amp - r-evolution phase 2 brochure.pdf

4
PHASE 2 . TO LET Planning consent in place Available Q1 2017 A new high quality development on the UK’s premier Advanced Manufacturing Park . Direct access to M1/J33 . Clear height of 7 metres . High quality fitted offices . Total of 52,000 sq ft of space From 4,900 sq ft (455 sq m) to 26,000 sq ft (2,415 sq m) B1 Business/manufacturing/research and development M1/J33 ROTHERHAM S60 5WG Speculative build Indicative image AT THE ADVANCED MANUFACTURING PARK www.harworthgroup.com/amp Transforming Regenerating Revitalising

Upload: david-travis

Post on 14-Jan-2017

91 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AMP - R-evolution Phase 2 Brochure.PDF

PHASE 2 . TO LET Planning consent in place Available Q1 2017A new high quality development on the UK’s premier Advanced Manufacturing Park. Direct access to M1/J33. Clear height of 7 metres. High quality fitted offices. Total of 52,000 sq ft of space

From 4,900 sq ft (455 sq m) to 26,000 sq ft (2,415 sq m) B1 Business/manufacturing/research and development

M1/J33 ROTHERHAM S60 5WG

Speculative build

Indicative image

AT THE ADVANCED MANUFACTURING PARK

www.harworthgroup.com/amp

Transforming Regenerating Revitalising

Page 2: AMP - R-evolution Phase 2 Brochure.PDF

AT THE ADVANCED MANUFACTURING PARK

www.harworthgroup.com/amp

Transforming Regenerating Revitalising

THE BENEFITSHarworth’s “R-evolution” model is designed to offer modern flexible business space targeting companies seeking to relocate to the prestigious Advanced Manufacturing Park.

Enterprise ZoneR-evolution sits within the UK’s leading Enterprise Zone, with possible incentives to new occupiers coming to the Park. These include enhanced capital allowances and increased support to inward investment.

Source: FDI Magazine (2015)

Environmental standards As part of our ongoing commitment to provide buildings which take environmental factors into account, the units will achieve a minimum BREEAM rating of Very Good.

PlanningPlanning consent is in place for B1 business/manufacturing/research and development.

Design and specificationFollowing the success of Phase 1, Harworth is developing Phase 2 of R-evolution (Units 7A, 7B, 8A-8D) in accordance with the Design Guide for the Advanced Manufacturing Park (AMP), to the following specification:

. Steel portal framed building with feature glazing to office

. 7 metres to underside of haunch

. One electronically operated 5 metre high loading door to warehouse/workshop per unit

. Floor loading of 50kN/sq m to the warehouse/workshop

. Dedicated car parking to each unit with large service yards to front

. Car parking space ratio of 1:1,000 sq ft

. Modern offices with WC facilities incorporated into each unit comprising minimum 10% of gross internal floorspace

. All mains services and drainage connections

. Bespoke internal fit out available - subject to agreement

PHASE 1 UNITS 3 & 4 - NOW SOLD

Page 3: AMP - R-evolution Phase 2 Brochure.PDF

AT THE ADVANCED MANUFACTURING PARK

www.harworthgroup.com/amp

Transforming Regenerating Revitalising

Service

yard

20 car parking spaces

79 c

ar p

arki

ng s

pace

s25 spaces

30 spaces

41 car parking spaces

50 spaces

16 car spaces

116

car p

arki

ng s

pace

s

115

car p

arki

ng s

pace

s

Proposed access road

Service

yard

Service

yard

Service

yard

Service

yard

Service

yard

Service

yard

Service

yard

Service

yard Service

yard

15 spaces 15 spaces

7 ca

r par

king

spa

ces

12 spaces 12 spaces

X-Cel Superturn

Metalysis

7A

Plot 6

7B

8C

8B

8A

Unit 10

Unit 9

8D

Nikken

Under offer

ACCOMMODATION

Unit 7A and 7B sq ft sq m

7A 15,000 1,394

7B 11,000 1,021

Total 26,000 2,415

Unit 8A - 8D sq ft sq m

8A 7,200 669

8B 6,000 557

8C 4,900 455

8D 7,650 711

Total 25,750 2,392

The dividing wall in each terrace can be removed prior to construction commencing to create a single unit of 26,000 sq ft on either terrace (unit 7 or 8).

