© 2018 petroliam nasional berhad (petronas)

Post on 20-May-2022

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© 2018 PETROLIAM NASIONAL BERHAD (PETRONAS)

All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Surveillance

Ground Patrol Air Patrol

……

Pig Receiver

Pig Launcher

Above Ground WallThickness Check

Crossing

Inter Pipe CrossingBlock Valve

10 Y (max)

Metering Station

Above Ground Piping Inspection

Cleaning Pig

• Clean inside pipe wall• Prepare pipe ready to

inspect

CP Station

• Check DC Voltage Source supply to protect pipe.

• Adjust to good protection

Compressor Station

• Above Ground Piping Inspection•Gas Turbine Monitoring

Close Internal Pipe Survey

(CIPS)

Direct Coating Voltage

Gradient (DCVG)

Detect Coating Defect Check protection

voltage every 1 meter

• Check pipe wall loss• Detect Corrosion

Valve & Actuator Maintenance

Pipe-to-Soil CP Survey

Annual CP Survey at every test post

Real Time Leak Detection

Pipeline Leak Detection

System (PLDS)

MFL PIG

Open

Open

Open

Open

Open

Open

Open

19Open

top related