Alpha Borough Project

Presented by

Beta Solutions

Dave Woodruff

Crystalann Harbold

Todd Baldwin

Katie O’Connor

Adam Brown

Page 2: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Presentation Overview

• Scope of Project• Concerns of Community• Ideas for new development• Present Preliminary Site

Design• Present Floor Plan• Funding Solutions• Question / Answer Session

Page 3: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Vulcanite Avenue site

Vulcanite Ave.

Springtown R

d.

Page 4: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Scope of Project

• Redesign Vulcanite Avenue recreational area so that it may provide services to a majority of the Alpha Borough community.

• Considerations:– economic, environmental, geotechnical, hydrology,

transportation, & structural

Page 5: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Concerns/Needs of Community(Based on 2/07/02 town meeting)

• Renovate Pool

• Build Senior/Youth center

• Additional sports fields– Limited space restricts practices

• Continued Maintenance of building

• Funding for Site Development– Building must be cost-effective

Page 6: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Ideas for New Development

• Renovate pool

• Build joint youth/senior center

• Refurbish park

• Provide sufficient parking

• Community Labor Assistance Program

• Be cost-effective in design– Exhaust all funding options

Page 7: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Design

Page 8: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Design(Youth/Senior Center)

9,660 Sq. Ft. Senior/Youth Center

Page 9: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Design (Outdoor facilities)

Relocation of small baseball feilds

Tennis Court and Basketball Court

Additional Picnic Tables

Roller Hockey Rink

Restriping of Football/Soccer Field

Page 10: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Design(Parking layout)

Page 11: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Design(Detention basin, community garden, walking path)

Community Garden Area

Walking Path

Proposed Detention Basin Area

Page 12: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Design(Generating revenue)

Lease Property to Generate $$:• Mini-Golf•Go-Carts•Arcade•Etc.

Page 13: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Building Floor Plan

Page 14: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Preliminary Cost Estimate

• Building

• Sports and recreation areas

• Detention basin

• Parking, lighting, Etc.

• Total estimated cost

$773,000

$230,000

$15,000

$642,400

$1,660,400

Page 15: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Funding • Options:

– Green Acres Loan• Recreation areas, etc.

• Up to $500,000

– Small Cities Grant• Building

• Up to $400,000

– Other Foundations• Community participation

– Increase Pool Fees

– YMCA Branch Facility

$

Page 16: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Conclusion• Layout fulfills requirement of Alpha

Borough

• Definite need of more outside funding sources (possible community support)

• Layout subject to change per community feedback

Page 17: Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown

Beta Solutions

Question or Comments?• Thank you on behalf of Beta Solutions

• Any questions and comments will be greatly appreciated so we can better serve your community.

• Please send any comments

to Crystalann Harbold at [email protected]