672.53 49,318.72 14,795.62 64,114.34 454.41 42,411.60 12,723.48 55,135.08 272.65 36,352.80 10,905.84 47,258.64

694.50 2,315.00 694.50 3,009.50

209 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

By Others

19.35 3,612.00 1,625.40 5,237.40

9.54 2,332.00 1,049.40 3,381.40

107.10 3,570.00 1,606.50 5,176.50 20.72 1,381.50 621.68 2,003.18 8,454.56 22,841.68 8,454.56 31,296.24 6,660.49 17,994.64 6,660.49 24,655.13 400.00 - 140,000.00 140,000.00

43.57 11,618.40 5,228.28 16,846.68

210 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

255.94 11,375.00 5,118.75 16,493.75

15.21 1,521.00 684.45 2,205.45

208.20 462.67 208.20 670.87

291.04 646.75 291.04 937.79 186.62 829.40 373.23 1,202.63 186.62 829.40 373.23 1,202.63 321.62 1,429.40 643.23 2,072.63 109.69 487.50 219.38 706.88 109.69 243.75 109.69 353.44 109.69 487.50 219.38 706.88 109.69 243.75 109.69 353.44 68.74 611.00 274.95 885.95 68.74 305.50 137.48 442.98 68.74 305.50 137.48 442.98 37.15 165.10 74.30 239.40 37.15 1,898.65 854.39 2,753.04 36.35 969.36 436.21 1,405.57 20.57 137.10 61.70 198.80

117.00 260.00 117.00 377.00 117.00 2,340.00 1,053.00 3,393.00 117.00 260.00 117.00 377.00 70.20 624.00 280.80 904.80

211 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

43.88 1,170.00 526.50 1,696.50 26.33 117.00 52.65 169.65 11.02 24.48 11.02 35.50 10.28 45.70 20.57 66.27 5.85 1,170.00 526.50 1,696.50

590.82 22,319.98 10,043.99 32,363.97 380.25 21,970.00 9,886.50 31,856.50 318.73 18,415.54 8,286.99 26,702.53 78.21 347.62 156.43 504.05

177.48 12,423.60 3,727.08 16,150.68

308.45 685.44 308.45 993.89

292.50 48,750.00 21,937.50 70,687.50 204.75 18,200.00 8,190.00 26,390.00 117.00 4,160.00 1,872.00 6,032.00 70.20 312.00 140.40 452.40 35.10 10,920.00 4,914.00 15,834.00 14.32 795.50 357.98 1,153.48 11.02 244.80 110.16 354.96 8.78 195.00 87.75 282.75 5.85 325.00 146.25 471.25

278.34 10,515.01 4,731.75 15,246.76

212 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

212.24 17,922.70 8,065.22 25,987.92 109.06 2,908.20 1,308.69 4,216.89

87.75 21,450.00 9,652.50 31,102.50

158.63 12,690.36 5,710.66 18,401.02 73.44 2,774.40 1,248.48 4,022.88 70.20 1,092.00 491.40 1,583.40

2,500.00 75,735.00 7,500.00 83,235.00

58.38 170.34 58.38 228.72

297.14 3,468.00 1,188.56 4,656.56

350.00 By Owner 1,400.00 1,400.00 700.00 By Owner 1,400.00 1,400.00 700.00 By Owner 21,000.00 21,000.00 800.00 By Owner 1,600.00 1,600.00

Not included on these costs are the following: (Fire Protection Works)Ground Floor : Grid Line B/F - 1/11 & Grid Line P/W -11/16Second Floor : Grid Line B/W - 1/6

213 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

9,691.05 27,688.72 9,691.05 37,379.77 0.0000% 5,449.89 15,571.12 5,449.89 21,021.01 0.0000% 2,536.93 347,921.28 121,772.45 469,693.73 62.5000% 62.5000% 2.0800% 1,516.47 823,228.20 288,129.87 1,111,358.07 42.1000% 42.1000% 13.1600% 1,010.12 150,075.12 52,526.29 202,601.41 57.7000% 57.7000% 3.8000% 747.33 53,380.50 18,683.18 72,063.68 64.0000% 64.0000% 12.0000% 510.05 87,436.80 30,602.88 118,039.68 50.0000% 50.0000% 5.0000% 362.21 124,185.60 43,464.96 167,650.56 50.0000% 50.0000% 8.3300% 291.98 154,334.40 54,017.04 208,351.44 35.0000% 35.0000% 5.4000% 226.57 313,959.90 109,885.97 423,845.87 51.5500% 51.5500% 6.1800%

