1 introducing ehps v32
Post on 07-Apr-2018
228 Views
Preview:
TRANSCRIPT
-
8/6/2019 1 Introducing EHPs v32
1/24
SAP 2008 / Page 1
Christian OehlerSAP Business Suite Solution ManagementVersion 2.2 (March 2010)
Transform Your Business
UsingSAP EnhancementPackages ForSAP ERP
-
8/6/2019 1 Introducing EHPs v32
2/24
Legal Disclaimer
This presentation is not subject to your
license agreement or any other agreementwith SAP. SAP has no obligation to pursue anycourse of business outlined in thispresentation or to develop or release anyfunctionality mentioned in this presentation.This presentation and SAP's strategy and
possible future developments are subject tochange and may be changed by SAP at anytime for any reason without notice. Thisdocument is provided without a warranty ofany kind, either express or implied, includingbut not limited to, the implied warranties ofmerchantability, fitness for a particularpurpose, or non-infringement. SAP assumesno responsibility for errors or omissions inthis document, except if such damages werecaused by SAP intentionally or grossly
negligent. SAP 2008 / Page 2 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
3/24
Agenda
Overview SAP EnhancementPackages For SAP ERP
News with SAP EnhancementPackage 4 For SAP ERP
Outlook And Further Information
AGENDA
1
2
3
SAP 2008 / Page 3 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
4/24
Agenda
Overview SAP EnhancementPackages For SAP ERP
News with SAP EnhancementPackage 4 For SAP ERP
Outlook And Further Information
AGENDA
1
SAP 2008 / Page 4 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
2
3
-
8/6/2019 1 Introducing EHPs v32
5/24
Once my system is up and running, you can touchmy core processes once every 5 years ...
and it needs to be a Saturday
and my CEO wants me to innovate every quarter
CIOs Dilemma: Deliver Innovation without
Disruption
CIO, Fortune 1000 Manufacturing Company
-
8/6/2019 1 Introducing EHPs v32
6/24
Enhancement Packages = Innovation + StabilityEnhancement Packages reduce conflict between stability and innovation
INNOVATION
STABILITY
Stable and robust businessprocesses for maximumefficiency and low TCO
Routine deployment of supportpackages to sustain compliance
Fast and easy introductionof business innovation atany time when needed
ENHANCEMENT PACKAGES =
INNOVATION + STABILITY
Installation of enhancementpackages as part of routinemaintenance
Selective, non-disruptiveactivation of innovation at anytime - driven by business needs
SAP 2008 / Page 6 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
7/24
Improved Software Lifecycle
In previous days: Upgrades and now: SAP Enhancement Packages
Time
BusinessRequirements
= innovation gap = R/3 4.6c standard
R/3 4.6c Implementation Time
BusinessRequirements/
SystemF
unctionality
BusinessRequirements
= innovation gap
ECC 6.0
= ERP 6.0 standard
EHP 2 EHP 4
Upgrade as a major business activity
every 5-6 years to fulfill businessrequirements.
New functionality implemented in digestible
portions via SAP enhancement packages.
BusinessRequirements/
SystemF
unctionality
= ERP 6.0 standard = EHP functionality
ERP Upgrade
Permanently decrease functional gapWith SAP enhancement packages for SAP ERP continuousprovisioning of new functionality is possible.
SAP 2008 / Page 7 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
8/24
Traditional SAP ApplicationInnovation Lifecycle
Co
EHPEHP
Maintenance:Support Package Stack
Legal/Tax Changes,Corrections, Mandatory
Technically a set of SupportPackages and patchesSAP ERP(ECC 6.0)
ReleaseUpgrade
Upgrade
SupportPackageSAP
System
New SAP Application InnovationLifecycle
TimeNew: SAP enhancementPackages for SAP ERP
How is this possible?
SupportPackage
SupportPackage
SupportPackage
SupportPackage
SupportPackage
New & improved functionality
Optional, new Software Components
Activate new functionality in SwitchFramework via Business Function
Install SAP enhancement packages combined with Support Pack Stackas a maintenance activity with only minor additional effort (ABAP).
EHP
SAP recommends to include thelatest Enhancement Package incase you upgrade to SAP ERP 6.0
Upgrade
SAP 2008 / Page 8 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
9/24
SAP ENHANCEMENT PACKAGES FOR SAP ERP
Delivered Delivered Delivered
We follow our roadmaps and keep promises First four generations of SAP enhancement packages for SAP
ERP delivered and adopted in the market
Proven by the high number of 5660+ live customers
Roadmap
SAP Enhancement Packages for SAP ERP
EHP1 EHP2 EHP3 EHP4
SAP 2008 / Page 9 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
Delivered
-
8/6/2019 1 Introducing EHPs v32
10/24
3500+ new productive EHP customers within the last 12 months
Growth Of Productive SAP Enhancement
Package Customers
General availabilityof EHP 3
General availabilityof EHP 4
In total: 5660
productive EHPcustomers
SAP 2008 / Page 10 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
11/24
The implementation of SAP enhancement package 2 for SAPERP 6.0 was much easier than upgrading a full release. Weinstalled all the software components that we could get in order
to be open to implement further innovations at minimized costat any time.
