allowable lane closure hours state highway system in ... · allowed during the time period that the...

100
Allowable Lane Closure Hours for the State Highway System in Hampton Roads District Virginia Department of Transportation April 2019

Upload: others

Post on 06-Jun-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Allowable Lane Closure Hours

for the

State Highway System

in

Hampton Roads District

Virginia Department of Transportation

April 2019

Allowable Lane Closure Hours

Hampton Roads District

Revisions

Date Description Pages Enter revision

date

Enter a description of the revision including what has changed and for

what reason.

Enter affected page

numbers

4/25/2019 I-264 WB Segment 14 CD corrected Summer Friday hours to

12A-5A 50

1. All revisions shall be approved by the Regional Operations Director.

2. Revisions shall be inserted into the document as new pages with the changes highlighted and

identified with the revision date at the bottom of the page.

Revised April 2019 ii

Table of Contents Title Page ......................................................................................................................... i

Revisions ......................................................................................................................... ii

Table of Contents .......................................................................................................... iii

Policy and Background ................................................................................................... 1

Chapter 1 – Purpose ....................................................................................................... 3

Chapter 2 - Work Beyond the Shoulder ......................................................................... 4

Chapter 3 - Shoulder Closures (Mobile or Stationary) ................................................... 5

Chapter 4 - Lane Closures (Mobile or Stationary) .......................................................... 6

Chapter 5 - Lane Closures Outside the Allowable Closure Hours .................................. 7

Chapter 6 - Full Directional Closures .............................................................................. 8

Chapter 7 – Ramps ....................................................................................................... 10

Chapter 8 - Managed Lanes ......................................................................................... 11

Chapter 9 - Hampton Roads Harbor Crossing Closures ............................................... 12

Appendix A – Allowable Lane Closure Schedules......................................................... 13

Appendix B – Methodology to Update the Interstate Allowable Lane ........................ 88

Closure Hours

Appendix C – Lane Closure Advisory Management System (LCAMS) .......................... 90

Requirements and Expectations

Appendix D – VA Traffic Requirements and Expectations ........................................... 92

Appendix E – Procedures for Working in the ............................................................... 94

Reversible Roadway (HOV-RR)

Appendix F – Lane Closure Precedence Guidance ....................................................... 95

iii

Page intentionally left blank

iv

Policy (IIM-LD-241/OD-16-03/TED-351)

• The Virginia Department of Transportation is committed in providing safe

and efficient movement of motorized and non-motorized traffic through or

around roadway work zones as well as providing protection for workers and

equipment located within work zones. VDOT will focus on roadway visibility

and functionality of temporary traffic control in work zones and traffic flow

through the work zone. Emphasis will begin with the preliminary

engineering stages and carried through to the completion of all work,

including post construction reviews.

• Compliance with this guidance is consistent with the Department’s goal of

reducing work zone crashes and improving travel time thereby benefiting all

citizens of the Commonwealth. This guidance outlines recommended

procedures to be followed and identifies responsibilities to achieve safer work

zones with minimal impact on the traveling public.

• Early coordination is the key to ensuring conflicts are resolved. All lane

closure requests for roadwork or water crossing closures must be coordinated

using the Lane Closure Advisory Management System (LCAMS). Significant

closure conflicts are discussed and resolved during ERO’s weekly Significant

Lane Closure meeting.

Background (IIM-LD-241/OD-16-03/TED-351)

In September 2004, the Federal Highway Administration (FHWA) published the

Final Rule on Work Zone Safety and Mobility, 23 CFR 630 Subpart J. This rule,

referred to as Work Zone Safety and Mobility, applies to State and local

governments that receive Federal-aid highway funding. The policy provisions in

the Final Rule on Work Zone Safety and Mobility:

• Requires agencies to implement a policy for the systematic consideration

and management of work zone impacts on all Federal-aid highway projects.

Furthermore, it encourages agencies to implement the policy for non-

Federal-aid projects and programs.

