Annex 1:
Sterile Medicinal Products
Table of Contents
.....................................................................................................4
Chapter 1 Scope ...............................................................................................4
.....................................................................................................4
Chapter 2 Principle............................................................................................ 4
...............................................................................5
Chapter 3 Cleanliness classification and monitoring ........................................5
....................................................................................15
Chapter 4 Isolator technology ......................................................................... 15
........................................................................................16
Chapter 5 Blow/fill/seal technology................................................................. 16
...................................................................................................17
Chapter 6 Personnel .......................................................................................17
............................................................................................19
Chapter 7 Premises.........................................................................................19
...................................................................................................21
Chapter 8 Equipment ......................................................................................21
...................................................................................................23
Chapter 9 Sanitation........................................................................................23
-
8/3/2019 2010 China GMP English Translation[1]
3/115
3
............................................................................................24
Chapter 10 Processing....................................................................................24
........................................................................................29
Chapter 11 Sterilisation ...................................................................................29
........................................................................................31
Chapter 12 Sterilisation method...................................................................... 31
......................................................................37
Chapter 13 Finishing of sterile products..........................................................37
........................................................................................38
Chapter 14 Quality control ..............................................................................38
...............................................................................................39
Chapter 15 Glossary .......................................................................................39
-
8/3/2019 2010 China GMP English Translation[1]
4/115
4
Chapter 1 Scope
Article 1 The sterile medicinal products, including sterile drug products and
drug substances, refer to the drug product and drug substances which are
subject to sterility test items as required in the statutory drug specifications
Article 2 This annex applies to the whole manufacture process for sterile
drug products, and to the process of sterilisation and sterile production for sterile
drug substances.
Chapter 2 Principle
Article 3 The manufacture of sterile products should meet the requirements of
quality and the intended use. It should minimize risks of microbiological
contamination, and of particulate and pyrogen contamination. The skill, training
and attitudes of the personnel involved are critical factors. The manufacture of
-
8/3/2019 2010 China GMP English Translation[1]
5/115
5
sterile products must strictly follow the established and validated methods of
preparation and procedure. The sterility or other quality characteristics of
products cannot only rely on any form of terminal process or finished product
test (including sterility test).
Article 4 Sterile medicinal products, according to the manufacturing process, can
be divided into two categories: Termininally sterilised products, where the
products are terminally sterilised; and non-terminally sterilised products, where
the manufacture processes are partially or completely aseptic.
Article 5 The manufacture of sterile products should be carried out in clean areas
entry to which shall be through airlocks for personnel and/or for equipment and
materials. If equipment is used to achieve continuous transfer of materials,
positive pressure air flow shall be used to protect materials and pressure
difference shall be monitored.
Article 6 The various operations of component preparation, product preparationand filling should be carried out in separate areas within the clean area.
Article 7 Clean areas for the manufacture of sterile products are classified
according to the properties of products, the characteristics of process and
equipment used. Each step of manufacturing operation requires an appropriate
environmental cleanliness level in the operational state in order to minimise the
risks of particulate or microbial contamination of the product or materials being
handled.
-
8/3/2019 2010 China GMP English Translation[1]
6/115
6
Chapter 3 Cleanliness Classification and Its Monitoring
Article 8 The design of each clean room or suite of clean rooms shall meet the
requirements of corresponding cleanliness classification, of which in operation
and at rest states shall be defined.
4
A
0.36-0.54m/s
BA
CD
/
(3)
0.5m 5.0m(2) 0.5m 5.0m
A(1) 3520 20 3520 20
B 3520 29 352000 2900
C 352000 2900 3520000 29000
D 3520000 29000
Article 9 For the manufacture of sterile medicinal products 4 grades can be
distinguished.
Grade A: The local zone for high risk operations, e.g. filling zone, stopper bowls,
open
-
8/3/2019 2010 China GMP English Translation[1]
7/115
7
containers that are in direct contact with sterile preparations, making aseptic
connections. Normally such conditions are provided by a uni-directional air flow
work station. uni-directional air flow systems should provide a homogeneous air
speed in a range of 0.36 0.54 m/s (guidance value) at the working position inopen clean room applications.Uni-directional state must be validated, and data
must be available to prove the validation status.
A lower velocities may be used in closed isolators and glove boxes.
Grade B: For aseptic preparation and filling, this is the background environment
for the grade A zone.
Grade C and D: Clean areas for carrying out less critical operation stages in the
manufacture of sterile products.
The maximum permitted airborne particle concentration for each grade is given
in the following table.
Maximum permitted number of particles per m3
equal to orgreater than the tabulated size
At rest In operation (3)Grade
0.5m 5.0m(2)
0.5m 5.0m
A (1) 3520 20 3520 20
B 3520 29 352000 2900
C 352000 2900 3520000 29000
D 3520000 29000 Not defined Not defined
1A1A
ISO 4.85.0mB
ISO 5
CISO 7ISO 8
DISO 8ISO14644-1
2
5.0m
-
8/3/2019 2010 China GMP English Translation[1]
8/115
-
8/3/2019 2010 China GMP English Translation[1]
9/115
9
(2) For Grade A zones, particle monitoring should be undertaken for the full
duration of critical processing, including equipment assembly, except wherejustified by contaminants in the process that would damage the particle counter
or present a hazard, e.g. live organisms and radiological hazards. In such cases,
monitoring should be undertaken during routine equipment set up operations, or
during simulated operations. The Grade A zone should be monitored at such a
frequency and with suitable sample size that all interventions, transient events
and any system deterioration would be captured if alert limits are exceeded. It is
accepted that it may not always be possible to demonstrate low levels of5.0
m particles at the point of fill when filling is in progress, due to the generation of
particles or droplets from the product itself.
BA B
A
(3) It is recommended that a similar monitoring system be used for Grade B
zones as the one used for Grade A zone. The sampling frequency and the
sample size can be adjusted according to the effectiveness of the segregation
between the adjacent Grade A and B zones.
(4) Where airborne particle monitoring systems are used, the length of tubing
and the radii of any bends in the tubing must be considered in the context of the
effect on test result.
(5) The sample sizes taken for monitoring purposes is not necessary to be the
same as that used for formal qualification of clean rooms and air handling
systems..
AB5.0 m
(6) In Grade A and B zones, it should be investigated if a few particle 5.0 m
ocurrs
-
8/3/2019 2010 China GMP English Translation[1]
10/115
10
consecutively or on a regular basis.
1520
(7)The particle limits given in the table for the at rest state should be achievedafter a
short clean up period of 15-20 minutes (guidance value) in an unmannedstate after completion of operations
CD
(8)The monitoring of Grade C and D areas in operation (when necessary) shouldbe performed in accordance with the principles of quality risk management. The
requirements and alert/action limits will depend on the nature of the operations
carried out, but the recommended clean up period should be attained.
(9) Temperature and relative humidity depend on the product and nature of the
operations carried out. These parameters should not interfere with the defined
cleanliness standard.
Article 11 Monitoring in operation should be done on microbe to evaluate its
status. The monitoring methods are settle plates, volumetric air and surface
sampling (e.g. swabs and contact plates),etc. Sampling methods used in
operation should not negatively impact cleanliness level in the zone. Results
-
8/3/2019 2010 China GMP English Translation[1]
11/115
11
from monitoring should be reviewed as a part of batch documentation for
finished product release.
Surfaces and personnel should be monitored after critical operations. Additional
microbiological monitoring is also required outside production operations, e.g.after
validation of systems, cleaning and sanitisation.
(1) Limits for microbiological monitoring of
clean areas during operation:
cfu/m3
90mm
cfu /4(2)55mm
cfu /
5
cfu /
A
-
8/3/2019 2010 China GMP English Translation[1]
12/115
12
24
Notes
(1) These are average values.
