0 O o 0 ° o Fueling the Future 0 00 0 o of Nuclear Power January 25, 2016 ACO 16-0005 ATTN: Document Control Desk Ms. Catherine Haney, Director Office of INuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 American Centrifuge Plant and American Centrifuge Lead Cascade Facility Docket Numbers 70-7004 and 70-7003; License Numbers SNM-2011 and SNM-7003 Annual Summary Report of Facility Changes Dear Ms. Haney: In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2) and Nuclear Regulatory Commission Materials License Conditions 1 6.c.ii (SNM-7003) and 24.c.ii (SNM-201 1), American Centrifuge Operating, LLC hereby submits a brief summary of the changes required by 10 CFR 70.62(a)(2) for facility changes made during calendar year 2015. Enclosure 1 provides the summary of facility changes for both the American Centrifuge Lead Cascade Facility and American Centrifuge Plant. If you have any questions regarding this matter, please contact me at (740) 897-3285. Mario Robles, Jr. Regulatory Manager Enclosure: As Stated cc (without enclosure unless otherwise noted): J. Downs, NRC HQ (Enclosure) T. Grice, NRC HQ L. Pitts, NRC Region II (Enclosure) 0. Siurano-Perez, NRC HQ (Enclosure) M. Sykes, NRC Region II T. Vukovinsky, Region II American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661

Upload: others

Post on 05-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

0 O

o 0 ° o Fueling the Future0 00 0 o of Nuclear Power

January 25, 2016ACO 16-0005

ATTN: Document Control DeskMs. Catherine Haney, DirectorOffice of INuclear Material Safety and SafeguardsU.S. Nuclear Regulatory CommissionWashington, DC 20555-0001

American Centrifuge Plant and American Centrifuge Lead Cascade FacilityDocket Numbers 70-7004 and 70-7003; License Numbers SNM-2011 and SNM-7003

Annual Summary Report of Facility Changes

Dear Ms. Haney:

In accordance with 10 Code of Federal Regulations (CFR) 70.72(d)(2) and Nuclear RegulatoryCommission Materials License Conditions 1 6.c.ii (SNM-7003) and 24.c.ii (SNM-201 1), AmericanCentrifuge Operating, LLC hereby submits a brief summary of the changes required by 10 CFR70.62(a)(2) for facility changes made during calendar year 2015. Enclosure 1 provides the summaryof facility changes for both the American Centrifuge Lead Cascade Facility and American CentrifugePlant.

If you have any questions regarding this matter, please contact me at (740) 897-3285.

Mario Robles, Jr.Regulatory Manager

Enclosure: As Stated

cc (without enclosure unless otherwise noted):J. Downs, NRC HQ (Enclosure)T. Grice, NRC HQL. Pitts, NRC Region II (Enclosure)0. Siurano-Perez, NRC HQ (Enclosure)M. Sykes, NRC Region IIT. Vukovinsky, Region II

American Centrifuge Operating, LLC3930 U.S. Route 23 South - P.O. Box 628Piketon, OH 45661

Page 2: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Enclosure 1 to ACO 16-0005Summary of Facility Changes for the American Centrifuge Lead Cascade Facilityand American Centrifuge Plant for Calendar Year 2015

Information Contained WithinDoes Not Contain

Export Controlled Information

Reviewer John LockwoodDate: 01/22/2016

Page 3: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

2015 Brief Summary of Changes for the American Centrifuge Lead Cascade Facility (LCF) andAmerican Centrifuge Plant (ACP)

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 14-0049 1 Title: 4/112015 Yes ESO-2301-0046 No None of the criteriaPCE 14-0024 1 Engineering Service Order ESO-2301-0046, X-7725 Chiller Flow Switch listed in 10 CFR

FSHL-01 Replacement 70.72(c) are met.

Description of Change:Changed the Ultrasonic Doppler Flow Switch to a Thermal Dispersion Flowswitch for the chiller X-7725-C-1021.

Reason for the Change:The alternate flow switch was chosen, in consultation with the vendor, forimproved performance due to fluid properties of the affected system.

FCE 14-0071 0 Title: 5/22/2014 No SP-2605-0027 Rev 5; SP- No NRC Preapproval.PCE 14-0035 0 Development of New Classified Network Information System Security 3605-0002 Rev 2; SP-3605- Required.

Plans 0009 Rev 0; SP-3605-001 0Description of Change: Rev 0; SP-3605-0011I Rev 0Deleted SP-2605-0027, Information System Security Plan (ISSP) forInterconnected Classified Networks Processing Classified Information andSP-3605-0002, Classified Data Processing Network Information SystemSecurity Plan (ISSP); developed new SP-3605-0010, InterconnectAgreement for the American Centrifuge Program, SP-3605-001 1,American Centrifuge Classified Administrative Network InformationSystem Security Plan (ISSP); SP-3605-0009, American CentrifugeClassified Administrative Network Baseline Security Control Security Plan.

Reason for the Change:In accordance with the guidance provided in DOE Manual 205.1 B, SP-3605-0009, and SP-3605-001 1 were developed. It was determined thatonly one plan would be required for joining currently accredited systems;therefore, SP-3605-001 0, was developed.

FCE 14-0071 1 Title: 12/15/2014 No ACP/LCF Security Program No NRC PreapprovalPCE 14-0035 1 Revision of New Classified Network Information System Security Plans Sections 2.2, 2.20, and Required.

Acronyms; SP-2605-0027Description of Change: Rev 5; SP-3605-0002 Rev 2;Based upon comments received on November 5, 2014 from the NRC, SP SP-3605-0009 Rev 0; SP-3605-0011, American Centrifuge Classified Administrative Network 3605-0010 Rev 0; SP-3605-Information System Security Plan, and SP-3605-0009, AmericanCentrifuge Classified Networks Baseline Security Control Security Plan, 0011 Rev 0

were revised.

Reason for the Change:The NRC conducted a review of the initial submittal of SP-3605-001 1 incoordination with the subject matter experts from the DOE's NuclearEnergy Oak Ridge Site Office. The NRC staff requested that AmericanCentrifuge Operating, LLC resubmit SP-3605-001 1 and SP-3605-0009resolving the November 5, 2014 comments.

NRC Report 2015 Page 1 of 68

Page 4: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-0071 2 Title: 1/8/2015 No ACP/LCF Security Program No NRC PreapprovalPOE 14-0035 2 Revision of New Classified Network Information System Security Plans Sections 2.2, 2.20, and Required.

Desciptin o Chage:Acronyms; SP-2605-0027Desciptin o Chage:Rev 5; SP-3605-0002 Rev 2;

Based upon comments received on December 18, 2014 from the DOE, SPL3605-0009 Rev 0; SP-SP-3605-001 1, American Centrifuge Classified Administrative Network36501Re0;P-05Information System Security Plan (lSSP), is being revised. 0011 RevO0

Reason for the Change:The NRC staff, in coordination with subject matter experts from the DOE'sNuclear Energy Oak Ridge Site Office, conducted a review of ACO'sresolution to the November 5, 2014 comments. During its review, the staffidentified additional information that was still necessary and providedadditional comments to ACO on December 18, 2014.

FOE 14-0089 2 Title: 5/20/2015 No TP-2201-0093 Rev 4 No None of the criteriaPOE - N/A Revision to Test Plan TP-2201-0093, X-3001 Universal Gas Analysis Test listed in 10 CFR

Plan 70.72(c) are met.

Description of Change:To allow the exhaust of the universal gas analyzer to be routed to a mini-gulper during testing at the mass spectrometer.

Reason for the Change:It was determined in order to improve the performance of the universalgas analyzer, the exhaust needed to be routed into the inlet of a portablegulper in lieu of the mass spectrometry room exhaust system.

FOE 14-0089 3 Title: 7/1/2015 No TP-2201-0093 Rev 4 No None of the criteriaPOE - N/A Revision to Test Plan TP-2201-0093, X-3001 Universal Gas Analysis Test listed in 10 CFR

Plan .70.72(c) are met.

Description of Change:Updated the Description of Change and Reasons For The Changecompleted in previous revisions that were not documented correctly.

Reason for the Change:To achieve compliance with change evaluation procedure.

NRC Report 2015 Pg f6Page 2 of 68

Page 5: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Re.Summary Reason NRCPCE Number. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 14-01 25 0 Title: 512712014 Yes None No None of the criteriaPCE 14-0057 0 X-300/X-1 020 Public Address Console Replacement listed in 10 CFR

Description of Change: 70.72(c) are met.

Replace obsolete Public Address control console interface and distributedprocess controllers in the X-300, Plant Control Facility and the X-1020,Emergency Operations Center.

Reason for the Change:Fluor-B&W Portsmouth, LLC is replacing the obsolete control consoleinterface and distributed process controllers because the components arefailing and cannot be repaired. The Public Address system is part of thePublic Warning System credited in certain events described in the ACPIntegrated Safety Analysis Summary.

FCE 14-0148 0 Title: 8/5/2014 No LCF Emergency Plan Table No None of the criteriaPCE 14-0061 0 Revision to Emergency Plan of Contents, Figures 1-2 and listed in 10 CFR

Description of Change: 1-2a, Section 6.1 70.72(c) are met.

Changed the references to the "X-1 04"' building in the Emergency Plan to"~Protective Force Headquarters."

Reason for the Change:The functions of the X-1 04 guard headquarters are being replaced by atriplex trailer, XT-1 04-D. The change to the Emergency Plan are made toreflect the proper name for the headquarters building.

FCE 14-0250 1 Title: 2/19/2015 No ACD2-EG-009 Chg 7 No None of the criteriaPCE 14-01 02 1 Revision to Procedure ACD2-EG-009, Processing Modification & Project listed in 10 CFR

Changes 70.72(c) are met.

Description of Change:Revised to correct change evaluation form.

Reason for the Change:To achieve compliance with change evaluation procedure.

FCE 14-0250 2 Title: 8/28/2015 No ACD2-EG-009 Chg 7 No None of the criteriaPCE 14-01 02 2 Revision to Procedure ACD2-EG-009, Processing Modification & Project listed in 10 CFR

Changes 70.72(c) are met.

Description of Change:This revision added revision descriptions to responses to questions lAand B.

Reason for the Change:To achieve compliance with change evaluation procedure.

NRC Report 20)5Pae3o6 Page 3 of 68

Page 6: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ]SAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 14-0281 0 Title: 1/6/2015 Yes ESO-2101-0087; TP-2101- No None of the criteriaPOE - N/A Engineering Service Order ESO-2101-0087, Treatment Cart 0065 Rev 0 listed in 10 CFR

Description of Change: 70.72(c) are met.

ESO-2101-0087 to construct and use a treatment cart. TP-2101-0065 willbe used to conduct a leak test of the treatment cart and the connectingpiping, and condition the piping and valves.

Reason for the Change:Test the use of a treatment gas to reduce or eliminate contaminates.

FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria

PCE 14-01 26 1 Revision to Procedure ACD3-EG-205, Engineering Evaluations listed in 10 CER

Description of Change: 70.72(c) are met.

Revised to correct change evaluation form.

Reason for the Change:

To achieve compliance with change evaluation procedure.

FOE 14-0293 2 Title: 8/28/2015 No ACD3-EG-205 Chg 7 No None of the criteria

POE 14-01 26 2 Revision to Procedure ACD3-EG-205, Engineering Evaluations listed in 10 CFR

Description of Change: 70.72(c) are met.

This revision added revision descriptions to responses to questions lAand B.

Reason for the Change:To achieve compliance with change evaluation procedure.

FOE 14-0305 0 Title: 1/9/2015 No ACD2-EC-006 Chg 7 No None of the criteria

POE 14-01 32 0 Revision to Procedure ACD2-EC-006, NPDES Compliance Procedure listed in 10 CFRDescription of Change: 70.72(c) are met.

Changed terminology specifically acronym "ES&H" replaced with"Environmental" throughout the procedure and a form was reduced to onepage, deleting sections that were not applicable to American CentrifugePlant outfalls.

Reason for the Change:Clarify, procedure requirements.

NRC Report 2015 Pg f6Page 4 of 68

Page 7: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 14-0312 0 Title: 1/9/2015 No ACD2-EC-011 Chg 3 No None of the criteriaPOE 14-0137 0 Revision to Procedure ACD2-EC-01 1, Compliance with the Spill listed in 10 CFR

Prevention, Control and Countermeasures (SPCC) Plan 70.72(c) are met.

Description of Change:Replaced "ES&H" with "Environmental"; added a section that discussescode inspection responsibilities; added verbiage to contact the Plant ShiftSuperintendent and Senior Shift Supervisor when leaks or spills occur;and made minor editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 14-0326 0 Title: .12/31/2014 No FBP-EM-PRO-00026 Rev 4 No None of the criteriaPOE - N/A Revision to Procedure FBP-EM-PRO-00026, Severe Weather Response listed in 10 CFR

Description of Change:702()aemtGeneral procedure revision completes the periodic review, which updatesreferences; change periodic review date to one year; and made formatchanges.

Reason for the Change:Clarify procedure requirements.

FOE 15-0001 0 Title: 1/2/2015 No AC4-AR-006 Chg 29 No None of the criterialPOE - N/A Revision to Procedure A04-AR-006, Cascade Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Added new alarm response.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0003 0 Title: 1/12/2015 No ACD2-SP-019 Chg 8 No None of the criterialPOE 15-0002 0 Revision to Procedure ACD2-SP-019, Classified Information Systems listed in 10 CFR

Security Administration 70.72(c) are met.

Description of Change:Updated definitions and added a section regarding establishment ofclassified networks. These practices are currently already followed; thischange only commits them to writing.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Paeof6 Page 5 of 68

Page 8: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0003 1 Title: 3/2/2015 No ACD2-SP-019 Chg 8 No None of the cnterialPCE 15-0002 1 Revision to Procedure ACD2-SP-019, Classified Information Systems listed in 10 CFR

Security Administration 70.72(c) are met.

Description of Change:Change evaluation revised to clarify the Decrease EffectivenessEvaluation form.

Reason for the Change:To achieve compliance with change evaluation procedure.

FOE 15-0004 0 Title: 1/15/2015 No ACD4-UW-003 Chg 9 No None of the criterialPCE 15-0003 o Revision to Procedure ACD4-UW-003, Recirculating Heating Water listed in 10 CFR

Operations 70.72(c) are met.

Description of Change:The normal operating level in the expansion tank was changed from 3 to 9feet to 3 to 15 feet to allow greater leeway for controlling the expansiontank pressure; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0005 0 •Title: 1/15/2015 No ACD4-UW-001 Chg 15 No None of the criterialPOE 15-0004 0 Revision to Procedure ACD4-UW-001, Boiler Operations listed in 10 CFR

Description of Change: , 70.72(c) are met.Revised forms to raise the maximum expansion tank level parameter to 15feet; deleted unneeded out of service fuel oil system parameters; deletedthe boiler outlet temperature; added a Sunday eyewash station check; andmade formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0006 0 Title: 5/11/2015 No ACD4-CO-076 Chg 3 No None of the criterial

POE 15-0005 0 Revision to Procedure ACO4-CO-076, Operation of the X-301 2 HVAC listed in 10 CERSystem 70.72(c) are met.

Description of Change:Added steps to turn off breakers for chill water pumps; added a section toswitch chill water pumps; added warning boxes; added driver procedurenumber to a form; and updated logo.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 6 of 68

Page 9: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0008 0 Title: 2/11/12015 No ACD2-MP-006 Chg 0 No None of the criterialPCE 15-0008 0 New Procedure ACD2-MP-006, Site Technical Representative listed in 10 CFR

Description of Change: 70.72(c) are met.

This new procedure compiles the responsibilities of the site technicalrepresentative in the oversight of contractor activities. The procedureprovides sections applicable to the organization of site technicalrepresentative functions, controls during the performance of work,completion of work, reverse work authorizations, and the exiting ofcontractor personnel.