0.0000% 266.86 13,724.10 4,803.44 18,527.54 55.5500% 55.5500% 5.6000% 150.98 14,235.21 4,982.32 19,217.53 48.4800% 48.4800% 6.0600% 135.65 6,976.26 2,441.69 9,417.95 100.0000% 100.0000% 11.0000% 56.53 3,553.00 1,243.55 4,796.55 86.3600% 86.3600% 9.0900% 46.73 1,335.00 467.25 1,802.25 100.0000% 100.0000% 100.0000% 30.98 1,327.50 464.63 1,792.13 73.3300% 73.3300% 13.0000% 23.28 2,394.00 837.90 3,231.90 47.2200% 47.2200% 0.0000% 13.94 50,982.40 17,843.84 68,826.24 25.3900% 25.3900% 2.6500%

266.86 7,624.50 2,668.58 10,293.08 50.0000% 50.0000% 0.0000% 150.98 17,686.17 6,190.16 23,876.33 29.2600% 29.2600% 9.7600% 124.78 713.00 249.55 962.55 100.0000% 100.0000% 50.0000%

60.90 19,140.00 6,699.00 25,839.00 30.9000% 30.9000% 15.4500% 41.30 6,844.00 2,395.40 9,239.40 44.8300% 44.8300% 29.3100%

214 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

32.55 3,162.00 1,106.70 4,268.70 50.0000% 50.0000% 0.0000% 18.27 15,138.00 5,298.30 20,436.30 26.5500% 26.5500% 11.0000%

1,253.00 3,580.00 1,253.00 4,833.00 0.0000% 0.0000% 150.98 4,313.70 1,509.80 5,823.50 50.0000% 50.0000% 20.0000% 150.98 431.37 150.98 582.35 100.0000% 100.0000% 100.0000% 124.78 713.00 249.55 962.55 100.0000% 100.0000% 0.0000% 124.78 713.00 249.55 962.55 100.0000% 100.0000% 50.0000% 72.80 1,664.00 582.40 2,246.40 40.0000% 40.0000% 0.0000% 49.53 35,375.00 12,381.25 47,756.25 16.8000% 16.8000% 0.0000% 37.54 27,885.00 9,759.75 37,644.75 43.4600% 43.4600% 13.0800%

34.91 15,960.00 5,586.00 21,546.00 42.5000% 42.5000% 21.2500% 34.91 7,980.00 2,793.00 10,773.00 15.0000% 15.0000% 0.0000% 34.91 9,775.50 3,421.43 13,196.93 48.9000% 48.9000% 17.3500% 24.07 14,099.90 4,934.97 19,034.87 52.6800% 52.6800% 16.5900% 24.07 3,232.66 1,131.43 4,364.09 50.0000% 50.0000% 0.0000% 18.65 13,322.50 4,662.88 17,985.38 100.0000% 100.0000% 13.6000%

713.29 16,303.68 5,706.29 22,009.97 0.0000% 0.0000% 173.25 5,940.00 2,079.00 8,019.00 0.0000% 0.0000% 133.98 30,624.00 10,718.40 41,342.40 40.0000% 40.0000% 20.0000% 106.26 10,929.60 3,825.36 14,754.96 0.0000% 0.0000% 92.40 4,224.00 1,478.40 5,702.40 0.0000% 0.0000%

215 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

77.92 9,262.88 3,428.48 12,691.36 34.0000% 34.0000% 13.6400%

121.80 57,420.00 20,097.00 77,517.00 42.4200% 42.4200% 20.6100% 96.60 23,460.00 8,211.00 31,671.00 30.6000% 30.6000% 0.0000% 58.80 7,560.00 2,646.00 10,206.00 48.0000% 48.0000% 11.0000%

1,222.74 6,606.96 2,445.48 9,052.44 356.29 11,550.96 4,275.48 15,826.44 192.01 4,149.92 1,536.08 5,686.00 136.55 737.86 273.10 1,010.96

2,420.40 24,235.20 2,420.40 26,655.60 1,935.79 427,971.60 40,651.59 468,623.19 354.96 214,812.00 27,686.88 242,498.88