(2) Individual settle plates may be exposed for less than 4 hours..At each points,
several settle plates may be used for continuously monitoring and cumulatively
counting.
Article 12 Appropriate alert and action limits should be set for the results of
particulate and microbiological monitoring. Corrective actions shall be defined in
operating procedures in case such limits are exceeded ..
C A
(1)
C
1.2.(2)3.
4.
D
1.2.3.
Article 13 The selection of production operations environment for sterile
medicinal products, refer to the examples in the following table.
Classification Examples of operations for terminally sterilised productsGrade A
environment
with aGrade
C background
Filling (or sealing)of products, when risk of contamination is
high(1)
Grade C
1. Filling (or sealing) of products;
2. Preparation and filtration of products, when risk of
contamination is high(2);
-
8/3/2019 2010 China GMP English Translation[1]
13/115
13
3. Preparation and filling(or sealing) of ophthalmic
preparation, sterile ointment, sterile emulsion or
suspension, etc.
4. Handling of primary packaging materials and tools
after final washing, which are in direct contact with
medicinal products
Grade D
1. Capping;
2.Material preparation before filling;
3.Preparation and filtration of products(concentration or
dilution in a closed system) and ,final washing of primary
packaging material tools a which directly contact with
medicinal products.
1
2
Note:
(1) Here the high risk of contamination refers to the situations where the product
promotes microbial growth, and filling operation is slow or the containers - are
wide- necked or must be exposed for more than a few seconds before sealing.(2) Here the high risk of contamination refers to the situations where the product
promotes microbial growth or must be held for a long period before sterilisation
or is not processed in closed systems.
B
A
1.(1)(2)2.
3.4.
B1.(1)2
C1.2.
D
-
8/3/2019 2010 China GMP English Translation[1]
14/115
14
1
2
C DAA
A
Note:
(1) The products before capping are deemed as not completely sealed.
(2)According to the sealing reliability, design of capping equipment, characteristics
of aluminium caps etc, capping operation can be conducted -in Grade A air
supply environment with a Grade C or D background. The Grade A air supply
environment should conform with at least the requirement of Grade A at rest.
Classificatio
n
Examples of operations for aseptic preparations
Grade A
environment
with a Grade B
background
1. Operation and transfer of those products which are not completelysealed in process(1), such as filling/sealing, subpackaging,
stoppering capping(2) of products etc.
2. Preparation of solutions or products which are not able to go
through sterile-filtration before filling;
3. Assembling of sterilised primary packaging materials and
apparatus which will directly contact with medicinal products.
Transfer and storage ofthose sterilised and partially sealed
apparatus and materials.Milling, sieving, mixing and subpackaging
of sterile drug substances.
Grade B
1. Transfer of partially sealed products in fully sealed containers.2. Transfer and storage of sterized primary packaging materials and
apparatus , which will direct contact with medicinal products. in
sealed containers
Grade C
1. Preparation of solutions or products which could be sterile filtered
before filling.
2. Filtration of products.
Grade D
Final washing, assembling or packaging, and sterilisation of primary
packaging materials and apparatus which will directly contact with
medicinal products.
-
8/3/2019 2010 China GMP English Translation[1]
15/115
15
Chapter 4 Isolator technology
D
Article 14 Operations associated with high contamination risk should be
performed inside isoloator. The isolator and the background environment should
be designed so that the required air quality for the respective zones can be
realised. Transfer devices may vary from a single door or double door designs to
fully sealed systems incorporating sterilisation mechanisms.
Special attention should be paid to prevent contamination when transferring of
materials into and out of the isolator.
The air classification required for the background environment depends on
the design of the isolator and its application. It should be controlled and for
aseptic processing it should be at least grade D.
Article 15 Isolators should be applied for routine operations only afterappropriate validation. Validation should take into account all critical factors of
isolator technology, for examples, the quality of the air inside and outside
(background) the isolator, sanitisation of the isolator, the transfer process and
isolator integrity.
-
8/3/2019 2010 China GMP English Translation[1]
16/115
16
Article 16 Monitoring should be carried out routinely and should include frequent
leak testing of the isolator and glove/sleeve system.
Chapter 5 Blow/fill/seal technology
A
A/B C
D
Article 17 Blow/fill/seal equipment used for aseptic production which is fitted with
an effective grade A air shower may be installed in at least a grade C
environment, provided that grade A/B clothing is used. Under at rest condition,
the suspended particles and microorganism should meet the standards. Under
in operation condition, the microorganism should meet the standards.Blow/fill/seal equipment used for the production of products which are terminally
sterilised should be installed in at least a grade D environment.
Article 18 Because of this special technology particular attention should be paid
to, at least the following:
equipment design and qualification
validation and reproducibility of cleaning-in-place and sterilisation-in-place
background clean room environment in which the equipment is located
operator training and gowning
operations in the critical zone of the equipment including any aseptic
assembly or set-up? prior to the commencement of filling.
-
8/3/2019 2010 China GMP English Translation[1]
17/115
17
Chapter 6 Personnel
Article 19 The total number of personnel shall be rigorously controlled .
Inspections and controls should be conducted outside the clean areas as far as
possible.
Article 20 All personnel (including those concerned with cleaning and
maintenance) employed in such areas should receive regular training in
disciplines relevant to the correct manufacture of sterile products. This training
should include reference to hygiene and to the basic elements of microbiology.
When outside staff who have not received such training (e.g. building ormaintenance contractors) need to be brought in, particular care should be taken
over their instruction and supervision.
Article 21 Personnel who have been engaged in the processing of animal tissue
materials or of cultures of micro-organisms other than those used in the current
manufacturing process shall not enter sterile-product areas unless rigorous and
clearly defined cleaning procedures have been followed.
-
8/3/2019 2010 China GMP English Translation[1]
18/115
18
Article 22 Personnel involved in the manufacture of sterile preparations should
be instructed to report any condition which may cause the shedding of abnormal
numbers or types of contaminants. Actions to be taken about personnel who
could be introducing undue microbiological hazard should be decided by adesignated competent person.
Article 23 Changing and washing should follow a written procedure designed to
minimize contamination of clean area or carry-through of contaminants to the
clean areas.
Article 24 The garment and its quality should be appropriate for the process and
the grade of the working area. It should be applied in such a way as to protect
the products and personnel from contamination.
The description of gowning required for each grade is given below:
D
Grade D: Hair and, where relevant, beard should be covered. A general
protective suit and appropriate shoes or overshoes should be worn. Appropriate
measures should be taken to avoid any contamination coming from outside the
clean area.
C
Grade C: Hair and where relevant beard and moustache should be covered. A
face mask should be worn. A jump suit or two-piece trouser suit, gathered at the
wrists and with high neck and appropriate shoes or overshoes should be worn.
They should be virtually free of fibres or particulate matter.
A/B
-
8/3/2019 2010 China GMP English Translation[1]
19/115
19
Grade A/B: Headgear should totally enclose hair and, where relevant, beard
and moustache; it should be tucked into the neck of the suit; safety goggles
should be worn; a face mask should be worn to prevent the shedding of droplets.
Appropriate sterilised, non-powdered rubber or plastic gloves and sterilised or
disinfected footwear should be worn. Trouser-legs should be tucked inside the
footwear and garment sleeves into the gloves. The sterilized jump suit should be
used. The suit should shed virtually no fibres or particulate matter and retainparticles shed by the body.
B C
A/B
Article 25 Outdoor clothing should not be brought into changing rooms leading to
grade B and C rooms. Every worker should change clean sterile protectivegarments at every time when he enters a grade A/B area; or at least once a shift
while feasibility of the methods should be verified by the results from monitoring.
Gloves should be regularly disinfected during operations. Masks and gloves
should be changed when necessary.