• Requires the policy to address work zone impacts throughout the various

stages of the project’s development and construction. The agency must

consider work zone impacts during project development, management of

work zone impacts during construction, and assessment of work zone

1

performance after implementation. The agency must also consider

communication with the public before and during the project.

• Recognizes the state policy may vary based on the characteristics and

expected work zone impacts of individual projects or classes of projects.

• Requires transportation management plans.

2

1. Purpose

The purpose of this document is to provide standard allowable hours for the following

operations:

• Work beyond the shoulder

• Shoulder closures

• Lane closures

• Full directional closures

• Ramp closures

• Managed lane closures,

and to provide a standard procedure to follow when work cannot be completed within

the allowable hours.

Adherence to this document does not constitute approval to implement a shoulder, lane

or full directional closure. In addition to these guidelines and before the approval of any

closure, the following should be considered:

• Scheduled water crossing closures expected to change traffic patterns

• Expected traffic impacts (if working outside the allowable hours)

• Adjacent and/or nearby active work zones

• Special events/holidays expected to increase traffic volumes

• The importance and/or urgency of the work

• Final coordination in LCAMS

3

2. Work Beyond the Shoulder

All Roadways - There are no time restrictions for work beyond the shoulder.

Note: Beyond the Shoulder means that no vehicle, equipment or personnel will be on

the shoulder.

4

3. Shoulder Closures (Mobile or Stationary)

Interstates

Removable – A removable shoulder closure is an operation that can move all

equipment, materials and workers beyond the shoulder with the shoulder in

usable condition within 20 minutes or less if directed at any time during the

operation. Allowable hours for removable shoulder closures are subject to

the discretion of the Regional Operations Director. Removable shoulder

closures may only be allowed within the times provided in Appendix A.

Non-Removable – A non-removable shoulder closure is an operation that cannot

move all equipment, materials and workers beyond the shoulder with the

shoulder in usable condition within 20 minutes or less if directed at any time

during the operation. Non-removable shoulder closures are allowed at any

time the Allowable Lane Closure Schedules allow for at least 1 lane to be

closed.

Non-Interstates – There are no time restrictions for shoulder closures.

5

4. Lane Closures (Mobile or Stationary)

Multi-Lane Roadways – See Allowable Lane Closure Schedules in Appendix A.

• For multi-lane roadways not included in Appendix A, there are no time restrictions

for lane closures. However, these operations should be monitored for traffic

impacts by field personnel as appropriate.

• Lane closures extending across multiple segments should adhere to the most

restrictive allowable lane closure hours when comparing the individual segments.

• The “# of Existing Lanes” and “# of Lanes Closed” shown on the schedules refers to

through lanes between interchanges/intersections.

� Within interchanges, the number of lanes varies due to lane drops and ramp

auxiliary lanes. For lane closures within interchanges, users will need to

distinguish between through lanes and ramp auxiliary lanes (acceleration lanes,

deceleration lanes, weaving sections) and determine the allowable hours based

on the number of open through lanes as opposed to the number of lanes

closed.

� Closing turn lanes at signalized intersections on multi-lane roadways should be

considered outside the allowable lane closure hours. See Chapter 5 for work

zone traffic impact assessment requirements.

Two-Lane Roadways

Route 175 – Lane closures (one-lane, two-way condition) are allowed between 8

pm Sunday and 3 pm Friday. Restrictions to traffic should be removed at

least 12 hours before all scheduled launches at NASA’s Wallops Island

Facility, and traffic should not be restricted again until at least 12 hours

after the launch.

Other Two-Lane Roadways – There are no time restrictions for lane closures

(one-lane, two-way condition). However, these operations should be

monitored for traffic impacts by field personnel as appropriate.

6

5. Lane Closures Outside the Allowable Closure Hours

Interstates – If the proposed work cannot be completed within the allowable lane closure

hours, a request for an exception needs to be submitted to VDOT’s project manager. All

requests need to include a detailed explanation as to why the work cannot be

completed within the allowable lane closure hours, and the following:

• Route/Direction

• Location of Closure (Interchange to Interchange)

• Number of Through Lanes to be Closed

• Closure Begin Time of Day/Day of Week

• Closure End Time of Day/Day of Week

• Work Date(s)

If the request is acceptable to the VDOT project manager, it will be sent to Traffic

Engineering. Traffic Engineering will provide an assessment of the work zone traffic

impacts within 2 weeks, and send the exception request to the Regional Operations

Director for review and approval.