Reason for the Change:Site technical representative responsibilities are delineated in multipleprocedures and in many cases duplicated; the new procedure gives thesite technical representative a single references to ensure requirementsare implemented.

FCE 15-0010 0 Title: 1/14/2015 " Yes ESO-2400-0021 No None of the criterial

PCE 15-0009 0 Engineering Service Order ESO-2400-0021, Duplex Strainer installation in. listed in 10 CFRthe Cooling Tower Supply Line to the Chiller System, X-7725 70.72(c) are met.

Description of Change:installation of a 6 inch duplex strainer in the cooling supply line to the X-7725 chiller.

Reason for the Change:Excessive debris in the Tower Water Cooling supply to the chiller isimpacting condensers valves positions, indicating lack of water flow andaffecting the performance of the chiller. The installation of duplex strainerand piping modification is necessary for maintaining the proper flow to theX-7725 chiller and keeping the system operational.

FCE 15-0011 0 Title: 2/4/2015 Yes ESO-2201-0099 .No - None of the criterialPCE 15-0010 0 Engineering Service Order ESO-2201-0099, Replace Train 4 machine listed in 10 CFR

Cooling Water (MCW) System's pH Probe and Transmitter 70.72(c) are met.

Description of Change:Replaced the present Train 4 machine cooling water system's pH probeand transmitter, which will entail modifying the present piping near thepresent pH probe.

Reason for the Change:A more robust pH probe and transmitter is being installed due to thenumber of failures of the present pH probe.

NRC Report 2015 Pg f6Page 7 of 68

Page 10: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Re.Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0012 0 Title: 1/23/2015 Yes ESO-2400-0020 No None of the criterialPOE 15-0011 a Engineering Service Order ESO-2400-0020, 4 Inch Flange for X-3002 listed in 10 CFR

Expansion Tank 70.72(c) are met.

Description of Change:Bolted together a 4 inch flange with gasket on the existing flange; installeda short nipple onto the 4 inch flange; reduced down the opening from 4inch to 1.5 inch; added a nipple; and installed a 1.5 inch ball valve.

Reason for the Change:When filling the expansion tank, the vent line requires a thorough seal toensure a pressurized air bubble is maintained in the expansion tank. Thisbubble is established by completely draining the expansion tank with thevent valve open, then closing the vent valve prior to filling. The currentisolation valve is a 4 inch gate valve which can easily leak if not seatedproperly. A 1.5 inch bail valve will allow sufficient venting of the expansiontank and will also provide a better isolation to prevent air leakage.

FOE 15-0013 0 Title: 2/23/2015 No ACD2-MM-001 Chg 11 No None of the criterialPOE 15-0012 o Revision to Procedure ACD2-MM-001, Control of Material listed in 10 CFR

Description of Change: 70.72(c) are met.

This change included a notification of the Plant Shift Superintendent in theevent of a leak/spill of hazardous material and included actions for SafetyData Sheets received with a shipment.

Reason for the Change:Clarify procedure requirements.

FCE 15-0014 0 Title: 1/26/2015 No ACD2-EC-007 Chg 9. No None of the criterialPOE 15-0013 0 Revision to Procedure ACD2-EC-007, Waste Management listed in 10 CFR

Description of Change: 70.72(c) are met.

Added guidelines for establishing Waste AccumulationlStorage Areas.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0015 0 Title: 2/2/2015 No AC4-AO-008 Chg 0 No None of the criterialPOE - N/A New Procedure AC4-AO-008, (U) AO100/1 007100 Machine Assembly listed in 10 CFR

Description of Change: 70.72(c) are met.

New procedure and form was developed.

Reason for the Change:A new procedure and form was required for AC1 00/1007100 machineassembly.

NRC Report 2015Paeof6 Page 8 of 68

Page 11: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FCE 15-0016 0 Title: 2/2/2015 No AC4-AO-009 Chg 0 No None of the criterialPCE - N/A New Procedure AC4-AO-009, (U) AC1 00/1 0071 00 Machine Disassembly listed in 10 CFR

Description of Change: 70.72(c) are met.

New procedure and form was developed.

Reason for the Change:A new procedure and form was required for AC1 00/1 0071 00 machinedisassembly.

FOE 15-0017 0 Title: 1/21/2015 No FBP-EM-PRO-00026 Rev 5 No None of the criterial

POE - N/A Revision to Procedure FBP-EM-PRO-00026, Severe Weather Response listed in 10 CFRDescription of Change: 70.72(c) are met.

Revised procedure to change "WATCH' to W•ARNING".

Reason for the Change:

Clarify procedure requirements.

FOE 15-0019 0 Title:. 1/27/2015 No A04-OP-067 Chg 15 No None of the criterial

POE - N/A Revision to Procedure AC4-OP-067, Operations of the Distributed Control -listed in 10 CFRSystem (DOS) 70.72(c) are met.

Description of Change:Added procedural step in section 7.3 to press the "Shut Down.."button toreboot the computer; clarified the scope of the procedure; added areference; and corrected the first use acronyms throughout the procedure.

Reason for the Change:Clarify procedure requirements.

FOE 15-0020 0 Title: 1/29/2015 No AC4-OP-032 Chg 13 No None of the criterial

POE - N/A Revision to Procedure AC4-OP-032, Connection/Disconnection of UF6 listed in 10 CFRCylinder to/from a Feed Cart 70.72(c) are met.

Description of Change:•Deleted requirement to perform Items Relied On For Safety surveillance,as it does not apply to feed cylinders; deleted the prerequisite step toperform a cylinder inspection; and moves the cylinder inspection to providea more logical order of operations.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Pg f6Page 9 of 68

Page 12: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FOE 15-0021 0 Title: 1/28/2015 No AC4-OP-006 Chg 17 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-006, MOW Chemical Addition listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps; clarified which chemicals are not to be added via SideStream filter; added water collection points in Step 7.8.3.A; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0022 0 Title: 1/28/2015 No AC4-OP-003 Chg 23 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-003, Machine Cooling Water Normal listed in 10 CFR

Operations 70.72(c) are met.

Description of Change:Deleted and modified steps; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0023 0 Title: 1/27/2015 No ACD2-EG-003 Chg 11 No None of the criterialPOE 15-0015 0 Revision to Procedure ACD2-EG-003, Nuclear & Commercial Modification listed in 10 CFR

Controls 70.72(c) are met.

Description of Change:Added a form to the procedure; revised Appendix 0 and forms; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0025 0 Title: 2/9/2015 Yes ESO-2901 -0007 No None of the cnterialPOE 15-0016 o Engineering Service Order ESO-2901-0007, X-3000 Switchgear listed in 10 OFR

Refurbishment HVAC 70.72(c) are met.

Description of Change:Replaced existing pneumatic controls with electronic controls; replacedexisting pneumatic actuators with electronic spring return actuators; andinstalled additional electric heat in the ductwork.

Reason for the Change:The X-3000 Switchgear Room HVAC pneumatic controls were abandonedprior to the American Centrifuge Plant acquisition of the facility. Updatesto this system will ensure operational reliability, and allow the facility to beexposed to improved environmental conditions.

NRC Report 2015Pae1of6 Page 10 of 68

Page 13: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-0026 0 Title: 2/9/2015 Yes ESO-31 0402-0003 No None of the criterialPCE 15-0017 0 Engineering Service Order ESO-31 0402-0003, X-5000 Switchgear listed in 10 CFR

Refurbishment HVAC 70.72(c) are met.

Description of Change:Replaced existing pneumatic controls with electronic controls; replaced theexisting pneumatic actuators with electronic spring return actuators; andinstalled electric heat installed in the ductwork.

Reason for the Change:The X-5000 Switchgear Room HVAC pneumatic controls were abandonedprior to the American Centrifuge Plant acquisition of the facility. Updatesto this system will ensure operational reliability and allow the facility to beexposed to improved environmental conditions.

FCE 15-0027 0 Title: 2/4/2015 Yes ESO-2409-0074 No None of the cditerialPCE 15-0018 0 Engineering Service Order ESO-2409-0074, X-6001 Staircase Foundation listed in 10 CFR

Description of Change: 70.72(c) are met.

Removed existing foundation and sidewalks, excavated soil, and laid theconcrete pad for the staircase foundation for the X-6001 cooling towers.

Reason for the Change:Due to the size of the X-6001 cooling towers, there should be two sets ofstairs that allow access to the top of the towers.

FCE 15-0028 0 Title: 2/5/2015 No AC4-OP-059 Chg 8 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-059, Purge Vacuum / Evacuation Vacuum listed in 10 CFR

Chemical Trap Operations 70.72(c) are met.

Description of Change:Provided for prerequisites to perform steps relating to alumina removaland addition; added reference to the instrument air valve whic:h feeds thechemical traps purge pressurization system: clarified requirements forItems Relied On For Safety surveillances in the event alumina media fillwill not immediately follow alumina media removal; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae1of6 Page 11 of 68

Page 14: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FCE 15-0029 0 Title: 2/4/2015 No OA-CS-131-15-003 Rev 0 No None of the criterialPCE - N/A New Cascade Settings Document OA-CS-131-15-003, (U) Cascade 131 listed in 10 CFR

Cascade Operating Parameters 70.72(c) are met.

Description of Change:Revised the settings due to changes in cascade configuration andchanges in test conditions.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

FCE 15-0030 0 Title: 2/9/2015 Yes ESO-2201 -0097 No None of the criterialPCE 15-0019 0 Engineering Service Order ESO-2201-0097, Generator Full Load Test listed in 10 CFR

Terminal Box 70.72(c) are met.

Description of Change:Fabricated and installed a terminal box at the end of the auxiliary standbygenerator switchgear and installed remote weld receptacles for attachingload boxes in order to perform load tests on the auxiliary standbygenerators.

Reason for the Change:Prior, there was no convenient means to perform load tests on theauxiliary standby generators to maintain reliability.

FCE 15-0033 0 Title: 2/11/2015 No SP-2605-0005 Chg 20 No None of the cnterialPOE 15-0022 0 Revision to SP-2605-0005, American Centrifuge Program Classified listed in 10 CFR

Matter Protection and Control Manual (CMPC) 70.72(c) are met.

Description of Change:Clarified requirements; revised Appendix E; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0034 0 Title: 4/1/2015 No ACD2-SH-017 Chg 5 No None of the criterial

POE 15-0023 o Revision to Procedure ACD2-SH-017, Accident Prevention?/ Equipment listed in 10 CFRControl Tags 70.72(c) are met.

Description of Change:Changed the "Issuing Authority" to "Facility Custodian/EquipmentOwner/designee"; added caveat for tagging if tag cannot be used; addednotification requirement for tag removal; clarified actions for missing tag;and made minor editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 12 of 68

Page 15: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Re.Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0035 0 Title: 2/12/2015 Yes ESO-2301-0062 No None of the criterialPCE 15-0024 0 Engineering Service Order ESO-2301-0062, X-7725/7726 002 Monitors listed in 10 CFR

Description of Change: 70.72(c) are met.

Installed carbon dioxide monitors in the return duct of the air handlers forthe American Centrifuge Plant office areas.

Reason for the Change:The installation of the carbon dioxide monitors will ensure the systemdampers will be controlled by carbon dioxide concentration levelsdecreasing the amount of wet air brought in, and at the same time controlthe air quality to an acceptable level.

FCE 15-0036 0 Title: 3/4/2015 No AC3-FO-002 Ohg 0 No None of the criterialPCE - N/A New Procedure AC3-FO-002, Out of Service/Inoperable IROES System, listed in 10 CFR

Structure, & Component Tracking 70.72(c) are met.

Description of Change:Developed and implemented new procedure.

Reason for the Change:The process outlined in this procedure provides guidelines that will confirmrequirements, such as post-maintenance testing, are successfullyperformed to assure Items Relied On For Safety related systems,structures, and components will perform their intended safety function(s)following maintenance or testing activities.

FOE 15-0037 0 Title: 7/1/2015 No ACD2-SP-034 Chg 6 No None of the criterialPOE 15-0025 o Revision to Procedure to ACD2-SP-034, Portal Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Modified the status of the X-1107BV Interconnecting Portal and revisedrequirements to add clarity.

Reason for the Change:Changes were made as a result of the NRC approved change of theInterconnecting Portal and to clarify procedure requirements.

FOE 15-0038 0 Title: 2/17/2015 No AC4-OP-003 Chg 24 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-003, Machine Cooling Water Normal listed in 10 CFR

Operations 70.72(c) are met.

Description of Change:This change modified venting of machine cooling water to allow cycling ofvent valves to remove air; deleted steps: and made editorial and formattingchanges.

Reason for the Change:ClarifyJ procedure requirements.

NRC Report 2015Pae1of6 Page 13 of 68

Page 16: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0039 0 Title: 2/17/2015 No AC4-OP-005 Chg 17 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-005, Lead Cascade Instrument Air listed in 10 CFR

Operations 70.72(c) are met.

Description of Change:Added a valve to Appendix A and a section; revised steps; and updated aprecaution to be consistent with other procedures.

Reason for the Change:Clarify procedure requirements.

FOE 15-0040 0 Title: 3/2/2015 No ACD3-SP-036 Chg 9 No None of the crdterialPOE 15-0026 0 Revision to Procedure ACD3-SP-036, Post Orders listed in 10 CFR

Description of Change: 70.72(c) are met.

Added action steps and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0041 0 Title: 3/18/2015 Yes ESO-2501-0018 N o None of the criterialPOE 15-0027 0 Engineering Service Order ESO-2501-0018, Install New Driveway Alarm at listed in 10 CFR

X-1 1O7DV Vehicle Portal 70.72(c) are met.

Description of Change:Installed a new driveway alarm in the X-1 107DV vehicle portal (D-VehiclePortal).

Reason for the Change:This alarm will signal when a vehicle is requesting access into theControlled Access Area.

FOE 15-0042 0 Title: 2/26/2015 No FBP-EM-PRO-00026 Rev 6 No None of the criterialPOE - N/A Revision to Procedure FBP-EM-PRO-00026, Severe Weather Response listed in 10 CFR

Description of Change: 70.72(c) are met.

Made formatting changes.

Reason for the Change:To format procedure in accordance with Fluor-B&W Portsmouth, LLCformatting guidelines.

NRC Report 2015 Pg 4o6Page 14 of 68

Page 17: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FCE 15-0043 0 Title: 2/22/2015 No OA-CS-131-15-003 Rev 1 No None of the criterialPCE - N/A Revision to Cascade Settings Document OA-CS-131-15-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:Revised to change the settings due to changes in cascade configurationand changes in test conditions.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

FCE 15-0044 0 Title: 3/10/2015 No ACD2-SP-010 Chg 5 No None of the criterialPCE 15-0028 0 Revision to Procedure ACD2-SP-010, Control of Classified Repositories listed in 10 CFR

Description of Change: 70.72(c) are met.

This change redefined Record of Combination to align with the ClassifiedMatter Protection Control Plan; redefined periodicity of combinationchanges; and clarified duties and responsibilities.

Reason for the Change:Clarify procedure requirements.

FCE 15-0044 1 Title: 11/12/2015 No ACD2-SP-010 Chg 5 No None of the criterialPCE 15-0028 1 Revision to Procedur'e ACD2-SP-010, Control of Classified Repositories listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised to correct minor issues with the procedure change forms.

Reason for the Change:

To achieve compliance with procedure process requirements.

FCE 15-0044 2 Title: 11/17/2015 No ACD2-SP-010 Chg 5 No None of the criterialPCE 15-0028 2 Revision to Procedure ACD2-SP-010, Control of Classified Repositories listed in 10 CFR

Description of Change: 70.72(c) are met.This revision corrects the revision numbers listed on the change evaluationform to the most recent version; added the decreased effectivenessevaluation form; and added description of change for revisions 1 and 2.

Reason for the Change:To achieve compliance with change evaluation procedure.