216 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

2,500.00 56,810.00 5,000.00 61,810.00

2,500.00 81,000.00 15,000.00 96,000.00

2,500.00 72,986.51 2,500.00 75,486.51 2,500.00 42,550.00 5,000.00 47,550.00

2,500.00 30,000.00 12,500.00 42,500.00

262.50 10,500.00 3,675.00 14,175.00

1,500.00 62,284.90 3,000.00 65,284.90

428.13 13,880.16 3,425.04 17,305.20

528.03 28,500.00 10,032.57 38,532.57

217 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

135.57 272,075.26 83,917.83 355,993.09

192.66 240,474.85 74,174.10 314,648.95

2,465.93 174,000.00 29,591.16 203,591.16 5,083.98 58,412.34 5,083.98 63,496.32

65,000.00 By Owner 65,000.00 65,000.00

45,000.00 By Owner 45,000.00 45,000.00

218 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

554.75 3,170.00 1,109.50 4,279.50 0.0000% 0.0000% 554.75 1,585.00 554.75 2,139.75 0.0000% 0.0000% 266.86 9,911.85 3,469.15 13,381.00 0.0000% 0.0000% 266.86 3,812.25 1,334.29 5,146.54 60.0000% 60.0000% 0.0000% 150.98 122,940.45 43,029.16 165,969.61 22.0000% 22.0000% 11.9200% 150.98 13,803.84 4,831.34 18,635.18 0.0000% 0.0000% 150.98 1,725.48 603.92 2,329.40 0.0000% 0.0000% 124.78 713.00 249.55 962.55 0.0000% 0.0000% 124.78 19,607.50 6,862.63 26,470.13 0.0000% 0.0000% 124.78 8,556.00 2,994.60 11,550.60 0.0000% 0.0000% 108.50 1,550.00 542.50 2,092.50 100.0000% 100.0000% 100.0000% 72.80 1,248.00 436.80 1,684.80 0.0000% 0.0000%

559.06 3,194.64 1,118.12 4,312.76 0.0000% 0.0000% 443.39 2,533.68 886.79 3,420.47 0.0000% 0.0000% 106.06 1,818.18 636.36 2,454.54 0.0000% 0.0000% 106.06 9,090.90 3,181.82 12,272.72 26.0000% 26.0000% 13.0000% 65.01 3,528.87 1,235.10 4,763.97 0.0000% 0.0000% 57.75 660.00 231.00 891.00 50.0000% 50.0000% 50.0000%

12.78 39,967.50 13,988.63 53,956.13

219 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

625.71 3,575.50 1,251.43 4,826.93

560.00 1,600.00 560.00 2,160.00 276.38 7,106.85 2,487.40 9,594.25

334.25 955.00 334.25 1,289.25 266.88 6,862.50 2,401.88 9,264.38

128.63 7,350.00 2,572.50 9,922.50 63.00 2,160.00 756.00 2,916.00 44.10 3,402.00 1,190.70 4,592.70

2,500.00 46,267.20 2,500.00 48,767.20 2,500.00 8,500.00 2,500.00 11,000.00

2,500.00 9,219.00 2,500.00 11,719.00

2,500.00 86,475.60 2,500.00 88,975.60

713.55 34,700.40 8,562.60 43,263.00

1,855.23 45,110.52 11,131.38 56,241.90

220 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

1,925.00 33,000.00 11,550.00 44,550.00 1,500.00 42,797.16 3,000.00 45,797.16

242.61 786.54 242.61 1,029.15

27,000.00 60,000.00 27,000.00 87,000.00 90.0000% 90.0000% 90.0000%

128,250.00 285,000.00 128,250.00 413,250.00 30.0000% 30.0000% 30.0000%

15,750.00 35,000.00 15,750.00 50,750.00

131,321.49 295,000.00 131,321.49 426,321.49 30.0000% 30.0000% 30.0000%

125,000.00 50,000.00 125,000.00 175,000.00

87,750.00 195,000.00 87,750.00 282,750.00

100,000.00 100,000.00 100,000.00 48.0000% 130,000.00 130,000.00 130,000.00 43.0000%

45,000.00 45,000.00 45,000.00 100.0000% 65,000.00 65,000.00 65,000.00 100.0000% 50,000.00 50,000.00 50,000.00

221 of 267 PROGRESS BILLING (APSI)