Non-Interstates – If the proposed work cannot be completed within the allowable lane

closure hours, a request for an exception needs to be submitted to VDOT’s project

manager. All requests need to include a detailed explanation as to why the work

cannot be completed within the allowable lane closure hours, and an assessment of

the work zone traffic impacts. The assessment needs to determine the expected

impacts as a result of the lane closure, be signed & sealed by a professional engineer

and be in accordance with VDOT’s Traffic Operations and Safety Analysis Manual. If the

request is acceptable to the VDOT project manager, it will be sent to the Residency

Engineer/Administrator for concurrence then sent to Traffic Engineering. Traffic

Engineering will concur with the analysis and expected impacts, or return review

comments within 2 weeks. After Traffic Engineering concurs with the analysis, the

exception request will be sent to the Regional Operations Director for review and

approval.

7

6. Full Directional Closures

20 Minutes or Less - Full directional closures not exceeding 20 minutes in duration are

allowed during the time period that the roadway is allowed to be reduced to a single

lane but in no case is a full directional closure allowed prior to 8pm (Sunday – Friday).

After traffic is released, a subsequent closure is not allowed until all traffic backups

have cleared.

Greater than 20 Minutes

HRBT, MMMBT, JRB, Berkley, High Rise, Downtown Tunnel, Mid-Town Tunnel – For full

directional closures exceeding 20 minutes at these water crossings, a request needs

to be submitted to VDOT’s project manager. All requests need to include a detailed

explanation as to why the work cannot be completed using lane closures, and the

following:

• Water Crossing/Direction

• Closure Begin Time of Day/Day of Week

• Closure End Time of Day/Day of Week

• Work Date(s)

• Analysis of the closing using the HRTPO water crossing spreadsheet

(https://www.hrtpo.org/page/closures-at-river-crossings/)

Full directional water crossing closures shall be planned, analyzed and coordinated

far enough in advance that the District Engineer can be fully briefed for approval on

the work effort and anticipated impacts at a minimum of three (3) weeks in advance

of the planned work. The following activities and completion time frames before

work commencement shall serve as a minimum guide in planning significant

closures:

6 weeks in advance of planned closure

• Complete traffic analysis and submit to Traffic Engineering

• Coordination with localities, special events and holidays

• LCAMS Request and conflict resolution

3 weeks in advance of planned closure

• Brief and obtain final approval from District Engineer

2 weeks in advance of planned closure

• TOC develop CMS plan in support of planned work

• Public Outreach on closure event

8

• Submit Closure in accordance with Regional Procedures for Planned

Closures at River Crossings- TOC will send required emails

The requestor will conduct a traffic analysis of the major facility closures to estimate

the anticipated back-ups and the delay time. Traffic Engineering will review the

traffic analysis prior to approval of a closure. This requires 2-3 weeks advance

notice.

The requestor will coordinate with localities to ensure pending road work does not

conflict with a major harbor crossing closure. Example: Coordination with City of

Chesapeake to ensure the Gilmerton Bridge is available during High Rise Bridge

closures. Additionally, managers need to ensure closures do not impact major

holidays or local events such as Harborfest, Neptune Festival, or graduations

amongst other events.

Other Locations – For full directional closures exceeding 20 minutes at other locations,

a request needs to be submitted to VDOT’s project manager. All requests need to

include a detailed explanation as to why the work cannot be completed using lane

closures, the proposed detour route, and an assessment of the work zone traffic

impacts. The assessment needs to determine the expected impacts as a result of the

full directional closure, be signed & sealed by a professional engineer and be in

accordance with VDOT’s Traffic Operations and Safety Analysis Manual. If the

request is acceptable to the VDOT project manager, it will be sent to Traffic

Engineering for review. Traffic Engineering will return review comments within 2

weeks. After any revisions, if Traffic Engineering concurs with the analysis, the

request will be sent to the Regional Operations Director for review and approval.

