amendment no.: three (3) · ths basketball court slab ”, a one (1) page file. this is the...

8
Solicitation Amendment Tombstone Unified School District Physical: 411 North 9th Street Mailing: PO Box 1000 Tombstone, AZ 85638 520.457.2217 Solicitation No: IFB #21-01-21 Description: HVAC Conversion Project at Tombstone High School and Huachuca City School Amendment No.: Three (3) Pursuant to the Uniform Instructions, (2)(F), Solicitation Amendments, the above referenced solicitation shall be amended as follows: 1. Add the following to the Scope of Work, Drawings (5) on Page 5: C. “THS Basketball Court Slab”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab D. “Huachuca Gym M-1R”, a one (1) page file. Attached sheet M-1R shall replace the sheet M-1 from the original bid set. All items shown "clouded" on sheet M-1R shall be included in the final bid. Enlarged mechanical room plan shown on Sheet M-2 does not apply. Refer to sheet M-1R for east and west enlarged room plans. HUACHUCA GYM M-1R - signed.pdf E. Additional Site Clarifications – Tombstone High School i. Existing evaporative cooler, and gas heaters being removed shall be returned to the owner. ii. Prior to working inside gym, contractor shall protect the wood floors with two (2) layers of "Ram Board" or equal product. F. Additional Site Clarifications – Huachuca City School i. Existing evaporative coolers inside east and west mechanical rooms, and gas heaters being removed shall be returned to the owner. Existing three (3) evaporative coolers located on outside wall shall be disposed. ii. Prior to working inside gym, contractor shall protect the wood floors with a layer of "Ram Board" or equal product. G. Q&A through Bonfire portal received by deadline, attached as separate, PDF file, named “Q&A 7-23-2020” with a total of four (4) pages. Q&A 7-23-2020.pdf 2. Revise the following Special Instructions, Pre-Bid Conference (1) on Page 24 as follows (emphasis added): D. The District reserves the right to schedule an additional pre-bid conference(s) if attendance is less than three (3) firms. The district reserves the right to verify the employment of any mandatory pre-bid conference participants, in a reasonable manner, to determine Bidder eligibility. If representatives work for multiple firms, it must be clearly indicated in the bid package to avoid a non-responsive determination.

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

Solicitation Amendment Tombstone Unified School District

Physical: 411 North 9th Street Mailing: PO Box 1000 Tombstone, AZ 85638

520.457.2217 Solicitation No: IFB #21-01-21 Description: HVAC Conversion Project at Tombstone High School and Huachuca City School

Amendment No.: Three (3)

Pursuant to the Uniform Instructions, (2)(F), Solicitation Amendments, the above referenced solicitation shall be amended as follows:

1. Add the following to the Scope of Work, Drawings (5) on Page 5:C. “THS Basketball Court Slab”, a one (1) page file. This is the structural as-built for the

basketball court.

THS BasketballCourt-Slab

D. “Huachuca Gym M-1R”, a one (1) page file. Attached sheet M-1R shall replace the sheet M-1from the original bid set. All items shown "clouded" on sheet M-1R shall be included in the final bid.Enlarged mechanical room plan shown on Sheet M-2 does not apply. Refer to sheet M-1R for eastand west enlarged room plans.

HUACHUCA GYM M-1R - signed.pdf

E. Additional Site Clarifications – Tombstone High Schooli. Existing evaporative cooler, and gas heaters being removed shall be returned to the owner.ii. Prior to working inside gym, contractor shall protect the wood floors with two (2) layers of

"Ram Board" or equal product.F. Additional Site Clarifications – Huachuca City School

i. Existing evaporative coolers inside east and west mechanical rooms, and gas heatersbeing removed shall be returned to the owner. Existing three (3) evaporative coolerslocated on outside wall shall be disposed.

ii. Prior to working inside gym, contractor shall protect the wood floors with a layer of "RamBoard" or equal product.

G. Q&A through Bonfire portal received by deadline, attached as separate, PDF file, named“Q&A 7-23-2020” with a total of four (4) pages.

Q&A 7-23-2020.pdf

2. Revise the following Special Instructions, Pre-Bid Conference (1) on Page 24 as follows (emphasis added):

D. The District reserves the right to schedule an additional pre-bid conference(s) if attendance is less than three (3) firms. The district reserves the right to verify the employment of any mandatory pre-bid conference participants, in a reasonable manner, to determine Bidder eligibility. If representatives work for multiple firms, it must be clearly indicated in the bid package to avoid a non-responsive determination.

Page 2: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

Solicitation Amendment Tombstone Unified School District

Physical: 411 North 9th Street Mailing: PO Box 1000 Tombstone, AZ 85638

520.457.2217 Solicitation No: IFB #21-01-21 Description: HVAC Conversion Project at Tombstone High School and Huachuca City School

Amendment No.: Three (3)

ALL OTHER PROVISIONS OF THE SOLICITATION SHALL REMAIN IN THEIR ENTIRETY.

Offeror hereby acknowledges receipt and understanding of the above amendment.

The above referenced amendment is hereby executed this date by the District.

| Nora Luna | 7/28/2020 Signature Date Signature Date

Nora Luna | Business Manager

Printed/Typed Name and Title Printed/Typed Name and Title

Page 3: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

07-26-20

Page 4: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca
Page 5: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

Generated on Jul 28, 2020 10:59 AM MST - Missy Mudry

Page 1 of 4

Questions and Answers

Berg Enterprises Inc. dba Berg's Heating & Air Conditioning

Tombstone Gym Building

Shin Anderson, Jul 21, 2020 2:18 PM MST

1.) Please clarify where the duct penetrations for the Gym units will be. Onsite discussion was had regarding the duct coming through the existing windows. If the West unit is lined up with the last window on the west side of the gym there will not be enough clearance between the new unit and the existing unit. 2.) If the new west unit is going to be lined up with the window and there is not enough clearance between units, how will this be addressed. Will there be an addendum to move the existing unit? 3) Please clarify if the basketball pad to the north of the gym roof will support a crane.