NRC Report 2015 Pg 5o6Page 15 of 68

Page 18: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FOE 15-0045 0 Title: 4/1/2015 No ACD2-SH-020 Chg 2 No None of the criterialPCE 15-0029 0 Revision to Procedure ACD2-SH-020, Safety Signs and Boundaries listed in 10 CFR

Description of Change: 70.72(c) are met.Re-arranged procedure content for ease of understanding and flow; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0046 0 Title: 2124/2015 No A04-AR-001 Chg 41 No None of the criteria[POE - N/A Revision to Procedure AC4-AR-001, Machine Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.Added steps for restoration for a series of fault conditions and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0047 0 Title: 2/24/2015 No AC4-AR-101 Chg 13 No None of the criterialPOE - N/A Revision to Procedure A04-AR-101, Cascade 131 Machine Alarms and listed in 10 CFR

Responses 70.72(c) are met.

Description of Change:Added steps for restoration for a series of fault conditions and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae1of6 Page 16 of 68

Page 19: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. _ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0049 0 Title: 7/6/2015 No ACP/LCF License No None of the cnterialPCE 15-0031 0 Revision to the ACP/LCF License Applications and Supporting Documents Application, Cover, Table of listed in 10 CFR

to Update Titles and Responsibilities and Other Editorial Changes Contents, Sections 2.0, 2.1, 70.72(c) are met.Description of Change: 4.2, 4.3, Figure 2.1-1; ACPChanged logo on cover pages; deleted Vice President, Enrichment Fundamental NuclearOperations and combined the description responsibilities with the Vice Secteia ont3.1; APLaFnQualityPresident, American Centrifuge; revised the reporting matrix for the Vice ASsrneto 3.;AP/lan DescriptioPresident, American Centrifuge to the Chief Executive Officer; revised title CoveraSctionsn 1.2,ri5.0,and responsibilities of Director, Nuclear Safety and Safeguards to Director, Figues, 1.1-1iand 1.12,;.0Regulatory Affairs; removed Information Technology as a responsibility for APCFig Security1 Program-2Plant Services Manager; removed multiple Oak Ridge titles and SectionF 2.3; it A PEmrogencyresponsibilities from the License Application; and made other editorialPlnCvr Section 4.1 C Eegecchanges.PanovSetn4.

Reason for the Change:Changes were made to the organizational structure to align to currentoperations.

FCE 15-0049 1 Title: 7/28/2015 No ACP/LCF License No None of the criterialPCE 15-0031 1 Revision to the ACP/LCF License Applications and Supporting Documents Application, Cover, Table of listed in 10 CFR

to Update Titles and Responsibilities and Other Editorial Changes Contents, Sections 2.0, 2.1, 70.72(c) are met.Description of Change: 4.2, 4.3, Figure 2.1-1; ACPIncluded the proposed change of the Security Program Figure 2-13 that Fundamental Nuclearwas inadvertently omitted; corrected header for the Fundamental Nuclear SecteiaConto 3.;APlCFnQualityMaterial Control Plan; and corrected Question 2 on the decreased ASsrneto 3.;AP/Lan Descriptioeffectiveness evaluation form. CoveraSctionsn 1.2,ri5.0,

Reason for the Change: Figures 1.1-1 and 1.1-2;To achieve compliance with change evaluation procedure. ACP/LCF Security Program

Section 2.3 and Figure 2-13;ACP Emergency Plan Cover,Section 4.1

NRC Report 2015Pae1of6 Page 17 of 68

Page 20: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval* Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0050 0 Title: 8/12/2015 Yes ESO-2412-0015 No None of the criterialPOE 15-0032 0 Engineering Service Order ESO-2412-0015, Addition of YA Airline to X- listed in 10 CFR

5000 High Voltage Duct Air Buffer System 70.72(c) are met.

Description of Change:Modified the air buffer system for the overhead transfer lines from X-5001Substation to the X-5000 Switchgear House and added an instrument airheader along the inside of X-5000 Switchgear Room to provide instrumentair as the air buffer to the buses.

Reason for the Change:To address an issue of multiple failures associated with an individualcompressor and filter system, which provides buffer air to each individualbus. This change will provide a more reliable source of air to the buses,as well as, reducing the need for maintenance.

FOE 15-0051 0 Title: 3/12/2015 Yes ESO-2201-0098 No None of the criterialPOE 15-0033 0 Engineering Service Order ESO-2201-0098, Installation of Vent Line and listed in 10 CFR

Air Filter on X-3001 North and South Air Receiver Tanks 70.72(c) are met.

Description of Change:Installed a vent line and small screwed sintered metal type filter on the X-3001 North and South air receiver tanks.

Reason for the Change:The installation of the vent line with a filter provides a safe vent path toeliminate the possibility of blowing debris/dust out of the drain line into thesurrounding work area.

FOE 15-0052 0 Title: 3/4/2015 No AC4-OP-023 Chg 20 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-023, Machine Transport and Installation listed in 10 CFR

Description of Change: 70.72(c) are met.Removed verification of calibration date on Wyler BlueLevels and clarifiedthe definition of a non-operational machine.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae1of6 Page 18 of 68

Page 21: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0053 0 Title: 3/9/2015 No AC2-RG-071 Chg 11 No None of the criterialPCE - N/A Revision to Procedure AC2-RG-071, Nuclear Material Control and listed in 10 CFR

Accountability (NMC&A) for the American Centrifuge Lead Cascade 70.72(c) are met.

Description of Change:Added steps to allow the receipt of UF6 clean empty cylinders (thosecontaining no heels) or cylinders that have been cleaned, washed, andhave a cleaning certificate or hydrostatic recertification, without obtainingnon-destructive enrichment results.

Reason for the Change:Clarify procedure requirements.

FCE 15-0054 0 Title: 3/18/2015 No ACD2-EC-007 Chg 10 No None of the criterialPCE 15-0034 o Revision to Procedure ACD2-EC-007, Waste Management lse n1 F

Description of Change:702()aemt

Added the requirement to contact the Plant Shift Superintendent upondiscovery of a spill or leak; and made editorial, formatting, and clarificationchanges.

Reason for the Change:Clarify procedure requirements.

FCE 15-0055 0 Title: 3/10/2015 No OA-CS-131-15-003 Rev 2 No None of the criterialPCE - N/A Revision to Cascade Settings Document OA-CS-131-15-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:Cascade settings document was revised to change the settings due tochanges in cascade configuration and changes in test conditions.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

FCE 15-0057 0 Title: 3/12/2015 No A04-OP-026 Chg 13 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-026, Machine Connections Leak Checking lse n1 F

Description of Change:702()aeet

Added conditions to allow the Shift Supervisor to forego leak check of anitem that is inaccessible or impractical; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Pg 9o6Page 19 0f68

Page 22: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0058 0 Title: 3/13/2015 Yes ESO-2201-0100 No None of the criterialPOE - N/A Engineering Service Order ESO-2201-0100, Evaluation of Assembling and listed in 10 CFR

Operating Reworked Machines 70.72(c) are met.

Description of Change:To return reworked machines to cascade operations, through a "Use As Is"disposition.

Reason for the Change:The primary function of the hardware is to facilitate pre-operation setupand verification of the machine when installed in the cascade. The valueof this function does not justify the resources required to replace defectivehardware in a rework machine, in the current mode of operation.

FOE 15-0059 0 Title: 3/16/2015 Yes ESO-2409-0053; ESO-2409- No None of the criterialPOE 15-0036 0 Engineering Service Orders ESO-2409-0053, Modify Air Start System Air 0072 listed in 10 CFR

Supply in the X-6000 and ESO-2409-0072, X-6000 Air Start System 70.72(c) are met.Modifications

Description of Change:Modified the air start system to prevent and eliminate water condensatewithin the system; relocated and installed additional equipment, piping,valves, instrumentation, and other associated equipment and materials.

Reason for the Change:This change will enable a reliable, clean, and dry supply of compressed airto ensure that standby power and pumping systems are reliable and willstart when necessary.

FOE 15-0060 0 Title: 3/27/2015 No ACD2-SH-016 Chg 8 No None of the criterialPOE 15-0037 0 Revision to Procedure ACD2-SH-016, Reporting Occupational Fatalities, listed in 10 CFR

Injuries and Illnesses 70.72(c) are met.

Description of Change:Added guidance for Senior Shift Supervisor to complete applicable sectionof a form; revised step to clarify that Industrial Safety to perform or assistin performance of investigations of workplace events involvingOccupational Safety and Health Administration recordable injury or illnessupon request; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pge2of6 Page 20 of 68

Page 23: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-0061 0 Title: 3/17/2015 No AC4-AR-004 Chg 21 No None of the criterialPCE - N/A Revision to Procedure AC4-AR-004, Purge Vacuum System Alarms and listed in 10 CFR

Responses 70.72(c) are met.

Description of Change:Deleted pump casing temperature; added high pump vibration; rewordedsections; added amplifying information; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

FOE 15-0062 0 Title: 3/19/2015 No AC4-AO-006 Chg 12 No None of the criterialPCE - N/A Revision to Procedure AC4-AO-006, (U) AC100/1005100 Machine listed in 10 CFR

Assembly 70.72(c) are met.

Description of Change:Deleted reference to non-value added quality hold points and signatures.

Reason for the Change:Quality hold points were previously added to the procedure to beconsistent with American Centrifuge Manufacturing, LLC practices, but arenot required by Centrus procedure process, quality system, or engineeringspecifications.

FOE 15-0063 0 Title: 3/18/20 15 No AC4-OP-008 Chg 7 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-008, Operation of X-3001 and X-7727H listed in 10 CFR

HVP Systems 70.72(c) are met.

Description of Change:Added reference to the new manual damper control for the process areaheating and pressurization units and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0064 0 Title: 3/26/2015 No ACD2-EC-010 Chg 7 No None of the criterialPOE 15-0038 o Revision to Procedure ACD2-EC-010, Air Compliance Program listed in 10 CFR

Description of Change:702()aemt

Added an explicit prohibition on installation or construction of a sourcerequiring National Emission Standards for Hazardous Air Pollutants'permission to construct until permission is obtained; added a form; andmade formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 21 of 68

Page 24: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-0065 0 Title: 3/23/2015 Yes ESO-310109-0002 No None of the criterialPOE 15-0039 0 Engineering Service Order ESO-310109-0002, American Centrifuge listed in 10 CFR

Roofing Project 70.72(c) are met.

Description of Change:Repaired roofs for the American Centrifuge buildings.

Reason for the Change:The existing roofs are in poor condition resulting in several leaks in variousplaces.

FCE 15-0065 1 Title: 5/20/2015 No ESO-31 0109-0002 No None of the criterialPCE 15-0039 1 Engineering Service Order ESO-31 01 09-0002, American Centrifuge listed in 10 CFR

Roofing Project 70.72(c) are met.

Description of Change:Deleted the revision number after Statement of Work.

Reason for the Change:The Statement of Work revision number does not need to be included indescription of work to be performed.

FOE 15-0065 2 Title: 6/24/2015 No ESO-310109-0002 No None of the criterialPCE 15-0039 2 Engineering Service Order ESO-31 01 09-0002, American Centrifuge listed in 10 OFR

Roofing Project 70.72(c) are met.

Description of Change:Changed Title and Description of Change on the change evaluation form.

Reason for the Change:To achieve compliance with change evaluation procedure.

FOE 15-0066 0 Title: 4/14/2015 Yes ESO-2201-0103 No None of the criterialPOE 15-0040 0 EngIneering Service Order ESO-2201-0103, Install Circuit Breaker within listed in 10 CFR

Distribution Panel 70.72(c) are met.

Description of Change:Removed existing breaker supplying the uninterrupted power supplybattery room exhaust fan and installed a breaker within distribution panelin an effort to configure panel for future American Centrifuge Plantexpansion of electrical loads.

Reason for the Change:To correct the over current protection device for this application.

NRC Report 2015Pae2of6 Page 22 of 68

Page 25: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0068 0 Title: 3/25/2015 No AC2-EG-010 Chg 7 No None of the criterialPCE - N/A Revision to Procedure AC2-EG-01 0, Nuclear Criticality Safety Program listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised a step; added use references; revised scope of change; revisedacronyms; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0069 0 Title: 3/25/2015 Yes ESO-2501-0013 No None of the criterialPCE 15-0042 0 Engineering Service Order ESO-2501-0013, Addition of Administrative listed in 10 CFR

Security Cameras 70.72(c) are met.

Description of Change:Installed a new security camera that will be connected through existingpenetrations, conduit runs, and partially through new conduit.

Reason for the Change:This is a pre-requisite to shared site notice FBP-14-010, Change ofOperators of the X-1107BV Interconnecting Portal.

FOE 15-0070 0 Title: 3/26/2015 Yes ESO-2412-0016 No None of the criterialPOE 15-0043 o Engineering Service Order ESO-2412-0016, X-530G Exterior Lighting listed in 10 CFR

Description of Change:702()aemt

Installed exterior lights near the two building entrance doors at the X-530Gfacility.

Reason for the Change:The addition of automatic lighting will improve safe travel through theareas around the two building entrances.

FOE 15-0071 0 Title: 3/25/2015 No AC4-OP-025 Chg 46 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-025, Machine Connections lse n1 F

Description of Change:702()aemt

Added step to ensure Area Control Room Operator enters the machineserial number on the distributed control system machine screen forCascade 131 operations; added steps to direct actions for error codes;and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae2of6 Page 23 of 68

Page 26: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0072 0 Title: 312612015 No ACD2-EG-005 Chg 17 No None of the criterialPCE 15-0044 0 Revision to Procedure ACD2-EG-005, Preparation of Statements of Work listed in 10 CFR

Description of Change: 70.72(c) are met.Added clarification for the formatting, storage, and requirementsassociated with statements of work; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

FOE 15-0074 0 Title: 3/26/2015 Yes ESO-2409-0028 No None of the criterialPOE 15-0045 0 Engineering Service Order ESO-2409-0028, X-6000 TWVC Diesel Driver listed in 10 CFR

Engine Access Platform 70.72(c) are met.

Description of Change:Fabricated and installed new access platforms for the two diesel driverengines in the X-6000. These platforms will allow for access to theengines for both operations and maintenance groups to perform regularfunctions on the engine.

Reason for the Change:Currently, operations and maintenance technicians have to use a climbingharness to access the engines. This will improve the safety of thetechnicians when performing these tasks.

FOE 15-0075 0 Title: 4/8/2015 No ACD4-C[-002 Chg 3 No None of the criterialPCE 15-0046 0 Revision to Procedure ACD4-Cl-002, inspection of Aerial Work Platforms listed in 10 CFR

Description of Change: 70.72(c) are met.Added personal protective equipment and portable eyewash stationrequirements for battery room inspections; and revised forms.

Reason for the Change:Clarify procedure requirements.

FOE 15-0076 0 Title: 4/8/2015 No ACD4-Cl-006 Chg 2 No None of the criterialPOE 15-0047 o Revision to Procedure ACD4-CI-006, Inspection of Powered Industrial listed in 10 CFR

Trucks 70.72(c) are met.

Description of Change:Added personal protective equipment and portable eyewash stationrequirements for battery room inspections; and revised form.

Reason for the Change:.Clarify procedure requirements.

NRC Report 2015Pae2of6 Page 24 of 68

Page 27: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. iSAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0077 0 Title: 4/8/2015 No ACD4-CI-010 Chg 2 No None of the criterialPCE 15-0048 o Revision to Procedure ACD4-CI-010, Inspection, Service and Issuance of listed in 10 CFR

Portable Eyewashes 70.72(c) are met.

Description of Change:Added a requirement to wear hearing protection when using aircompressors; and added verbiage that portable eyewashes are to betracked on a form.

Reason for the Change:Clarify procedure requirements.