9

7. Ramps

Partial Ramp Closures – Partial ramp closures are allowed at any time a shoulder closure is

allowed on the interstate. See Chapter 3 for allowable shoulder closure hours.

Full Exit Ramp Closures – Exit ramps can be closed to through traffic during the time period

that the interstate is allowed to be reduced to a single lane.

Full Entrance Ramp Closures – The allowable hours and necessary detours for the full

closure of an entrance ramp from city streets shall be coordinated with the locality. Full

closures of entrance ramps from streets maintained by VDOT shall be coordinated with

the local Resident Administrator. If the local street has allowable closure times listed in

Appendix A of this document, ramp closures shall be limited to those times when the

street may be reduced to a single lane.

Full Interstate to Interstate Ramp Closures – Are considered as part of the interstate

system and any lane closures must conform to the most restrictive times of the

interstates they connect. These must be approved by the Regional Operations

Director. Entrances and exits to and from CD roadways and single lane CD roadways

must similarly conform to the most restrictive times of the segments they connect.

(See “Full Directional Closures” for submittal and review requirements.)

10

8. Managed Lanes

Shoulder Lanes – For purposes of this document, the managed shoulder lanes along I-264

between Witchduck Road and Rosemont Road should be considered shoulders. See

Chapter 3 for allowable shoulder closure hours.

Concurrent HOV Lanes – For purposes of this document, concurrent HOV lanes adjacent to

general purpose lanes should be considered through lanes. See Chapter 4 for allowable

lane closure hours.

HOV-Express Lanes / Reversible Roadway (HOV-EL/RR) – The HOV-EL/RR along I-64

between I-564 and I-264 can be closed to traffic during the following hours:

Monday-Thursday Friday Saturday Sunday

9:30am-12:30pm*

8pm-12am

12am-3am

9:30am-12:30pm*

8pm-12am

12am-3am

All Hours All Hours

* Requires a work plan and RTOM or ROD approval.

11

9. Hampton Roads Harbor Crossing Closures

VDOT will not allow closures or restricted travel at two major competing harbor or river

crossings at the same time for scheduled work. Work Zones are not allowed at water

crossings in the same direction at the same time. In the case of a maintenance emergency,

when an existing lane closure at a competing water crossing cannot be quickly removed, the

Deputy District Administrator or the Duty Officer must approve the work. Such approval must

be confirmed in writing or by email as soon as possible.

The potential competing crossings are grouped into two sets. The potential conflicting pairs

are listed below.

• Hampton Roads - James River Crossings

o Hampton Roads Bridge Tunnel (HRBT) and Monitor Merrimac Memorial Bridge

Tunnel (MMMBT)

o James River Bridge (JRB) and MMMBT

• Elizabeth River Crossings

o Downtown Tunnel (DTT) and Midtown Tunnel (MTT)

o Berkley Bridge and MTT

o High Rise Bridge and Berkley Bridge

o High Rise Bridge and DTT

o High Rise Bridge and Gilmerton Bridge

The footprint of each of these crossings is defined as:

• MMMBT: Terminal Blvd. off ramps in Newport News to Armstead Rd. overpass in Suffolk

• HRBT: Mallory Overpass to 13th

/15th View Interchange

• JRB: footprint of the bridge

• MTT: MLK Freeway to Brambleton overpass

• DTT: Effingham St to beginning of Berkley Bridge

• Berkley Bridge: Eastbound- from the western bridge abutment of the Berkley Bridge to

the Tidewater Dr. off ramp from I-264 E; Westbound - from the split of I-264 W and the

off ramp to Waterside Dr. to the western bridge abutment of the Berkley Bridge.

• High Rise: Shell Rd overpass to I-464

See Chapter 6 for additional requirements pertaining to extended full closures (over 20

minutes).

