amjad dar_ cv pic mobily 15y

3
AMJAD MASOOD DAR : +966 565678131 : [email protected] [email protected] Objective Highly competent individual who has 15 years of experience in planning, implementation, monitoring, managing and directing both large and small project in telecommunication field of IBS for 2G/3G/4G/LTE network Green Field/ Roof top and COW sites. Preferably in Jeddah_Makkah_Taif _Abaha_Baha (WR) Saudi Arabia Experience Dynamic professional offering 15 years of rich experience in: ~ Project Management ~ Operations & Maintenance ~ Installation & Commissioning ~ Client Relationship Management ~ Team Management ~ Testing & Inspection ~ Network Roll-Out Management ~ Reporting & Documentation ~ Project Implementation Expertise in implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipment and maintaining requisite documents with experience in Active & Passive solutions Hands on experience in project management activities including project scoping, estimation, planning, finalization of technical specifications, resource administration and quality management Skilled in showing quality performance and assuring timely deliveries of IBS Projects within agreed time frame & KPI’s Adept in executing the detail study of purchase process, preparation of technical requirements and evaluation of technical bids for the IBS projects Skilled in handling project activities with accountability of working out various requirements with respect to utilities, machines, manpower and monitoring overall project operations for ensuring timely completion A result –oriented individual with excellent planning, time management & problem solving skills Experience Mobily (Etihad Etisalat) Jeddah Saudi Arabia: Specialist Manager Antenna System (Market specialist in Iqama) Aug-2006 - Jul-2015 Mobily (Etihad Etisalat) Jeddah Saudi Arabia: AE/MS/Antenna System Feb-2005-July 2006 2 nd GSM project KSA under Etisalat UAE HO (Transfer) Etisalat United Arab Emirate (UAE) Abu Dhabi HO: Aerial Engineer Feb-2001- Feb-2005 United Arab Emirate with Etisalat Head Office. Etisalat Karachi Pakistan SH Zaid Bin Sultan Palace: GSM Installation Team Leader of IBS VVIP Highness SH Zaid Bin Sultan Palace at 2001. Sultan of Oman SH Khalifa Bin Zaid Palace: Team Leader of GSM Installation of IBS VVIP Highness SH Khalifa Bin Zaid Palace at 2000 in Suhar - Oman. Tanzania Zantel GSM Project: May 1999 Under Etisalat Abu Dhabi Head Office VVIP Highness SH Zaid project. Etisalat United Arab Emirate (UAE) Abu Dhabi HO: Radio, MOI & TV Microwave Link (NEC, Sumitomo) Balfour Beatty Limited-UK 1986 - 1988 Sri Lanka:

Upload: masood-dar

Post on 12-Apr-2017

240 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Amjad Dar_ CV pic Mobily 15y

AMJAD MASOOD DAR

: +966 565678131

: [email protected] [email protected]

Objective Highly competent individual who has 15 years of experience in planning, implementation, monitoring, managing and directing both large and small project in telecommunication field of IBS for 2G/3G/4G/LTE network Green Field/ Roof top and COW sites. Preferably in Jeddah_Makkah_Taif _Abaha_Baha (WR) Saudi Arabia Experience

Dynamic professional offering 15 years of rich experience in: ~ Project Management ~ Operations & Maintenance ~ Installation & Commissioning ~ Client Relationship Management ~ Team Management ~ Testing & Inspection ~ Network Roll-Out Management ~ Reporting & Documentation ~ Project Implementation

Expertise in implementing maintenance schedules and carrying out

periodic checks to ensure performance of various equipment and maintaining requisite documents with experience in Active & Passive solutions

Hands on experience in project management activities including project scoping, estimation, planning, finalization of technical specifications, resource administration and quality management

Skilled in showing quality performance and assuring timely deliveries of IBS Projects within agreed time frame & KPI’s

Adept in executing the detail study of purchase process, preparation of technical requirements and evaluation of technical bids for the IBS projects

