Alpha Borough Project
Presented by
Beta Solutions
Dave Woodruff
Crystalann Harbold
Todd Baldwin
Katie O’Connor
Adam Brown
Beta Solutions
Presentation Overview
• Scope of Project• Concerns of Community• Ideas for new development• Present Preliminary Site
Design• Present Floor Plan• Funding Solutions• Question / Answer Session
Beta Solutions
Vulcanite Avenue site
Vulcanite Ave.
Springtown R
d.
Beta Solutions
Scope of Project
• Redesign Vulcanite Avenue recreational area so that it may provide services to a majority of the Alpha Borough community.
• Considerations:– economic, environmental, geotechnical, hydrology,
transportation, & structural
Beta Solutions
Concerns/Needs of Community(Based on 2/07/02 town meeting)
• Renovate Pool
• Build Senior/Youth center
• Additional sports fields– Limited space restricts practices
• Continued Maintenance of building
• Funding for Site Development– Building must be cost-effective
Beta Solutions
Ideas for New Development
• Renovate pool
• Build joint youth/senior center
• Refurbish park
• Provide sufficient parking
• Community Labor Assistance Program
• Be cost-effective in design– Exhaust all funding options
Beta Solutions
Preliminary Design
Beta Solutions
Preliminary Design(Youth/Senior Center)
9,660 Sq. Ft. Senior/Youth Center
Beta Solutions
Preliminary Design (Outdoor facilities)
Relocation of small baseball feilds
Tennis Court and Basketball Court
Additional Picnic Tables
Roller Hockey Rink
Restriping of Football/Soccer Field
Beta Solutions
Preliminary Design(Parking layout)
Beta Solutions
Preliminary Design(Detention basin, community garden, walking path)
Community Garden Area
Walking Path
Proposed Detention Basin Area
Beta Solutions
Preliminary Design(Generating revenue)
Lease Property to Generate $$:• Mini-Golf•Go-Carts•Arcade•Etc.
Beta Solutions
Building Floor Plan
Beta Solutions
Preliminary Cost Estimate
• Building
• Sports and recreation areas
• Detention basin
• Parking, lighting, Etc.
• Total estimated cost
$773,000
$230,000
$15,000
$642,400
$1,660,400
Beta Solutions
Funding • Options:
– Green Acres Loan• Recreation areas, etc.
• Up to $500,000
– Small Cities Grant• Building
• Up to $400,000
– Other Foundations• Community participation
– Increase Pool Fees
– YMCA Branch Facility
$
Beta Solutions
Conclusion• Layout fulfills requirement of Alpha
Borough
• Definite need of more outside funding sources (possible community support)
• Layout subject to change per community feedback
Beta Solutions
Question or Comments?• Thank you on behalf of Beta Solutions
• Any questions and comments will be greatly appreciated so we can better serve your community.
• Please send any comments
to Crystalann Harbold at [email protected]