12

Appendix A

Allowable Lane Closure Schedules

Interstates

Summer (April 15 to October 15) & Non-Summer (October 16 to April 14)

I-64

Eastbound.........................................................................................................15

Westbound .......................................................................................................25

I-95

Northbound ......................................................................................................35

Southbound ......................................................................................................39

I-264

Eastbound.........................................................................................................43

Westbound .......................................................................................................49

I-464

Northbound ......................................................................................................55

Southbound ......................................................................................................57

I-564

Eastbound.........................................................................................................59

Westbound .......................................................................................................60

I-664

Northbound ......................................................................................................61

Southbound ......................................................................................................65

13

Primaries

Route 10 (Benns Church Blvd) ..................................................................... 69

US 13 (Charles M Lankford Jr Memorial Hwy) ............................................................. 70

US 17 (George Washington Memorial Hwy/Carrollton Blvd) .............................. 71

Route 32 (Brewers Neck Blvd) ..................................................................................... 72

US 58 (Southampton Pkwy) ......................................................................................... 73

US 58 (Midtown Tunnel) ............................................................................................. 74

US 60 (Pocahontas Trail/Richmond Rd) ...................................................................... 75

Route 143 (Merrimac Trail) ........................................................................ 76

Route 164 (Western Fwy) ............................................................................................ 77

Route 171 (Victory Blvd) .............................................................................................. 83

Route 179 (Market St) .................................................................................................. 84

Route 199 (Humelsine Pkwy/Marquis Center Pkwy) ............................................ 85

US 258 (Brewers Neck Blvd) ........................................................................................ 86

US 460 (General Mahone Blvd/Windsor Blvd) ........................................................... 87

14

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 3

3

Eltham

Rd

Exit 2

20

Rt. 3

0

Old

Sta

ge R

d

Exit 2

27

12 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 3

0

Old

Sta

ge R

d

Exit 2

27

Rt. 6

07

Cro

aker

Rd

Exit 2

31

22 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 6

07

Cro

aker

Rd

Exit 2

31

Rt. 1

99/R

t. 6

46

Hum

els

ine P

kw

y

New

man R

d

Exit 2

34

32 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 EB - Segment 1 (Exit 220) through Segment 3 (Exit 234)A

llo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-6

4 E

B -

Se

gm

en

t 1

(E

xit

22

0)

thro

ug

h S

eg

me

nt

3 (

Ex

it 2

34

)A

llo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

15

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

99/R

t. 6

46

Hum

els

ine P

kw

y

New

man R

d

Exit 2

34

Rt. 1

43

Merr

imac T

r

Exit 2

38

42 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

43

Merr

imac T

r

Exit 2

38

Rt. 1

99

Hum

els

ine P

kw

y

Exit 2

42

52 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

2* 1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

2*

*C

on

tact

Tra

ffic

En

gin

ee

rin

g f

or

an

All

ow

ab

le L

an

e C

losu

re H

ou

rs e

xce

pti

on

fo

r 2

la

ne

clo

sure

s in

Se

gm

en

ts 6

th

rou

gh

10

.

I-64 EB - Segment 4 (Exit 238) through Segment 7 (Exit 247)

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

99

Hum

els

ine P

kw

y

Exit 2

42

Rt. 6

0/R

t. 1

43

Bush G

ard

ens

Exit 2

43

63 M

L

Rt. 6

0/R

t. 1

43

Bush G

ard

ens

Exit 2

43

Rt. 1

43/R

t. 2

38

Jeffers

on A

ve

Exit 2

47

73 M

L

I-6

4 E

B -

Se

gm

en

t 4

(E

xit

23

8)

thro

ug

h S

eg

me

nt

7 (

Ex

it 2

47

)A

llo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

16

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

2* 1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

2* 1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

2* 1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 2

A;

5P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A;

12A

- 7

A;

12A

- 5

A;

10P

- 1

2A

12A

- 5

A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

*C

on

tact

Tra

ffic

En

gin

ee

rin

g f

or

an

All

ow

ab

le L

an

e C

losu

re H

ou

rs e

xce

pti

on

fo

r 2

la

ne

clo

sure

s in

Se

gm

en

ts 6

th

rou

gh

10

.