Skilled in handling project activities with accountability of working out various requirements with respect to utilities, machines, manpower and monitoring overall project operations for ensuring timely completion

A result –oriented individual with excellent planning, time management & problem solving skills

Experience

Mobily (Etihad Etisalat) Jeddah Saudi Arabia:

Specialist Manager Antenna System (Market specialist in Iqama) Aug-2006 - Jul-2015

Mobily (Etihad Etisalat) Jeddah Saudi Arabia:

AE/MS/Antenna System Feb-2005-July 2006 2nd GSM project KSA under Etisalat UAE HO (Transfer)

Etisalat United Arab Emirate (UAE) Abu Dhabi HO:

Aerial Engineer Feb-2001- Feb-2005 United Arab Emirate with Etisalat Head Office.

Etisalat Karachi Pakistan SH Zaid Bin Sultan Palace:

GSM Installation Team Leader of IBS VVIP Highness SH Zaid Bin Sultan Palace at 2001.

Sultan of Oman SH Khalifa Bin Zaid Palace:

Team Leader of GSM Installation of IBS VVIP Highness SH Khalifa Bin Zaid Palace at 2000 in Suhar - Oman.

Tanzania Zantel GSM Project:

May 1999 Under Etisalat Abu Dhabi Head Office VVIP Highness SH Zaid project.

Etisalat United Arab Emirate (UAE) Abu Dhabi HO:

Radio, MOI & TV Microwave Link (NEC, Sumitomo) Balfour Beatty Limited-UK 1986 - 1988

Sri Lanka:

Page 2: Amjad Dar_ CV pic Mobily 15y

Line Man Power Transmission overhead lines. Balfour Beatty Limited-UK 132KV 220KV 1985-1986 Role: Leading the project implementation team as well as co-ordinating all activities needed to bring an equipment/

system to service, etc. Estimating the project equipment cost, field & engineering effort, training and other data for the Capital

Expenditure Request documentation Creating Statement of Work, modifying the appropriate standard installation instructions and Acceptance Test

Instructions Offering technical support, interfacing with Internal Depts. for finalization of projects in time and following

checklist, Punch point’s clearance, etc. Preparing daily progress report & sending the same to Indoor contactors for the proper follow up Monitoring 3 Indoor contractors (Aces, Adeed, Huawei) including Vendors (Ericsson, Huawei) which includes

Installation Supervisors, BSS Engineers, RF Engineers, Site Engineers & Quality Engineers Assuring detailed engineering drawing, material estimation, material handling & technical discussions material

for IBS Monitoring Acceptance Schedules with Indoor contractors & Ericsson Quality Team and Managed Services as per

the requirements

Worked on different Active Solution vendors like Andrew, Power wave, Huawei, Rosenberger etc.

Successfully Implemented & handed over to Mobily Optimization more than 100 IBS projects for Western region Looking after the commercial requirements for P.O, FIS & Invoicing for indoor contractors & Vendors Looking after the Successful process of different claims from Mobily Vendors & contractors for

o First approver for SDN, RFS, PAC, FAC Performa Invoices for all Indoor contractor under West region Aug-2006 to July-2015: Mobily (Etihad Etisalat) Jeddah, KSA as MRN implementation Specialist Manger of Antenna System. Role:

Managing the issuance of sites arrangements, sites BOQ, budget, preliminary schedules and determination of project requirements for IBS sites

Review and approve the final design, Drawings, link budget, BOQ and technical specifications performed by design department and discuss it with Indoor contactors

Follow and monitor all the field activities of indoor contractors (Site Acquisition, Materials preparing and Installation) and discuss the updates in regular meetings with them.

Manage project time & prioritize activities, monitor day to day implementation team's activities and reports to guarantee projects progress in accordance with the project schedule & KPI.

Review & process RF Technical Site Surveys (TSS) for the In-Building design.

Review & approval of RF Technical Design Proposal (TDP) by Indoor contractors for In-Building Solutions to meet the Mobily KPI’s Coverage Design plan.

