Status of Triad’s ICET – 8april09 Peter Garbincius, John Carwardine, Tom Himel, Tetsuo Shidara, Triad: Spencer Curtis, Larry Lew, Kevin Long • (almost) weekly WEBEX - Tues 1300 GMT • Demo at last CMG meeting by TomH and JohnC • DESY EDMS Jens Kreutzkamp & Daniel Szepielak joined 31march & will join again 9april (tomorrow) • Triad sent ICET_V1.3 (16march) – Peter is working with it, exercising, finding & reporting small bugs. He can write to desktop mysql DB, run reports from Triad scripts, and export to MS Access DB.

Upload: demetrius-porter

Post on 01-Jan-2016

25 views

Category:

Documents


1 download

DESCRIPTION

Status of Triad’s ICET – 8april09 Peter Garbincius, John Carwardine, Tom Himel, Tetsuo Shidara, Triad: Spencer Curtis, Larry Lew, Kevin Long. (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

Status of Triad’s ICET – 8april09Peter Garbincius, John Carwardine, Tom Himel, Tetsuo Shidara,

Triad: Spencer Curtis, Larry Lew, Kevin Long

• (almost) weekly WEBEX - Tues 1300 GMT• Demo at last CMG meeting by TomH and JohnC• DESY EDMS Jens Kreutzkamp & Daniel Szepielak

joined 31march & will join again 9april (tomorrow)• Triad sent ICET_V1.3 (16march) – Peter is working

with it, exercising, finding & reporting small bugs. He can write to desktop mysql DB, run reports from Triad scripts, and export to MS Access DB.

Page 2: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

• I won’t simply repeat what Tom & John showed last time unless you want to see something

• Example: Level 7 WBS following CF&S summary for the RDR est – Civil_Engineering & Electrical only– WBS configuration file: http://www-ilcdcb.fnal.gov/CFS-ILC WBS v3.3 truncated.xls

– Build: (screen shot) – 21 blank Est Mod. files– Fill in some dummy $ to test links– Download to DB: phg_v1.3_test-T-7april– Generate reports: http://www-ilcdcb.fnal.gov/T-7-CostSummaryExcelallData.xls

– Basically, this is a test to see that links & logic all work– MS Access DB example: http://www-ilcdcb.fnal.gov/march27.accdb

use costwbs: table and select estimate name = r4x…

Page 3: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

WBS Configuration File: ILC WBS v3.3 truncated.xls

BUILD(blank) Estimating_Module.xls workbooks

EXTRACT to DB

GenerateEXCEL Reports

fill by hand

Page 4: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

current priority is on files/folders/versions/EDMS

• Following Lars’ suggestion: => download EstimatingModules.xls files from EDMS => build WBS in desktop ICET workspace => store info in mysql database => generate EXCEL reports for distribution => store all processed files in EDMS

• ICET EM.xls files accessible by AS-TAGL estimators (need 5 teams for confidentiality)

• Triad’s example folder structure in EDMS

Page 5: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

2. EDMS WorkspaceProposed Overall EDMS Directory Structure for All Estimate Files

Cost Estimating

Cost Estimate Modules

Supporting Estimate Docs

Triad Sandbox

Zip Files

CEM’s stored in separate directory to simplify interface with ICET

Need to resolve access issues to CM and RF estimate details?Can access be controlled at the EDMS Item level vs. directory?

Directory Structure req’d – based on Tech Sys, Global Sys & Area

Triad testing in EDMS ILC_Cost_Database_Team

Page 6: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

2. EDMS Workspace (cont’d)Example Directory Structure for Baselines & VariantsCost Estimating

CEM1

Cost Estimate Modules

Baseline 1

CEM2 CEM3 CEM50……………………………………………………………………………... (full set)

Variant1-1

Variant1-1-1

CEM2 CEM7 CEM17 CEM36

CEM7 CEM17

Variant1-2

CEM6 CEM12 CEM15 CEM46

CEM1

Baseline 2

CEM2 CEM3 CEM50……………………………………………………………………………... (full set)

Variant2-1

CEM5 CEM10 CEM15 CEM20

Flat Structure within each Baseline or Variant directory

This directory structure may not adequately

handle various access groups

Page 7: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

2. EDMS Workspace (cont’d)

ElectronSource

PositronSource

DampingRings RTML Main Linac

Beam DeliverySystem

Magnet SystemsVacuumInstrumentationRF PowerCryomodulesCavity PackageDumps & CollimatorsAccelerator PhysicsConv. Facilities & SiteAvailability & OperationsControlsCryogenicsInstallation

Tec

hn

ical

Sys

tem

sG

lob

alS

yste

m

AREA SYSTEM

Example Directory Structure for Supporting DocumentationSupporting Estimate Docs

Technical Systems

Magnet Systems

Vacuum

Areas

….

Global Systems

Instrumentation

CF&S

Controls

….

Cryogenics

Electron Source

RTML

….