TERMS The units are available to let on full repairing and insuring terms to be agreed.

LEGAL COSTS Each party will bear their own legal costs incurred in the transaction.

PHASE 2

ROLLS-ROYCER-EVOLUTION PHASE 1

PLANNING CONSENT IN PLACE

AT THE ADVANCED MANUFACTURING PARK

CompletedLegend Design and build opportunities

Page 4: AMP - R-evolution Phase 2 Brochure.PDF

AT THE ADVANCED MANUFACTURING PARK

www.harworthgroup.com/amp

Transforming Regenerating Revitalising

ADVANCED MANUFACTURING PARK

AMP Training Centre

Rolls-Royce

MetalysisX-Cel Superturn

Maher NikkenUnder OfferM1/J33

M1

M69M6

M6 Toll

M1

M11

M25

A3(M)

A1(M)

A1(M)

A1(M)

M25M23

M2M26M3

M27

M4M4

M40

M40

M42

M5

M50

M5

M6

M6

M6

A74(M)

M74

M56

M62M62

M180M18

M56M57

M54

M8

M61

Holyhead

Manchester

Leicester

BirminghamCoventry

Derby Nottingham

Sheffield

Stoke-on-Trent

Liverpool

Southampton

Poole

Bristol

Gloucester

Cardiff

Plymouth

Exeter

Cambridge

MiltonKeynes

Dover

London

Middlesbrough

Scarborough

Whitehaven

Dumfries

Carlisle

LeedsImmingham

Grimsby

York

NewcastleUpon Tyne

Edinburgh

Perth

Glasgow

LOCATIONThe Advanced Manufacturing Park (AMP), is strategically located on the Rotherham/Sheffield border, just two minutes from junction 33 of the M1 motorway and just off the A630 Sheffield Parkway.

The overall site comprises 150 acres of land that has been developed to create a world-class business and manufacturing park.

The AMP is recognised internationally for its innovative research and advanced manufacturing processes, and has already attracted world leading high technology companies such as Rolls-Royce, The University of Sheffield Advanced Manufacturing Research Centre (AMRC) with Boeing, Nuclear AMRC, AMRC Training Centre and TWI.

Technologies at the AMP currently include: aerospace, automotive, medical, sport, environmental, energy and construction.

The Sheffield City Region is situated in the heart of the UK and offers excellent access to the UK via mainline rail and motorway networks.

London is only two hours away by train and there are six international airports within a 90 minute drive of Sheffield, including Robin Hood Airport Doncaster-Sheffield, Manchester International Airport, Birmingham International Airport, Nottingham East Midlands Airport, Leeds-Bradford Airport and Humberside Airport.

The east coast deepwater ports on the Humber are less than two hours drive away, as is the west coast port of Liverpool.

reac

hmar

ketin

g.co

.uk

24

604

09/

16

Misrepresentation act: Knight Frank and Gent Visick for themselves and for the vendors or lessors of this property, whose agents they are give notice that: a) all particulars are set out as general outline only for the guidance of intending purchasers or lessees, and do not comprise part of an offer or contract: b) all descriptions, dimensions, references to condition and necessary permissions for use and occupation, and other details are given in good faith and are believed to be correct but any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves by inspection or otherwise as to the correctness of each of them. c) no person in the employment of Knight Frank and Gent Visick has any authority to make any representation or warranty whatsoever in relation to this property. All photography is indicative.September 2016

CONTACT & FURTHER INFORMATION

A6135

A6109

A630SheffieldParkway

A618

A618

A618

M1M18M1

M1

J33

J34

J31

J32

A57

A57A57

To Leeds To Doncaster

Meadowhall

RotherhamCentral

Rother ValleyCountry ParkCrystal Peaks

Rotherham

Sheffield

To NottinghamADVANCED MANUFACTURING PARK - S60 5WG

Rebecca Schofield [email protected]

Tom Swallow [email protected]

Andrew Gent [email protected]

Paul Mack [email protected]

Supported by

AMP Technology Centre

TWI

Morrisons Supermarket

University of Sheffield AMRC

Sheffield Parkway / A630

Legend

R-evolution at the AMP

R-evolution Phase 2