Ⅰ. Introduction of Samcheok Green Power
Project Name : Samcheok Green Power Unit 1,2
Location : East Coast of Korea
Construction for the Samcheok Green Power
호산항
작진항
Area : about 2.6million m2 (Land 1.6million m2 + Sea 1million
Before construction
Under construction
Capacity : 2,000MW (1,000MW × 2units)
Fuel : Coal (Subbituminous Coal & Biomass co-firing)
Generation Quantity : 15,768 GWh/year (at 90% availability)
Major Equipment
- Main Equipment
(The World`s First Supercritical CFBC Boiler & Turbine 2:1
Configuration)
Boiler
: Supercritical, CFBC
: Manufacturer - Foster Wheeler
Turbine Generator
: Tandem Compound, Reheat,
Condensing Turbine
: Manufacturer – Toshiba
- B.O.P : Mech. 20 Package + I&C 13 Package
Gen. 1,000MW
CFBC Boiler
500MW
CFBC Boiler
500MW
Construction for the Samcheok Green Power
Aerial View of Samcheok Green Power
Unit1 Boiler
Coal Shed
Unit1 Turbine
Control Room with Stack
Coal Unloading Dock
Biomass Equip.
SNG Equip.
3rd Fuel Unloading Dock
Small Hydro Power Equip.
Unit2 Boiler
Unit2 Turbine
Construction Milestones
2009. 8 Planning
2011. 1 Start site grading
2012. 5 Constuction Permit
2012. 6 Excavation
2013. 8 Start pressure part installation
2014. 6 Power receiving
2015. 1 Initial firing
2015.12 Unit 1 COD (43 months from excavation)
2016. 6 Unit 2 COD (49 months from excavation)
Ⅱ. Samcheok CFBC Boiler
Samcheok Green Power Conditions
Samcheok CFBC Boiler
Outlet Steam Condition
- Flow ton/h 1,572 / 1,296
- Pressure bar 255.5 / 52.8
- Temperature deg.C 603 / 603
Fuel Range
Design Range
HHV (af) Kcal/kg 4,250 Min. 3,750
Moisture (af) % 33.5 Min. 43
Ash (ad) % 4.5 1.21~17
Sulfur (ad) % 0.1 Max 1.0
Configuration of Boiler
Samcheok CFBC Boiler
Benson type
Vertical tube furnace
8 Cyclones per boiler
INTREX Heat Exchanger
- 4ea S/H and 4ea R/H
Regenerative air pre-
heater
8 Coal silos and 1 Bio-
mass silo
Cyclone Arrangement
Samcheok CFBC Boiler
Steam Cooled type
Compact type
Refractory
8 Cyclones per boiler
Economizer system
Evaporator system
Superheater system
Reheater system
Steam system
Comparison Table
Plant Condition & Fuel Comparison
Division PC Power Plant
(Example) (500MW)
Lagisza Power Plant
(460MW)
Samcheok Green Power
(500MW)
Steam
Condition
<@BMCR>
Flow (SH/RH)
Pr.(SH/RH)
Temp.(SH/RH)
1,605/1,281 t/h
255/53.78 bar
569/596 ℃
1,300/1,102 t/h
275/55 bar
560/580 ℃
1,572/1,296 t/h
255.5/52.8 bar
603/603 ℃
Environment
Condition
Sox
Nox
Dust
40 ppm
50 ppm
15 ppm
69.9 ppm
97.3 ppm
30 [mg/Nm3]
50 ppm
50 ppm
15 ppm
Design Coal
Analysis
Heating Value
Total Moisture
Ash
Sulfur
6,080
kcal/kg(HHV)
10 %(AF)
15 %(AD)
0.72 %(AR)
5,015
kcal/kg(HHV)
12 %(AF)
26.1 %(AD)
1.2 %(AF)
4,250 kcal/kg(HHV)
33.5 %(AF)
4.5 %(AD)
0.1 %(AF)
Biomass
Analysis
Heating Value
Total Moisture
Ash
N/A
2268.6
kcal/kg(LHV)
45 %
1.3 %
3773.04
kcal/kg(LHV)
5~15 %
0.7~16.2 %
Plant Configuration (2:1) : Overcome the 500MW capacity limitation
World’s 1st 2:1 combined Once Through SC CFB power plant
1,000MW Toshiba 48 inch LSB Turbine
CFBC Boiler 500MW
Generator 1,000MW
CFBC Boiler
500MW
CFBC Boiler 500MW
Generator 1,000MW
CFBC Boiler
500MW
Unit 1 Unit 2
Environmental Equipment - Reduction of Foot Print
Past Power Plant