Missy Mudry, Jul 21, 2020 3:20 PM MST

Good afternoon, thank you for your inquiry. It has been received and being reviewed. Any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 10:01 AM MST

The new west unit (AC-1) is not lined-up with last window. It is lined-up with the window before last. Refer to bid plan sheet M-1. We could not verify if the basketball court slab is "Fire-Truck Rated". For reference, we are providing the structural as-built (attached) of the existing basketball court slab. This information will be included in Amendment #3. Thank you!

Huachuca City Gym Building

Shin Anderson, Jul 21, 2020 2:26 PM MST

1) Does the school district want any enclosure ie. chain link fencing with man gates around the new package units and condensers? 2) Do the dampers in the ridge vent opening close? If they are not able to be closed will they need to be capped off or sealed from above. Is there any consideration of removing the dampers and re-roofing the ridgevent opening?

Missy Mudry, Jul 21, 2020 3:21 PM MST

Good afternoon, thank you for your inquiry. These questions have been received and will be reviewed. Any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 10:03 AM MST

1) M-1R will be revised in Amendment #3 that shows clouded revisions, which includes new chain-link fences. 2) Existing ridge vent shall be capped from above. Refer to an attached M-1R for ridge-vent sealing detail. This information will be shared in Amendment #3. Thank you!

Page 6: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

Generated on Jul 28, 2020 10:59 AM MST - Missy Mudry

Page 2 of 4

General Contractor's License

Shin Anderson, Jul 21, 2020 2:32 PM MST

Addendum 1 addresses the work being performed under a General Contractor's License. My company has an in-house General Contracting Company, Munsey Contract & Development, that all the necessary work & subcontractors can perform under. They were not at the mandatory walk thru as this addendum had not been issued. Will we still be able to submit under their license. I do work for both companies and if so needed can represent the General Contracting company and Berg's Heating & Air.

Missy Mudry, Jul 21, 2020 3:22 PM MST

Good afternoon, thank you for your interest in this project. This inquiry has been received and is currently being reviewed. Any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 10:59 AM MST

The district reserves the right to verify the employment of any mandatory pre-bid conference participants, in a reasonable manner, to determine Bidder eligibility. If representatives work for multiple firms, it must be clearly indicated in the bid package to avoid non-responsive determination. This information will be shared in Amendment #3. Thank you!

Tombstone Gym

Shin Anderson, Jul 21, 2020 3:41 PM MST

On the gym high roof are the curbs for the relief hoods and evaporative coolers to be pulled and roofed over?

Missy Mudry, Jul 22, 2020 8:35 AM MST

Good morning, thank you for your inquiry. It has been received and being reviewed. Any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 10:43 AM MST

The relief hoods are to be removed with associated barometric damper. The roof-curbs are to remain, and be sealed as shown in the bid plans. The evaporative coolers located on high roof curbs have been removed already. Refer to the bid plans for details. This will be included in Amendment #3. Thank you!

Page 7: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

Generated on Jul 28, 2020 10:59 AM MST - Missy Mudry

Page 3 of 4

HACI Service LLC. Tombstone H.S.

Chuck Waelde, Jul 21, 2020 8:47 AM MST

can you tell me if the roof where the new A/C units is under warranty?

Missy Mudry, Jul 21, 2020 3:20 PM MST

Good afternoon, thank you for your inquiry. It has been received and being reviewed. Any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 9:59 AM MST

As per our knowledge, the roof is not under warranty. This information will be included in Amendment #3. Thank you!

LOR Construction

License Requirement

Jacqueline Meseroll, Jul 17, 2020 8:56 AM MST

What license will be required by the bidding contractor for this project?

Missy Mudry, Jul 17, 2020 1:17 PM MST

Good afternoon, thank you for your inquiry. It has been received and any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 9:58 AM MST

A General Contractor is required for this project, as outlined in Amendment #2. Thank you!

Lectra-Serv, Inc. HCS - Electrical Service Feed

Isaac Banks, Jul 17, 2020 8:05 AM MST

Please confirm that new gym building electrical service is to be fed from existing SSVEC transformer at West end of property, adjacent to SES #1.

Page 8: Amendment No.: Three (3) · THS Basketball Court Slab ”, a one (1) page file. This is the structural as-built for the basketball court. THS BasketballCourt-Slab. D. “ Huachuca

Generated on Jul 28, 2020 10:59 AM MST - Missy Mudry

Page 4 of 4

Missy Mudry, Jul 17, 2020 1:17 PM MST

Good afternoon, your question has been received and will be reviewed ASAP. Any changes will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 9:56 AM MST

This scope of work is to add two (2) new circuit breakers to an existing distribution panel and extend out with conductors to the new AC units. There is no need address existing transformers. The existing SES and distribution panel is located to the south side of the gymnasium. This information will be included in Amendment #3. Thank you!

HCS - Electrical Service Rating

Isaac Banks, Jul 17, 2020 8:07 AM MST

Please confirm that the AIC rating of the new gym building service entrance is to be 100K. This adds significant cost to the switchgear, and likely is not required per SSVEC specifications.

Missy Mudry, Jul 17, 2020 1:17 PM MST

Good afternoon, thank you for your inquiry. It has been received and any changes, if applicable, will be addressed in a future amendment. Thank you!

Missy Mudry, Jul 28, 2020 9:57 AM MST

Available Fault Current from APS is 56,135 A.I.C. The new circuit breaker will need to be rated at 42,000 A.I.C. This information will be included in Amendment #3. Thank you!