UNIT COST TOTAL COSTTOTAL AMOUNT

PERCENTAGE OF ACCOMPLISHMENTLABOR MATERIALS LABOR MATERIALS LABOR

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

130,000.00 130,000.00 130,000.00 100.0000% 150,000.00 150,000.00 150,000.00 290,000.00 290,000.00 290,000.00 44.0000% 60,000.00 60,000.00 60,000.00 67.0000% 210,000.00 210,000.00 210,000.00 48.0000% 1,200,000.00 1,200,000.00 1,200,000.00 43.0000%

12,466,695.16 6,783,304.84 19,250,000.00 11.8743%

19,250,000.00

Engr. Rolando PolicarpioProject Manager

222 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

To Date

0.0000% - - - 0.00% - 0.00% - 12.0000% 75,775.80 10,768.14 86,543.94 29.93% 86,543.94 29.93% - 10.0000% 281,883.38 24,872.06 306,755.44 38.28% 306,755.44 38.28% - 18.7700% 90,689.07 15,019.71 105,708.78 41.00% 105,708.78 41.00% - 18.3800% 45,231.97 5,124.84 50,356.81 56.05% 50,356.81 56.05% - 24.0000% 33,893.75 6,311.25 40,205.00 47.45% 40,205.00 47.45% -

12.0000% 27,825.18 3,196.94 31,022.11 36.14% 31,022.11 36.14% - 6.6700% 45,523.62 2,355.85 47,879.47 42.07% 47,879.47 42.07% -

14.4400% 12,547.22 1,216.89 13,764.12 50.69% 13,764.12 50.69% - 34.6200% 996.27 168.70 1,164.97 74.19% 1,164.97 74.19% -

223 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

17.2300% 3,696.89 582.60 4,279.49 39.28% 4,279.49 39.28% -

16.0000% 14,305.50 1,170.45 15,475.95 65.66% 15,475.95 65.66% - 4.8000% 34,333.20 1,236.00 35,569.20 42.87% 35,569.20 42.87% -

27.6900% 6,837.19 1,290.83 8,128.02 54.11% 8,128.02 54.11% - 80.0000% 669.80 301.41 971.21 80.00% 971.21 80.00% - 10.8100% 1,842.66 165.99 2,008.65 40.60% 2,008.65 40.60% -

12.7300% 44,394.74 2,595.05 46,989.79 71.54% 46,989.79 71.54% - 82.0000% 5,233.45 2,054.41 7,287.86 90.28% 7,287.86 90.28% -

35.7100% 58,541.57 13,175.54 71,717.12 60.32% 71,717.12 60.32% - 15.5600% 26,347.98 2,244.39 28,592.36 61.52% 28,592.36 61.52% -

80.0000% 3,382.15 1,323.45 4,705.60 88.28% 4,705.60 88.28% - 7.0000% 7,041.40 291.85 7,333.25 54.59% 7,333.25 54.59% - 8.8000% 3,694.95 159.04 3,853.99 66.18% 3,853.99 66.18% -

11.8800% 6,477.00 554.02 7,031.02 46.79% 7,031.02 46.79% -

224 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

27.5000% 3,682.20 479.66 4,161.86 74.05% 4,161.86 74.05% -

100.0000% 803.25 361.46 1,164.71 100.00% 1,164.71 100.00% -

100.0000% 166.60 74.97 241.57 100.00% 241.57 100.00% -

38.4600% 7,624.50 1,434.32 9,058.82 75.38% 9,058.82 75.38% - 659.23 - 659.23 63.45% 659.23 63.45% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

225 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

226 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

227 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

228 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

-

-

229 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

-

-

-

- - -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

230 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

231 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

232 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

233 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - -

234 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 2.0800% 217,450.80 2,532.87 219,983.67 46.84% 219,983.67 46.84% -

13.1600% 346,579.07 37,917.89 384,496.96 34.60% 384,496.96 34.60% - 3.8000% 86,593.34 1,996.00 88,589.34 43.73% 88,589.34 43.73% -

12.0000% 34,163.52 2,241.98 36,405.50 50.52% 36,405.50 50.52% - 5.0000% 43,718.40 1,530.14 45,248.54 38.33% 45,248.54 38.33% - 8.3300% 62,092.80 3,620.63 65,713.43 39.20% 65,713.43 39.20% - 5.4000% 54,017.04 2,916.92 56,933.96 27.33% 56,933.96 27.33% - 6.1800% 161,846.33 6,790.95 168,637.28 39.79% 168,637.28 39.79% -