Checking the calculation of Link Budget (EIRP) and reviewing of the schematic diagram for IBC solutions submitted by Indoor contactors if IBS projects

Once RF equipment is installed, perform RF data collection to ensure that the quality of service meets RF design specifications such as Rx Level, Rx Qual, Handover, parameter verification.

Verify macro, micro and In-building coverage plans to meet quality specifications.

Extend the technical support needed to the IBS contractors for all installations (Feeders, Antennas, Splitters, Triplexes, Combiners, Base station, indoor transmission unites, MW and Radio unit).

Control and archiving the project documents (daily reports, as Built documents, Acceptance and Invoices Doc., Auto CAD drawings and VSWR results).

Supervise and coordinate with indoor contractor’s engineers progress for electromechanical drawings and installations (cable trays, HVAC, AC, MDB, Fire systems, External alarms and power cables connectivity)

Lead the implementation process in urgent cases if required.

Use project scheduling and control tools to monitor the sites progress

Following Implementation Designing & handover to Optimization for IBS & Large venues Networks based on UMTS, GSM, CDMA, LTE, and Public Safety

Worked on different solutions like Active, Passive, Hybrid, Direct node B & repeater solutions for single & multiple operators.

Suggest and implement Network Parameters changes for reducing call drops and better coverage and

Page 3: Amjad Dar_ CV pic Mobily 15y

analysis of impact after changing of parameters.

Feb-2005 Jul-2006: Aerial Engineer Role:

Assists in Technical site survey for GSM/UMTS In-Building Solutions (IBS) in Abu Dhabi HO, Dubai, and Sharjah, in UAE with Alcatle, AT&T and Motorola.

Assists in the Preparation of antenna and cabling layout with RF designer.

Perform the task given by the Senior RF Engineer.

• Checking in building installations of macro, micro and make sure quality level is maintained.

Supervising (Site Master) Sweep Test report of feeders and jumper’s cables with antennas.

o Microwave Systems of Ericsson (Mini Link), NEC, Andrew and Sumitomo survey and implementation. TRAININGS AND SEMINARS ATTENDED:

Technical trainings: LTE Multiple Antenna Techniques from Apis - Stockholm, Sweden-2011 Andrew Active Solution training from Andrew Jeddah, KSA 2014 IBS Active solution workshop from Huawei- Jeddah, KSA GSM RBS 6201 Field Maintenance Ericsson Academy –KSA 2013 GSM RBS 6000 Overview Ericsson-KSA, 2010, 2013 LTE Overview Training, LTE Air Interface, eNode B LTE Product Description 2011 GSM system Survey from Ericsson-Jeddah, KSA Andrew connector Attachment Training:

Abu Dhabi UAE, sep-1998, Apr-1999, May-1999, Nov-1999, Sep-2000, May-2002 TATWEER-UK Quality Awareness: Abu Dhabi UAE, Apr- 1999 RFS Germany Assembly of Coaxial: Advance Cellflex-R Product Training Abu Dhabi UAE, Nov-1999, Sep-

2002, Sep-2003 Anritsu USA: Site Master Operational Training Abu Dhabi UAE, May-1999 SALA UK: Fall Arrest & Safety Rescue System Training Abu Dhabi UAE, Apr-2003

Education

1983 2 years Bachelor of Arts (B.A) University of Punjab (Lahore-Pakistan)

1979 2 years Intermediate Govt. Islamia Collage (Gujranwala Pakistan)

1977 2 year SSC from Govt. High School Ahmed Nager (Gujranwala Pakistan)

Personal Details

Date of Birth : 16 Jan 1961 Address : Gujranwala Pakistan Languages Known : English, Arabic, & Urdu, Panjabi, Nationality : Pakistan Marital Status : Married No. of Dependants : 3 Driving License : KSA, UAE, Pakistan Visa Status : Residence Visa/ Transferable Iqama (Market specialist) Passport Details : AM 7999482 (Expiry Date: 2025)