1. 2 introduction of proficium infastructural projects reliability analysis how ptc windchill qs...

Post on 19-Jan-2016

222 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

2

3

• Introduction of Proficium

• Infastructural Projects

• Reliability Analysis

• How PTC Windchill QS helps us

Content

4

Technical consulting agency in the field of infrastructure

• Founded in 2011• Based in Breukelen, Utrecht• Providing services to infrastructural market in the Netherlands• Specialised in Maintenance Engineering, Asset Management and Life

Cycle Management

1. Introduction

Mission• High quality and sustainable advice on asset efficiency;• Stay ahead of new developments;• Providing practical solutions to achieve the goals of the client

Vision• Put proven theories into practice• Distinguish from others: do not react but create.

Goals• To grow to become a prominent consulting agency within the maintenance sector• To optimally support and unburden our clients

5

2. Mission, Vision, and Goals

6

• RCM studies• RAMSHE studies• LCC analyses• FME(C)As• Strategical Maintenance concepts• NEN2767 Condition inspections• Contract/Project Management

3. Services

• Systems Engineering• Advice on Technical Tunnel Installations• Life Cycle Management• Advice on Acceptation and Embedding

processes• Education and Training• Guidance in ISO 55000 Certification process

8

Performance contracts:Design, Build, Finance and Maintain (DBFM)

Contractor responsible for whole life-cycle of assets.

6. Changing Landscape: DBFM

Be in Control of

Assets!

9

Reward for Performance – Fines for unavailability of installations

Insight in performance of assets crucial:Trade-offs in design on Costs vs Availability

7. Performance contracts

10

Function Breakdown Structure (FBS)

7. FBS vs SBS

System Breakdown Structure (SBS)

S.1.1 Sub-system

S.1 Infrasystem

S.1.2 Sub-system

S.1.1.1 Element

S.1.1.2 Element

S.1.1.3 Element

S.1.2.1 Element

S.1.2.2 Element

S.1.2.3 Element

F.1 (Functional) System requirements

Function F.1.1

Requirment F.1.1.1

Function F.1.2

Requirment F.1.1.2

Requirment F.1.1.3

Requirment F.1.2.1

Requirment F.1.2.2

Requirment F.1.2.3

11

Failure Mode, Effect, and Criticality Analysis

8. FMECA

1. Function

2. Function Fulfiller

3. Failure Mechanism

4. Cause of Failure

5. Effect of Failure

6. Critcality of Failure

7. Control Measures

1. Function2. Function Fulfiller3. Failure Mehcanism4. Cause of Failure5. Effect of Failure6. Critcality of Failure7. Control Measures

Qualitative Analysis

12

9. Fault Tree Analysis

Quantitative Analysis

13

(Dutch: Dynamisch Route Informatiepaneel (DRIP))

10. Case: Variable Message Sign

Function: Inform drivers by showing text/images

14

System Tree in PTC Windchill Quality Solutions

15

FMECA in PTC Windchill Quality Solutions

16

Fault Tree Analysis in PTC Windchill Quality Solutions

17

Fault Tree Analysis in PTC Windchill Quality Solutions

Result: Failure Rate= 1.296e-5 /hour

Mean Time to Failure: 77160 hour = 8.8 year

Thank you!

top related