Article 26 Clean area garments should be cleaned and handled in such away that it does not introduce additional contaminants which can latercontaminate clean areas. The operations should follow written procedures.Separate laundry facilities for such clothings cleaning and sterilisation aredesirable.
-
8/3/2019 2010 China GMP English Translation[1]
20/115
20
Chapter 7 Premises
B
Article 27 The design of the clean premise should avoid the unnecessary access
of supervision or monitoring person . Grade B area should be designed as that
the inside operations could be monitored by supervision or monitoring person
from outside
Article 28 To reduce accumulation of dust and to facilitate cleaning there should
be no uncleanable recesses on shelves, cupboards and equipment in cleaning
area. Doors should be designed to avoid those uncleanable recesses.
A/B
Article 29 Sinks and drains should be prohibited in grade A/B areas used for
aseptic manufacture. In other areas, sinks and drains should have proper design,
layout and maintainance. Cleanable facilities with air break function should be
fitted to prevent backflow. The connection with outside drain system should be
designed to prevent microbial contamination.
Article 30 Changing rooms should be designed as airlocks and used to provide
physical separation of the different stages of changing and so minimize microbial
and particulate contamination of protective clothing. They should be flushed
-
8/3/2019 2010 China GMP English Translation[1]
21/115
21
effectively with filtered air. The final stage of the changing room should, in the
at-rest state, be the same grade as the area into which it leads. The use of
separate changing rooms for entering and leaving clean areas is sometimes
desirable. In general hand washing facilities should be provided only in the firststage of the changing rooms.
Article 31 Both airlock doors should not be opened simultaneously. An
interlocking system or a visual and/or audible warning system should be
operated to prevent the opening of both doors at a time.
Article 32 A filtered air supply should maintain a positive pressure and an air flow
relative to surrounding areas of a lower grade under all operational conditions
and should flush the area effectively.
Particular attention should be paid to the protection of the zone of greatest risk,
that is, the immediate environment to which a product and cleaned components
which directly contact the product are exposed.
The various recommendations regarding air supplies and pressure differentials
may need to be modified where it becomes necessary to contain some materials,
e.g. pathogenic, highly toxic, radioactive or live viral or bacterial materials or
products. Decontamination of facilities and treatment (eg. Install a filter at the
exit) of air leaving a clean area may be necessary for some operations.
Article 33 It should be demonstrated and documented (e.g. the video of smoke
test) that air-flow patterns do not present a contamination risk.
-
8/3/2019 2010 China GMP English Translation[1]
22/115
22
Article 34 A warning system should be provided to indicate failure in the air
supply. Indicators of pressure differences should be fitted between areas where
these differences are important. These pressure differences should be recorded
regularly or otherwise documented.
Article 35 There should be a separate zone and adequate air extraction devicefor capping due to the generation of particles from the operation. If there is no
separate zone for capping, it should be demonstrated that the capping operation
will not have negative impact on product quality.
Chapter 8 Equipment
A/B
Article 36 A conveyor belt should not pass through a partition between a grade A
or B area and a processing area of lower air cleanliness, unless the belt itself is
continually sterilised (e.g. in a sterilising tunnel).
Article 37 As far as practicable equipment, fittings and services should be
designed and installed so that operations, maintenance and repairs can be
carried out outside the clean area. If sterilisation is required, it should be carried
out, wherever possible, after complete reassembly.
-
8/3/2019 2010 China GMP English Translation[1]
23/115
23
Article 38: HVAC system for the clean area of sterile medical products
manufacturing should keep running continuously in order to maintain the
corresponding cleanness classification. If the HVAC system is interrupted and
recommenced, testing is necessary to ensure the clean area can meet the
regulated classification requirement.
Article 39 When equipment maintenance has been carried out within the clean
area, the area should be cleaned, disinfected and/or sterilised where appropriate,
before processing recommences if the required standards of cleanliness and/or
asepsis have not been maintained during the work. The operation can be
restarted when the monitoring result is acceptable.
Article 40 All equipment such as sterilisers, air handling system and process
water systems etc., should be subject to validation and planned maintenance;their return to use should be approved.
Article 41 Fibre-shedding characteristics of filters should be minimal. Asbestine
filters are prohibited. The filter should not have negative impact on product
quality by reaction with product , release of substances into it or absorption .
Article 42 The process gas (e.g. compressed air, nitrogen, except flammable gas)
should be filtered before entering sterile area. The integrity test of sterilization
filters and vent filters should be performed periodically.
-
8/3/2019 2010 China GMP English Translation[1]
24/115
24
Chapter 9 Sanitation
Article 43 Clean areas should be cleaned thoroughly in accordance with an
operation procedure. Where disinfectants are used, more than one type should
be employed. UV should not replace chemical disinfectants. Monitoring shouldbe undertaken regularly in order to detect the development of resistant strains.
A/B
Article 44 Disinfectants and detergents should be monitored for microbial
contamination; Prepared disinfectants and cleaning agents should be stored in
cleaned containers and should only be stored for defined periods. Disinfectants
and detergents used in Grades A and B areas should be sterile or sterilized priorto use.
Article 45 Fumigation of clean areas may be useful for reducing microbiological
contamination in inaccessible places. The residue level of the fumigant should
be validated.
Chapter 10 Processing
-
8/3/2019 2010 China GMP English Translation[1]
25/115
25
Article 46 Precautions to minimize contamination should be taken during all
processing stages including the stages before sterilisation.
3
1
Article 47 Validation of aseptic processing should include a process simulation
test using a nutrient medium (media fill).
Selection of the nutrient medium should be made based on dosage form of theproduct and selectivity, clarity, concentration and suitability for sterilisation of the
nutrient medium. The process simulation test should imitate as closely as
possible the routine aseptic manufacturing process and include all the critical
subsequent manufacturing steps which may affect the aseptic result. It should
also take into account various
interventions known to occur during normal production as well as worst-case
situations.
Process simulation tests should be performed as initial validation with three
consecutive
satisfactory simulation tests per shift and repeated at defined intervals and after
any
significant modification to the HVAC-system, equipment, process and number of
shifts.
Normally process simulation tests should be repeated twice a year per shift and
process., one batch at least in each time.
-
8/3/2019 2010 China GMP English Translation[1]
26/115
26
The number of containers used for media fills should be sufficient to enable a
valid
evaluation. For small batches, the number of containers for media fills should at
least equal the size of the product batch. The target should be zero growth andthe following should apply:
5000
5000 10000
1.1
2.2
10000
1.1
2.2
1. When filling fewer than 5000 units, no contaminated units should be
detected.
2. When filling 5,000 to 10,000 units:
One (1) contaminated unit should result in an investigation, including
consideration of a repeat media fill test;
Two (2) contaminated units should result in revalidation, following
investigation.
3. When filling more than 10,000 units:
One (1) contaminated unit should result in an investigation;
Two (2) contaminated units should result in revalidation , following
investigation.
4. All microbial contamination should be investigated.
Article 48 Care should be taken that any validation does not compromise the
processes.
A/B
-
8/3/2019 2010 China GMP English Translation[1]
27/115
27
Article 49 Water used in the purification of sterile APIs, preparation of sterile
medical products, final rinsing of utensils and packing material which directlycontact with products, and preparation of disinfectants and detergents used ingrades A and B areas should meet the specifications of water for injection.
Article 50 Endotoxins for processing water should be monitored regularly.
Records should be maintained of the results of the monitoring and of any
corrective action taken.
Article 51 Activities in clean areas and especially when aseptic operations are in
progress should be kept to a minimum and movement of personnel should be
controlled and methodical, to avoid excessive shedding of particles and
organisms due to over-vigorous activity. The ambient temperature and humidity
should be comfortable because of the nature of the garments worn.