Thomas Muhler, Technology Consultant,cormeta ag
Innovate -Just in Time Stability and Access to
Innovation
activate newfunctionality on demand.
Cost reduction Lower effort to install
functional enhancements,ideally silent as part ofsystem maintenance
Easier testing with standard
test case templates
Within an extremely short timeframe, we managed to implement
functional enhancements around Real Estate Management. Wewent live after only a few weeks.
Martin Kling, Head of Group Financials,TreuHandStelle GmbH
We were delighted that no side effects occurred at all outsidethe activated new functional capability. The EHP conceptallowed us to fulfill requirements years before we will start our
next release upgrade. The end-user reactions were very positiveand no critical issues occurred.
Stephan Polster, Project Manager,ThyssenKrupp Steel
We implemented enhancement package 2 in order to use thenew capabilities for Bank Relationship Management. No criticalissues occurred. The implementation was very easy.
Joerg Engel, System Engineer, Wuerth-Group
Benefits of SAP Enhancement PackagesFurther Customer Proof Points
SAP 2008 / Page 11 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
12/24
Criteria Upgrades SAP Enhancement Packages
Total Project Duration 18 weeks 8 weeks
Duration of ProjectPhases in weeks
Preparation: 3 w Blueprint: 3 w Realization: 8 w
Prep for cutover: 3 w Prod. Cutover & support: 2 w
Preparation: 1 w Blueprint: 1 w Realization: 2 w
Prep for cutover: 1,5 w Prod. Cutover & support: 1 w
- 56%
- 50 to
75%
Technical Upgrade Project vs.Enhancement Package Installation
1 Based on 140 upgrades from SAP R/3 4.6C to SAP ERP 6.0. Source: Upgrade Experience Database2 Based on 51 enhancement package installations to SAP EHP 2 and 3. Source: Enhancement Package Experience Database
Based on current statistics of EHP 2, EHP 3 and EHP4 , enhancement packageinstallations are much faster than upgrade projects.
Get the latest EHP Experience Database report: http://service.sap.com/ehp-db
http://service.sap.com/ehp-dbhttp://service.sap.com/ehp-dbhttp://service.sap.com/ehp-dbhttp://service.sap.com/ehp-db -
8/6/2019 1 Introducing EHPs v32
13/24
What the Ramp-Up Showed
Installation
Perceived as smooth and straight forward
Customer should plan for some additional technical preparationand execution effort with new EHP installation tool (EHPi)
Implementation
Turned out to be much simpler than customers expected
Effort
Large effort savings if compared with upgrades
We were 3 times faster than in our upgrade project.
Business Function Concept System behaviour indeed only changed where a business function was activated
Capsulation of business functions using the Switch Framework works very well
Key Message: The enhancement package concept works.
SAP 2008 / Page 13 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
14/24
Agenda
Overview SAP Enhancement
Packages For SAP ERP
News with SAP EnhancementPackage 4 For SAP ERP
Outlook And Further Information
AGENDA
2
SAP 2008 / Page 14 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
1
3
-
8/6/2019 1 Introducing EHPs v32
15/24
Clear separation of new functionality
in enhancement packages andcorrections in support packages
Reduced effort for testing and no end-user training required when applyingSAP enhancement packages
Adding new functionality predictableand controllable
Improvement Benefits
SAP NetWeaver 7.0
SAP ERP 6.0
BUSINESS SUITE - Stable Core
EHP EHPEHP
EHP EHP
New With EHP4 for SAP ERP:
SAP Enhancement Packages for SAP NetWeaver
EHP 4 components for SAP ECCServer 6.0 always require* SAPenhancement package 1 for SAPNetWeaver 7.0
Optional deployment of SAP enhance-ment package 1 for SAP NetWeaver7.0 usage types, e.g. Portal
*Installation will be automatically performed altogether. SAP 2008 / Page 15 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
16/24
At-A-Glance:
SAP Enhancement Package 4
Talent Management:
New capabilities for E-Recruiting
Performance Management : UI,Functionality and Integration
Enhanced Compensation Management
Integrated Talent ManagementProcesses (incl. Nakisa)
Enriched learning solution
HCM processes & forms for mass processes
Concurrent Employment Management
Additional HCM Localizations
Employee Interaction Center
HCM
Enterprise Asset Management
New standard solution for RecyclingAdministration (REA)
Project Management Handling largeprojects
Real Estate Management
New capabilities for Travel Management
