0 nyct subway car program building on success presented to nyctrc michael p. wetherell, p.e. acting...
Post on 31-Mar-2015
220 Views
Preview:
TRANSCRIPT
1
NYCT Subway Car ProgramNYCT Subway Car Program
“Building on Success” “Building on Success”
Presented to NYCTRCPresented to NYCTRC
Michael P. Wetherell, P.E.Michael P. Wetherell, P.E.
Acting Chief Mechanical OfficerActing Chief Mechanical Officer
Department of SubwaysDepartment of Subways
April 26,April 26, 20122012
,.
2
Presentation Outline
New Millennium Rail Car Initiative R-160 Project Overview R-188 Project Discussion New Projects - R-179 and Beyond
3
New Millennium Train Initiative
R110A & R110B R110A & R110B
New Technology Test TrainsNew Technology Test Trains
4
New Millennium Fleets
5
R-160 Fleet 1662 60 ft B Division
Cars Assigned to
NMJZQEFL Lines NYCT’s Best
Performing Fleet to date – over 700k - 12 Month Rolling MDBF
Introduced new features
6
R-160 Features Ergonomic Cab FIND Display Enhanced
Regeneration Improved Door
System CBTC Ready – in
CBTC service on L line
Light Weight Flooring
7
R188 Project Overview 126 New ‘A’ Division
Cars & Conversion of 380 R-142A Cars (Kawasaki)
Provides 46 11-car trains for Flushing CBTC / 7 Line Extension service
Communication Communication Based Train ControlBased Train Control
Convert R142AConvert R142A New “C” CarsNew “C” Cars
8
R188 Project Overview
A1 C B B A2 A2 B B B A1C
CBTCEquipped
CBTCEquipped
TachometerEquipped
TachometerEquipped
5-Car Unit 6-Car Unit
CBTCEquipped
CBTCEquipped
Note: the 7 Line is the only NYCT subway line that runs eleven car trains
R188 11-Car Configuration
9
R188 Project OverviewR188 Contractual Delivery Schedule (Cumulative)
Begin Option Deliveries (May 2013)
0
100
200
300
400
500
600
Ne
w &
Co
nv
ert
ed
Ca
rs
All New & Converted Cars Delivered (Jan 2016)
• Base deliveries complete in December 2012• First new Option train scheduled to be delivered May 2013• 8 new trains forecasted to be accepted in time for opening of 7 Line
Extension• Completion of delivery of all new and converted trains scheduled for
January 2016
10
R188 Project Status Base Order: 23
New Cars + Conversion of 10 R142A Cars
Option Order: 103 New Cars + Conversion of 370 R142A
11
R188 Project Status
10 R142A Conversion cars were delivered in December 2011
New Cars in Production
Critical Design Reviews, Qualification Tests, and First Article Inspections ongoing
12
R188 Project Status CBTC Ready:
Cars will be outfitted with wiring and housing to accommodate CBTC equipment to be provided by Thales under separate contract. NYCT is facilitating interface between the Carbuilder and CBTC Supplier
13
R179 Project300 60-foot ‘B’ Division cars replace 272 75-foot R44s
Based on R-160 Design – Upgraded Communications
EPA Compliant Refrigerant
Reduced Weight
14
In-Process Work Car Procurements
R-156/174 Locomotives R-157 Flat Cars and CWR Cars R-172 Ballast Regulators R-190 Snow Throwers Vacuum Trains (Specification
Development)
15
R157 Flat CarsR157 Flat Cars
R157 General Arrangement -
R157 Production – Yonkers, NY
16
R156/174 Diesel R156/174 Diesel LocomotivesLocomotives
MPI Boise, Idaho
17
Future Project Overview R211 ‘B’ Div cars to replace R46
fleet (752 cars) Additional fleet growth cars as required
Next Generation design to address NYCT’s goals
Purchase proposed for 2015 – 2019 Capital Program