Article 52 Microbiological contamination of starting materials should be minimal.
Specifications should include requirements for microbiological limits, bacterial
endotoxin or pyrogen.
Article 53 Containers and materials with fibre-shedding characteristics should be
minimised in clean areas. They are prohibited to be used in aseptic process.
Article 54 Where appropriate, measures should be taken to minimize the
particulate contamination of the end product.
-
8/3/2019 2010 China GMP English Translation[1]
28/115
28
Article 55 Components, containers and equipment should be handled after the
final cleaning process in such a way that they are not recontaminated.
Article 56 The interval between the washing and drying and the sterilisation of
packaging material, containers and equipment as well as between their
sterilisation and use should be minimised and subject to a time-limit appropriate
to the storage conditions.
Article 57 The time between the start of the preparation of a solution and its
sterilisation or filtration through a micro-organism-retaining filter should be
minimised. There should be a set maximum permissible time for each product
that takes into account its composition and the prescribed method of storage.
Article 58 There should be working limits on contamination immediately before
sterilisation, which are related to the efficiency of the method to be used. Whereappropriate the level of endotoxins or pyrogen should be monitored.
Article 59 Components, containers, equipment and any other article required in a
clean area where aseptic work takes place should be sterilised and passed into
the area through double-ended sterilisers sealed into the wall, or by a procedure
which achieves the same objective of not introducing contamination.
-
8/3/2019 2010 China GMP English Translation[1]
29/115
29
Article 60: Unless otherwise specified, the principle for batch classification
of sterile pharmaceutical products:
1. Large/small volume injection: Homogeneous products, which are derived
from the solution that terminally prepared in one tank at once should be
regarded as one batch. One batch of products which is sterilized in different
equipment or in the same equipment but in several loads should be trackable.
2. Powder for injection: Homogeneous products which are produced from
the same batch of sterile APIs within the same continuous production cycle
should be regarded as one batch.
3. Lyophilized powder for injection: Homogeneous products which are
produced by the same Lyophilizer with the same batch of solution within the
same production cycle should be regarded as one batch.
4. Eye Preparation, Sterile Ointment, Emulsion and Suspension:
Homogeneous products, which are terminally prepared in the same tank should
be regarded as one batch.
-
8/3/2019 2010 China GMP English Translation[1]
30/115
30
Chapter 11 Sterilisation
SAL 10-6
F0 8
Article 61 Where possible, heating sterilization is the method of choice for Sterileproducts. For terminally sterilized products, the microbial survival probability
(Sterility Assurance Level ,SAL) should be not more than 10-6
. For moist heat as
terminal sterilization, the standard sterilization time F0 should be more than 8
minutes. Flow steam treatment should not be considered as terminal
sterilization.
Aseptic process operation or sterile filtration should be considered as
alternatives for thermal instable products.
Article 62 Moist heat, dry heat, radiation, ethylene oxide or filtration could be
applied as sterilization methods. Every sterilization method has its specific
application scope. In any case, the sterilisation process must be in accordance
with the marketing and manufacturing authorisations. All sterilisation processes
should be validated.
Article 63 Before any sterilisation process is adopted its suitability for the
product and its efficacy in achieving the desired sterilising conditions in all parts
of each type of load to be processed should be demonstrated by physical
-
8/3/2019 2010 China GMP English Translation[1]
31/115
31
measurements and by biological indicators where appropriate.
Article 64 The validity of the sterilisation process should be verified at scheduled
intervals, at leastannually. And whenever significant modifications have been
made to the equipment, revalidation should be performed. Records should be
kept of the results.
Article 65 For effective sterilisation the whole of the material must be subjectedto the required treatment and the process should be designed to ensure that this
is achieved.
Article 66 Validated loading patterns should be established for the material
which is sterilised in the chamber of sterilisation equipment.
Article 67 Biological indicators should be stored and used according to the
manufacturers instructions, and their quality checked by positive controls.
If biological indicators are used, strict precautions should be taken to avoid
transferring microbial contamination from them.
Article 68 There should be a clear means of differentiating products which have
not been sterilised from those which have. Each basket, tray or other carrier of
products or components should be clearly labelled with the material name, its
-
8/3/2019 2010 China GMP English Translation[1]
32/115
32
batch number and an indication of whether or not it has been sterilised.
Indicators such as autoclave tape may be used, where appropriate.
Article 69 Sterilisation records should be available for each sterilisation run.
They should be approved as part of the batch release procedure.
Chapter 12 Sterilisation method
Article 70 Sterilisation by heat include moist heat and dry heat, it should
conform to the following requirements:
-
(1) During the validation and production, control instrumentation should normally
be independent of monitoring instrumentation and recording charts. The position
of the temperature probes used for controlling and/or recording should have
been determined during the validation . Each heat sterilisation cycle should berecorded on a time/temperature chart.
Where automated control and monitoring systems are used for these
applications theyshould be validated to ensure that critical process requirements are met. System
and cycle faults should be registered by the system and observed by the
operator. The reading of the independent temperature indicator should be
routinely checked against the chart recorder during the sterilisation period.
-
8/3/2019 2010 China GMP English Translation[1]
33/115
33
(2)Chemical or biological indicators may also be used to monitor aseptic process,
but should not take the place of physical measurements.
(3)Sufficient time must be allowed for the whole of the load to reach the required
temperature before measurement of the sterilising time-period is commenced.
This time must be determined for each type of load to be processed.
(4) Precautions should be taken against contamination of a sterilised load
during cooling. Any cooling fluid or gas in contact with the product should be
sterilised unless it can be shown that any leaking container would not be
approved for use.
Article 71 Moist heat sterilization should conform to the following requirements:
(1) Sterilization time, temperature and pressure should be used to monitor the
process.
For sterilisers fitted with a drain at the bottom of the chamber, it may also be
necessary to record the temperature at this position, throughout the sterilisation
period. There should be frequent leak tests on the chamber when a vacuum
phase is part of the cycle.
(2) The items to be sterilised, other than products in sealed containers, should
be wrapped in a material which allows removal of air and penetration of steam
but which prevents recontamination after sterilisation. All parts of the load should
-
8/3/2019 2010 China GMP English Translation[1]
34/115
34
be in contact with the sterilizing agent at the required temperature for the
required time.
Article 72 Dry heat sterilization should conform to the following requirements:(1) The process used should include air circulation within the chamber and
the maintenance of a positive pressure to prevent the entry of non-sterile
air. Any air admitted should be passed through a HEPA filter, which
should be qualified by the integrity test.
(2) Where this process is also intended to remove pyrogens, challenge
tests using endotoxins should be used as part of the validation.
(3) Temperature, time and pressure difference between inside and outside
of the chamber should be recorded during sterilization process.
Article 73 Sterilisation by radiation should conform to the following requirements:
(1) Radiation sterilisation is permissible only when the absence of deleterious
effects on the product has been confirmed experimentally. Radiation sterilisation
should conform to and registered authorisation.
(2) Radiation sterilisation process should be validated. The validation protocol
should include the radiation dose, radiation time, packaging material, loading
pattern. Validation procedures should ensure that the effects of variations in
density of the
-
8/3/2019 2010 China GMP English Translation[1]
35/115
35
packages are considered.
(3) During the sterilisation procedure the radiation dose should be measured by
using dosimetry indicators.
(4) Biological indicators may be used as an additional control.
(5) Measures should be taken to prevent mix-up between irradiated and
non-irradiated materials. Radiation sensitive colour disks should also be used on
each package to differentiate between packages.
(6) The total radiation dose should be administered within a predetermined time
span.
(7)The radiation sterilisation process should be recorded.