I-64 EB - Segment 8 (Exit 247) through Segment 11 (Exit 256)

Rt. 1

43

Jeffers

on A

ve

Exit 2

55

Rt. 1

71

Vic

tory

Blv

d

Exit 2

56

11

4 M

LA

ll D

ay

All

Day

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-6

4 E

B -

Se

gm

en

t 8

(E

xit

24

7)

thro

ug

h S

eg

me

nt

11

(E

xit

25

6)

Rt. 1

05/R

t. 1

43

Ft. E

ustis B

lvd

Exit 2

50

Rt. 1

43

Jeffers

on A

ve

Exit 2

55

10

3 M

L

All

Day

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

43/R

t. 2

38

Jeffers

on A

ve

Exit 2

47

York

tow

n R

d

Exit 2

47

83 M

L

York

tow

n R

d

Exit 2

47

Rt. 1

05/R

t. 1

43

Ft. E

ustis B

lvd

Exit 2

50

93 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

17

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 2

A;

5P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A;

12A

- 7

A;

12A

- 5

A;

10P

- 1

2A

12A

- 5

A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 2

A;

5P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A;

12A

- 7

A;

12A

- 5

A;

10P

- 1

2A

12A

- 5

A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

31A

- 4

A

12A

- 5

A 1

A -

6A

1A

- 7

A 12A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 6

A

12A

- 8

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

31A

- 4

A

12A

- 5

A 1

A -

6A

1A

- 7

A 12A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 6

A

12A

- 8

A;

11P

- 1

2A

I-64 EB - Segment 12 (Exit 256) through Segment 15 (Exit 263)

I-6

4 E

B -

Se

gm

en

t 1

2 (

Ex

it 2

56

) th

rou

gh

Se

gm

en

t 1

5 (

Ex

it 2

63

)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Ham

pto

n R

oads

Cente

r P

kw

y

Exit 2

61

Rt. 1

34

Magru

der

Blv

d

Exit 2

62

14

4 M

LA

ll D

ay

All

Day

All

Day

Fro

mT

o

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Seg

men

t

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Rt. 1

71

Vic

tory

Blv

d

Exit 2

56

Rt. 1

7

J. C

lyde M

orr

is

Blv

d

Exit 2

58

12

4 M

L

Rt. 1

7

J. C

lyde M

orr

is

Blv

d

Exit 2

58

Ham

pto

n R

oads

Cente

r P

kw

y

Exit 2

61

13

4 M

LA

ll D

ay

All

Day

All

Day

Rt. 1

34

Magru

der

Blv

d

Exit 2

62

US

258

W. M

erc

ury

Blv

d

Exit 2

63

15

4 M

LA

ll D

ay

All

Day

All

Day

All

Day

All

Day

All

Day

18

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

31A

- 4

A

12A

- 5

A 1

A -

6A

1A

- 7

A 12A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 6

A

12A

- 8

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

12A

- 1

2P

;

3P

- 5

P;

7P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

P;

5P

- 1

2A

A

ll D

ay

212A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 6

A 1

2A

- 8

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2 A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

12A

- 1

2P

;

3P

- 5

P;

7P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

P;

5P

- 1

2A

A

ll D

ay

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 6

A 1

2A

- 8

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

11P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

60

Settle

rs L

andin

g

Rd

Woodla

nd R

d

Exit 2

67

Rt. 1

69

Mallo

ry S

t

Ft. M

onro

e

Exit 2

68

19

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 EB - Segment 16 (Exit 263) through Segment 19 (Exit 268)

4 M

L

Fro

mT

oS

eg

men

t

Rt. 1

67

Lasalle

Ave

Exit 2

65

US

60

Settle

rs L

andin

g

Rd

Woodla

nd R

d

Exit 2

67

18

3 M

L

US

258

W. M

erc

ury

Blv

d

Exit 2

63

I-664

Exit 2

64

16

I-664

Exit 2

64

Rt. 1

67

Lasalle

Ave

Exit 2

65

17

3 M

LA

ll D

ay

All

Day

All

Day

All

Day

I-6

4 E

B -

Se

gm

en

t 1

6 (

Ex

it 2

63

) th

rou

gh

Se

gm

en

t 1

9 (

Ex

it 2

68

)

