alpine workshop log cabin - garden buildings direct · premium alpine workshop iii: side elevation...
TRANSCRIPT
For Queries and Helpplease access our Support Centre:
www.gardenbuildingsdirect.co.uk/help
PROPRIETARY AND CONFIDENTIALITYAll the information contained within this document including all technical data, dimensions, shape/form and branding (inc. Trademarks, logos, etc.) Is the sole property of Kybotech Limited. The reproduction and/or disclosure to any third party of any information contained within this document is strictly prohibited. Breaches of the copyright will be dealt with on the highest level of severity with immediate legal proceedings.
© July 2014 - BillyOh.com
Alpine WorkshopLog Cabin
Technical Details
©
gardenbuildingsdirect .co.ukIn association with
Sizes availableavailable in standard 19mm cladding types
Alpine Workshop Log CabinFront elevation: width 3.5m
Overall Building Width: Includes Overhangall thicknesses = 4.093m/13’ 5”
Building Wall Width 19mm = 3.458m/11’ 4”
Internal Width all thicknesses = 3.234m/10’ 7”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Exte
rnal
Eav
es H
eigh
tal
l thi
ckne
sses
= 2
.090
m/6
’ 10”
Inte
rnal
Eav
es H
eigh
t19
mm
Flo
or =
2.0
33m
/6’ 8
”11
mm
Flo
or =
2.0
41m
/6’ 8
”
Inte
rnal
Rid
ge H
eigh
t19
mm
Flo
or =
2.3
94m
/7’ 1
0”11
mm
Flo
or =
2.4
02m
/7’1
1”
BILLYOH
Alpine Workshop II Log CabinW3.5m x D3.5m
(Including Overhang)
Alpine Workshop I Log CabinW3.5m x D3.0m
(Including Overhang)
W3.5m x D3.5m / W11’6” x D11’6”Alpine Workshop II: Side elevation
Please note: your base must be perfectly level and drainage is required to allow water to run off the surface. There must also be at least 2m clearance on each side to allow annual treatment to be applied.
Base Size and Bearers Layout (Pressure Treated)
Internal Depthall thicknesses = 2.634m/8’ 8”
Overall Building Depth (Including Overhang)all thicknesses = 3.508m/11’ 6”
Building Wall Depth (Excluding Overhang)
19mm = 2.858m/9’ 5”
Overhang Depth = 0.693m/2’ 3”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Side of Building
Total Bearer Length = 3.322m/10’ 11”
Minimum Base Width = 3.402m/11’ 2”
Min
imum
Bas
e D
epth
all t
hick
ness
es =
2.7
52m
/9’ 0
”
Out
er B
eare
r Dis
tanc
e19
mm
= 2
.672
m/8
’ 9”
Bear
er S
pac
ing
from
cen
tre
of e
ach
bear
er
19m
m =
0.3
31m
/1’ 1
”
Front of BuildingOverhang Depth
= 0.693m/2’3”
38PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
Overhang Area
W3.5m x D3.0m / W11’6” x D9’10”Alpine Workshop I: Side elevation
Please note: your base must be perfectly level and drainage is required to allow water to run off the surface. There must also be at least 2m clearance on each side to allow annual treatment to be applied.
Base Size and Bearers Layout (Pressure Treated)
Internal Depthall thicknesses = 2.334m/7’ 8”
Overall Building Depth (Including Overhang)all thicknesses = 2.908m/9’ 6”
Building Wall Depth (Excluding Overhang)
19mm = 2.558m/8’ 5”
Overhang Depth = 0.393m/1’ 3”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Side of Building
Total Bearer Length = 3.322m/10’ 11”
Minimum Base Width = 3.402m/11’ 2”
Min
imum
Bas
e D
epth
all t
hick
ness
es =
2.4
52m
/8’ 1
”
Out
er B
eare
r Dis
tanc
e19
mm
= 2
.372
m/7
’ 9”
Bear
er S
pac
ing
from
cen
tre
of e
ach
bear
er
19m
m =
0.3
35m
/1’ 1
”
Front of Building
Overhang Depth= 0.393m/1’3”
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
Overhang Area
Sizes availableavailable in standard 28mm cladding types
Premium Alpine Workshop Log CabinFront elevation: width 4.0m
Overall Building Width: Includes Overhangall thicknesses = 4.649m/15’ 3”
Building Wall Width 28mm = 4.076m/13’ 4”
Internal Width all thicknesses = 3.834m/12’ 7”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Exte
rnal
Eav
es H
eigh
tal
l thi
ckne
sses
= 2
.090
m/6
’ 10”
Inte
rnal
Eav
es H
eigh
t19
mm
Flo
or =
2.0
33m
/6’ 8
”11
mm
Flo
or =
2.0
41m
/6’ 8
”
Inte
rnal
Rid
ge H
eigh
t19
mm
Flo
or =
2.3
94m
/7’ 1
0”11
mm
Flo
or =
2.4
02m
/7’1
1”
BILLYOH
Premium Alpine Workshop IIIW4.0m x D5.0m
(Including Overhang)
Premium Alpine Workshop IIW4.0m x D4.0m
(Including Overhang)
Premium Alpine Workshop IW4.0m x D3.0m
(Including Overhang)
W4.0m x D5.0m / W13’1” x D16’5”Premium Alpine Workshop III: Side elevation
Please note: your base must be perfectly level and drainage is required to allow water to run off the surface. There must also be at least 2m clearance on each side to allow annual treatment to be applied.