5.6000% 7,623.74 268.99 7,892.73 42.60% 7,892.73 42.60% - 6.0600% 6,901.23 301.93 7,203.16 37.48% 7,203.16 37.48% -

11.0000% 6,976.26 268.59 7,244.85 76.93% 7,244.85 76.93% - 9.0900% 3,068.37 113.04 3,181.41 66.33% 3,181.41 66.33% -

100.0000% 1,335.00 467.25 1,802.25 100.00% 1,802.25 100.00% - 13.0000% 973.46 60.40 1,033.86 57.69% 1,033.86 57.69% - 0.0000% 1,130.45 - 1,130.45 34.98% 1,130.45 34.98% - 2.6500% 12,944.43 472.86 13,417.29 19.49% 13,417.29 19.49% -

0.0000% 3,812.25 - 3,812.25 37.04% 3,812.25 37.04% - 9.7600% 5,174.97 604.16 5,779.13 24.20% 5,779.13 24.20% -

50.0000% 713.00 124.78 837.78 87.04% 837.78 87.04% -

15.4500% 5,914.26 1,035.00 6,949.26 26.89% 6,949.26 26.89% - 29.3100% 3,068.17 702.09 3,770.26 40.81% 3,770.26 40.81% -

235 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

0.0000% 1,581.00 - 1,581.00 37.04% 1,581.00 37.04% - 11.0000% 4,019.14 582.81 4,601.95 22.52% 4,601.95 22.52% -

0.0000% - - - 0.00% - 0.00% - 20.0000% 2,156.85 301.96 2,458.81 42.22% 2,458.81 42.22% -

100.0000% 431.37 150.98 582.35 100.00% 582.35 100.00% - 0.0000% 713.00 - 713.00 74.07% 713.00 74.07% -

50.0000% 713.00 124.78 837.78 87.04% 837.78 87.04% - 0.0000% 665.60 - 665.60 29.63% 665.60 29.63% - 0.0000% 5,943.00 - 5,943.00 12.44% 5,943.00 12.44% -

13.0800% 12,118.82 1,276.58 13,395.40 35.58% 13,395.40 35.58% -

21.2500% 6,783.00 1,187.03 7,970.03 36.99% 7,970.03 36.99% - 0.0000% 1,197.00 - 1,197.00 11.11% 1,197.00 11.11% -

17.3500% 4,780.22 593.62 5,373.84 40.72% 5,373.84 40.72% - 16.5900% 7,427.83 818.71 8,246.54 43.32% 8,246.54 43.32% - 0.0000% 1,616.33 - 1,616.33 37.04% 1,616.33 37.04% -

13.6000% 13,322.50 634.15 13,956.65 77.60% 13,956.65 77.60% -

0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% -

20.0000% 12,249.60 2,143.68 14,393.28 34.81% 14,393.28 34.81% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% -

236 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

13.6400% 3,149.38 467.64 3,617.02 28.50% 3,617.02 28.50% -

20.6100% 24,357.56 4,141.99 28,499.56 36.77% 28,499.56 36.77% - 0.0000% 7,178.76 - 7,178.76 22.67% 7,178.76 22.67% -

11.0000% 3,628.80 291.06 3,919.86 38.41% 3,919.86 38.41% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

237 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

238 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

-

-

239 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 0.0000% 2,287.35 - 2,287.35 44.44% 2,287.35 44.44% -

11.9200% 27,046.90 5,129.08 32,175.97 19.39% 32,175.97 19.39% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% -

100.0000% 1,550.00 542.50 2,092.50 100.00% 2,092.50 100.00% - 0.0000% - - - 0.00% - 0.00% -

0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% - 0.0000% - - - 0.00% - 0.00% -

13.0000% 2,363.63 413.64 2,777.27 22.63% 2,777.27 22.63% - 0.0000% - - - 0.00% - 0.00% -

50.0000% 330.00 115.50 445.50 50.00% 445.50 50.00% -

- - - 0.00% - 0.00% -

240 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

241 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

- - - 0.00% - 0.00% - - - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

90.0000% 54,000.00 24,300.00 78,300.00 90.00% 78,300.00 90.00% -

30.0000% 85,500.00 38,475.00 123,975.00 30.00% 123,975.00 30.00% -

- - - 0.00% - 0.00% -

30.0000% 88,500.00 39,396.45 127,896.45 30.00% 127,896.45 30.00% -

- - - 0.00% - 0.00% -

- - - 0.00% - 0.00% -

48.0000% - 48,000.00 48,000.00 48.00% 48,000.00 48.00% - 43.0000% - 55,900.00 55,900.00 43.00% 55,900.00 43.00% -