FOE 15-0078 0 Title: 3/27/2015 No AC4-OP-015 Chg 29 No None of the criterial

POE - N/A Revision to Procedure AC4-OP-015, Sample Cart Operation listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted section and steps; and made editorial and formatting changes.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0079 0 Title: 3/30/2015 Yes ESO-2409-0024 No None of the criterial

POE 15-0049 0 Engineering Service Order ESO-2409-0024, X-6000 Cone Valve Actuator listed in 10 CFRReplacement, Support Pier Repair, and Lifting Support Mount Installation 70.72(c) are met.

Description of Change:Replaced the existing cone valve actuators with larger ones; installedmounting bolts for floor reinforcement for the cone valve removal; andinstalled and repaired piers that support the cone valves.

Reason for the Change:The cone valve actuators that were initially installed were undersized forthe 8pplication. This engineering service order will replace theseactuators for appropriate sized ones and perform other necessary repairs.

FOE 15-0080 0 Title: 3/31/2015 No ACD2-SP-004 Chg 10 No None of the criterial

POE 15-0050 0 Revision to Procedure ACD2-SP-004, Pre-Employment Security Screening listed in 10 CFR

Description of Change: 70.72(c) are met.

Added DOE Optional Form 306; replaced DOE Form OR5632.1A withOR206.2; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pge2of6 Page 25 of 68

Page 28: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-0081 0 Title: 4/2/2015 No AC4-OP-001 Chg 38 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-001, Purge Vacuum Normal Operating listed in 10 CFR

Procedure 70.72(c) are met.

Description of Change:Added cascades 132 and 135 for procedural applicability; addeddiscussion of new personal protective equipment requirements: and madeformatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0082 0 Title: 4/212015 No AC4-OP-002 Chg 26 No None of the crdterialPCE - N/A Revision to Procedure AC4-OP-002, Evacuation Vacuum Normal lse n1 F

Operating Procedure 70.72(c) are met.

Description of Change:This change clarified Train 3 to the procedure's applicability; addeddiscussion of new personal protective equipment requirements; and madeformatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0083 0 Title: 4/13/2015 Yes ESO-2541-0007 No None of the criterialPOE 15-0051 o Engineering Service Order ESO-2541 -0007, ME-0100 Trailer Mounted lse n1 F

Generator and Diesel Fuel Above Ground Storage Tank, Fuel Tank 70.72(c) are met.Replacement

Description of Change:Replaced a 1,000 gallon diesel fuel above ground storage tank for the ME-0100 Trailer Mounted Generator System.

Reason for the Change:The 1,000 gallon tank that is currently mounted on the trailer is leakingand will be replaced with a new on-hand 1,000 gallon Fireguard DieselFuel Above Ground Storage Tank that meets current fire codes and safetyrequirements.

FOE 15-0084 0 Title: 4/8/2015 No AC4-ST-002 Chg 1 No None of the criterialPOE 15-0054 0 Revision to Procedure AC4-ST-002, Surveillance and Adjustment of lse n1 F

Battery Room Detectors 70.72(c) are met.

Description of Change:Revised sections and added notes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 26 of 68

Page 29: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FOE 15-0085 0 Title: 4/8/2015 No ACD4-Cl-007 Chg 3 No None of the criterialPOE 15-0052 0 Revision to Procedure ACD4-CI-007, Inspection of Cranes and listed in 10 CFR

Hoisting/Lifting Equipment 70.72(c) are met.

Description of Change:Clarified step that during a visual inspection no attempt should be made todisassemble equipment and component other than opening doors andcovers; revised forms; added documentation of welded link load chainstretch calculation; and added line to document the associated work ordernumber.

Reason for the Change:Clarify procedure requirements.

FOE 15-0086 0 Title: 4/23/2015 No OA-CS-131-15-003 Rev 3 No None of the criterialPOE - N/A Revision to Cascade Settings Document OA-CS-131-15-003, (U) Cascade listed in 10 CFR

131 Cascade Operating Parameters 70.72(c) are met.

Description of Change:Revised cascade operating settings.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

FOE 15-0088 0 Title: 5/4/2015 No ACD2-MA-002 Chg 14 No None of the criterialPOE 15-0055 0 Revision to Procedure ACD2-MA-002, Work Control Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Restructured the procedure for better process flow; clarified requirementsthroughout the procedure; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0089 0 Title: 4/16/2015 No ACD2-EG-001 Chg 6 No None of the criterialPOE 15-0056 0 Revision to Procedure ACD2-EG-001, Request for Engineering Services listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised a form by replacing technical review signature with engineeringmanagement signature; added steps to update engineering service orderdatabase throughout performance of engineering service order process;and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae2of6 Page 27 of 68

Page 30: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0090 0 Title: 4/24/2015 No ACD2-PS-003 Chg 7 No None of the criterialPCE 15-0057 0 Revision to Procedure ACD2-PS-003, Forms Control listed in 10 CFR

Description of Change: 70.72(c) are met.Clarified that forms can have only one driver procedure and the driverprocedure must be processed through the change evaluation process ifthe form implements any regulatory requirement: and made formattingchanges.

Reason for the Change:Clarify procedure requirements.

FOE 15-0091 0 Title: 412112015 No AC4-AO-008 Chg 1 No None of the criterialPOE - N/A Revision to Procedure A04-AO-008, (U) AC1 00/1 0071 00 Machine listed in 10 CFR

Assembly 70.72(c) are met.

Description of Change:Deleted reference to non-value added quality hold points and signatures.

Reason for the Change:Quality hold points were previously added to the procedure to beconsistent with American Centrifuge Manufacturing LLC practices, but arenot required by Centrus procedure process, quality system, or engineeringspecifications.

FOE 15-0092 0 Title: 4/19/2015 No A04-OP-177 Chg 8 No None of the criterialPOE - N/A Revision to Procedure A04-OP-1 77, Cascade 131 Tails Scoop Verification listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised multiple sections to clarify when the use of an operationsdiagnostic unit cart may not be required. Others changes were made forbetter flow of operation and more efficient use of UF6.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae2of6 Page 28 Of 68

Page 31: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FCE 15-0093PCE - N/A

0Title:Removal of Machine Isolation Valves as a Lead Cascade Facility ItemsRelied On For Safety

Description of Change:Removed the machine isolation valves from being a credited Items ReliedOn For Safety in the LCF's Integrated Safety Analysis.

Reason for the Change:When the LCF's Integrated Safety Analysis was developed, crediblerelease events were established and the machine isolation valve setswere assumed to be present and would serve to minimize the Material AtRisk to be released. The LCF's Integrated Safety Analysis credits themachine isolation valve sets as Items Relied On For Safety for a numberof events for this purpose. Engineering Evaluation, EE-2101-0066,evaluated the effect of the machine isolation valves either not beingpresent or not working as designed. The current release quantities andrelease rates assumed for the Integrated Safety Analysis events thatcredit the machine isolation valves as Items Relied On For Safety remainbounding of an actual release whether the machine isolation valvesfunction or not. Therefore, it was concluded that the machine isolationvalves were not required to be credited as Items Relied On For Safety tomeet the performance requirements of 10 CFR Part 70.

9/16/2015 No EE-2101-0056; LOFIntegrated Safety Analysis,LCF Integrated SafetyAnalysis Summary, LCFIntegrated Safety AnalysisSummary [Redacted]Sections 3.6, 6.1, 6.2, and7.3, Tables 7.2-1 and C-1

Yes None of the criteriallisted in 10 CFR70.72(c) are met.

FOE 15-0094 0POE 15-0058 0

Deascriptiontof Change:

and oreplnaceaNMlae series A3000 Photohelic differential proiebytessure

sitch/gaugewthorue.I addtotepooe new instrument mountingpae/odsemlan

pnew/NEMA 4atedsery ies Arovide Phtoedcdifferl

ential proessure.

5/11/2015 Yes ESO-2201-0108 No None of the criteriallisted in 10 CFR70.72(c) are met.

Reason for the Change:The original series A3000 Photohelic switch/gauge provided by the aircompressors manufacturer was only rated for a NEMA 1 application(general-purpose, indoor use only). The X-3001 Auxiliary AirOompressor's air intake filter is located outside, thus the correctswitch/gauge for this application is a NEMA 4 rated unit (watertight,indoor/outdoor use). In addition, the proposed new instrument mountingpanel/hood assembly will provided additional weather protection.

NRC Report 2015Pae2of6 Page 29 of 68

Page 32: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-0095 0 Title: 4/24/2015 No AC4-AR-005 Chg 24 No None of the criterialPCE - N/A Revision to Procedure AC4-AR-005, Instrument Air and Vent Monitor listed in 10 CFR

Alarms and Responses 70.72(c) are met.

Description of Change:Implemented a changed to valving used to isolate the X-3001 from theoutside air supply; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0096 0 Title: 4/28/2015 No AC3-OP-018 Chg 7 No None of the criterialPCE - N/A Revision to Procedure AC3-OP-018, RMC Routine Checks listed in 10 CFR

Description of Change: 70.72(c) are met.

Reworded several steps to ensure clarity and proper flow; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0097 0 Title: 4/29/2015 No AC4-AR-012 Chg 8 No None of the cnterialPCE - N/A Revision to Procedure AC4-AR-012, Power System Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.Added warning boxes cautioning against arc flash to alarm responsesections; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0098 0 Title: 10/7/2015 No ACD4-UP-016 Chg 4 No None of the cnterialPCE 15-0059 0 Revision to Procedure ACD4-UP-016, Operation of the X-1020 Electrical listed in 10 CFR

Distribution System 70.72(c) are met.

Description of Change:Added notification of the Fire Depadrtment throughout the procedure; addedcaution and note boxes; added and revised steps; revised form; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae3of6 Page 30 of 68

Page 33: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISA

FCE Number Summary Reason NRC

PCE Number Re.Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? RequiredlComments

FOE 16-0099 0 Title: 5/6/2015 No FBP-EM-PRO-00021 Rev 2 No None of the criteriaiPCE - N/A Revision to Procedure FBP-EM-PRO-00021, Public Warning System lse n1 F

Activation 70.72(c) are met.

Description of Change:Revised procedure format; and updated phone numbers, definitions, andreferences.

Reason for the Change:Clarify procedure requirements.

FOE 15-0100 0 Title: 5/7/2015 No FBP-EM-PRO-00024 Rev 2 No None of the criterialPCE - N/A Revision to Procedure FBP-EM-PRO-00024, Testing of the Public lse n1 F

Warning System 70.72(c) are met.

Description of Change:Updated references; added a note box; revised the procedure format; andadded steps.

Reason for the Change:Clarify procedure requirements.

FOE 16-0101 0 Title: 5/19/2015 No ESO-2201-0109; X-3001-951- No None of the criterialPOE 16-0060 o Engineering Service Order ESO-2201-01 09, Correct Centrifuge Mounting S-Z Rev 1 listed in 10 CFR

Isolator Drawing 70.72(c) are met.

Description of Change:Revised a centrifuge mounting isolator drawing; and added and revisednotes.

Reason for the Change:To provide operator aid and clarify drawing details to assist in themanufacturing of the isolators.

FOE 15-01 02 0 Title: 5/20/2015 No ACD2-TP-001 Chg 17 No None of the cnterialPOE 15-0061 0 Revision to Procedure ACD2-TP-001, Procedure Process lse n1 F

Description of Change:702()aemt

Removed requirement for procedure owning organization to verify thatdocument and records were loaded into the electronic documentmanagement system; modified forms; added verbiage to clarify performingthe first use validation process; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae3of6 Page 31 of 68

Page 34: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-01 03 0 Title: 5/7/2015 Yes ESO-2500-0022 No None of the cnterialPCE 15-0062 0 Engineering Service Order ESO-2500-0022, X-112 Backup Portable listed in 10 CFR

Cooling Units 70.72(c) are met.

Description of Change:Provided portable cooling units to the X-1 12 building.

Reason for the Change:To ensure portable cooling was available to the X-1 12 building to ensurethe server room is maintained at 69 degrees Fahrenheit during a towercooling water system outage for maintenance repairs.

FCE 15-01 04 0 Title: 5/8/2015 No AC4-OP-050 Chg 39 No None of the criterial

PCE - N/A Revision to Procedure AC4-OP-050, Machine Conditioning, Tails Scoop listed in 10 CFRVerification, and Charging] with UF6 70.72(c) are met.

Description of Change:Clarified when an operations diagnostic unit cart is not required;rearranged steps; and modified form content and completion requirements.

Reason for the Change:Clarify procedure requirements.

FCE 15-0106 0 Title: 5/13/2015 No ACD3-EG-203 Chg 5 No None of the criterialPCE 15-0064 0 Revision to Procedure ACD3-EG-203, Engineering Drawing Controls listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised forms; added and deleted use references; added definitions andacronyms; revised appendices; clarified the process for reserving drawingnumbers; deleted Appendix 0; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-01 07 0 Title: 5/15/2015 No AC4-AR-101 Chg 14 No None of the criterial

PCE - N/A Revision to Procedure AC4-AR-101, Cascade 131 Machine Alarms and listed in 10 CFRResponses 70.72(c) are met.

Description of Change:Revised caution box; revised and added steps; added a note; revised anddeleted references; added an alert and Appendix C.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae3of6 Page 32 of 68

Page 35: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FCE 15-01 08 0 Title: 5/15/2015 No AC4-AR-001 Chg 42 No None of the cnterialPCE - N/A Revision to Procedure AC4-AR-001, Machine Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised caution box; revised and added steps; added a note; revised anddeleted references; added an alert and Appendix A.

Reason for the Change:Clarify procedure requirements.

FCE 15-0109 0 Title: 5/20/2015 Yes ESO-2415-0029; ESO-2409- No None of the criterial

PCE 15-0065 0 Engineering Service Orders ESO-2409-0072, install Air Diffuser on Air 0072 listed in 10 CFRStart Compressor's Inlet Filters and ESO-2415-0029, ASG Air Compressor 70.72(c) are met.Vibration issues

Description of Change:Evaluated, analyzed, tested, and redesigned the standby generator anddiesel driver air start systems.

Reason for the Change:The current systems designs are problematic and unreliable. Multipleproblems with the air start system pressure regulating valves, pressureswitches, and air compressors have occurred.

FCE 15-0110 0 Title: 5/20/2015 No AC3-OP-022 Chg 5 No None of the criterial

PCE - N/A Revision to Procedure AC3-OP-022, Operating a Pendant Crane listed in 10 CFRDescription of Change: 70.72(c) are met.

Removed redundant and non-applicable steps; added steps; updated logo;changed procedure owner; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae3of6 Page 33 of 68

Page 36: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0111 0 Title: 5/20/2015 No AC4-OP-003 Chg 25 No None of the cnterialPCE - N/A Revision to Procedure AC4-OP-003, Machine Cooling Water Normal listed in 10 CFR

Operations 70.72(c) are met.

Description of Change:Changed required position of supply needle valve in Appendix A; changednormal position of pump check valve bypass valves to closed; addedsteps; changed valve nomenclature in Appendix A for supply needle valveand inlet to match nameplate; changed the normal position of a valve toalign for actual system configuration; changed the nameplate data and thenormal positions of inlet calibration valve, outlet calibration valve, andoutlet calibration B valve to align for actual system configuration; updatedAppendix D; changed caution boxes related to step with an arc flashpotential to warning 'boxes; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0112 0 Title: 5/29/2015 No AC4-AR-011 Chg 7 No None of the criterialPCE - N/A Revision to Procedure AC4-AR-011i, DCS System Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Updated and deleted alarm responses; revised, deleted, and added newattachments to the procedure; and updated procedure owner.

Reason for the Change:Clarify procedure requirements.

FOE 15-0113 0 Title: 5/20/2015 Yes ESO-2500-0023 No None of the criterialPOE 15-0066 0 Engineering Service Order ESO-2500-0023, Install Ball Type Valves for listed in 10 CFR

Boiler Blowdown 70.72(c) are met.

Description of Change:Installed ball type valves on the blowdown lines for boiler 1 and 2 locatedin X-3002 Boiler Systems.

