Alternative Acquisition/Delivery Methods
PRESENTED BY:
Dave Leighow, FHWA
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Looking Down The Road!
ALTERNATIVE ACQUISITION / DELIVERY METHODS
• Implementer – This is the way we need to do it – Let’s be careful and not take
too many risks – I don’t know about that; we’ve
always done it this way – Let’s stick to the “tried and
true”
Are you an implementer or a pathfinder?
• Pathfinder – Let’s consider some other
options – Sure, it may be risky, be we can
manage the risk – The old way has just not been
efficient for us – We can save time and money if
we are willing to give this a try
ALTERNATIVE ACQUISITION / DELIVERY METHODS
• Transportation Planning – ROW is at the table – ROW “in the corridor” – Demographics – Regional Impacts
Start With An Essential Linkage
• NEPA – Communities – Neighborhoods – Residents – Businesses
ALTERNATIVE ACQUISITION / DELIVERY METHODS
• 23 USC 108(c) – Acquire pre-NEPA clearance – Use State funds to acquire – State has planning process – Governor certified – Federal funds
reimbursement
Consider This: Early Acquisition (per MAP-21)
• 23 USC 108(d) – EA project in STIP – EA project NEPA cleared – Fed $$$ authorized – Acquire w/Fed $$$ – 20 years to use
ALTERNATIVE ACQUISITION / DELIVERY METHODS
• “Walk in the other fella’s shoes!”
• Design team includes ROW from the start
• Plan changes reduced • Engineers:
“Understand ROW’s requirements!”
• ROW: “Understand the project constraints!”
Get Design and ROW in Sync
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Be Creative in ROW Certification
• Cert 1: ROW clear, project can proceed to ad. • Cert 2: ROW not clear, but have right of entry • Cert 3: ROW not clear, may be some displacees
Remember: “It’s all about risk management!”
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Know the Risk—Manage It!
• Cert 1: Risk free • Cert 2: Limited risk; manage terms of the ROE • Cert 3: Several risks, but manageable
» Contractor claims if ROW is not clear on schedule » Adverse impacts on property owners, displaced persons » Noncompliance with Federal and State requirements
• All ROW Cert risks can be managed, if properly planned
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Here’s What a Proactive Program Looks Like
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What does the Road Look Like Now?
ALTERNATIVE ACQUISITION / DELIVERY METHODS
David Leighow Right of Way Program Manager
FHWA – Office of Reality (503) 316-2543
Email: [email protected]
Alternative Acquisition/Delivery Methods
PRESENTED BY:
Hugh Hadsock, FHWA James Olschewski, UDOT
ALTERNATIVE ACQUISITION / DELIVERY METHODS
IF WE ARE NOT BUILDING ROADS
THEN WE ARE BUILDING ROAD BLOCKS
ALTERNATIVE ACQUISITION / DELIVERY METHODS
EVERY DAY COUNTS INITIATIVE
These are methods and tools within the Uniform Act that will help you save
Time and Money
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What different type of Incentive Programs are currently available?
Incentive for Acquisition
Incentive for Relocation
Pilot Program for Single Payment Relocation
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Incentive for Acquisition
Incentive for signing with 1st 30 days either: Signed Contract Signed Right to Enter and Construct (ROO)
ALTERNATIVE ACQUISITION / DELIVERY METHODS
6 Different Projects Signed Contract within 30 days
35 Owners Signed (including commercial properties)
Signed Right of Entry within 30 days
25 Owners Signed (including commercial properties)
If only one (1) day per ownership is saved, 60 days have been saved… If an average single days delay claim is $40,000…
UTAH DEPARTMENT OF TRANSPORTATION Incentive Program for Acquisition
ALTERNATIVE ACQUISITION / DELIVERY METHODS
6 Different Projects 35 Owners Signed 25 Owners Signed $40,000 Cost Per day Delay Claim
TOTAL UDOT SAVINGS
$2,400,000
UTAH DEPARTMENT OF TRANSPORTATION Incentive Program for Acquisition
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Incentive for Relocation Incentive for relocating early Incentive for not renewing or creating new tenants Protective Rents
Presently UDOT does not have any projects where we have
been able to use this valuable tool.
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Pilot Program for Single Relocation Payment Choice for a single payment
ALTERNATIVE ACQUISITION / DELIVERY METHODS
1 Project 12 Owners Relocated 12 Owners Accepted Single Payment
Time to Vacate Building and reduction in UDOT Relocation Oversight 59 Days Saved Per Relocation $40,000 Cost Per day Delay Claim
TOTAL UDOT SAVINGS
$2,360,000
UTAH DEPARTMENT OF TRANSPORTATION Pilot Program for Single Relocation Payment
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What is the dream Job/Project?
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What is the dream Job/Project?