100.0000% - 45,000.00 45,000.00 100.00% 45,000.00 100.00% - 100.0000% - 65,000.00 65,000.00 100.00% 65,000.00 100.00% -

- - - 0.00% - 0.00% -

242 of 267 PROGRESS BILLING (APSI)

PERCENTAGE OF ACCOMPLISHMENT Value of Accomplishment To Date Present Previous AccomplishmentLABOR MATERIALS LABOR TOTAL AMOUNT % Prog. Present Amount % Prog. % Wt.

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

100.0000% - 130,000.00 130,000.00 100.00% 130,000.00 100.00% - - - - 0.00% - 0.00% -

44.0000% - 127,600.00 127,600.00 44.00% 127,600.00 44.00% - 67.0000% - 40,200.00 40,200.00 67.00% 40,200.00 67.00% - 48.0000% - 100,800.00 100,800.00 48.00% 100,800.00 48.00% - 43.0000% - 516,000.00 516,000.00 43.00% 516,000.00 43.00% -

7.3355% 2,285,808.02 1,412,083.42 3,697,891.44 19.21% 3,697,891.44 19.21%

243 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.45% 30.00% 86,743.35 0.45% 30.00% 86,743.35 - - 1.46% 35.00% 280,501.59 1.46% 35.00% 280,501.59 - - 0.55% 41.00% 105,708.78 0.55% 41.00% 105,708.78 - - 0.23% 50.00% 44,922.16 0.23% 50.00% 44,922.16 - - 0.20% 45.00% 38,130.47 0.20% 45.00% 38,130.47

- - 0.16% 35.00% 30,045.27 0.16% 35.00% 30,045.27 - - 0.25% 42.00% 47,799.80 0.25% 42.00% 47,799.80 - - 0.07% 50.00% 13,577.22 0.07% 50.00% 13,577.22 - - 0.01% 74.00% 1,161.95 0.01% 74.00% 1,161.95

244 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.02% 35.00% 3,813.36 0.02% 35.00% 3,813.36

- - 0.08% 65.00% 15,321.52 0.08% 65.00% 15,321.52 - - 0.17% 40.00% 33,188.76 0.17% 40.00% 33,188.76 - - 0.04% 50.00% 7,510.55 0.04% 50.00% 7,510.55 - - 0.01% 80.00% 971.21 0.01% 80.00% 971.21 - - 0.01% 40.00% 1,979.15 0.01% 40.00% 1,979.15

- - 0.22% 65.00% 42,695.96 0.22% 65.00% 42,695.96 - - 0.04% 85.00% 6,861.94 0.04% 85.00% 6,861.94

- - 0.37% 60.32% 71,717.12 0.37% 60.32% 71,717.12 - - 0.15% 61.52% 28,592.36 0.15% 61.52% 28,592.36

- - 0.02% 85.00% 4,530.98 0.02% 85.00% 4,530.98 - - 0.04% 54.59% 7,333.25 0.04% 54.59% 7,333.25 - - 0.02% 66.18% 3,853.99 0.02% 66.18% 3,853.99

- - 0.04% 46.79% 7,031.02 0.04% 46.79% 7,031.02

245 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.02% 74.05% 4,161.86 0.02% 74.05% 4,161.86

- - 0.01% 90.00% 1,048.24 0.01% 90.00% 1,048.24

- - 0.00% 90.00% 217.41 0.00% 90.00% 217.41

- - 0.04% 70.00% 8,411.81 0.04% 70.00% 8,411.81 - - 0.00% 63.45% 659.23 0.00% 63.45% 659.23

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

246 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

247 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

248 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

249 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% -

250 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% - - - 0.00% - 0.00% 0.00% - - - 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

251 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

252 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

253 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

254 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% - - - 0.00% - 0.00% 0.00% - - - 0.00% - 0.00% 0.00% - - - 0.00% - 0.00% 0.00% -