Reason for the Change:The use of ball type valves is recommended by the chemical treatmentsupplier to perform boiler blowdowns, which will minimize scale, corrosion,carryover-suspended solids, maintenance costs and other specificproblems.

NRC Report 2015Pae3of6 Page 34 of 68

Page 37: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0114 0 Title: 5/26/2015 No AC4-OP-055 Chg 41 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-055, Machine Disconnect listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a warning and a step; and updated a form.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0115 0 Title: 5/27/2015 Yes ESO-2901-0008 No None of the criterialPOE 15-0067 0 Engineering Service Order ESO-2901-0008, X-3000 Discharge Line Re- listed in 10 CFR

sizing 70.72(c) are met.

Description of Change:Replaced the 1.5 inch discharge line of the chiller pump with a 2.0 inchsteel piping.

Reason for the Change:To prevent chiller pump from shutting down, due to low output flow.

FOE 15-0116 0 Title: 6/23/2015 No ACD2-HP-001 Chg 2 No None of the criterialPOE - N/A Revision to Procedure ACD2-HP-001, As Low As Reasonably Achievable listed in 10 CFR

Program 70.72(c) are met.

Description of Change:Identified that Health Physics-Industrial Hygiene will be responsible for thecompletion of certain Items Relied On For Safety surveillance evaluationsinvolving procedures requiring use of personal protective equipment andadded a requirement for Health Physics-Industrial Hygiene to evaluate theeffectiveness of the personal protective equipment Items Relied On ForSafety and reference the evaluation within the Annual Radiation ProtectionReport.

Reason for the Change:Clarify procedure requirements.

FOE 15-0116 1 Title: 7/8/2015 No ACD2-HP-001 Chg 2 No None of the criterialPOE 15-0084 o Revision to Procedure ACD2-HP-001, As Low As Reasonably Achievable lse n1 F

Program 70.72(c) are met.

Description of Change:Added a plant change evaluation number to the change evaluationpackage that was inadvertently omitted in error.

Reason for the Change:To achieve compliance with change evaluation procedure.

NRC Report 2015 Page 35 of 68

Page 38: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

ISAFCE Number Summary Reason NRCPCE Number Rev. Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0117 0 Title: 6/23/2015 No ACD2-HP-005 Chg 6 No None of the criterialPCE - N/A Revision to Procedure ACD2-HP-005, Radiological Work Permit listed in 10 CFR

Description of Change: 70.72(c) are met.Identified that Health Physics-Industrial Hygiene will be responsible for thecompletion of certain Items Relied On For Safety surveillance evaluationsinvolving procedures requiring use of personal protective equipment andadded a requirement for Health Physics-Industrial Hygiene to evaluate theeffectiveness of the personal protective equipment Items Relied On ForSafety and reference the evaluation within the Annual Radiation ProtectionReport.

Reason for the Change:Olarifyi procedure requirements.

FOE 15-0117 1 Title: 7/8/2015 No ACD2-HP-005 Chg 6 No None of the criterialPOE 15-0085 0 Revision to Procedure ACD2-HP-005, Radiological Work Permit listed in 10 CFR

Description of Change:7 .2()ae etAdded a plant change evaluation number to the change evaluationpackage that was inadvertently omitted in error.

Reason for the Change:To achieve compliance with change evaluation procedure.

FOE 15-0118 0 Title: 5/28/2015 No ACD2-RG-007 Chg 5 No None of the criterialPOE 15-0068 0 Revision to Procedure AOD2-RG-007, Operating Experience Review listed in 10 CFR

Program 70.72(c) are met.

Description of Change:Added process flowcharts as Attachments B and 0; added the use of aform for external operating experience items; deleted Appendix A to makea separate guidance document; and made editorial and formattingchanges.

Reason for the Change:Clarify~ procedure requirements.

FOE 15-0119 0 Title: 6/1/2015 No ACD2-RG-044 Chg 12 No None of the criterialPOE 15-0069 0 Revision to Procedure ACDJ2-RG-044, Nuclear Regulatory Event Reporting listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed procedure title; clarified procedure steps: added a processflowchart; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 36 of 68

Page 39: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-01 20 0 Title: 6/2/2015 No ACD2-SP-028 Chg 8 No None of the criterialPCE 15-0070 0 Revision to Procedure ACD2-SP-028, Incident of Security Concern iisted in 10 CFR

Conduct of Inquiry 70.72(c) are met.

Description of Change:Clarified how IMI-1 and IMI-2 security events are reported to the NRC;clarified how DOE Form 5639.3 is completed for IMI-3 and IMI-4 events;updated a referenced procedure title; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0121 0 Title: 6/5/2015 Yes OA-CS-131-15-001 Rev 0 No None of the criterialPCE - N/A New Cascade Settings Document OA-CS-131-15-001, (U) Cascade 131 listed in 10 CFR

CentrifugeOperating Parameters 70.72(c) are met.

Description of Change:Provided wider tolerances while running at limited operating conditions.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

FCE 15-01 22 0 Title: 6/26/2015 No AC4-AO-006 Chg 15; AC4- No None of the criterialPCE - N/A Revision to Procedures AC4-AO-006, (U) AC100/1005000-1005100 AO-008 Chg 3 listed in 10 CFR

Machine Assembly, and AC4-AO-008, (U) AC100/110071 00 Machine 70.72(c) are met.Assembly

Description of Change:Added steps; added specifications chart; and revised forms.

Reason for the Change:

Clarify procedure requirements.

FCE 15-0123 0 Title: 6/11/2015 No ACD3-EO-001 Chg 2 No None of the criterialPCE 15-0071 o Revision to Procedure ACD3-EO-001, Job Briefs listed in 10 CFR

Description of Change: 70.72(c) are met.

Provided guidelines to consider discussions of applicable radiological workpermits, radiological conditions, lessons learned, and waste disposalrequirements during job briefs.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae3of6 Page 37 of 68

Page 40: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0124 0 Title: 6/11/2015 No ACD2-SH-019 Chg 16 No None of the criterialPCE 15-0072 0 Revision to Procedure ACD2-SH-01 9, Safety and Health Work Permit listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised form; updated logo; and added a use reference.

Reason for the Change:Clarify procedure requirements.

FOE 15-01 25 0 Title: 6/11/2015 No AC4-OP-167 Chg 4 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-167, CDC Operation of the DOS listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a step and changed the name of the Process Area Manager.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0126 0 Title: 6/2312015 No CWP-PB2SOU-9101 Rev 2 No None of the criterialPOE 15-0073 o CWP-PB2SOU-9101, Install Temporary Welding Power Cables listed in 10 CFR

Description of Change:702c)aemt

Extended due date of temporary change for installed temporary electricalfeeder cables and receptacles in the X-3002 for connecting portablewelding carts; connected feeder cables to either a live substation in thenorth end of X-3002 or to a portable generator located outside of X-3002;provided and delivered shop fabricated portable welding power-carts; andprovided temporary power supply for generators in storage within X-3002.

Reason for the Change:Planned refurbishment and construction in the X-3002 requires temporarypower be established to support welding and construction activitiesthroughout the building. Temporary power may also be needed tomaintain the internal environment of generators to be stored in X-3002until they are permanently installed. Due to delays in building theAmerican Centrifuge Plant, the due date must be extended.

FOE 15-0127 0 Title: 6/11/12015 No JFI-2101-0059 Rev 0 No None of the criteralPOE - N/A New Job Field Instruction JFI-2101-0059, Stand Alone Operation of UGA listed in 10 CFR

Instruments in the Lead Cascade 70.72(c) are met.

Description of Change:Provided the use of a portable Universal Gas Analyzer.

Reason for the Change:To analyze the ambient air for system checkout or calibration purposes.

NRC Report 2015 Page 38 of 68

Page 41: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0128 0 Title: 6/10/2015 No AC4-OP-014 Chg 17 No None of the cnterialPOE - N/A Revision to Procedure AC4-OP-014, Operations of the Lead Cascade listed in 10 CFR

Uninterruptible Power Supply 70.72(c) are met.

Description of Change:Revised a section; added warning boxes to each section that has an arcflash hazard; and added '(OAT 0 PPE)' terminology to related steps.

Reason for the Change:Clarify procedure requirements.

FCE 15-0129 0 Title: 6/22/2015 No AC2-RG-071 Chg 12 No None of the criterialPOE - N/A Revision to Procedure AC2-RG-071, Nuclear Material Control and listed in 10 CFR

Accountability (NMC&A) for the American Centrifuge Lead Cascade 70.72(c) are met.

Description of Change:Added and revised steps; and made editorial changes.

Reason for the Change:- Clarify procedure requirements.

FOE 15-0130 0 Title: 7/8/2015 Yes ESO-2303-0042 No None of the criterialPOE 15-0074 0 Engineering Service Order ESO-2303-0042, Fixture Assembly lse n1 F

Modifications 70.72(c) are met.

Description of Change:Modified storage stand in order to allow for proper fitment and operation.

Reason for the Change:This change occurred because the storage stand is sized for the use of alift bail that has been discontinued and have not yet been modified to allowuse of the current lift bail.

FOE 15-0131 0 Title: 7/6/2015 No AC4-OP-060 Chg 6 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-060, Helium Leak Detector listed in 10 CFR

Description of Change:702()aemt

Changed procedure use category to in hand; revised caution boxes; andmade editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae3of6 Page 39 of 68

Page 42: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

•FC Rev.ISACE Number Summary Reason NRC

PCE Number Re.Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FOE 15-0132 0 Title: 6119/2015 No AC4-OJP-005 Chg 18 No None of the criterial

PCE - N/A Revision to Procedure AC4-OP-005, Lead Cascade Instrument Air listed in 10 CFR -

Operations 70.72(c) are met.

Description of Change:Changed use category to an in hand procedure; deleted note; and addedand revised steps.

Reason for the Change:Clarify procedure requirements.

FOE 15-0133 0 Title: 6/22/2015 No AC4-CM-001 Chg 8 No None of the criterial

PCE - N/A Revision to Procedure A04-CM-001, Chemical Trap Media Change listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted sections, steps, and references.

Reason for the Change:Clarify procedure requirements.

FOE 15-0134 0 Title: 7/9/2015 No A04-OP-026 Chg 14 No None of the criterial

POE - N/A . Revision to Procedure AC4-OP-026, Machine Connections Leak Checking listed in 10 CFR

Description of Change: 70.72(c) are met.

Changed the use category to in hand; deleted prerequisite for torquewrench calibration periodicity; changed caution boxes; and made editorialand formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0135 0 Title: 6/22/2015 No JFI-2101-0063 Rev 0 No None of the criterial

POE 15-0075 0 New Job Field Instruction JFI-2101-0063, X-3001 Urninterruptable Power listed in 10 CFRSupply (UPS) Mode Testing 70.72(c) are met.

Description of Change:Evaluated and troubleshot X-3001 uninterruptable power supply unitspertaining to starting and stopping the equalizing charge feature.

Reason for the Change:This job field instruction was created to troubleshoot the procedure whichwas previously revised to ensure the uninterruptable power supplyequalizing feature is not activated after normal power is restored to theunit.

NRC Report 2015 Page 40 of 68

Page 43: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-01 36 0 Title: 6/26/2015 No JFI-2303-0025 Rev 0 No None of the criterialPCE - N/A New Job Field instruction JFI-2303-0025, Sample Coupons listed in 10 CFR

Description of Change: 70.72(c) are met.

Provided instructions on obtaining samples for laboratory analysis.

Reason for the Change:Sampling and testing is needed in support of nuclear materials control andaccountability functions and evaluation of nondestructive assaycapabilities.

FCE 15-01 37 0 Title: 6/25/2015 No AC4-ON-004 Chg 21 No None of the criterialPCE - N/A Revision to Procedure AC4-ON-004, Loss of Machine Cooling Water listed in 10 CFR

Description of Change: 70.72(c) are met.Clarified steps; added nomenclature for the breaker designation; andadded note boxes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0138 0 Title: 7/13/2015 No TP-2101-0066 Rev 0 No None of the criterialPCE - N/A New Test Plan TP-2101-0066, Light Gases Test Plan listed in 10 CFR

Description of Change: 70.72(c) are met.

To add inert light gases into the Lead Cascade and to sample for testingpurposes.

Reason for the Change:This test plan was initiated to add inert light gases into the Lead Cascadefor testing purposes.

FCE 15-0138 1 Title: 8/28/2015 No TP-2101-0066 Rev 3 No None of the criterialPCE - N/A Revision to Test Plan TP-2101-0066, Light Gases Test Plan listed in 10 CFR

Description of Change: 70.72(c) are met.

To provide the exhaust of the universal gas analyzer to be routed to anyexisting sample location to be continuously sampled.

Reason for the Change:This revision was initiated to allow for the completion of continuoussampling without having to always rely on the usage of a portable gulperto control the exhaust of the universal gas analyzer.

NRC Report 2015 Pg 1o6Page 41 of 68

Page 44: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0138 2 Title: 9/22/2015 No TP-2101-0066 Rev4 No None of the criterialPOE - N/A Revision to Test Plan TP-2101-0066, Light Gases Test Plan listed in 10 CFR

Description of Change:702()aemt

This revision allows for the option of sampling at multiple locations.

Reason for the Change:To allow for sampling at multiple locations.

FOE 15-01 39 0 Title: 6/25/2015 Yes ESO-2409-0075 No None of the criterialPOE 15-0076 0 Engineering Service Order ESO-2409-0075, X-6000 Air Receiver Auto listed in 10 CFR

Drains 70.72(c) are met.

Description of Change:Abandoned current malfunctioning moisture sensors and installed timingcontrols on the existing solenoid valves which are located in the existingcondensate drain system.

Reason for the Change:This change was developed to install a more reliable method ofautomatically draining moisture/condensation build-up within the AirReceiver Tanks.

FOE 15-0140 0 Title: 6/25/2015 Yes ESO-2413-0010 No None of the criterialPOE 15-0077 0 Engineering Service Order ESO-2413-0010, X-5001B Oil Pump House listed in 10 CFR

Description of Change: 70.72(c) are met.

Provided a temporary jumper to bypass the supervisory relay contact inthe normal power circuit at the X-5001 B Oil Pump House until a new relayis received.

Reason for the Change:The current oil pump system for the 345 kV underground cables is in asingle point failure configuration. This will temporarily allow a pump in X-5001 B to be put back in service to eliminate the single point failureconfiguration.

FOE 15-0140 1 Title: 8/10/2015 Yes ESO-2413-0010; ESO-2413- No None of the criterialPOE 15-0077 1 Engineering Service Orders ESO-2413-0010, X-5001B Oil Pump House 0012 lse n1 F

and ESO-2413-0012, X-5001B Oil Pump House Power Restoration 70.72(c) are met.

Description of Change:Added reference to ESO-2413-0012 which returns the circuit to its originalconfiguration and removed the temporary expiration date.

Reason for the Change:A separate engineering service order was developed to return the circuit toits original state. As a result, the change evaluation was revised toreference that engineering service order.

NRC Report 2015Pae4of6 Page 42 of 68

Page 45: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FCE 15-0141 0 Title: 6/25/2015 Yes ESO-2400-0027 No None of the criterialPOIE 15-0078 0 Engineering Service Order ESO-2400-0027, X-3002 Fire Exit Signs listed in 10 CFR

Description of Change: 70.72(c) are met.Provided power to and installed several new lighted exits signs in the X-3002 North and South Mezzanine areas.

Reason for the Change:This change was developed to replace multiple exit signs, currently on theX-3002 North and South Mezzanine, which are not lighted. It has beendetermined that it would be difficult to locate the un-lit signs in the event ofa power loss.

FOE 15-0142 0 Title: 8/19/2015 No AC4-CM-001 Chg 9 No None of the criterialPOE - N/A Revision to Procedure AC4-CM-001, Chemical Trap Media Change listed in 10 CFR

Description of Change: 70.72(c) are met.