Article 74 Sterilisation with ethylene oxide should conform to the following
requirements:
(1) The Sterilisation with ethylene oxide should conform to and registered authorisation
-
8/3/2019 2010 China GMP English Translation[1]
36/115
36
(2) During process validation it should be shown that there is no damaging
effect on the product and that the conditions and time allowed for degassing are
such as to reduce any residual gas and reaction products to defined acceptable
limits for the type of product or material.
(3) Direct contact between gas and microbial cells is essential; precautions
should be taken to avoid the presence of organisms likely to be enclosed in
material such as crystals or dried protein. The nature and quantity of packaging
materials can significantly affect the process.
(4) Before exposure to the gas, materials should be brought into equilibrium with
the
humidity and temperature required by the process.
(5) Each sterilisation cycle should be monitored with suitable biological
indicators, using the appropriate number of test pieces distributed throughout the
load. The information so obtained should form part of the batch record.
(6) For each sterilisation cycle, records should be made of the time taken to
complete the cycle, of the pressure, temperature and humidity within the
chamber during the process and of the gas concentration and of the total
amount of gas used. The pressure and temperature should be recorded
-
8/3/2019 2010 China GMP English Translation[1]
37/115
37
throughout the cycle on a chart. The record(s) should form part of the batch
record.
(7) After sterilisation, the load should be stored in a controlled manner under
ventilated conditions to allow residual gas and reaction products to reduce to the
defined level.
Article 75 Filtration of medicinal products which cannot be sterilised in their
final container should conform to the following requirements:
0.22m
(1)Filtration alone is not considered sufficient when sterilisation in the final
container is
possible. If the product cannot be sterilised in the final container, solutions or
liquids can be filtered through a sterile filter of nominal pore size of 0.22 micron(or less), or with at least equivalent micro-organism retaining properties, into apreviously sterilised container. Such filters can not remove all viruses ormycoplasmas. Consideration should be given to complementing the filtrationprocess with some degree of heat treatment.
(2) Due to the potential additional risks of the filtration method as compared with
other
sterilization processes, a second filtration via a further sterilised micro-organism
retaining filter, immediately prior to filling, may be advisable. The final sterile
filtration should be carried out as close as possible to the filling point.
-
8/3/2019 2010 China GMP English Translation[1]
38/115
38
(3) The integrity of the sterilised filter should be confirmed immediately after use
by an appropriate method such as a bubble point, diffusive flow or pressure hold
test.
(4)The time taken to filter a known volume of bulk solution and the pressure
difference to be used across the filter should be determined during validation
and any significant differences from this during routine manufacturing should be
noted and investigated. Results of these checks should be included in the batch
record.
(5) The using time of filters with the same specification should be validated.
Normally it should not be used for more than one working day.
Chapter 13 Finishing of sterile products
Article 76 Crimping of the cap should be performed as soon as possible after
stopper insertion. Appropriate measures should be taken to prevent
contamination if the product leaving the clean area/room before capping.
100%
Article 77 The integrity of the sterile medical product containers should be
validated to avoid the product contamination. Containers closed by fusion, e.g.
glass or plastic ampoules should be subject to 100% integrity test. Samples of
other containers should be checked for integrity according to appropriate
procedures.
-
8/3/2019 2010 China GMP English Translation[1]
39/115
39
Article 78 Containers sealed under vacuum should be tested for maintenance of
that vacuum after an appropriate, pre-determined period.
Article 79 Filled containers of parenteral products should be inspected
individually for extraneous contamination or other defects. When inspection is
done visually, it should be done under suitable and controlled conditions of
illumination and background. Operators doing the inspection should pass regular
eye-sight checks, and be allowed frequent breaks from inspection. Where other
methods of inspection are used, the process should be validated and the
performance of the equipment checked at intervals. Results should be recorded.
Chapter 14 Quality control
/
Article 80 Sample plan for sterility testing should based on the result of risk
assessment, Samples should in particular include samples taken from parts of
-
8/3/2019 2010 China GMP English Translation[1]
40/115
40
the batch considered to be most at risk of contamination. The sterility testing
samples should at least comply with the followings:
a. for products which have been filled aseptically, samples should include
containers filled at the beginning and end of the batch and after any significantintervention.
b. or products which have been heat sterilised in their final containers,
consideration should be given to taking samples from the potentially coolest part
of the load.
c. For one batch of product which are sterilised by different equipment or by the
same equipment but in deferent sterilization cycles, samples should be taken
from each equipment/cycle involved.
Chapter 15 Glossary
Article 81 The definitions of the glossary are:
(1)Blow/fill/seal units are purpose built machines in which, in one continuous
operation, containers are formed from a thermoplastic granulate, filled and then
sealed, all by the one automatic machine.
(2)The in operation state is the condition where the installation is functioning in
the defined operating mode with the specified number of personnel working.
-
8/3/2019 2010 China GMP English Translation[1]
41/115
41
(3) Laminar flow means the method that the air flows unidirectional with the
stable symmetrical way and enough rate. It can continuously remove the
particles at the critical operation area.
B ISO 5
(4) Isolator is a barrier or system that is equiped with Grade B (ISO 5) or
even higher cleanness air handling units and can isolate completely the internal
environment from external environment (e.g clean room and operators).
The at-rest state is the condition where the installation is installed, complete
with production equipment but with no operating personnel present and no
production activities.
(6) Seal means using an appropriate method to keep the containers or
utensils in closed in order to prevent outside microbe entering.
Annex 1 reviewed by Michael Lee, Ji Yiyun, He Guoling
-
8/3/2019 2010 China GMP English Translation[1]
42/115
42
2
Annex 2:
Active Substances Used As Starting Materials
Table of content
..............................................................................................43
Chapter 1 Scope .............................................................................................43 ...................................................................................43
Chapter 2 Buildings and Facilities...................................................................43
..............................................................................................44
Chapter 3 Equipment ......................................................................................44
..............................................................................................46
Chapter 4 Materials.........................................................................................46
..............................................................................................48
Chapter 5 Validation........................................................................................48
..............................................................................................52
Chapter 6 Documentation ...............................................................................52
.............................................................................................54
Chapter 7 Production Management................................................................ 54
......................................................... 60
Chapter 8 Rejected Intermediates or APIs......................................................60
.............................................................................................63
Chapter 9 Quality Management ......................................................................63
...........................................64
Chapter 10 Specific Requirement for APIs Manufactured
-
8/3/2019 2010 China GMP English Translation[1]
43/115
43
by Fermentation ..............................................................................................64
.................................................................................................68
Chapter 11 Glossary........................................................................................68
Chapter 1 Scope
Article 1 The annex applies to the manufacture of non-sterile active
substances and the operations of non-sterile process during the sterile
substance production.
Article 2: The point at which production of the active substance begins and its
process should be designated in accordance with the registered and authorised
process.
Chapter 2 Buildings and Facilities
D
-
8/3/2019 2010 China GMP English Translation[1]
44/115
44
Article 3: The exposed environment where purification, drying, milling, and
packaging of non-sterile active substances are carried out should meet grade D
area described in Annex 1.
Article 4: Where pyrogen or endotoxin specification have been established
for the intermediate or API, , The facilities,should be designed with particular
attention to prevent the microbialogical contamination, e.g. relevant precautions
should be set up according to the intended use of products and process
requirements.
Article 5: Quality control laboratory areas should normally be separated
from production areas. Laboratory areas used for in-process control can be
located in production areas , provided the manufacturing operations do not affect
the accuracy of the laboratory measurements, and the laboratory and its
operations do not adversely affect the production process.
Chapter 3 Equipment
Article 6: Any substances associated with the operation of equipment, suchas lubricants, heating fluids or coolants, should not contact intermediates or APIs
so as to alter their quality beyond the official or other established specifications.
Any deviations from this should be evaluated and handled properly to ensure
that there are no detrimental effects upon the fitness for purpose and quality of
the products.
