Preventive Maintenance Work Orders :
EAM enables you to generate WO automatically based on meter readings, runtime intervals and calendar days.
this reduces the probability of failure or degradation of the assets physical conditions.
executed periodically by usage or based on the condition of an asset number.
can execute the generate preventive maintenance wo process.
Rebuild WO:
Rebuild WO are created as child Work Orders.
for example : a WO was issued for the inspection of a pumpduring pump inspection you found that the motor one of the components of the pump is problematicyou have two options you can repair and reinstall the motor (rebuildable item)you can replace the rebalance item by issuing a new motor rebuilable item from inventory if you choose to perform a material issue from inventory the old motor rebuilable item attaches to the work order automatically creating the childrebuild WO number associated to the parent WOif you choose to repair and then reinstall the problematic motor rebuildable items you can manually create the child rebuild WO for the old motor
work orders >> rebuildable WO
eAM Work Order Statuses:
EAM WO may progress through several statuses throughout its lifecycle duration
wo might start at a draft status then move to Releasedcompleteand finally closed
easy wo are created in Relaased status by passing the draft status
WO Relationships:
wO relationships nable you to manage a network of related WOenabling you to manage complex projects such as planned or facility shutdowns.
different relationships provide separate scheduling rules that are used to manage large projects
valid relationsips
parent child::: enables a network of WO which includes one top level work order that defines the time line of all its children WOthe start and end dates of the child WO are within the start and end dates of the Parent WO
end to start dependency:::: you can create WO with scheduling dependency relationships one wo scheduled start is dependent on another WO completion they should be siblings sharing a common parent
cost relationship:::: you can optionally roll a child work orders costs into the parent WO for reporting purposes.
follow up workyou can create a WO for a capital asset number or rebuildable item while executing work for the sset on another WO
Capitalizing WO:
you can capitalize part or all of the costs incurred, while maintaining an asset.The assets book value and useful life increment with the additional value,
navigate to find work order >> capitalize work order
enter a capitalization % for the costs associated with the selected items and resources optionally change the defaulted offset accountchoose initiate capitalization to execute a concurrent process that capitalizes the current work orders mantained assets associated FA with the calculated amounts.
Generating work orders:
after defining the Preventive Maintainance Scheduling Definitions you can generate WO
two ways to generate WO:1. Generate Preventive Maintenance Work Order2. implement forecasted WO from maintenance Work bench
eAM Property Manager:
pan kys
kyc status www.kra.ndml.in
44gruha lakshmibehind school
@gandhian School
Asset Groups : represents groups of assets that are virtually identical
Defining Assets :
EAM provides three methods
create individually by copying information from the existing asset utilize multiple entry methodor use asset import number interface
to deactivate an asset:
assets > asset numbers > Asset numbersquery asset numbertools > deactivate asset number D