Updated logo; added, deleted, and modified sections; added steps; andmade editorial changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0143 0 Title: 9/17/2015 No LCF License Application Yes None of the criterialPOE 15-0089 0 LCF and ACP License Application Change Chapter 9 to Update Section 9.2; ACP License listed in 10 CFR

Hazardous Waste Generator Requirements Application Section 9.2 and 70.72(c) are met.Description of Change: Table 9.2-9; LCF IntegratedThis change revised applicable portions of the LCF and ACP License Safety Analysis, LCFApplications and Supporting Documents to generalize how hazardous and Summarye Lafet Intgatedimixed waste is handled according to applicable state and federal Sumafey, AnLysi Summaryteregulations. [Redacted] Section 3.8; ACP

Reason for the Change: Integrated Safety AnalysisAccording to the Resource Conservation and Recovery Act regulations for Summary Section 3.7how hazardous waste is handled, generator status can change frommonth to month thus changing the requirements. It is a cost savings to beable to change between generator statuses and manage hazardous wasteutilizing the greater time limits.

FOE 15-0144 0 Title: 7/6/2015 No AC4-OP-019 Chg 13 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-01 9, Operation of Rigid Mast Crane listed in 10 CFR

Description of Change: 70.72(c) are met.

Added clarification to the recalibration process; grouped steps throughoutto improve flow and provide flexibility; added note boxes to support thestep groupings; changed procedure owner; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 43 of 68

Page 46: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISA

FCE Number Summary Reason NRC

PCE Number Re.Approval Change Documents Modified Update Preapproval NotDate to SSC? Due to Change Required? Required/Comments

FOE 15-0145 0 Title: 6/30/2015 No AC4-AO-007 Chg 7 No None of the cnterialPCE - N/A Revision to Procedure A04-AO-007, (U) AO 100/1 005000-1 0051 00 listed in 10 CFR

Machine Disassembly 70.72(c) are met.

Description of Change:Deleted step; revised a form; and updated logo.

Reason for the Change:Clarify procedure requirements.

FOE 15-0146 0 Title: 6/30/2015 No AC4-AO-009 Chg 2 No None of the criterialPOE - N/A Revision to Procedure AC4-AO-0O9, (U) AC1 00/1 0071 00 Machine ... listed in 10 OFR

Disassembly 70.72(c) are met.

Description of Change:Deleted and revised forms.

Reason for the Change:Clarify form requirements.

FOE 15-0147 0 Title: 6/29/2015 No AC4-OP-004 Chg 6 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-004, MOW Delonizer Operations listed in 10 CFR

Description of Change: 70.72(c) are met.Revised wording and steps; added valve tables; revised the delonizerbottle monitoring-lights receptacle power to 120 VAC; deleted an acronym;updated a note; and changed use category to in hand.

Reason for the Change:Clarify procedure requirements.

FOE 15-0148 0 Title: 6/29/2015 No AC4-OP-013 Chg 19 No None of the cnterialPOE - N/A Revision to Procedure AC4-OP-01 3, Operation of the X-3001 Battery and listed in 10 CFR

DO Power System 70.72(c) are met.

Description of Change:Added, rearranged, and modified steps; added a use procedure; andadded warning boxes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae4of6 Page 44 of 68

Page 47: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0149 0 Title: 6/29/2015 Yes JFI-2101-0066 Rev 0 No None of the criterialPOE - N/A New Job Field Instruction JFI-2101-0066, X-3001 Train 3 Machine Cooling listed in 10 CFR

Water Ethernet Test Cable -. 70.72(c) are met.

Description of Change:Disconnected the existing ethernet cable and routing a temporary cable tothe machine cooling water control cabinet from the Cascade 132distributed control system cabinet to allow for testing on cable conditions.

Reason for the Change:X-3001 Train 3 Machine Cooling Water has been experiencingcommunication issues with the distributed control system. This job fieldinstruction will attempt to find the cause of the communication error.

FOE 15-01 50 0 Title: 6/29/20 15 Yes ESO-2409-0080 No None of the criterialPOE 15-0079 0 Engineering Service Order ESO-2409-0080, X-6001 Cooling Tower Repairs listed in 10 CFR

Description of Change: 70.72(c) are met.

Provided partial repairs to the upper decking: replaced rotten woodstructure; installed water distribution nozzles; and applied fiberglasssurface material to the upper deck.

Reason for the Change:To restore X-6001 Cooling Tower to full operation. This will allow water toflow through and complete the refurbish process of the cooling tower.

FOE 15-01 51 0 Title: 7/9/2015 No ACD2-MA-002 Chg 15 No None of the criterialPOE 15-0080 0 Revision to Procedure ACD2-MA-002, Work Control Process listed in 10 CFR

Description of Change: 70.72(c) are met.Added titles of forms in multiple sections; added, modified, and deletedsteps; corrected policy title; added definition of "In Process Work Activity';and revised forms.

Reason for the Change:Clarify procedure requirements.

FOE 15-01 52 0 Title: 6/30/2015 Yes JFI-2101-0067 Rev 0 No None of the criterialPOE - N/A New Job Field Instruction JFI-2101-0067, Troubleshooting and Data listed in 10 CFR

Collection Job Field Instructions 70.72(c) are met.

Description of Change:Performed troubleshooting activities and collected data; and installedbreak-out cables at desired locations.

Reason for the Change:This job field instruction will be used to gather the necessary data.

NRC Report 2015Pae4of6 Page 45 of 68

Page 48: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0153 0 Title: 6/30/2015 No AC4-OP-077 Chg 5 No None of the crdterialPCE - N/A Revision to Procedure AC4-OP-077, Purge Vacuum System Leak listed in 10 CFR

Checking 70.72(c) are met.

Description of Change:Updated procedure owner; added, reworded, and rearranged steps;updated a form; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0154 0 Title: 7/8/2015 No AC3-ST-001 Chg 14 No None of the criterialPCE - N/A Revision to Procedure AC3-ST-001, Cascade 132 Machine Isolation listed in 10 CFR

System and Secondary Isolation System Calibration 70.72(c) are met.

Description of Change:Added caution note; revised and added steps; and added an acronym.

Reason for the Change:Clarify procedure requirements.

FCE 15-01 55 0 Title: 7/8/2015 No AC3-ST-005 Chg 4 No None of the criterialPCE - N/A Revision to Procedure AC3-ST-005, Commercial Demonstration Cascade listed in 10 CFR

Machine Isolation System and Secondary Isolation System Calibration 70.72(c) are met.

Description of Change:Added notes; added and revised steps; revised Appendix B; and madeeditorial changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0156 0 Title: 8/;17/2015 No ACD2-MM-001 Chg 12 No None of the criterial

PCE 15-0081 0 Revision to Procedure ACD2-MM-001, Control of Material listed in 10 CFRDescription of Change: 70.72(c) are met.

Changed purpose to only apply to unclassified material; deleted steps,references, and requirements; revised and added steps, terminology,directions, references, requirements, and notes; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae4of6 Page 46 of 68

Page 49: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0167 0 Title: 7/10/2015 No ACD4-AR-201 Chg 8 No None~of the criterialPCE 15-0082 0 Revision to Procedure ACD4-AR-201, X-6000/X-6001 Tower Water listed in 10 CFR

Cooling System and Associated Equipment Alarm Response 70.72(c) are met.

Description of Change:Added option to valve in instrument air to re-pressurize air start receivers;updated terms for clarity; added guidance to allow the shift supervisor todetermine whether immediate and supplemental actions are unnecessarybased on trend analysis and troubleshooting of alarms and expectedalarms; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-01568 0 Title: 7/9/2015 No AC4-OP-101 Chg 14 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-101, Commercial Demonstration Cascade listed in 10 CFR

Purge Vacuum Operating Procedure 70.72(c) are met.

Description of Change:Updated procedure owner; reworded, renamed, deleted, added, andrearranged steps; and added a note box.

Reason for the Change:Clarify procedure requirements.

FCE 15-0159 0 Title: 7/9/2015 No AC4-OP-001 Chg 39 No None of the cnterialPOE - N/A Revision to Procedure AC4-OP-001, Purge Vacuum Normal Operating listed in 10 CFR

Procedure 70.72(c) are met.

Description of Change:Updated procedure owner; deleted reference to procedure that is on hold;deleted and revised steps; added note box; deleted a section; addedprocedure numbers to list of use references; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-01 60 0 Title: 9/25/20 15 No ACD2-MP-002 Chg 5 No None of the criterialPOE 15-0086 o Revision to Procedure ACD2-MP-002, Stop Work Actions listed in 10 CFR

Description of Change: 70.72(c) are met.

Added log and unique identifier for tracking stop work notices;incorporated requirement for stop work releases be approved by qualityassurance; revised organizational titles; and made editorial changes.

Reason for the Change:To flow down license application requirements and clarify procedurerequirements.

NRC Report 2015 Page 47 of 68

Page 50: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FCE 15-0161 0 Title: 7/28/2015 No LCF LA-2605-0001 Table of No None of the criterialPCE - N/A Revision to LCF License Application, Section 11.1 Configuration Contents, Acronyms, Section listed in 10 CFR

Management 11.1, and Figure 11.1-1 70.72(c) are met.

Description of Change:Added clarity to what documents are design input and output documents;provided more complete information regarding design requirements;included verification that installed structures, systems, and componentsmeet design requirements prior to incorporation into the baselineconfiguration information; removed conceptual design descriptiondocuments from the list of information utilized in the 10 CFR Part 70.72reviews; and Figure 11.1-1 is being removed for consistency with the ACPLicense Application Section 11.1.

Reason for the Change:This change is being implemented in response to a 2011 assessment ofthe ACP Change Evaluation Process for Construction Work Packages,where weaknesses were identified. At the time it was determined that theLCF was a temporary demonstration facility and didn't warrant a change.Due to various events since 2011, it has been decided that the LCFLicense Application now warrants update to resolve the relatedweaknesses. Also as a result of non-produced and supersededdocuments, revisions to the LCF License Application Section 11.1 arenecessary to reflect specific documentation that has been or will bedeveloped to establish and identify the LCF design bases and designrequirements.

FCE 15-01 63 0 Title: 7/9/2015 No JFI-2101-0068 Rev 0 No None of the criterialPCE - N/A Job Field Instruction JFI-2101-0068, Rate-of-Rise listed in 10 CFR

Description of Change:702()aemt

To perform a pressure rate-of-rise test with the vacuum systeminstrumentation.

Reason for the Change:To determine leak rate.

FCE 15-0165 0 Title: 7/13/2015 No AC4-OP-112 Chg 8 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-112, X-3012 ASG lse n1 F

Description of Change:702()aemt

Revised steps to alter the operating range from 200-250 psig to 150-180psig.

Reason for the Change:The change occurred as result of ESO-2415-0029, which modified the X-3012 air start system air pressure. This decrease in pressure willultimately produce a smaller chance of a fault.

NRC Report 2015Pae4of6 Page 48 of 68

Page 51: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0166 0 Title: 7/14/2015 No AC4-OP-080 Chg 9 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-O80, ODU Cart Operations iisted in 10 CFR

Description of Change:702c)aemt

Added sections and steps; and deleted steps.

Reason for the Change:Clarify procedure requirements.

FOE 15-0167 0 Title: 7/17/2015 Yes ESO-2303-0043 No None of the criterialPCE 15-0088 0 Engineering Service Order ESO-2303-0043, Test Stand Handrail listed in 10 CER

Description of Change:7.2()aemt

Removed a safety gate and modified each handrail.

Reason for the Change:To eliminate the potential of an employee to inadvertently open a safetygate while servicing a test stand, which would put the employee in anunsafe condition.

FOE 15-0168 0 Title: 7/15/2015 No A04-OP-014 Chg 19 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-014, Operations of the Lead Cascade listed in 10 CER

Uninterruptible Power Supply 70.72(c) are met.

Description of Change:Revised and deleted steps; added section; and added a definition fornormal battery equalizing charge mode.

Reason for the Change:Clarify procedure requirements.

FOE 15-0169 0 Title: 7/17/2015 No TP-2201-0101 Rev 1; TP- No None of the criterialPOE - N/A Revision to Test Plan TP-2201-0101 and New Test Plan TP-2201-0102; 2201-0102 Rev 0; OA-CS- listed in 10 CFR

and Cascade Settings Documents OA-CS-132-15-001, (U) 132 Cascade, 132-15-001 Rev 0; OA-CS- 70.72(c) are met.Centrifuge Operating Parameters and OA-CS-132-15-002, (U) Cascade, 132-15-002 Rev 0Cascade Operating Parameters

Description of Change:The revision to test plan TP-2201-0101 involved increasing the number oftest centrifuges. The new test plan TP-2201 -0102 provided instructions forconfiguring and operating the 132 Cascade. The configuration under bothtest plans are cover by the cascade settings documents.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

NRC Report 2015Pae4of6 Page 49 of 68

Page 52: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-01 70 0 Title: 7/20/2015 No AC4-OP-053 Chg 28 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-053, Machine Venting with the Backfill Unit listed in 10 CFR

Description of Change: 70.72(c) are met.

Added steps, definitions, and sections; and made editorial changes.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0171 0 Title: 7/20/2015 No AC4-OP-010 Chg 7 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-01 0, Operation of Auxiliary Power listed in 10 CFR

Substations 70.72(c) are met.

Description of Change:Revised sections; deleted references; combined attachments B and 0;deleted attachments A, D, and E; deleted sections and steps; deleted andadded use references; corrected breaker nomenclature; changed methodof denoting required personal protective equipment; and made formattingchanges.

Reason for the Change:Clarify procedure requirements.

FOE 15-0173 0 Title: 7/23/2015 No AC4-OP-079 Chg 10 No None of the cnterialPOE - N/A Revision to Procedure AC4-OP-079, MDU and POF Operations listed in 10 CFR

Description of Change: 70.72(c) are met.Revised sections and steps; added warning boxes; and added a procedureas a use reference.

Reason for the Change:Clarify procedure requirements.

FOE 15-0174 0 Title: 7/23/2015 No ACD4-ON-204 Chg 3 No None of the criterialPOE 15-0091 o Revision to Procedure ACD4-ON-204, Loss of 345/13.8 kV X-5000 Power listed in 10 CFR

Transformer 70.72(c) are met.

Description of Change:Updated logo; revised a section and steps; and added Appendix B.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae5of6 Page 50 of 68

Page 53: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0175 0 Title: 7/27/2015 Yes ESO-2409-0081 No None of the criterialPCE 15-0092 0 Engineering Service Order ESO-2409-0081, TWC Seal Water Supply Line listed in 10 CFR

Modification 70.72(c) are met.

Description of Change:Modified the tower water cooling line that supplies the seal water to thetower water cooling plumbing system and the piping within the chemicalrooms in X-6000 to place plugs in the existing piping to stop leaks.

Reason for the Change:The previously abandoned tower water cooling water lines within the X-6000 chemical rooms were leaking.

FOE 15-0176 0 Title: 7/23/2015 No JFI-2101-0069 Rev 0; JFI- No None of the criterialPCE - N/A New Job Field Instructions JFI-2101-0056, Functional Verification of Motor 2101-0056 Rev 0 listed in 10 CFR

Operated Valves and JFI-2101-0069, Functional Verification of Cascade 70.72(c) are met.131 Motor Operated Valves

Description of Change:This change involves activities to perform functional testing of the airoperated valves to open and close properly.

Reason for the Change:This change occurred due to the requirement to test the air operatedvalves.

FOE 15-01 77 0 Title: 9/2/2015 No ACD2-SH-020 Chg 3 No None of the criterialPOE 15-0093 o Revision to Procedure ACD2-SH-020, Safety Signs and Boundaries listed in 10 CFR

Description of Change: 70.72(c) are met.