-
8/3/2019 2010 China GMP English Translation[1]
45/115
45
Article 7: Closed or contained equipment should be used whenever
appropriate. Closed equipment and pipelines can be placed outdoor. Where
open equipment is used, or opened, appropriate precautions should be taken to
avoid the risk of contamination.
Article 8: Where equipment shared with different intermediates or APIs, the
rational should be provided. Appropriate precautions should be taken to prevent
from the risk of cross-contamination.
Article 9: The equipment or component which is difficult to clean should be
used dedicated.
Article 10: Equipment cleaning
1. Where the equipment is assigned to continuous production or campaign
production of successive batches of the same intermediate or API, the
equipment should be cleaned at appropriate intervals to prevent build-up of
contaminants (e.g. degradants or objectionable levels of micro-organisms). The
equipment should be cleaned thoroughly between productions of different
batches to prevent cross-contamination where carry-over with adversely affect
the quality of APIs or intermediates.
2. Non-dedicated equipment (especially the ones for the starting material
purification) should be cleaned between productions of different products to
prevent cross-contamination.
-
8/3/2019 2010 China GMP English Translation[1]
46/115
46
3. Acceptance criteria for residues and the choice of cleaning procedures
and cleaning agents should be defined and justified.
Article 11: Process water used in the final purification steps of non-sterile
APIs should, at a minimum, meet the quality standards of purified water.
Chapter 4 Materials
Article 12: The incoming materials should be labelled correctly. After
sampling (or testing), these material can be mixed with existing stocks (e.g.,solvents or stocks in silos), then release for production using. Procedures should
be available to prevent discharging wrong incoming materials into the existing
stock.
Article 13: If bulk deliveries are made in non-dedicated tankers,
precautions should be taken to assure no cross-contamination from the tanker.
Article 14: Large storage containers, and their attendant manifolds, filling
and discharge lines should be appropriately labeled.
-
8/3/2019 2010 China GMP English Translation[1]
47/115
47
Article 15: At least one test to verify the identity of each batch of material
should be conducted. A supplier's Certificate of Analysis can be used in place of
performing other tests, provided that the manufacturer has a system in place to
evaluate suppliers.
Article 16: Processing aids, hazardous or highly toxic raw materials, other
special materials, or materials transferred to another production area within the
companys control do not need to be tested if the manufacturers Certificate ofAnalysis is obtained, showing that these raw materials conform to established
specifications. Visual examination of containers, labels, and recording of batch
numbers should help in establishing the identity of these materials. The lack of
on-site testing for these materials should be justified and documented.
Article 17 Full analyses should be conducted on at least the first threebatches before reducing in-house testing. However, a dull analysis should be
performed at appropriate intervals and compared to the Certificates of Analysis
from supplier. The reliability and accuracy of the certificates offered by supplier
should be evaluated periodically.
Article 18: Certain materials in suitable containers can be stored outdoors,
provided identifying labels remain legible and containers are appropriately
cleaned before opening and use.
Article 19: Materials should be re-evaluated as appropriate to determine
their suitability for use (e.g., after prolonged storage or exposure to heat or
humidity).
-
8/3/2019 2010 China GMP English Translation[1]
48/115
48
Chapter 5 Validation
Article 20: The critical product quality attributes , critical process
parameters that could affect these attributes, the range for each critical
process parameter expected to be used during routine manufacturing and
process control should be defined before process validation. The reproducibility
of the process operations should be ensured by validation activities.
Critical quality attributes and process parameters should normally be identified
during the development stage or from historical data.
Article 21: Validation should cover those operations determined to be
critical to the quality (especially to the purity and impurity)
Article 22 Approaches to process validation
1. Prospective validation should normally be performed for all API
processes. Concurrent validation can be conducted when API batches are
produced infrequently, only a limited number of API batches have been
produced, or API batches are produced by a modified process, where data
from replicate production runs are unavailable.
-
8/3/2019 2010 China GMP English Translation[1]
49/115
49
2. An exception can be made for retrospective validation for processes that
have been used without significant changes to API quality due to changes in raw
materials, equipment, systems, facilities, or the production process. This
validation approach may be used where:
1.
1) Critical quality attributes and critical process parameters have been
identified;
2.
2) Appropriate in-process acceptance criteria and controls have beenestablished;
3.
3) There have not been significant process/product failures attributable to
causes other than operator error or equipment failures unrelated to equipment
suitability; and
4.
4) Impurity profiles have been established for the existing API.
3. Batches selected for retrospective validation should be representative of
all batches made during the review period, including any batches that failed to
meet specifications, and should be sufficient in number to demonstrate process
consistency. Where necessary, the testing data of retained samples can be used
as supplements of retrospective validation.
Article 23: Process Validation program
-
8/3/2019 2010 China GMP English Translation[1]
50/115
50
1. The number of process runs for validation should depend on the
complexity of the process or the magnitude of the process change being
considered. For prospective and concurrent validation, three consecutive
successful production batches should be used as a guide, but there may be
situations where additional process runs are warranted to prove consistency of
the process (e.g., complex API processes or API processes with prolonged
completion times).
2. Critical process parameters should be controlled and monitored during
process validation studies. Process parameters unrelated to quality, such as
control variables to minimize energy consumption or equipment use, need not to
be included in the process validation.
3. Process validation should confirm that the impurity profile for each API
is within the limits specified. The impurity profile should be comparable to the
data of the profile determined during process development or of batches usedfor pivotal clinical and toxicological studies.
Article 24: Cleaning validation
1. Cleaning procedures should normally be validated. In general, cleaning
validation should be directed to situations or process steps where contaminationor carryover of materials poses the greatest risk to API quality.
-
8/3/2019 2010 China GMP English Translation[1]
51/115
51
2. Validation of cleaning procedures should reflect actual equipment
usage patterns. If various APIs or intermediates are manufactured in the same
equipment and the equipment is cleaned by the same process, a representative
intermediate or API can be selected for cleaning validation. This selection should
be based on the solubility and difficulty of cleaning and the calculation of residue
limits based on activity, toxicity, and stability.
3. The cleaning validation protocol should describe the equipement to be
cleaned, cleaning procedures, cleaning agents, acceptable criteria, parameters
to be monitored and controlled, and analytical methods. The protocol should
also indicate the type of samples (e.g. chemicals or micro organisms), location of
sampling, methods of sampling, label of samples to be obtained. Visual
inspection can be adapted as the testing method to dedicated equipment and
with consistent product quality.
4. Sampling should include swabbing, rinsing, or alternative methods
(e.g., direct extraction), as appropriate, to detect both insoluble and soluble
residues.
5. Validated and high sensitive analytical methods should be used to
detect residues or contaminants. The detection limit for each analytical method
should be sufficiently sensitive to detect the established acceptable level of the
-
8/3/2019 2010 China GMP English Translation[1]
52/115
52
residue or contaminant. The methods attainable recovery level should be
established. Residue limits should be practical based on the most deleterious
residue. Limits can be established based on the minimum known
pharmacological, toxicological, or physiological activity of the API or its mostdeleterious component.
6. Equipment cleaning validation protocol should address pyrogen and
endotoxin contamination for those processes where there is a need to control
endotoxins or pyrogens.
7. Cleaning procedures should be monitored by analytical methods
established at appropriate intervals after validation to ensure that these
procedures are effective when used during a routine production.
Chapter 6 Documentation
Article 25: Incoming material quality specification should be established
according to process requirements, the impact on the product quality, material
nature, as well as the suppliers quality assessment .
Article 26: Quality specification should be established for certain materials,
such as process aids, gaskets, and other materials with critical impact on quality
during the production of intermediates or APIs.