255 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 1.10% 45.00% 211,362.18 1.10% 45.00% 211,362.18 - - 1.73% 30.00% 333,407.42 1.73% 30.00% 333,407.42 - - 0.42% 40.00% 81,040.56 0.42% 40.00% 81,040.56 - - 0.19% 50.00% 36,031.84 0.19% 50.00% 36,031.84 - - 0.24% 38.33% 45,248.54 0.24% 38.33% 45,248.54 - - 0.34% 39.20% 65,713.43 0.34% 39.20% 65,713.43 - - 0.30% 27.33% 56,933.96 0.30% 27.33% 56,933.96 - - 0.88% 39.79% 168,637.28 0.88% 39.79% 168,637.28

- - 0.04% 42.60% 7,892.73 0.04% 42.60% 7,892.73 - - 0.04% 37.48% 7,203.16 0.04% 37.48% 7,203.16 - - 0.04% 76.93% 7,244.85 0.04% 76.93% 7,244.85 - - 0.02% 66.33% 3,181.41 0.02% 66.33% 3,181.41 - - 0.01% 90.00% 1,622.03 0.01% 90.00% 1,622.03 - - 0.01% 57.69% 1,033.86 0.01% 57.69% 1,033.86 - - 0.01% 34.98% 1,130.45 0.01% 34.98% 1,130.45 - - 0.07% 19.49% 13,417.29 0.07% 19.49% 13,417.29

- - 0.02% 37.04% 3,812.25 0.02% 37.04% 3,812.25 - - 0.03% 24.20% 5,779.13 0.03% 24.20% 5,779.13 - - 0.00% 87.04% 837.78 0.00% 87.04% 837.78

- - 0.04% 26.89% 6,949.26 0.04% 26.89% 6,949.26 - - 0.02% 40.81% 3,770.26 0.02% 40.81% 3,770.26

256 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.01% 37.04% 1,581.00 0.01% 37.04% 1,581.00 - - 0.02% 22.52% 4,601.95 0.02% 22.52% 4,601.95

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.01% 42.22% 2,458.81 0.01% 42.22% 2,458.81 - - 0.00% 90.00% 524.11 0.00% 90.00% 524.11 - - 0.00% 70.00% 673.79 0.00% 70.00% 673.79 - - 0.00% 87.00% 837.42 0.00% 87.00% 837.42 - - 0.00% 29.63% 665.60 0.00% 29.63% 665.60 - - 0.03% 12.44% 5,943.00 0.03% 12.44% 5,943.00 - - 0.07% 35.58% 13,395.40 0.07% 35.58% 13,395.40

- - 0.04% 36.99% 7,970.03 0.04% 36.99% 7,970.03 - - 0.01% 11.11% 1,197.00 0.01% 11.11% 1,197.00 - - 0.03% 40.72% 5,373.84 0.03% 40.72% 5,373.84 - - 0.04% 43.32% 8,246.54 0.04% 43.32% 8,246.54 - - 0.01% 37.04% 1,616.33 0.01% 37.04% 1,616.33 - - 0.07% 77.60% 13,956.65 0.07% 77.60% 13,956.65

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.07% 34.81% 14,393.28 0.07% 34.81% 14,393.28 - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

257 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.02% 28.50% 3,617.02 0.02% 28.50% 3,617.02

- - 0.15% 36.77% 28,499.56 0.15% 36.77% 28,499.56 - - 0.04% 22.67% 7,178.76 0.04% 22.67% 7,178.76 - - 0.02% 38.41% 3,919.86 0.02% 38.41% 3,919.86

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

258 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

259 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% -

- - 0.00% - 0.00% 0.00% -

260 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.01% 44.44% 2,287.35 0.01% 44.44% 2,287.35 - - 0.16% 19.00% 31,534.23 0.16% 19.00% 31,534.23 - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.01% 90.00% 1,883.25 0.01% 90.00% 1,883.25 - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.01% 22.63% 2,777.27 0.01% 22.63% 2,777.27 - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 50.00% 445.50 0.00% 50.00% 445.50

- - 0.00% 0.00% - 0.00% 0.00% -

261 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

262 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.00% 0.00% - 0.00% 0.00% - - - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.41% 90.00% 78,300.00 0.41% 90.00% 78,300.00

- - 0.64% 30.00% 123,975.00 0.64% 30.00% 123,975.00

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.66% 30.00% 127,896.45 0.66% 30.00% 127,896.45

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.00% 0.00% - 0.00% 0.00% -

- - 0.25% 48.00% 48,000.00 0.25% 48.00% 48,000.00 - - 0.29% 43.00% 55,900.00 0.29% 43.00% 55,900.00