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

All

Day

19

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

69

Mallo

ry S

t

Ft. M

onro

e

Exit 2

68

Rt. 1

68

Ocean V

iew

15th

Vie

w

Bayv

ille A

ve

Exit 2

72

20

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

68

Ocean V

iew

15th

Vie

w

Bayv

ille A

ve

Exit 2

72

US

60

4th

Vie

w S

t

Exit 2

73

21

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

60

4th

Vie

w S

t

Exit 2

73

Bay

Ave

Exit 2

74

22

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 EB - Segment 20 (Exit 268) through Segment 22 (Exit 274)

I-6

4 E

B -

Se

gm

en

t 2

0 (

Ex

it 2

68

) th

rou

gh

Se

gm

en

t 2

2 (

Ex

it 2

74

)

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Fro

m

20

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Bay

Ave

Exit 2

74

I-564

Rt. 4

60

Gra

nby

St

Exit 2

76

23

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

12A

- 1

1A

;

3P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

12A

- 1

1A

;

3P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 9

A;

5P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 1

1A

;

1P

- 1

2A

12A

- 3

P;

4P

- 1

2A

212A

- 4

A 1

2A

- 5

A 12A

- 6

A 12A

- 7

A 1

2A

- 5

A;

9P

- 1

2A

1

2A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

11P

- 1

2A

I-64 EB - Segment 23 (Exit 274) through Segment 26 (Exit 279)

I-6

4 E

B -

Se

gm

en

t 2

3 (

Ex

it 2

74

) th

rou

gh

Se

gm

en

t 2

6 (

Ex

it 2

79

)

Rt. 2

47

Norv

iew

Ave

Exit 2

79

26

3 M

L12A

- 3

P;

7P

- 1

2A

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 3

P;

7P

- 1

2A

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

I-564

Rt. 4

60

Gra

nby

St

Exit 2

76

Rt. 1

68

Tid

ew

ate

r D

r

Exit 2

77

24

3 M

L

Rt. 1

68

Tid

ew

ate

r D

r

Exit 2

77

Rt. 1

94

Chesapeake

Blv

d

Exit 2

78

Rt. 1

94

Chesapeake

Blv

d

Exit 2

78

25

3 M

LA

ll D

ay

All

Day

All

Day

21

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 9

A;

5P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

1P

- 1

2A

12A

- 3

P;

4P

- 1

2A

212A

- 4

A 1

2A

- 5

A 12A

- 6

A 12A

- 7

A 1

2A

- 5

A;

9P

- 1

2A

1

2A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 9

A;

5P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

1P

- 1

2A

12A

- 3

P;

4P

- 1

2A

212A

- 4

A 1

2A

- 5

A 12A

- 6

A 12A

- 7

A 1

2A

- 5

A;

9P

- 1

2A

1

2A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

1

2A

- 9

A;

7P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

1

2A

- 9

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

312A

- 5

A

1A

- 5

A 1

A -

6A

1

A -

7A

12A

- 5

A 1

2A

- 5

A 12A

- 6

A 12A

- 8

A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

5P

- 1

2A

312A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 6

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 6

A;

10P

- 1

2A

12A

- 8

A;

8P

- 1

2A

I-64 EB - Segment 27 (Exit 279) through Segment 30 (Exit 286)A

llo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-6

4 E

B -

Se

gm

en

t 2

7 (

Ex

it 2

79

) th

rou

gh

Se

gm

en

t 3

0 (

Ex

it 2

86

)

All

Day

All

Day

Rt. 2

47

Norv

iew

Ave

Exit 2

79

Rt. 1

65

Robin

Hood R

d

Exit 2

81

27

3 M

L12A

- 3

P;