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What does our Opportunity look like
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What does success look like
Using all the tools = Success
ALTERNATIVE ACQUISITION / DELIVERY METHODS
“Change is the law of life.
Those who look only to the past or present
are sure to miss the future.”
- John Fitzgerald Kennedy
ALL ABOUT CHANGE
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Appraisal Waiver Valuation Limits &
Conflict of Interest
The waiver valuation is an efficiency provided for both in law and in regulation under 49CFR 24.102(c)(2).
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Proposal
Increase the waiver valuation limit from $25,000 to $50,000
Increase the conflict of interest limit from $25,000 to $50,000
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Reasoning Expedite acquisition process for property owners, reduce
staff time and project costs and increase overall efficiencies
Reduction in staffing levels and limited project funding
Attempt to make the valuation limits more consistent with current property values
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Recommendations
1) Duration of pilot program will be five years 2) UDOT will produce a semi-annual interim report measuring
staff time savings, project cost and overall project efficiencies.
3) Appraisal waivers will only be prepared on appropriately selected, non-complex, low value parcels that present time and cost saving
4) Appraisal waivers will only be prepared by qualified UDOT staff, using confirmed arms length transactions.
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Recommendations Cont.
5) If the property owner request and appraisal on their property, UDOT will have an appraisal prepared and the Waiver of Appraisal process will not be used.
6) The appraiser or review appraiser shall have no interest in the property being valued.
7) UDOT will amend the, Real Estate Procedure Manual on Waiver of Appraisals and UDOT’s requirements & guidelines for UDOT staff prepared market studies to reflect the increase $25,000 to $50,000.
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Recommendations Cont.
8) Wavier of Appraisal valuations will be informally reviewed by UDOT appraisal staff as part of the procedure to achieve valuation consistency.
9) Waiver valuations will be complete using, the most up-to-date market data available.
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Key Element When possible, UDOT staff will contact the property owner prior to
commencing the waiver of Appraisal process.
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Anticipated Outcomes
Efficient use of its appraisal and acquisition staffs
Reduce project costs/Shorten project delivery time
ALTERNATIVE ACQUISITION / DELIVERY METHODS
UTAH DEPARTMENT OF TRANSPORTATION Riverdale Road Pilot Program
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Appraisal vs.
Administrative Compensation Estimate(ACE) Appraisal
61 Appraisals completed average 44 days each
The average cost for 61 appraisals was $2,854
Appraisal Review 61 Reviews completed average 14 days each The average cost for 61 reviews was $875
UTAH DEPARTMENT OF TRANSPORTATION Riverdale Road Pilot Program
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Appraisal vs.
Administrative Compensation Estimate (ACE) ACE 29 Aces' completed average 16 day each The average cost for 29 Aces' was $900
ACE Review 29 Reviews completed average 4 days each The average cost for 29 reviews was $250
UTAH DEPARTMENT OF TRANSPORTATION Riverdale Road Pilot Program
ALTERNATIVE ACQUISITION / DELIVERY METHODS
COST SAVINGS Appraisal Report and Review - $3,729.00 per parcel
Appraisal Waiver Valuation and Review - $1,150.00 per parcel
Total Cost Savings = $2,579 per parcel
TOTAL PROJECT SAVINGS
$74,791.00
UTAH DEPARTMENT OF TRANSPORTATION Riverdale Road Pilot Program
ALTERNATIVE ACQUISITION / DELIVERY METHODS
TIME SAVINGS
Preparation of Administrative Comp Est. = 20 Days
Preparation of Appraisal Report:
Produce Sales Brochure = 60 Days Produce an Appraisal = 44 Days Produce Appraisal Review = 4 Days
Total Days Saved
108 Days – 20 Days = 88 Days
UTAH DEPARTMENT OF TRANSPORTATION Riverdale Road Pilot Program
ALTERNATIVE ACQUISITION / DELIVERY METHODS
TIME SAVINGS 30 of the 61 Appraisal value below $50,000 (Ace completed in 20 days; additional days saved) = 88 Days
COST SAVINGS 30 ACES’ performed with value below $50,000 (Ace cost per parcel savings $2,579) = $77,370
TOTAL PROJECT SAVINGS
88 Days & $77,370
UTAH DEPARTMENT OF TRANSPORTATION Riverdale Road Pilot Program
ALTERNATIVE ACQUISITION / DELIVERY METHODS
“Determine that the thing can and shall be done, and then we shall find the way”
- Abraham Lincoln
ALTERNATIVE ACQUISITION / DELIVERY METHODS
What’s Next?
ALTERNATIVE ACQUISITION / DELIVERY METHODS
Hugh Hadsock Right of Way Program Manager
FHWA – NV & UT Divisions (801) 955-3518
Email: [email protected]
James Olschewski Right of Way Deputy Director
UDOT (801) 965-4821
Email: [email protected]