Article 27: Master production instructions should include:
-
8/3/2019 2010 China GMP English Translation[1]
53/115
53
1. The name of the intermediate or API being manufactured;
2. A complete list of raw materials and intermediates designated bynames or codes;
3. An accurate statement of the quantity or ratio of each raw material or
intermediate to be used, including the unit of measure. Where the quantity is not
fixed, the calculation for each batch size or rate of production should be included.
Variations to quantities should be included where they are justified;
4. The production location and major production equipment to be used
(model type and materials etc.);
5. Detailed production instructions, including:
1.
1) The sequences to be followed;
2.
2) Ranges of process parameters to be used;
3.
3) Sampling instructions and quality specification of raw materials,
intermediates and APIs;
4.
4) Time limits for completion of individual processing steps and/or the total
process, where appropriate;
5.
5) Expected yield ranges at appropriate phases of processing or according
to time;
6.
6) Where appropriate, special notations and precautions to be followed, or
cross references to these; and
-
8/3/2019 2010 China GMP English Translation[1]
54/115
54
7.
7) The instructions for storage of the intermediate or API to assure its
suitability for use, including the labeling and packaging materials and special
storage conditions with time limits, where appropriate.
Chapter 7 Production Management
Article 28: Production operations
Raw materials should be weighed or measured under appropriate
conditions that do not affect their suitability for use. Weighing and measuring
devices should be of suitable accuracy for the intended use.
If a material is subdivided for later use in production operations, the
receiving container should be suitable and should be so identified with the
following information:
1.
1) Material name and/or item code;
2.
2) Receiving lot number or serial number;
3.
3) Weight or measure of material in the sub-container; and
4.
-
8/3/2019 2010 China GMP English Translation[1]
55/115
55
4) Re-evaluation or retest date if appropriate.
3. Critical weighing, measuring, or subdividing operations should be
reviewed or subjected to an equivalent control. Prior to use, production
personnel should verify that the materials is for intended used t.
4. Actual yields should be compared with expected yields at designatedsteps in the production process. Expected yields with appropriate ranges should
be established based on previous laboratory, pilot scale, or manufacturing data.
Deviations in yield associated with critical process steps should be investigated
to determine their impact or potential impact on the resulting quality of affected
batches.
5. If time limits are specified in the master production instruction, these
time limits should be met strictly. Deviations should be documented and
evaluated. Time limits may be inappropriate to a target value, where completion
of reactions or processing steps are determined by in-process sampling and
testing.
6. Intermediates held for further processing should be stored under
appropriate conditions to ensure their suitability for use.
Article 29: In-process controls and sampling
1. The acceptance criteria, type and extent of testing can depend on the
-
8/3/2019 2010 China GMP English Translation[1]
56/115
56
nature of the intermediate or API being manufactured, the reaction or process
step being conducted, and the degree to which the process introduces variability
in the products quality. Less stringent in-process controls may be appropriate in
early processing steps, whereas tighter controls may be appropriate for laterprocessing steps (e.g., isolation and purification steps).
2. In-process controls can be performed by qualified personnel in
production department and the process adjusted without prior quality unit if the
adjustments are made within pre-established limits approved by the quality
unit(s). Out-of-specification (OOS) investigations are not normally needed forin-process tests that are performed during the adjusting process.
3. Written procedures should describe the sampling methods for
in-process materials, intermediates, and APIs.
4. In-process sampling should be conducted according to the written
procedures, and samples should be sealed properly to prevent contamination ofthe sampled material and other intermediates or APIs.
Article 30 Viral removal/inactivation steps
1. Viral removal and viral inactivation steps should be performed
according to validated procedure.
2. Appropriate precautions should be taken to prevent potential viral
contamination from pre-viral to post-viral removal/inactivation steps. Open
processing should be performed in areas that are separate from other
processing activities and have separate air handling units.
-
8/3/2019 2010 China GMP English Translation[1]
57/115
57
3. The same equipment is not normally used for different purification
steps, i.e. different products or different phases of the same product. If the same
equipment is to be used, the equipment should be appropriately cleaned and
sanitized before reuse. Appropriate precautions should be taken to prevent
potential virus carry-over (e.g. through equipment or environment) from previous
steps.
Article 31 Blending batches of intermediates or APIs
1. For the purpose of this article, blending is defined as the process of
combining APIs within the same specification to produce a homogeneous API.In-process mixing of fractions from single batches (e.g., collecting several
centrifuge loads from a single crystallisation batch) or combining fractions from
several batches for further processing is considered to be part of the production
process and is not considered to be blending.
2. Out-Of-Specification batches should not be blended with other
batches.
3. Each batch incorporated into the blend should have been
manufactured using an established process and should have been individually
tested and found to meet appropriate specifications prior to blending.
4. Acceptable Blending operations include but not limited to:
-
8/3/2019 2010 China GMP English Translation[1]
58/115
58
1.
1) Blending of small batches to increase batch size
2.
2) Blending of tailings from batches of the same API to form a single
batch.
5. Blending processes should be adequately controlled and documented
and the blended batch should be tested for conformance to established
specifications where appropriate.
6. The batch record of the blending process should allow traceability
back to the individual batches that make up the blend.
7. Where physical attributes of the API are critical (e.g., APIs intended
for use in solid oral dosage forms or suspensions), validation should include
testing which can show homogeneity of the combined batch, and testing of
critical attributes (e.g., particle size distribution, bulk density, and tap density)
that may be affected by the blending process.
8. If the blending could adversely affect stability, stability testing of the
final blended batches should be performed.
9. The expiry or retest date of the blended batch should be based on the
manufacturing date of the oldest tailings or batch in the blend.
Article 32: Principles for distinguishing batches
-
8/3/2019 2010 China GMP English Translation[1]
59/115
59
In case of continuous production , the homogenous product which is
produced in a fixed time intervalshould be considered as a single batch.
For batch production, a specific quantity of homogenous product which
is blended by a certain number of products should be considered as a single
batch.
Article 33: Contamination control
Adequate controls should be implemented where residual materials are
carried over into successive batches of the same intermediate or API. Such
carryover should not result in the carryover of degradants or microbial
contamination that may adversely alter the established API impurity profile.
Production operations should be conducted in a manner that prevent
contamination of intermediates or APIs from other materials.
Precautions to avoid contamination should be taken when APIs are
handled after purification.
Article 34: Packaging of APIs and intermediates
1. Containers should provide an adequate protection against
deterioration or contamination of the intermediate or API that may occur during
-
8/3/2019 2010 China GMP English Translation[1]
60/115
60
transportation and recommended storage. These containers should not be
reactive, additive, or absorptive so as to alter the quality of the intermediate or
API beyond the specified limits.
2. Containers should be clean and, where indicated by the nature of the
intermediate or API, sanitized to ensure that they are suitable for their intended
use.
3. If containers are re-used, they should be cleaned in accordance withoperational procedures and all previous labels should be removed or defaced.
4. Intermediate or API containers that are transported outside of the
manufacturer's control should be properly sealed in a manner such that, the
recipient will be alerted when the seals alter.
Chapter 8 Rejection
Article 35: Intermediates and APIs failed to meet specifications can be
reprocessed or reworked as described in Articles 36 and 37. The final disposition
of rejected materials should be recorded.
Article 36: Reprocessing
1. Introducing an intermediate or API, including one that does not conform
to standards or specifications, back into the process and reprocessing by
repeating a crystallisation step or other appropriate chemical or physical
-
8/3/2019 2010 China GMP English Translation[1]
61/115
61
manipulation steps, e.g., distillation, filtration, chromatography, milling, that are
part of the established manufacturing process is generally considered
acceptable.
2. If such reprocessing is used for a majority of batches, such
reprocessing should be included as part of the standard manufacturing process.
