2General PerformanceGeneral PerformanceGeneral Performance
Span lengths: 250 - 400m Voltage levels: Up to 700 kV Conductor types: All common types Bundles: single - quad Ground clearances: min. 7 - 8 m,
adaptable
Span lengths:Span lengths: 250 - 400m250 - 400m Voltage levels:Voltage levels: Up to 700 kVUp to 700 kV Conductor types:Conductor types: All common typesAll common types Bundles:Bundles: single - quadsingle - quad Ground clearances:Ground clearances: min. 7 - 8 m,min. 7 - 8 m,
adaptableadaptable
EL 1EL 1
Standard Design CriteriaStandard Design CriteriaStandard Design Criteria
Max. conductor temp. 80C Min el. Clearance: 7m 400 kV Wind on conductors: 640 N/m (115 km/h gust) Wind on towers: 815 N/m (130 km/h gust) Ice load: optional
(these are design loads, load factor of 1.5)
Max. conductor temp.Max. conductor temp. 80C80C Min Min elel. Clearance:. Clearance: 7m 400 kV Wind on conductors:Wind on conductors: 640 N/m 640 N/m (115 km/h gust)(115 km/h gust) Wind on towers:Wind on towers: 815 N/m 815 N/m (130 km/h gust)(130 km/h gust) Ice load:Ice load: optionaloptional
(these are design loads, load factor of 1.5)(these are design loads, load factor of 1.5)
-
3TowersTowersTowers
Tower types: dead end towerstension towerssuspension towersrunning angle
Tower height: approx.. 35m Options: single or double circuit
earth wire (or OPGW)
Tower types:Tower types: dead end towersdead end towerstension towerstension towerssuspension towerssuspension towersrunning anglerunning angle
Tower height:Tower height: approx.. 35mapprox.. 35m Options:Options: single or double circuitsingle or double circuit
earth wire (or OPGW)earth wire (or OPGW)
-
4
-
5118118
119119
-
6StructureStructureStructure
Material: Steel and aluminium Length sections: 1.45 and 2.9m Outside dimension: 575 mm square Column outside face: no protruding flanges Inter-connection: 4 high strength bolts Surface treatment: hot dip galv. 70 m Section weight: 130 kg Steel
90 kg Aluminium Total weight: 1700 kg, Steel
1350 kg, Aluminium
Material:Material: Steel and aluminiumSteel and aluminium Length sections:Length sections: 1.45 and 2.9m1.45 and 2.9m Outside dimension:Outside dimension: 575 mm square575 mm square Column outside face:Column outside face: no protruding flangesno protruding flanges Inter-connection:Inter-connection: 4 high strength bolts4 high strength bolts Surface treatment:Surface treatment: hot dip hot dip galvgalv. . 70 70 mm Section weight:Section weight: 130 kg Steel130 kg Steel
90 kg Aluminium90 kg Aluminium Total weight:Total weight: 1700 kg, Steel1700 kg, Steel
1350 kg, Aluminium1350 kg, Aluminium
-
7FoundationFoundationFoundation
Outline dimension: 2.5 m x 1.2 m Steel parts: 120 kg Support structure: 2.5 m x 1.2 m Grounding: hinge allowing leaning
and rotation in alldirections.
Outline dimension:Outline dimension: 2.5 m x 1.2 m2.5 m x 1.2 m Steel parts:Steel parts: 120 kg120 kg Support structure:Support structure: 2.5 m x 1.2 m2.5 m x 1.2 m Grounding:Grounding: hinge allowing leaninghinge allowing leaning
and rotation in alland rotation in alldirections.directions.