Quality Management Q-Notifications
Cross SAP ERP: Coverage of all commonbusiness cases with PDF-Based Forms
Corporate Services Outsourced manufacturing scenario:
Work order integration Product Life Cycle Management
new functions, UI and integration to iPPE
Manufacturing Execution (Configurabledashboard and more)
Flexible and adaptive manufacturingprocesses with order-split functionality
Cross systems tracking of all batch relatedobjects
Integration to SAP LPO
Product Developmentand Manufacturing
End-to-end support for supplier andcustomer returns
Sales order entry via CRM
Incentive and commission management
Sales and Service
Extended Service Procurement
Procurement Multiple Account Assignment
Supplier Managed Inventory (SMI) andVendor Managed Inventory (VMI)
Extended Warehouse Managementintegration with Kanban and repetitive
manufacturing
Procurement andLogistics Execution
Highlights
Treasury & Risk Management Exposure & Hedge Mgmt for Commodities and FX
Correspondence monitor with automatic matching
IFRS 7 Reporting
Master Data Governance: CentralMaintenance for Chart of Accounts
Financial Supply Chain Management
New enterprise services and new web UIs
Collections Management: Support of several
backends and collections from subsidiaries Financial accounting and New General
Ledger
Information Life Cycle Management for TaxAuditing
Simplified Reporting and Power Lists
Financials
-
8/6/2019 1 Introducing EHPs v32
17/24
Comparing SAP Enhancement Packages for
SAP ERP and SAP NetWeaver
SAP ERP
Installation Procedure Impact of Installation Selective Activation
New functions areswitched on selectively(ABAP switchframework)
SAP provides an impactanalyzer tool and testcase templates
SAPNetWeaver
SAP
Enhancement
Packages for
Both: Efficient and fastinstallation with EHPinstaller based on proven
SAP software lifecyclemanagement tools
Both: No UI or processchange for end users afterinstallation of SAP
enhancement package.
Switching procedurebetween old and newUI screens is provided
SAP Enhancement Package 1 for SAP NetWeaver
supports SAP Enhancement Package 4 for SAP ERP
NW EHP adds newfunctionality, butdoes not replaceexisting functionality
SAP 2008 / Page 17 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
18/24
SAP Enhancement Package InstallerNew Standard Installation Tool
MINIMIZEDDOWNTIME Risk mitigation due to isolated
shadow system
Plan for some additionaltechnical preparation andexecution runtime
RELIABLE &INTUITIVE Mature, stable and optimized
system switch procedure
Improved user experience dueto intuitive guided procedure
Streamlined installation process
SAP enhancement package InstallerNew Installation Tool
SAP 2008 / Page 18 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
19/24
Agenda
Overview SAP Enhancement
Packages For SAP ERP
News with SAP EnhancementPackage 4 For SAP ERP
Outlook And Further Information
AGENDA
3
SAP 2008 / Page 19 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
2
1
-
8/6/2019 1 Introducing EHPs v32
20/24
SAP NetWeaver 7(foundation for the SAP Business Suite)
EHP EHPEHP
SAP Business Suite 7
Continuous Innovation
ERP
CRM SCM
PLMSRM
EHP EHPEHP
SAP Business Suite 7core applications:
EHP 4 forSAP ERP 6.0
SAP CRM 7.0
SAP SRM 7.0
SAP SCM 7.0
SAP PLM 7.0
SAP enhancementpackages across theSAP Business Suite 7planned for 2010
Non-SAP
SAP Business Suite 7 Outlook
EHP EHP
Composite Applications
SAP NetWeaver
Accelerated Innovation
PI 7.1 CE 7.1
Increasing flexibilitythrough composition
SAP 2008 / Page 20 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
21/24
Summary
Gain stability andaccess to innovation
Upgrade only the enhancements applicableto your business
Reduce risk and downtime
Speed implementation and test less
Reduce training effort
SAP 2008 / Page 21 / Introducing SAP enhancement package 4 for SAP ERP / Christian Oehler
-
8/6/2019 1 Introducing EHPs v32
22/24 SAP 2007 / Page 22
What IT professionalsmust know aboutSAP enhancement packagesfor SAP ERP
New version of SAP Enhancement Package
Must Know Guide available
service.sap.com/erp-ehp
-
8/6/2019 1 Introducing EHPs v32
23/24
-
8/6/2019 1 Introducing EHPs v32
24/24
Questions?
Thank you for your time.
Christian OehlerSolution ManagerSolution Management SAP Business Suite
SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany
Mobile +49/160/3603621Fax +49/6227/78-31120E-Mail christian.oehler@sap.com
mailto:christian.oehler@sap.commailto:christian.oehler@sap.com
top related