    Articmaster HVAC/Refrigeration Solutions

    HVAC/Refrigeration Solutions consistently deliver:

    Significant Energy savings

    Improved Equipment Production

    Increased Life Expectancy of the equipment

    1

  • 8/11/2019 Am Case Studies1

    2/15

    2

    Articmaster Clients (Partial List)

    Sprint / NextelLockheed Martin

    Sterling Vineyards

    DGS - State of California /

    Real Estate Services Division

    Prince of Peace Lutheran Church

    Encompass Mechanical

    Army National GuardTrane Corporation

    Switch & Data

    Michael David Winery

    Kerman Unified School District

    IBM

    OK Produce (Fresno)

    MENEds Pizza

    TXU Energy (Texas)

    Animatics

    St. Isidores Catholic Church

    Ruby Hills Winery

  • 8/11/2019 Am Case Studies1

    3/15

    Client:

    Trane Corporation

    Rocklin OfficeParts Room

    Project:

    TraneRocklin, CA

    Articmaster HVAC Optimization Pilot Project

    August, 2011

    RESIDENTIAL SIZE APPLICATION

    3

  • 8/11/2019 Am Case Studies1

    4/15

    Articmaster Pilot Test Background:

    OVERVIEW:

    To verify the performance of the Articmaster HVAC/RefrigerationOptimization System, the Trane CorporationSacramento Division

    performed a pilot installation on their own building. The pilot

    installation took place on an existing Trane Voyager Packaged Rooftop

    unit that independently services their Parts Department at their

    Rocklin, CA office. Tranes in-house Voyager lead technician installed

    the Articmaster Optimization System, performed data trending and

    verified all of the Before and After results.

    Articmaster Condenser Controller

    on 4-Ton Trane HVAC Unit

    HVAC & ARTICMASTER EQUIPMENT :

    The Pilot consisted of installing a single Articmaster (Model # TSA1-1/8U) and RMS-1 refrigerant

    optimization device on an existing Trane Voyager 4-Ton Packaged HVAC system.

    TRANE VOYAGER HVAC UNIT INFORMATION:

    Model # YHC061C3L

    Size 4-Ton

    Type Package

    Phase 3

    Voltage 230

    RLA 18

    Compressors 1

    Refrig. Charge 10.2

    Refrigerant R-22

    4

  • 8/11/2019 Am Case Studies1

    5/15

    27.43%

    5

  • 8/11/2019 Am Case Studies1

    6/15

    Client:

    Army National Guard

    Mississippi Division

    Project:

    Hawkins Readiness CenterJackson, MS

    Articmaster HVAC Optimization Pilot Project

    MAY, 2011

    MEDIUM SIZED APPLICATION

    6

  • 8/11/2019 Am Case Studies1

    7/15

    RESULTS:

    Before (pre-Installation) data was taken over a period of 2-weeks

    (5/11/115/25/11) with an industry accepted Data Logger. After (post-

    installation) data was then taken over a period of 2-weeks (5/26/11

    6/9/11). Results averaged 21.6% kWh reduction per-day.

    PILOT RESULTS SUMMARY:

    1.) 21.6% Amp reduction average

    2.) 15.6% Colder air (reaches temperature set point faster / unit shuts off)

    3.) 21.6% reduction in kWh (reduction in energy costs)

    4.) 34% reduction in Head Pressure (extends life of the compressor)5.) 21.6% more capacity in the cooling system with no additional energy

    ARTICMASTER BENEFITS:

    1.) Substantial energy reductions / Operational cost savings

    2.) Increased life expectancy of the HVAC system

    3.) Process stability and capability improvements4.) Increased HVAC production rates without additional energy consumption

    5.) Reduction in Carbon emissions (reduced kWh)

    Articmaster

    7

  • 8/11/2019 Am Case Studies1

    8/15

    8

  • 8/11/2019 Am Case Studies1

    9/15

    Client:

    Sprint / Nextel

    Project:Wireless Cell Site Base Station

    Articmaster HVAC Optimization Pilot Project

    El Centro, CA

    April, 2009

    LARGE SIZED APPLICATION

    9

  • 8/11/2019 Am Case Studies1

    10/15

    Cell Site

  • 8/11/2019 Am Case Studies1

    11/15

    11

    Test Results

  • 8/11/2019 Am Case Studies1

    12/15

    12

    Financials

    Overall energy savings on the HVAC systems at the site were 38% (we are using33% for all ROI calculations to allow for variations between sites).

    Estimated Pay Back Period of 33.69 months without Utility rebates. Profitability Index of $3.38 in gains for every dollar invested.

    Internal Rate of Return of 61%

    Net Present Value per installation of $20,068.53

    Cumulative Savings $60,217.00 per site over a 15 year life span.

  • 8/11/2019 Am Case Studies1

    13/15

    Client:

    Switch & Data (Now Equinix)

    Project:

    Commercial Data Center (Collocation)

    San Jose, CA

    Articmaster HVAC Optimization Pilot Project

    September, 2009

    LARGE SIZED APPLICATION

    13

  • 8/11/2019 Am Case Studies1

    14/15

    Switch & Data:

    Articmaster Installation Summary

    Region: San Jose, CA

    Client: National Data Center

    Facility Type: Data Center

    Building Size: 18,000 Sft

    Floor Space: 15,000

    Utility Company: PG&E

    Energy Savings Products: Articmaster & RMS-1

    HVAC Equipment: (9) 20-Ton Liebert/ATS Systems

    (2) Trane 10-Ton Systems, (1) Carrier 10-Ton System

    (210-Tons Total)

    ABOUT: Switch & Data operates (34) sites across North America specifically designed to house the servers their customers use to

    aggregate and distribute data and digital media content.PROBLEM: Substantial and varying cooling load required. Facility optimization is controlled by capacity of HVAC system, typically

    undersized. Internal heat generated by servers are the main source of the load that HVAC system is required to cool. HVAC systems

    regularly fail due to the severe load that this mission critical facility creates. Facility was limited on the amount of power available

    to the building, so the Articmaster was the only solution to increasing their cooling capacity, without any infrastructure costs.

    SOLUTION/BENEFITS: The Articmaster Refrigerant Optimization System provided immediate and substantial reduction in head

    Pressure, which lead to reduction in compressor amp draw. The Articmaster also created colder air temperatures which allowed

    the system to reach set point and cycle off (shut off). Due to the substantial energy reduction from the Articmaster system, the

    client was able to add another 20-ton HVAC System, which was previously not possible without a major renovation to mainelectrical panel, and an investment in a new larger back up diesel generator.

  • 8/11/2019 Am Case Studies1

    15/15

    Results: 16 % Efficiency Gain on HVAC Equipment

    8~10% Head Pressure reduction (Substantial

    decreased load on Compressor) Reduction in Amps

    Colder Air means Increased Cooling Capacity

    ROI of less than 2 Years