- - 0.08% 35.00% 15,750.00 0.08% 35.00% 15,750.00 - - 0.12% 35.00% 22,750.00 0.12% 35.00% 22,750.00 - - 0.00% 0.00% - 0.00% 0.00% -

263 of 267 PROGRESS BILLING (APSI)

Previous Accomplishment Accomplishment for this Period Accomplishment To Date% Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT % Wt. % Prog. TOTAL AMOUNT

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, ManilaTel.: 353-3526 Fax: 559-8812

e: prompt_managers@yahoo.com

- - 0.20% 30.00% 39,000.00 0.20% 30.00% 39,000.00 - - 0.00% 0.00% - 0.00% 0.00% - - - 0.66% 44.00% 127,600.00 0.66% 44.00% 127,600.00 - - 0.06% 20.00% 12,000.00 0.06% 20.00% 12,000.00 - - 0.44% 40.00% 84,000.00 0.44% 40.00% 84,000.00 - - 1.87% 30.00% 360,000.00 1.87% 30.00% 360,000.00

0.000% - 16.735% 3,221,488.92 16.735% 3,221,488.92

Original Contract Amount 19,250,000.00 Downpayment 10.000% 1,925,000.00

To Date Accomplishment 16.735% 3,221,488.92 Previous Accomplishment 0.000% 0.00

This Period Accomplishment 16.735% 3,221,488.92

Deduction: Retention 10.000% 322,148.89 EWT

Recoupment of DP 10.000% 322,148.89 Others

TOTAL AMOUNT DUE THIS BILLING 2,577,191.14

Recommendation for Payment

Project : PROJECT NEOLocation : Lot 1&2, Block 3, Phase 7, LTI-SEZ, Binan LagunaContractor : AAA Plumbing Services, Inc.Contract Package : CP-03 PLUMBING, SANITARY, & FIREPROTECTION WORKSSubject : PROGRESS BILLING NO. 1Period covered : March 16 to May 23, 2015Contract Amount : Php 19,250,000.00

SUMMARY

Item No. Description Contract Amount Previous

Weight % %

I SANITARY AND PLUMBING WORKS 8,910,420.81 46.288% 0.000% 0.000%

II FIRE PROTECTION WORKS 6,474,507.70 33.634% 0.000% 0.000%

III MISCELLANEOUS WORKS, ETC 1,435,071.49 7.455% 0.000% 0.000%

IV PRELIMINARIES 2,430,000.00 12.623% 0.000% 0.000%

Grand Total 19,250,000.00 100.000% 0.000% 0.000%

Evaluated & Endorsed By: Recommended for Payment By:Prompt Managers & Construction Services, Inc. Laguna Clear Lake Realty Corp.Construction Project Manager Owner

Engr. Wilson F. Falculan Jr. Ms. Ellen AguillarOIC/Project Engineer LCLRC - VP-Operation/Project Lead

Relative Wt. %

Engr. Rolando M. Policarpio Mr. Jefferson M. ChengProject Manager LCLRC - President & General Manager

SUMMARYPrevious This Period To Date

Amount Weight % % Amount Weight % % Amount

- 4.667% 10.084% 898,490.29 4.667% 10.084% 898,490.29

- 6.378% 18.964% 1,227,827.18 6.378% 18.964% 1,227,827.18

- 1.715% 23.007% 330,171.45 1.715% 23.007% 330,171.45

- 3.974% 31.481% 765,000.00 3.974% 31.481% 765,000.00

- 16.735% ### 3,221,488.92 16.735% ### 3,221,488.92

Original Contract Amount 19,250,000.00 Downpayment 10.000% 1,925,000.00

To Date Accomplishment 16.735% 3,221,488.92 Previous Accomplishment 0.000% 0.00

This Period Accomplishment 16.735% 3,221,488.92

10.000% 322,148.89 EWT

Deduction: Retention

PROMPT MANAGERS& CONSTRUCTION SERVICES INC.

Room 511 Doña Felisa Syjuco Building, Remedios StreetCorner Taft, Avenue, Malate, Manila

Tel.: 353-3526 Fax: 559-8812 e: prompt_managers@yahoo.com

Recoupment of DP 10.000% 322,148.89 Others

TOTAL AMOUNT DUE THIS BILLING 2,577,191.14