Base Size and Bearers Layout (Pressure Treated)
Internal Depth all thicknesses = 4.134m/13’ 7”
Overall Building Depth (Including Overhang)all thicknesses = 5.052m/16’ 7”
Building Wall Depth(Excluding Overhang) 28mm = 4.376m/14’ 4”
Overhang Depth = 0.693m/2’ 3”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Win
dow
Op
enin
g H
eigh
tal
l thi
ckne
sses
= 1
.217
m/4
’ 0”
Side of Building
Total Bearer Length = 3.922m/12’ 10”
Bearer Length = 1.961m/6’ 5”Bearer Length = 1.961m/6’ 5”
Minimum Base Width = 4.002m/13’ 6”
Min
imum
Bas
e D
epth
all t
hick
ness
es =
4.2
70m
/14’
0”
Out
er B
eare
r Dis
tanc
e28
mm
= 4
.190
m/1
3’ 9
”
Bear
er S
pac
ing
from
cen
tre
of e
ach
bear
er
28m
m =
0.2
96m
/1’ 0
”
Front of Building
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
75PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
75PT
Overhang Area
Overhang Depth= 0.693m/2’3”
W4.0m x D4.0m / W13’1” x D13’1”Premium Alpine Workshop II: Side elevation
Please note: your base must be perfectly level and drainage is required to allow water to run off the surface. There must also be at least 2m clearance on each side to allow annual treatment to be applied.
Base Size and Bearers Layout (Pressure Treated)
Internal Depthall thicknesses = 3.234m/10’ 11”
Overall Building Depth (Including Overhang)all thicknesses = 4.120m/13’ 6”
Building Wall Depth (Excluding Overhang)28mm = 3.476m/11’ 5”
Overhang Depth = 0.693m/2’ 3”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Win
dow
Op
enin
g H
eigh
tal
l thi
ckne
sses
= 1
.217
m/4
’ 0”
Side of Building
Total Bearer Length = 3.922m/12’ 10”
Bearer Length = 1.961m/6’ 5”Bearer Length = 1.961m/6’ 5”
Minimum Base Width = 4.002m/13’ 6”
Min
imum
Bas
e D
epth
all t
hick
ness
es =
3.3
70m
/11’
1”
Out
er B
eare
r Dis
tanc
e28
mm
= 3
.290
m/1
0’ 1
0”
Bear
er S
pac
ing
from
cen
tre
of e
ach
bear
er
28m
m =
0.3
25m
/1’ 1
”
Front of BuildingOverhang Depth
= 0.693m/2’3”
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
75PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
75PT
Overhang Area
W4.0m x D3.0m / W13’1” x D9’10”Premium Alpine Workshop I: Side elevation
Please note: your base must be perfectly level and drainage is required to allow water to run off the surface. There must also be at least 2m clearance on each side to allow annual treatment to be applied.
Base Size and Bearers Layout (Pressure Treated)
Internal Depthall thicknesses = 2.334m/7’ 8”
Overall Building Depth (Including Overhang)all thicknesses = 2.920m/9’ 7”
Building Wall Depth (Excluding Overhang)
28mm = 2.576m/8’ 5”
Overhang Depth = 0.393m/1’ 3”
Exte
rnal
Rid
ge H
eigh
tal
l thi
ckne
sses
= 2
.470
m/8
’ 1”
Win
dow
Op
enin
g H
eigh
tal
l thi
ckne
sses
= 1
.217
m/4
’ 0”
Side of Building
Total Bearer Length = 3.922m/12’ 10”
Bearer Length = 1.961m/6’ 5”Bearer Length = 1.961m/6’ 5”
Minimum Base Width = 4.002m/13’ 6”
Min
imum
Bas
e D
epth
all t
hick
ness
es =
2.4
70m
/8’ 1
”
Out
er B
eare
r Dis
tanc
e28
mm
= 2
.390
m/7
’ 10”
Bear
er S
pac
ing
from
cen
tre
of e
ach
bear
er
28m
m =
0.3
35m
/1’ 1
”
Front of Building
Overhang Depth= 0.393m/1’3”
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
38PT
38PT
38PT
38PT
38PT
38PT
75PT
75PT
Overhang Area