Added fire and safety, emergency management, nuclear criticality safety,laser, and security sign exclusions; added guidance for specific programssigns; deleted sign illumination requirements; deleted non-applicableacronyms; added source reference; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae5of6 Page 51 of 68

Page 54: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Req uiredlComments

FOE 15-01 78 0 Title: 7/24/2015 Yes ESO-2201-0112 No None of the criterialPOE 15-0094 0 Engineering Service Order ESO-2201-0112, Replace Train 4 MOW listed in 10 CFR

Expansion Tank Nitrogen Cylinder with Compressed Air 70.72(c) are met.

Description of Change:Replaced Train 4 machine cooling water expansion tank nitrogen cylinderwith compressed instrument air cylinders in order to reduce the corrosionrate of copper and mild steel in the expansion tank.

Reason for the Change:It has been found that the corrosion rate for copper and mild steel in theTrain 4 machine cooling water expansion tank has risen over the last fewmonths. It has been determined that the cause of this increase is due to asulfate-reducing bacteria which can be reduced by applying oxygen to thesystem.

FOE 15-0179 0 Title: 7/24/2015 Yes ESO-2518-0029 No None of the criterialPOE - N/A Engineering Service Order ESO-2518-0029, Power for X-6614G listed in 10 CFR

Description of Change: 70.72(c) are met.

Allowed for a generator to be installed, to operate X-6614G untilpermanent power can be restored, at which time, the generator will beremoved.

Reason for the Change:This change occurred due to the existing power cables connected to atransformer, outside the building, having rain water collecting in the cablesand causing a fault to the building supply breaker.

FOE 15-0179 1 Title: 7/30/2015 Yes ESO-251 8-0029; ESO-251 8- No None of the criterialPOE 15-0095 0 Engineering Service Orders ESO-2518-0029, Install and Remove 0030 listed in 10 CFR

Temporary Power for the X-6614G and ESO-2518-0030, Install Overhead 70.72(c) are met.Feed for X-6614G

Description of Change:Included ESO-251 8-0030 for the restoration of permanent power to the X-6614G and added a plant change evaluation number to the changeevaluation package since the installation will be permanent.

Reason for the Change:To install the permanent feed overhead instead of down the pole andunderground to the facility in order to restore permanent power to the X-6614G.

NRC Report 2015Pae5of6 Page 52 of 68

Page 55: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ~ ~~~ISA ReurdCmntFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? ReurdCm nt

FCE 15-0180 0 Title: 9/3/2015 No AC2-RG-071 Chg 13 No None of the criterialPCE - N/A Revision to Procedure A02-RG-071, Nuclear Material Control & listed in 10 CFR

Accountability (NMC&A) 70.72(c) are met.

Description of Change:Added the definitions of process knowledge and uranium-bearing samplesin Appendix A; clarified steps; added a note; clarified whose responsibilityit is to obtain receiver's signature; added a source reference; and addedlifetime retention periods for quality and non-quality records.

Reason for the Change:Clarify procedure requirements.

FOE 15-0182 0 Title: 8/3/2015 No AC4-OP-173 Chg 11 No None of the criterial

POE£ - N/A Revision to Procedure AC4-OP-173, Cascade 131 Operations listed in 10 CFRDescription of Change:702()aemtRevised and rearranged steps; and reworded note box.

Reason for the Change:Clarify procedure requirements.

FOE 15-01 83 0 Title: 8/21/2015 No AC4-HP-002 Chg 0 No None of the criterialPCOE - N/A New Procedure AC4-HP-002, Shipment and Receipt Surveys of listed in 10 CFR

RadioactiVe Material Packages 70.72(c) are met.

Description of Change:This is a new procedure intended to documents requirements to monitorpackages of radioactive material for radiation and radioactivecontamination at the Lead Cascade in support of radioactive materialshipments.

Reason for the Change:To flowdown license application requirements in radioactive shipments.

FOE 15-0184 0 Title: 8/17/2015 No FBP-EM-PRO-00004 Rev 2 No None of the criterialPOE - N/A Revision to Procedure FBP-EM-PRO-00004, Computer Generation of listed in 10 CFR

ALOHA® Plume Models 70.72(c) are met.

Description of Change:Changed procedure title; added responsibilities section; added a step tocheck release version of software before use; updated and addedreferences; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page53 of 68

Page 56: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FOE 15-0185PCE - N/A

0Title:Engineering Service Order ESO-2201-0014, Portable Pump Down Cart

Description of Change:Provided a portable pump down cart that will be used when periodic pumpdown and testing must be performed on sections of piping, equipment,and instrumentation for calibration. New Test Plan TP-2201-0103 will beused to operate the cart as designed.

8/12/2015 Yes ESO-2201-0014; TP-2201-0103 Rev 0

No None of the criteriallisted in 10 CFR70.72(c) are met.

Reason for the Change:To remove residual uranium from small sections of piping and equipmentto prevent the contamination of inner components of equipment used forcalibration, which must be periodically shipped off-site for recalibration.

FOE 15-01 86 0 Title: 8/27/2015 No AC4-OP-049 Chg 66 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-049, Machine Acceleration & Deceleration listed in 10 CER

Description of Change: 70.72(c) are met.

Added and rearranged steps; and updated list of use references.

Reason for the Change:

Clarify procedure requirements.

FOE 15-0187 0 Title: 8/13/2015 No ACD3-EG-204 Chg 5 No None of the cnterialPOE 15-0097 o Revision to Procedure ACD3-EG-204, Engineering Calculation Controls listed in 10 CFR

Description of Change: 70.72(c) are met.Added and revised notes; replaced the term "computer programs" with"nonstandard software"; revised steps; added clarity to "altematecalculations"; deleted obsolete references; revised flowchart and form; andmade editorial changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0188 0 Title: 8/28/2015 No AC4-OP-025 Chg 47 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-025, Machine Connections listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised and added sections; and revised form.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae5of6 Page 54 of 68

Page 57: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0189 0 Title: 8/28/2015 No AC4-OP-055 Chg 42 No None of the criterialPOE - N/A Revision to Procedure A04-OP-055, Machine Disconnect listed in 10 CFR

Description of Change:702()aeet

Updated and added sections; revised use references and form.

Reason for the Change:Clarify procedure requirements.

FCE 15-01 90 0 Title: 8/14/2015 No ACD3-EG-402 Chg 5 No None of the criterialPOE 15-0098 0 Revision to Procedure ACD3-EG-402, Engineering Impact Analysis listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised the instructions to Appendix B to match the actual fields on form.

Reason for the Change:Clarify procedure requirements.

FOE 15-0191 0 Title: 8/14/2015 No AC2-OP-033 Chg 9 No None of the criterialPOE - N/A Revision to Procedure AC2-OP-033, Operation of the Portable Mini-Gulper listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised, added, and deleted steps; and made formatting changes.

Reason for the Change:

Clarify procedure requirements.

FOE 15-01 92 0 Title: 8/28/2015 No AC4-AR-011 Chg 9 No None of the criterialPOE - N/A Revision to Procedure AC4-AR-01 1, DOS System Alarms and Responses listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised guidance listed on the unclassified controlled nuclear informationstamp; added actions; and added power supply information.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae5of6 Page 55 of 68

Page 58: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0193 0 Title: 8/28/2015 No AC4-AR-1 11 Chg 7 No None of the criterialPCE - N/A Revision to Procedure AC4-AR-1 11, CDC DOS System Alarms andI listed in 10 CFR

Responses 70.72(c) are met.

Description of Change:Updated procedure owner and guidance listed on the unclassifiedcontrolled nuclear information stamp; added server actions; revised listedpower supplies; added actions; and revised and deleted steps.

Reason for the Change:Clarify procedure requirements.

FOE 15-01 94 0 Title: 9/3/2015 Yes ESO-2413-0007 No None of the criterialPOE 15-0099 0 Engineering Service Order ESO-241 3-0007, Replacement of Transfer Trip listed in 10 CFR

Equipment Between X-530 and X-5000 70.72(c) are met.

Description of Change:Replaced the existing 30 year old GE Proguard Tone Equipment with thenew version NS4OA.

Reason for the Change:This change was initiated because the GE Tone Equipment has reachedits normal life expectancy and has become unreliable. Attempts havebeen made to repair the equipment, but there are no availablereplacement parts.

FOE 15-01 95 0 Title: 9/23/2015 No ACD2-TP-004 Chg 5 No None of the criterialPOE 15-01 00 0 Revision to Procedure ACD2-TP-004, Use of Procedures listed in 10 CFR

Description of Change:702()aemt

Updated logo; revised and deleted steps; added a use reference; revisedAppendix A; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-01 96 0 Title: 9/14/2015 No AC4-AO-001 Chg 33 No None of the criterialPOE - N/A Revision to Procedure AC4-AO-001, Machine Assembly, LC3 Build listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted reference for completing a form; revised and added steps;updated form to include driver procedure and non-op check box; andupdated logo.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae5of6 Page 56 of 68

Page 59: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0197 0 Title: 9/11/2015 No AC4-OP-075 Chg 15 No None of the crterdalPCE - N/A Revision to Procedure AC4-OP-075, AC1 00/LC3 Machine Disassembly listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted reference for completing a form; and updated a form.

Reason for the Change:

Clarify procedure requirements.

FCE 15-0198 0 Title: 9/8/2015 No AC4-OP-002 Chg 28 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-002, Evacuation Vacuum Normal listed in 10 CFR

Operating Procedure 70.72(c) are met.

Description of Change:Revised sections to add needed operations to isolate and restart the AirJet; and revised a use reference.

Reason for the Change:Clarify procedure requirements.

FCE 15-01 99 0 Title: 9/30/2015 No ACD4-UW-001 Chg 16 No None of the criterialPCE 15-01 01 0 Revision to Procedure ACD4-UW-001, Boiler Operations listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised and deleted steps; added notes; and revised Appendix C,Attachments A and B.

Reason for the Change:Clarify procedure requirements.

FCE 15-0200 0 Title: 9/29/2015 No ACD2-RG-003 Chg 14; ACD2- No None of the criterialPCE 15-01 02 0 Revision to Procedures ACD2-RG-003, Regulatory Communications and RG-007 Chg 6 listed in 10 CFR

ACD2-RG-007, Operating Experience Review Program 70.72(c) are met.

Description of Change:ACD2-RG-003:Deleted sections and source references; revised a form; changedorganization titles; added flowcharts for incoming and outgoingcorresponden'ce; revised appendices; updated use references; and madeeditorial and formatting changes.

ACD2-RG-007:Deleted and revised sections; deleted notes; updated flowcharts; andmade editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015 Page 57 of 68

Page 60: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0201 0 Title: 9/30/2015 No ACD2-MP-001 Chg 9 No None of the critedialPCE 15-0103 0 Revision to Procedure AOD2-MP-001, Safety Review Committee listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised scope• updated acronyms; changed organizational title; deleteduse references; and made editorial and formatting changes.

Reason for the Change:Clarify' procedure requirements.

FOE 15-0202 0 Title: 9/24/2015 No ACD2-EC-012 Chg 3 No None of the cnterialPOE 15-0104 0 Revision to Procedure ACD2-EC-01 2, Control of Refrigerants listed in 10 CFR

Description of Change: 70.72(c) are met.

Revised a form; and made editorial and formatting changes.

Reason for the Change:

Olarify procedure requirements.

FOE 15-0203 0 Title: 9/18/2015 No ACD2-EG-407 Ohg 10 No None of the cdterialPOE 15-01 05 0 Revision to Procedure ACD2-EG-407, Test Plans listed in 10 CFR

Description of Change: 70.72(c) are met.

Added a note; clarified when the test plan format may be used; addedexemption for test plans started prior to effective date of this change;added references, acronym, and definition; clarified when a changeevaluation must be in place; revised a form; and made editorial andformatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0204 0 Title: 11/2/2015 No AC4-OP-061 Chg 6 No None of the criterial

POE - N/A Revision to Procedure AC4-OP-061, Transport Trailer Loading/Unloading listed in 10 CFRProcedure 70.72(c) are met.

Description of Change:Updated logo; changed scope; added action steps and appendices D, E,and F; and updated references.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae5of6 Page 58 of 68

Page 61: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? RequiredlComments

FOE 15-0205 0 Title: 9/22/2015 Yes ESO-2201-0114 Rev 0; SPC- No None of the criterialPCE 15-0106 0 Engineering Service Order ESO-2201-0114, MOW pH Probe Calibration 2101-0008 Rev 3; SPC-2201- listed in 10 CFR

Frequency 0008 Rev 2 70.72(c) are met.

Description of Change:Reduced the preventative maintenance frequency of the Train 3 and 4machine cooling water systems' pH monitoring instrumentation loops to asemiannual (six months) preventative maintenance task as oppose to thepresent monthly task. Also included updating the loop accuracycalculation documents and associate configuration item database entriesfor installed plant instrumentation.

Reason for the Change:Changing the preventative maintenance frequency for the machine coolingwater systems' pH monitoring instrumentation loops will reduce the risk ofdamaging the pH probe tips.

FOE 15-0206 0 Title: 10/14/2015 No LCF Integrated Safety yes None of the criterialPOE - N/A Remove Battery Room Hydrogen Monitoring as a Lead Cascade Items Analysis, LCF Integrated listed in 10 CFR

Relied On For Safety Safety Analysis Summary, 70.72(c) are met.Description of Change: LCF Integrated SafetyRemoved battery room hydrogen monitoring from being a credited Items Anealysis Summary7.3Relied On For Safety in the LCF integrated Safety Analysis and Integrated[Rdce]Stin73Safety Analysis Summary. The hydrogen detectors will not be physically Tables 7.2-1, C-1, and F-i.

modified in any way.

Reason 'for the Change:Since the battery room hydrogen monitoring is not necessary meet theperformance requirements of 10 CFR 70.61, it is being removed as anItems Relied On For Safety.

FOE 15-0207 0 Title: 9/23/20 15 No AC4-ON-110 Chg 7 No None of the criterial

POE - N/A Revision to Procedure AC4-ON-1 10, 000 Loss of DOS lse n1 FDescription of Change: 70.72(c) are met.

Revised and added steps: and revised note boxes.

Reason for the Change:Clarii• procedure requirements.

NRC Report 2015Pae5of6 Page 59 of 68

Page 62: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number .Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0208 0 Title: 9/23/2015 No AC4-AR-002 Chg 30 No None of the criterialPCE - N/A Revision to Procedure AC4-AR-002, Machine Cooling Water Alarms and listed in 10 CFR

Responses 70.72(c) are met.

Description of Change:Added an alarm response: and made editorial and formatting changes.

Reason far the Change:Clarify procedure requirements.

FCE 15-0209 0 Title: 9/2512015 No AC4-OP-059 Chg 9 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-059, Purge Vacuum / Evacuation Vacuum listed in 10 CFR

Chemical Trap Operations 70.72(c) are met.

Description of Change:Revised procedure owner; revised, deleted, and rearranged steps; reviseda note box; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0210 0 Title: 9/30/2015 No AC4-ON-009 Chg 33 No None of the criterialPCE - N/A Revision to Procedure AC4-ON-009, Response to Loss of Power listed in 10 CFR

Description of Change: 70.72(c) are met.

Deleted a step; revised and added steps; added a note; and revised tables.

Reason for the Change:Clarify procedure requirements.

FCE 15-0211 0 Title: 11/9/2015 Yes OA-CS-132-15-001 Rev 1 No None of the crnterialPCE - N/A Revision to Cascade Settings Document OA-CS-132-15-001, (U) Cascade listed in 10 CFR

132 Centrifuge Operating Parameters 70.72(c) are met.

Description of Change:Revised operating parameters for Cascade 132.

Reason for the Change:The change was required to maintain optimum production for the availablecascade configuration.

NRC Report 2015Pae6of8 Page 60 of 68

Page 63: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0213 0 Title: 10/5/2015 No AC4-OP-020 Chg 9 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-020, Machine Mount Hardware Installation listed in 10 CFR

/ Removal 70.72(c) are met.

Description of Change:Revised procedure owner; added, revised, and rearranged steps; andrevised definitions and a form.