Page 8: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

ICET-EDMS interfaceLarry, Kevin, Jens, Daniel

• See Triad’s example folder structure above• EDMS “collection item”, e.g. “named baseline”

points at all related ICET files for the estimate, regardless of folder or team

• EDMS team will provide scripts to allow:– ICET to query “collection item” for metadata of all files,

versions, types (i.e. native .xls, not .pdf)– ICET to download single file using metadata (loop)– Upload of Build folder, WBS config file, reports

• Jens promises sample scripts tomorrow

Page 9: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

3. ICET Workspace (cont’d)ICET Interface with EDMS – 2 interactions via webservices

I

C

E

T

E

D

M

S

Webservice request for all CEM metadata in EDMS

(i.e. \CEM directory of the ILC Cost Database Team folder)

Return .txt file with requested metadata information

Webservice request(s) to download specified CEM’s for a specific

Machine Configuration

CEM files returned to ICET Staging area

Page 10: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

CM v1

CM v2

CM v3

CM Team

RF Team

RF v3

RF v2

RF v1

“All Other” Team

Electron v1

Electron v2

Magnets v2

ML v1 Magnets v1

Vacuum v1

Tunnels v1

Tunnels v2

Tunnels v3

Cryo v1

Controls v1

EDMSICET-ED

MS Interface

1. asks for metadata for all files in collection2. EVMS returns metadata 3. Prepares selection template Electron v1, _Electron v2, ML v1 Magnets v1, Magnets v2 Vacuum v1 Tunnels v1, Tunnels v2, Tunnels v3 Controls v1 Cryo v1 CM v1, CM v2, CM v3 RF v1, RF v2, RF v3

4. Person designing selects files & returns √ Electron v1, Electron v2, √ ML v1 Magnets v1, √ Magnets v2 √ Vacuum v1 Tunnels v1, Tunnels v2, √ Tunnels v3 Controls v1 √ Cryo v1 CM v1, √ CM v2, CM v3 RF v1, RF v2, √ RF v3

5. Requests selected files (one-by-one?)6. dumps selected files to ICET workspace

Electron v1 ML v1

Magnets v2 Vacuum v1

Tunnels v3 Cryo v1

CM v2 RF v3

ICETfile-version_flow_phg_24march09.ppt

related in collection item e.g. a “named baseline”

Page 11: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

other things still to do:

• Next, we will need Triad to work on Rebuild – where we use existing Estimating Modules, not blanks, to build WBS while preserving links

• Learn to use the same standard “atomic” parts in multiple applications, e.g. most AS use 8C1Q Cryomodules

• Learn to use “tags” to sort data by Area Sys, Technical/Global Sys, Disciplines, etc.

Page 12: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

More: • Robustness: links preserved under transport

ICET workspace => EDMS (different folders) => back to ICET workspace (no problems so far)

• Parametric application: one can link cells in EMs.xls to an external EXCEL file, e.g. for quantities. The quantities (of # CM, length of tunnel, cryo capacity) in this external EXCEL drive file can be related parametrically to something like total energy, (see next page). I’ve demonstrated that this actually works!

Page 13: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

configuration_parameters.xls these should link into Estimating Modules as quantitiesname: ILC_RDR_Aug07prepared: Peter H. Garbinciusdate: 2-Apr-09

500 GeV - CM energy1 Positron Source: 1/0 = undulator/conventional3 GeV - energy loss in undulator2 number of RTML stages

10 GeV - RTML energy gain238 GeV - electron Main Linac energy gain (- electron source - RTML + undulator)235 GeV - positron Main Linac energy gain (- electron source - RTML)

31.5 MV/m - nominal cavity gradient for ML (at top end)80% cavity yield at this nominal gradien/90%

1.038 meter - effective length per RF cavity0.032697 GeV - energy gain per cavity at nominal gradient

26 RF Cavities per ML RF unit0.850122 energy gain per RF unit at nominal gradient

37.956 meters - length per RF unit279.9598 number of RF units for electron ML (without overhead)276.4309 number of RF units for positron ML (without overhead)

3% overhead for RF units288.3586 number of RF units for electron ML (with overhead)

289 ROUNDED number of RF units for electron ML (with overhead)289 number of 8C1Q CM for electron ML (with overhead)578 number of 9C0Q CM for electron ML (with overhead)

10969.28 meters - length of electron ML (with overhead)284.7238 number of RF units for positron ML (with overhead)

285 ROUNDED number of RF units for positron ML (with overhead)285 number of 8C1Q CM for positron ML (with overhead)570 number of 9C0Q CM for positron ML (with overhead)

10817.46 meters - length of positron ML (with overhead)

inp

ut

par

amet

ers

qu

anti

ties

fo

r IC

ET

EM

.xls

Page 14: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

Still more:• Maura organized an off-site mysql server at

Tourmaline for use as the ICET DataBase (outside of Fermilab firewall)

• JohnC has imported PeterG’s MS Access DB into Tourmaline mysql DB,

he is trying to understand schema• Maura is reviewing applications for a summer

student to share Maura: web development and Peter: loading Estimating_Modules.xls

Page 15: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

Finances for Triadbi-monthly invoicing

1april091200 hoursavg = 1.4 FTE@ 83% time worked

1oct08

40% increase 1march09

~ 2.4 months remaining at current rate

Page 16: (almost) weekly WEBEX - Tues 1300 GMT Demo at last CMG meeting by TomH and JohnC

Peter’s Personal Predicament• New Fermilab Associate Director for Research

has been named – Peter is slowly off-loading much of his responsibility in this area. Most of his directorate assignments will end by late July. Two assignments will continue indefinitely

• Peter is able to spend more time on ILC tasks: last 3 weeks: 45%, 50%, 60% - hooray! But there will be 4 weeks of mainly directorate work