Location- Amarpali Sapphire, sector 45,
near amity university
Site area: 12.5 acre.
Ground coverage: 30%
No. of parking in basement : 3000
No. of basement: 02
No. of flats in each tower: 120
No. of penthouse in each tower: 4
Facilities: club house, swimming pool,
gym and children play area.
No. of entry gates: 4
No. of towers: 25
30M
wid
e ro
ad
10M wide
9M wide road
Place for services
24M wide road
45M wide road
CLUB CLUB
4M
4M
4MX Y Z
APPROXIMITIES • 5 minutes drive away from its nearest Metro station golf
course.• 10 minutes drive away from the Sector 18, Market.• 10 min drive from Great India Place Mall.
Vehicular movementPedestrian movement
Swimming pool serves for recreational purpose.
Blocks exposed to direct sunlightThese blocks gets self shadow
Symmetry along central line
N
morning
afternoon
evening
SECTION:
CLUB
30M WIDE ROADROAD SECTION
Domestic water supply
MCDOverhead tank
UndergroundFiredomestic
Pump Overhead tank
units
sewage line
STP
STORM WATER LINE
Fire hydrant line
FIRE HYDRANT AND HOSE REEL
Electric supply
Electric substation
Power station Substation1100V
Transformer LT panels Distribution boards homes
LANDSCAPING
No provision for old people
Only one tennis court for 12 towers.
No trees are planted on the site that provides shade
Corbel stones are used for pathways
No sufficient children play area
Corbel stones
Concrete tiles
Narrow roads accessing the front of towers, thus hindering entry for emergency vehicles.
Fire hose cabinet & Fire hydrants are placed at every 30m.
No shading trees are planted on the site except some ornamental trees for landscaping.
Swimming pool remains under direct sunlight
The water body in the play area
O.A.T and other sitting area
Wooden pergola
PLANNING
U-TOWER -TYPICAL FLOOR PLAN :
CIRCULATION (LIFT CORRIDOR).NEGATIVE SPACES.
LIFT SHAFT.
TWO STAIRCASES ADJACENT TO EACH OTHER.
INTERNAL TOILET SHAFT.
SHAFT FOR ELECTRICITY WIRES AND WET RISER SYSTEM PIPES FOR FIRE FIGHTING.
IRREGULAR NEGATIVE SPACES FORMED DUE TO THE U-SHAPED TOWER WHICH MAKES DIFFICULTIES FOR THE AIR TO CROSS AND CAUSE DARKNESS DUE TO THE LESS SUNLIGHT PENETRATING THROUGH IT DUE TO THE LONG SHAFT.
TOILET SHAFT.
SHAFT LOCATION :
Irregular negative space which is used as shaft as it is surrounded by toilets , lift and a staircase .This shaft has one of its sides open which is 750mm in length that can allow the air cross through it but not entirely due to its irregular difficult profile .ENCLOSED INTERNAL
TOILET SHAFT.Less light penetrating through it .Enclosed by rooms , toilets and lift from all its sides.
The sprinklers in the lobby for all floors
FIRE SHAFT IN LOBBY
MACHINEROOM FOR LIFT
WATER SUPPLY FROM OVER HEAD TANK
The common shaft for the drainage pipe and water supply pipe for the toilets
TYPE AREA
2BHK 1140 sq.ft
3 BHK 1390 sq.ft
•No. of floors- G+17•No. of dwellings-36•No refuge area is provide.•Pent house present on the last floor.•Penthouse has private terraces.•All the dwellings have private balconies•Staircases-2•Lifts-2
TYPE AREA
3BHK 1640 sq.ft
3 BHK 1850 sq.ft
TYPE AREA
4BHK 2500 sq.ft
4BHK 3075 sq.ft
DEWELING UNITS SIZE
(2BR-2T,105.909 M2)MASTER BED ROOMBEDROOM
3.2MX3.65M3.35MX3.251M
(3BR-2T,129.135 M2)BEDROOMMASTER BED ROOMGUEST ROOM
3.96MX3.048M3.2MX4.572M3.65MX3.048M
(3BR-3T,152.360 M2)MASTER BED ROOMKIDS ROOMGUEST ROOM
4.572MX3.35M3.502MX3.96M3.65MX3.048M
DEWELING UNITS SIZE
(3BR-3T-1SR,171.870 M2)MASTER BED ROOMKIDS ROOMGUEST ROOMSERVANT ROOM
3.35MX4.572M3.2MX3.802M3.96MX3.048M1.878MX2.282M
(4BR-4T,229.005 M2)GUEST ROOMBEDROOMMASTER BED ROOMKIDS ROOM
3.35MX4.267M3.2MX3.65M5.486MX3.65M3.35MX4.267M
(4BR-4T,285.676 M2)MASTER BED ROOMBEDROOMKIDS ROOMGUEST ROOM
3.96MX6M3.35MX5M3.2MX3.65M3.35MX4.267M
• No proper light and ventilation in basement.
• There are four entrances to the second basement at a slope of 1:12
• Clear height of first basement is 4m and of second basement is 3.6m.
Entrance to the first basement provided at 4 places on the site with slope of 1:12 and 10m wide
No division on ramp for in & out going cars.
Fire hose cabinets and sprinklers
Drainage pipe and fire pipe is going below the ceiling in basement .
The basement covered the entire site
BASEMENT
Reinforced concrete framed structure.
Glazed tiles in the lobby.
Glass façade used for capsule lift.
Burnt clay tiles.
STRUCTURE & MATERIALS
DEMERITS
• There were no trees on the site except ornamental plants.
• Inclined parking having no shades on the site.
Pool area was getting direct sunlight.
less headroom height
No natural light in the service core (poorly lit)
The soil and waste pipe vents open to the private terrace making it uncomfortable by the smell
Uncomfortable stairs
• Basement is covering the whole site as a result there were no trees.
• No segregation between pedestrian and vehicular movement at the entrance(wrong location of ramps)
• No public terrace.
• Courts were not oriented to northeast to southwest
• No refuge area.
• Insufficient interactive spaces.
• No ramps on the site
• Blocks placed at south were getting direct harsh sunlight through the whole day & no provision for shade.
Thanks