-
8Hydraulic power pack and winchHydraulicHydraulic power pack and winch power pack and winch
113113
-
9GuysGuysGuys
# of guys: 4 - 9 Guy length: 45 and 55 m Ultimate strength: > 140 kN Max applied load: 80 kN Specials: provided with prefab
fittings Guy insulation: depends on tower
configuration
# of guys:# of guys: 4 - 94 - 9 Guy length:Guy length: 45 and 55 m45 and 55 m Ultimate strength:Ultimate strength: > 140 kN> 140 kN Max applied load:Max applied load: 80 kN80 kN Specials:Specials: provided with prefabprovided with prefab
fittingsfittings Guy insulation:Guy insulation: depends on towerdepends on tower
configurationconfiguration
-
10
AnchorsAnchorsAnchors
Standard type: direct embedded spreadanchors
Admissible load: 80 kN Options: cross plate anchors
expanding rock anchorschemical rock anchorssand, water bags
Installation: hydraulic equipment
Standard type:Standard type: direct embedded spreaddirect embedded spreadanchorsanchors
Admissible load:Admissible load: 80 kN80 kN Options:Options: cross plate anchorscross plate anchors
expanding rock anchorsexpanding rock anchorschemical rock anchorschemical rock anchorssand, water bagssand, water bags
Installation:Installation: hydraulic equipmenthydraulic equipment
-
11
InsulatorsInsulatorsInsulators
Insulation levels: Acc. IEC 71-1 SML: 80-300 kN Creepage: 20 - 25 mm/kV (adaptable) Material: Composite insulators Assembly: Horizontal V Exchangeability: String insulators
exchangeable
Insulation levels:Insulation levels: AccAcc. IEC 71-1. IEC 71-1 SML:SML: 80-300 kN80-300 kN Creepage:Creepage: 20 - 25 mm/kV (adaptable)20 - 25 mm/kV (adaptable) Material:Material: Composite insulatorsComposite insulators Assembly:Assembly: Horizontal VHorizontal V Exchangeability:Exchangeability: String insulatorsString insulators
exchangeableexchangeable
-
12
-
13
StorageStorageStorage
420 kV: 2 complete towers in one20 container
> 420 kV one complete tower in one20 container
420 kV: 420 kV: 2 complete towers in one2 complete towers in one20 container20 container
> 420 kV> 420 kV one complete tower in oneone complete tower in one20 container20 container
-
14
One example of the manualOne exampleOne example of the of the manual manual
-
15
1. Foudation 250 kgheaviest part80 kg
2. Short sectionSteel :Aluminium:
75 kg55 kg
3. Standard sectionSteel:Aluminium:
130 kg92 kg
4. Coupling box 35 kg
5. Bottum section 70 kg
6. Derrick 45 kg
7. Hydralic tools:Which type 1, 20 kN:Which type 2, 28 kN:(optional)
Powerpack
175 kg (wheeled)235 kg (wheeled)
82 kg
-
16
1. Foudation 250 kgheaviest part80 kg
2. Short sectionSteel :Aluminium:
75 kg55 kg
3. Standard sectionSteel:Aluminium:
130 kg92 kg
4. Coupling box 35 kg
5. Bottum section 70 kg
6. Derrick 45 kg
7. Hydralic tools:Which type 1, 20 kN:Which type 2, 28 kN:(optional)
Powerpack
175 kg (wheeled)235 kg (wheeled)
82 kg
Anchor installationAnchor installationAnchor installation
209209
-
17
215215
115115
-
18
207207
218218
-
19
Vertical ErectionVertical ErectionVertical Erection
Quick erection time (4 hours per tower) Small building site All work at low height
Quick erection time (4 hours per tower)Quick erection time (4 hours per tower) Small building siteSmall building site All work at low heightAll work at low height
-
20
-
21
KELSOPKELSOPKELSOP
Route overviews Calculation and approval of mechanical loads
on the towers Sag & Tension Tables Reports which can be used as worksheets for
the erection
Route overviewsRoute overviews Calculation and approval of mechanical loadsCalculation and approval of mechanical loads
on the towerson the towers Sag & Tension TablesSag & Tension Tables Reports which can be used as worksheets forReports which can be used as worksheets for
the erectionthe erection
-
22
Title pageTitle pageTitle page
Load tabLoad tabLoad tab
-
23
Conductor tabConductor tabConductor tab
Tower tabTower tabTower tab
-
24
Route Data ScreenRoute Data ScreenRoute Data Screen
Tower Construction Data ScreenTower Construction Data ScreenTower Construction Data Screen
-
25
Tower Type Selection ScreenTower Type Selection ScreenTower Type Selection Screen
Guy Wire Data ScreenGuy Wire Data ScreenGuy Wire Data Screen
-
26
Route Data (top view)Route Data (top view)Route Data (top view)
Route Data (side view)Route Data (side view)Route Data (side view)
-
27
Sag/TensionSag/TensionSag/Tension
Verification results TowersVerification results TowersVerification results Towers
-
28
-
29
-
30
-
31
-
32
... IN CASE OF DAMAGE ...... IN CASE OF DAMAGE ...... IN CASE OF DAMAGE ...
the most important is:the most important is:the most important is:
SPEEDSPEEDSPEED