SCR
Wet FGD
PC Boiler Stack Gypsum
Samcheok Green Power
FGD removed
CFBC Boiler
E.P
Stack
SOx : 40ppm NOx : 50ppm Dust : 15ppm
SOx : 50ppm NOx : 50ppm Dust : 15ppm
<Eco. Outlet> SOx : 1,000 ppm NOx : 180 ppm
<Eco. Outlet> SOx : 50 ppm NOx : 175 ppm
E.P
SCR
Ⅲ. Eco-Friendly Power Plant
Coal Stock Yard Ash Pond Stack
Not In My Back Yard
NIMBY
Control Room Office Restaurant Viewing Deck
Eco-Friendly Multi Complex Office Using Stack
New Concept
3 No Power Plant
No Outdoor Coal Stock Yard
No Discharge
No Ash Pond
• No Visible Coal Storage • Ash Recycling • Waste Water RECYCLE
Plant Site with Non-visible Coal Storage
Samcheok Green Power
A.B.C(Air-supported B.C.) & Underground Conveyer
Coal is transferred by air slides
Outdoor Conveyer
Existing Power Plant
Complex spider web of conveyors
Non-efficient land use
Plant Site with Non-visible Coal Storage
Environmentally Unfriendly Disposal of Ash Waste
No Ash Pond
Existing Power Plant
No Ash Pond
Ash handling system
100% recycling
- Using bottom ash for light aggregate, fly ash for cement
- Remaining ash will be used for mine back fill
- No need for an ash pond
Fly Ash Bottom Ash
Cement Material
ESP
CFBC Boiler Stack
Producing light aggregate -> selling as a construction material
Mine Back fill
Abandoned Mine
Abandoned Mine Backfill by Ash
Water Supply : A New Idea
Samcheok
Choice 1. Recirculation of retention basin discharge
Choice 2. Seawater desalination
Water supply
Water pond Underground Channel
Plant
Sea
Desalination
Facility
Storage
Tank Plant
Existing
Expensive, Impact on environment and civil issues
New Dam Construction
Intake from new dam or existing dam
Existing Plant Samcheok
Dam
Dumped into the sea
Treated Water
Waste Water
Discharge
: about 900 tons/day
Retention Desalination Rain water
Treated Water
Waste Water
Water & Waste Water Treatment : No Waste Water Discharge
Zero discharge by closed loop system of
water & waste water treatment system
Ⅳ. Clean Energy Production
1. SNG
KOSPO operates a number of CCPP
Hard to introduce LNG directly
Coal gasification as an alternative fuel
Coal gasification using low grade coal
Keep in LNG storage tank &
use for CCPP alternative fuel
SNG
2. Small Hydro-power
Using discharge
Capacity : 5,500 kW (1,375kW x 4
Units)
Type : Kaplan
Ⅴ. Status of Construction Work
1. Status of Construction Work
Air Photograph of Samcheok Green Power (`2013. 7)
Air Photograph of Samcheok Green Power (Sep. 2013)
Sea Water Disch.
#1,2 BLR
EP
Switch yard
Stack and Control BLDG.
Construction Office
3rd Fuel Unloading Dock
Carrying Spot
Carrying Spot
Construction Photographs
1. Status of Construction Work
Construction Photographs
1. Status of Construction Work
Construction Photographs
1. Status of Construction Work
Samcheok |Multi-stage Ground Elevation
Existing Plant |Flat Ground Elevation
Reduce earthwork volume 700 million m3
[Save $83 million]
150m
[Save $42 million]
60m
90m
Site Formation : Reduction of earthwork volume with a multi-stage site grading plan
Samcheok [Both Side Access : 1 Pier Required]
Existing [One Side Access : 2 Piers
Required]
Unloading Dock : Both Side Access
Length of Jetty : 1,4OO m
Length of Jetty : 900 m