3. Introducing unreacted material back into a process and repeating a
chemical reaction is considered to be reprocessing unless it is part of the
established process. Such reprocessing should be preceded by careful
evaluation to ensure that the quality of the intermediate or API is not adversely
impacted due to the potential formation of by-products and over-reacted
materials.
4. If continuation of a process step after an in-process control test hasshown that the step is incomplete, it still can be processed following the normal
process. This is not considered to be reprocessing.
Article 37: Reworking
1. Batches that have been reworked should be subjected to appropriate
evaluation, testing, stability testing if warranted, and documentation to show that
the reworked product is of equivalent quality to that produced by the original
process. Concurrent validation can be used to define the rework procedure, how
it will be carried out, and the expected results.
-
8/3/2019 2010 China GMP English Translation[1]
62/115
62
2. Reworking should be performed according to approved operational
procedure, comparing the impurity profile of each reworked batch against
batches manufactured by the established process. Where routine analytical
methods are inadequate to characterize the reworked batch, additional methods
should be used.
Article 38: Recovery of materials and solvents
1. Recovery (e.g. from mother liquor or filtrates) of reactants,
intermediates, or the API is considered acceptable, provided that approved
procedures exist for the recovery and the recovered materials meet
specifications suitable for their intended use.
2. Solvents can be recovered and reused in the same process step or in
different process step of the same product, provided that the recovery
procedures are controlled and monitored to ensure that recovered solvents meet
appropriate standards. Provided no adverse impact on product quality , recovery
solvents can be used in different products.
3. Fresh and recovered solvents and reagents can be combined if anadequate testing has shown their suitability for all manufacturing processes in
which they may be used.
4. The use of recovered solvents, mother liquors, and other recovered
-
8/3/2019 2010 China GMP English Translation[1]
63/115
63
materials should be adequately documented with traceability, and the impurity
be tested regularly.
Chapter 9 Quality Management
Article 39: The specifications should include a control of impurities (e.g.
organic impurities, inorganic impurities, and residual solvents). Microbiological or
endotoxin specification should be established where applicable.
Article 40: An impurity profile describing the identified and unidentified
impurities present in a typical batch produced by a specific controlled production
process should normally be established for each API. The impurity profile should
include the identity or some qualitative analytical designation (e.g. retention
time), the range of each impurity observed, and classification of each identified
impurity (e.g. inorganic, organic, solvent). The impurity profile is normally
dependent upon the production process and an origin of the API. Impurity
profiles are normally not necessary for APIs from herbal or animal tissue origin
and manufactured by fermentation process.
-
8/3/2019 2010 China GMP English Translation[1]
64/115
64
Article 41: The impurity profile should be compared at appropriate
intervals against the impurity profile in the register submission or compared
against historical data in order to detect changes to the API resulting from
modifications in raw materials, equipment operating parameters, or the
production process.
Article 42: Stability monitoring of APIs
1) Stability samples should be stored in containers that simulate or are
same with the marketed product container.
2) Normally the first three commercial production batches should be
placed on the stability monitoring program to confirm the expiry date.
3) For APIs with short shelf-lives, testing should be done more frequently
during the stability monitoring.
Chapter 10 Specific Requirement for APIs Manufactured
by Classical Fermentation
(?????)
Article 43: Appropriate control should be used to minimize the risk of
-
8/3/2019 2010 China GMP English Translation[1]
65/115
65
microbial contaminations during manufacture of APIs, which are produced by
classical fermentation process
Article 44: Process controls should take into account:
1. Maintenance of the working cell bank;
2. Proper control of inoculation and expansion of the culture;
3. Control of the critical operating parameters during fermentation/cell
culture;
4. Monitoring of the process for cell growth and productivity
5. Harvest and purification procedures while protecting the intermediate or
API from contamination
6. Monitoring of microbial contamination level and, where needed,
endotoxin levels at appropriate stage of production
Article 45: Where appropriate, the removal of media components, host cell
proteins, other process-related and product-related impurities and contaminants
should be demonstrated.
Article 46: Cell bank maintenance and record keeping
1. Access to cell banks should be limited to authorized personnel.
-
8/3/2019 2010 China GMP English Translation[1]
66/115
66
2. Cell banks should be maintained under storage conditions designed to
maintain a required viability level and prevent contamination.
3. Records of the use of the vials from the cell banks and storage
conditions should be maintained.
4. Cell banks should be periodically monitored to determine suitability for
use.
5. When necessary, strain identification should be conducted.
Article 47: Cell culture/fermentation
1. Where aseptic addition of cell substrates, media, buffers, and gases is
needed, closed or contained systems should be used. If the inoculations of the
initial vessel, subsequent transfers or additions (media, buffers) are performed in
open vessels, there should be controls and procedures in place to avoid the risk
of contamination.
2. Where the quality of the API can be affected by microbial
contamination, manipulations using open vessels should be performed in theproper controlled environment.
3. Personnel should be appropriately gowned and take special
precautions when handling the cultures.
-
8/3/2019 2010 China GMP English Translation[1]
67/115
67
pH
4. Critical operating parameters (for example temperature, pH, agitation
rates, addition of gases and pressure) should be monitored to ensure
consistency with the established process. Cell growth, productivity should also
be monitored where appropriate.
5. As appropriate, fermentation equipment should be cleaned, and
sanitized or sterilised.
6. Culture media should be sterilised before use.
7. There should be appropriate procedures in place to detect microbial
contamination occurred during the process operations and determine the course
of action to be taken, including procedures to determine the impact of microbialcontamination on the product and those to decontaminate the equipment and
return it to normal production condition. When dealing with contaminated
materials, foreign micro organisms observed during fermentation processes
should be identified as appropriate and the effect of their presence on product
quality should be assessed, if necessary.
8. Records of micro contamination events and corresponding handling
should be maintained.
9. Shared (multi-product) equipment should be warranted by conducting
necessary tests after cleaning between product campaigns, as appropriate, to
minimize the risk of cross-contamination.
-
8/3/2019 2010 China GMP English Translation[1]
68/115
68
Article 48: Harvesting, isolation and purification
1. Harvesting steps, either to remove cells or cellular components or to
collect cellular components after disruption, should be performed in equipment
and areas designed to minimize the risk of contamination.
2. Harvest and purification procedures including inactivating cells,removing cellular debris and media components should be established and
corresponding procedures should be conducted to minimize degradation and
contamination, so as to ensure that the intermediate or API is recovered with
consistent quality.
3. If open systems are used, isolation and purification and should be
performed under environmental conditions appropriate for the preservation of
product quality.
4. Additional controls, such as the use of dedicated chromatography
medium or additional testing, may be appropriate if the equipment is to be used
for harvest, isolation or purification of multiple products.
Chapter 11 Glossary
Article 49: The following glossaries mean:
1. Classical fermentation
-
8/3/2019 2010 China GMP English Translation[1]
69/115
69
The term classical fermentation refers to processes that use
microorganisms existing in nature and/or modified by conventional methods (e.g.
irradiation or chemical mutagenesis) to produce APIs. APIs produced by
classical fermentation are normally low molecular weight products such as
antibiotics, amino acids, vitamins, and carbohydrates.
2. Non-sterile APIs
This refers to APIs of which the sterile inspection items are not listed instatutory standards.
3. Critical quality attributes
This refers to attributes of physical, chemical, biological or
microorganism, should be of certain limits, scope or distribution, so as to meetexpectant product quality.
4. Process aids
This refers to the materials (e.g. filter aid, activated carbon, etc,
excluding solvents), used as an aid in the production of an intermediate or API
that do not participate in a chemical or biological reaction itself.
5. Mother liquor
The residual liquid remains after the crystallisation or isolation processes.
Annex 2 reviewed by Zhao Chunhua, Zhao Yunxia
-
8/3/2019 2010 China GMP English Translation[1]
70/115
70
3
top related