Reason for the Change:Clarify procedure requirements.

FOE 15-0214 0 Title: 10/5/2015 No AC4-OP-002 Chg 29 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-002, Evacuation Vacuum Normal listed in 10 CFR

Operating Procedure 70.72(c) are met.

Description of Change:Revised procedure owner; added steps; and made editorial and formattingchanges.

Reason for the Change:Clarify procedure requirements.

FOE 15-0215 0 Title: 10/13/2015 No AC4-OP-101 Chg 15 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-101, Commercial Demonstration Cascade listed in 10 CFR

Purge Vacuum Operating Procedure 70.72(c) are met.

Description of Change:Added steps; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FOE 15-0216 0 Title: 10/6/2015 No AC4-OP-102 Chg 6 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-1 02, Commercial Demonstration Cascade listed in 10 CFR

Evacuation Vacuum Normal Operating Procedure 70.72(c) are met.

Description of Change:Added steps; and made editorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae6of8 Page 61 of 68

Page 64: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0217 0 Title: 10/8/2015 No ESO-2201-0116; SPC-2415- No None of the criterialPCE - N/A Engineering Service Order ESO-2201 -0116, Update Affected Engineering 0001 Rev 2 listed in 10 CFR

Documents/Drawings in Accordance with the IAR for FAC 15-0005, 70.72(c) are met.Removal of MIVs as a Lead Cascade IROES

Description of Change:Revised setpoint and tolerance calculation document, database entries,quality levels, and engineering drawings and documents to removemachine isolation valves as a Lead Cascade Items Relied On For Safety.

Reason for the Change:To authorize the updating of the engineering documents and. drawingsaffected by the removal of the machine isolation valves as a LeadCascade Items Relied On For Safety as approved and evaluated in FCE15-0093 Rev 0/FAC 15-0005 Rev 0.

FOE 15-0218 0 Title: 11/5/2015 No AC3-ST-001 Chg 16 No None of the criterialPOE - N/A Revision to Procedure AC3-ST-001, Cascade 132 Machine Isolation listed in 10 CFR

System and Secondary Isolation System Calibration 70.72(c) are met.

Description of Change:Modified the as-left tolerance for pressure switches; revised, deleted, andre-numbered steps; and made editorial and formatting changes.

Reason for the Change:This change was made as a result of a previously evaluated change FOE15-0093 Rev 0/FAC 15-0005 Rev 0 that removed the machine isolationvalves from being credited as an Items Relied On For Safety in the LCFand to clarify procedure requirements.

FOE 15-0219 0 Title: 11/5/2015 No AC3-ST-005 Chg 6 No None of the criterialPOE - N/A Revision to Procedure AC3-ST-005, Commercial Demonstration Cascade listed in 10 CFR

Machine Isolation System and Secondary isolation System Calibration 70.72(c) are met.

Description of Change:Modified the as-left tolerance for pressure switches; revised, deleted, andre-numbered steps; and made editorial and formatting changes.

Reason for the Change:This change was made as a result of a previously evaluated change FOE15-0093 Rev 0/FAC 15-0005 Rev 0 that removed the machine isolationvalves from being credited as an Items Relied On For Safety in the LCFand to clarify procedure requirements.

NRC Report 2015Pae6of8 Page 62 of 68

Page 65: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0220 0 Title: 10/22/2015 No AC4-OP-001 Chg 40 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-001, Purge Vacuum Normal Operating lse n1 F

Procedure 70.72(c) are met.

Description of Change:Added operation of instrument air filter drain valves to purge vacuum pumpstartup and shutdown and deleted references to an Items Relied On ForSafety surveillance.

Reason for the Change:Clarify procedure requirements.

FOE 15-0221 0 Title: 11/5/2015 No LOF Fundamental Nuclear Yes None of the criterialPCE 15-01 07 0 Revision to the ACP/LCF Fundamental Nuclear Material Control Plans, Material Control Plan Section listed in 10 CFR

LCF Integrated Safety Analysis, LOF Integrated Safety Summary, and LCF 6.5; ACP Fundamental 70.72(c) are met.Nuclear Criticality Safety Approval and Evaluation to Address Potential Nuclear Material Control PlanIssues within the Lead Cascade Material Balance Area Section 8.3: LCF IntegratedDescription of Change: Safety Analysis, LCFRevised LCF Nuclear Criticality Safety Approval and Evaluation to address Integrated Safety Analysisissues; updated LCF Integrated Safety Analysis and Integrated Safety Summary, LCF IntegratedAnalysis Summary to align with what is stated in the LCF Nuclear safety Analysis SummaryCriticality Safety Approval and Evaluation; and revised ACP/LCF [Redacted] Section 5.1; LCFFundamental Nuclear Material-Control Plans for clarity and consistency .Nuclear Criticality Safety.with other noted changes. Approval and Evaluation

Reason for the Change:To improve the Lead Cascade Inventory Control Program regardingpotential issues associated with material within the Lead Cascade materialbalance area.

FOE 15-0222 0 Title: 10/30/2015 No ACD4-UP-010 Chg 14 No None of the criterialPOE 15-01 08 0 Revision to Procedure ACD4-UP-010, Routine Switchyard Station Checks lse n1 F

at the X-5000 70.72(c) are met.

Description of Change:Deleted step for performing inspection of batteries.

Reason for the Change:This change was initiated to eliminate the impracticality of visuallyinspecting batteries on a daily basis, since the inspection is required on aquarterly maintenance task.

NRC Report 2015Pae6of8 Page 63 of 68

Page 66: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRC

PENumber Re.Approval Change Documents Modified Update Preapproval NotCEDate to SSC? Due to Change Required? Required/Comments

FOE 15-0223 0 Title: 10/30/2015 No ACD4-UP-029 Chg 4 No None of the criterialPCE 15-01 09 0 Revision to Procedure ACD4-UP-029, Operation of the X-5000 Battery listed in 10 CFR

Room and DO Power Distribution 70.72(c) are met.

Description of Change:Deleted a section for routine battery room operational checks.

Reason for the Change:This change was initiated to eliminate the impracticality of visuallyinspecting batteries on a daily basis, since the inspection is required on aquarterly maintenance task.

FOE 15-0224 0 Title: 11/2/2015 No AC4-OP-101 Chg 16 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-1 01, Commercial Demonstration Cascade listed in 10 CFR

Purge Vacuum Operating Procedure 70.72(c) are met.

Description of Change:Deleted sections and a portion of a note.

Reason for the Change:This change was made as a result of a previously evaluated change FOE15-0093 Rev 0/FAC 15-0005 Rev 0 that removed the machine isolationvalves from being credited as an Items Relied On For Safety in the LCFand to clarify procedure requirements.

FOE 15-0225 0 Title: 11/23/2015 No ACD2-MA-002 Chg 16 No None of the criterialPOE 15-0110 0 Revision to Procedure ACD2-MA-002, Work Control Process listed in 10 CFR

Description of Change: 70.72(c) are met.

Added, revised, and deleted steps; revised reference paragraph andforms; and made formatting changes.

Reason for the Change:Clarify procedure requirements.

FOIE 15-0226 0 Title: 12/14/2015 No AC4-ST-002 Chg 2 No None of the criterialPOE - N/A Revision to Procedure AC4-ST-002, Functional Test and Adjustment of listed in 10 CFR

Battery Room Hydrogen Detectors 70.72(c) are met.

Description of Change:Revised procedure title; deleted non-applicable references; revised anddeleted notes; rearranged sections; revised steps, sources references,and a form; and made editorial changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae6of8 Page 64 of 68

Page 67: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

FOE 15-0227 0 Title: 11/11/2015 No TP-2101-0067 Rev 0 No None of the criternalPOE - N/A New Test Plan TP-2101-0067 listed in 10 OFR

Description of Change: 70.72(c) are met.

Tested the effectiveness and efficiency of a modified backfill andevacuation method.

Reason for the Change:This Test Plan was developed to determine if a suggested altemnatemethod of operations during backfill and evacuation will be more efficient.

FOE 15-0228 0 Title: 11/13/2015 No AC4-OP-013 Chg 21 No None of the criterial

POE - N/A Revision to Procedure AC4-OP-013, Operation of the X-3001 Battery and - listed in 10 CFRDO Power System 70.72(c) are met.

Description of Change:Revised and deleted steps; and made editorial changes.

Reason for the Change:This change was made as a result of a previously evaluated change FOE15-0206 Rev 0/FAC 15-0009 Rev 0 that removed the battery roomhydrogen monitoring from being credited as an Items Relied On ForSafety in the LCF and to clarify procedure requirements.

FOE 15-0229 0 Title: 11/13/2015 No A04-ON-009 Chg 34 No None of the criterial

POE - N/A Revision to Procedure AC4-ON-009, Response to Loss of Power listed in 10 CFR

Description of Change: 70.72(c) are met.

Added and revised steps; and made formatting changes.

Reason for the Change:This change was made as a result Of a previously evaluated change FOE15-0206 Rev 0/FAC 15-0009 Rev 0 that removed the battery roomhydrogen monitoring from being credited as an Items Relied On ForSafety in the LCF and to clarify procedure requirements.

FOE 15-0230 0 Title: 12/3/2015 Yes ECR-E4794-02 Rev 0 No None of the criterial

POE 15-0111 0 ECR-E4794-02, X-1 020 Meteorological Data Acquisition System - Radio, listed in 10 CFRAntenna, and Cable Replacement 70.72(c) are met.

Description of Change:Replaced the existing radio located in room 129 of the X-1 020 building;inspected and determined if the existing coaxial cable needed to bereplaced; and replaced the existing antenna, Drawing X-1020-6E isupdated to reflect this modification.

Reason for the Change:Initiated because the existing radio, antenna, and cables have reached theend of their useful life, and are no longer compatible with the othercomponents of the Meteorological Data Acquisition System.

NRC Report 2015Pae6of8 Page 65 of 68

Page 68: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FOE 15-0231 0 Title: 11/17/2015 No AC4-AR-008 Chg 36 No None of the criteria!PCE - N/A Revision to Procedure AC4-AR-008, X-3001 Power System Alarms and listed in 10 CFR

Responses 70.72(o) are met.

Description of Change:Deleted reference to items Relied On For Safety surveillance IS-039.

Reason for the Change:This change was made as a result of a previously evaluated change FCE15-0206 Rev 0/FAG 15-0009 Rev 0 that removed the battery roomhydrogen monitoring from being credited as an Items Relied On ForSafety in the LOF and to clarify procedure requirements.

FOE 15-0232 0 Title: 11/19/2015 Yes ESO-2409-0089 No None of the criterialPOE 15-0112 0 Engineering Service Order ESO-2409-0089, Install Reset Pushbuttons on listed in 10 CFR

Phase Unbalance Relays on X-6000 TWO Motors #2 and #4 70.72(c) are met.

Description of Change:Installed new lighted push buttons to act as a manual reset for the X-6000tower water cooling pump motors phase unbalance relays.

Reason for the Change:To alleviate a possible motor unbalance issue. The current phaseunbalance relays do not have a manual reset and may automatically resetthe motor after an unbalanced condition exists without any correctiveaction.

FOE 15-0233 0 Title: 12/8/2015 No TP-2101-0068 Rev 0 No None of the criterialPOE 15-0113 0 New Test Plan TP-2101-0068 listed in 10 CFR

Description of Change: 70.72(c) are met.This Test Plan allows for two methods of load testing involving the use ofload bank connections and switchgear components, and the use of loadmanagement software.

Reason for the Change:To collect data to ensure the auxiliary standby generators are in soundoperational condition with a specific amount of load applied.

FOE 15-0236 0 Title: 12/1/2015 No AC4-AR-103 Chg 8 No None of the criterialPOE - N/A Revision to Procedure AC4-AR-1 03, Commercial Demonstration Cascade listed in 10 CFR

Evacuation Vacuum Alarms and Responses 70.72(c) are met.

Description of Change:Revised and deleted steps; deleted tables; updated logo; and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae6of8 Page 66 of 68

Page 69: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0237 0 Title: 12/6/2015 No ACD2-SH-013 Chg 3 No None of the crnterialPCE 15-0114 0 Revision to Procedure ACD2-SH-013, Job Hazard Analysis listed in 10 CFR

Description of Change: 70.72(c) are met.

Added guidance to include industrial Safety in the development of jobhazard analyses: incorporated Appendix A contents into body of procedureand deleted Appendix A; added examples of administrative controls,engineering controls, and personal protective equipment; revised recordretention of a form from one year to five years; revised a form: and madeeditorial and formatting changes.

Reason for the Change:Clarify procedure requirements.

FCE 15-0238 0 Title: 12/3/2015 Yes ESO-2412-0018 No None of the criterialPCE 15-0115 0 Engineering Service Order ESO-2412-0018, Remove Automatic Operation listed in 10 CFR

from Transfer Switches for Transformers 501, 502, and 503 70.72(c) are met.

Description of Change:Slotted hole was cut in the transfer switch panels. The motor actuator wasdisconnected and the interlock throw-over handle was extended out theside of the panels for manual operation.

Reason for the Change:To alleviate an automatic back-up switch failure. Under normal operation,the unit originally sensed a loss of power and would automatically switchfrom normal power to back-up power for the transformer tap changer.Recently, the automatic transfer switches began functioning without a lossof power, leaving no control power and causing an alarm in the controlroom.

FOE 15-0239 0 Title: 12/17/2015 No SP-3605-0009 Rev 1; SP- No None of the criterialPCE 15-0116 o Changes to American Centrifuge Classified Cyber Security Plans 3605-0011 Rev 1; SP-3605- listed in 10 CFR

Description of Change: 0013 Rev 1 70.72(c) are met.

Revised a procedure title for ACD2-RG-044, Regulatory and SecurityEvent Notification and Reporting; and revised network system owners,information systems security officers, and administrators due toretirements at the facility.

Reason for the Change:To update the cyber security plans to reflect the new procedure title andnetwork system owners, information systems security officers, andadministrators.

NRC Report 2015Pae6of8 Page 67 of 68

Page 70: American Centrifuge Plant and American Centrifuge Lead ...FCE 14-0293 1 Title: 2/19/2015 No ACD3-EG-205 Ohg 7 No None of the criteria PCE 14-01 26 1 Revision to Procedure ACD3-EG-205,

Rev. ISAFCE Number Summary Reason NRCPCE Number Re.Approval Change Documents Modified Update Preapproval Not

Date to SSC? Due to Change Required? Required/Comments

FCE 15-0240 0 Title: 12/10/2015 No AC4-OP-110 Chg 4 No None of the criterialPOE - N/A Revision to Procedure AC4-OP-1 10, 0DC Auxiliary Power Substation listed in 10 CFR

Description of Change: 70.72(c) are met.Deleted statements in precaution and body of procedure that are normal-expectations; rearranged note boxes from beginning of actions steps intoprecautions; deleted part of warning boxes that are no-longer applicable;added warning boxes; and revised steps.

Reason for the Change:Clarify procedure requirements.

FOE 15-0241 0 Title: 12/10/2015 No AC4-OP-010 Chg 8 No None of the criterialPCE - N/A Revision to Procedure AC4-OP-01 0, Operation of X-3001 Auxiliary Power listed in 10 CFR

Substations 70.72(c) are met.

Description of Change:Deleted statements in precaution and body of procedure that are normalexpectations; rearranged note boxes from beginning of actions steps intoprecautions; deleted part of warning boxes that are no-longer applicable;added warning boxes; and revised steps.

Reason for the Change:Clarify procedure requirements.

FOE 15-0242 0 Title: 12/11/2015 No AC4-AR-106 Chg 15 No None of the criterialPOE - N/A Revision to Procedure A04-AR-106, CDC Cascade Alarms and Responses listed in 10 CFR

Description of Change:702()aemtUpdated logo and added a note box in Appendix 0.

Reason for the Change:Clarify procedure requirements.

NRC Report 2015Pae6of8 Page 68 of 68