4” diameter tube inserted into 21” riser at the seafloor (5000’) new riser allowing flow to...

Post on 01-Apr-2015

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

• 4” Diameter tube inserted into 21” riser at the seafloor (5000’)• New riser allowing flow to the drillship Enterprise • Oil separated & shipped ashore• System designed to minimize the formation of hydrates• Riser tube will also be equipped with methanol injection system to control hydrates• Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls• Support barge is capable of storing 137,000 bbls

Riser Insertion Tube

Blowout Preventer - Top Kill

The Incident Command PostsUnified Source Control – Houston Tx.

• Stack Intervention

− Top Kill

− Swing Valve

− Split Stack

• Containment

− Top hat

− Hot tap

• Relief Wells

− DD II

− DD III

• Longer Term Options

The On-Site Command PostTactical Response Team (TRT) – MC 252