7P

- 1

2A

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

US

13

Nort

ham

pto

n

Blv

d

Exit 2

82

I-264

Exit 2

84

29

4 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

65

Robin

Hood R

d

Exit 2

81

US

13

Nort

ham

pto

n

Blv

d

Exit 2

82

28

3 M

L12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-264

Exit 2

84

Rt. 4

07

India

n R

iver

Rd

Exit 2

86

30

4 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

22

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 1

2P

;

5P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

All

Day

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A 1

2A

- 7

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A

12A

- 7

A;

11P

- 1

2A

12A

- 8

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 2

P;

5P

- 1

2A

A

ll D

ay

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A 1

2A

- 8

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A 1

2A

- 9

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 2

P;

5P

- 1

2A

A

ll D

ay

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A 1

2A

- 8

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A 1

2A

- 9

A;

9P

- 1

2A

Rt. 1

68

I-464

Oak G

rove

Connecto

r

Exit 2

91

Rt. 1

90

Gre

at B

ridge

Blv

d

Exit 2

92

34

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

*R

efe

r to

th

e I

nte

rsta

te t

o I

nte

rsta

te r

est

rict

ion

s (C

ha

pte

r 7

) fo

r fu

ll c

losu

res

of

this

la

ne

.

I-64 EB - Segment 31 (Exit 286) through Segment 34 (Exit 292)

All

Day

All

Day

Rt. 1

68

Battle

field

Blv

d

Exit 2

90

Rt. 1

68

I-464

Oak G

rove

Connecto

r

Exit 2

91

33

4 M

L12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Gre

enbrier

Pkw

y

Exit 2

89

Rt. 1

68

Battle

field

Blv

d

Exit 2

90

32

4 M

L

I-6

4 E

B -

Se

gm

en

t 3

1 (

Ex

it 2

86

) th

rou

gh

Se

gm

en

t 3

4 (

Ex

it 2

92

)

Rt. 4

07

India

n R

iver

Rd

Exit 2

86

Gre

enbrier

Pkw

y

Exit 2

89

31

4 M

L

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

All

Day

All

Day

All

Day

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

23

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

90

Gre

at B

ridge

Blv

d

Exit 2

92

US

17

Georg

e

Washin

gto

n H

wy

Exit 2

96

34

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

17

Georg

e

Washin

gto

n H

wy

Exit 2

96

US

13

Mili

tary

Hw

y

Exit 2

97

35

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

13

Mili

tary

Hw

y

Exit 2

97

I-264/I-6

64

Exit 2

99

36

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 EB - Segment 34 (Exit 292) through Segment 36 (I-664/I-264 Exit)

I-6

4 E

B -

Se

gm

en

t 3

4 (

Ex

it 2

92

) th

rou

gh

Se

gm

en

t 3

6 (

I-6

64

/I-2

64

Ex

it)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

24

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

I-264/I-6

64

Exit 2

99

US

13

Mili

tary

Hw

y

Exit 2

97

36

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

13

Mili

tary

Hw

y

Exit 2

97

US

17

Georg

e

Washin

gto

n H

wy

Exit 2

96

35

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

17

Georg

e

Washin

gto

n H

wy

Exit 2

96

Rt. 1

90

Gre

at B

ridge

Blv

d

Exit 2

92

34

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 WB - Segment 36 (I-664/I-264 Exit) through Segment 34 (Exit 292)A

llo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-6

4 W

B -

Se

gm

en

t 3

6 (

I-6

64

/I-2

64

Ex

it)

thro

ug

h S

eg

me

nt

34

(E

xit

29

2)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

25

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

90

Gre

at B

ridge

Blv

d

Exit 2

92

Rt. 1

68/I-4

64

Oak G

rove

Connecto

r

Exit 2

91

34

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

8P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

2 M

L1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 1

P;

3P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 1

0A

;

4P

- 1

2A

2 C

D1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 7

A;

4P

- 1

2A

12A

- 9

A;

2P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

0A

;

5P

- 1

2A

12A

- 1

2P

;

1P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 2

P;

5P

- 1

2A

A

ll D

ay

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A 1

2A

- 8

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A 1

2A

- 9

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

4P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

6P

- 1

2A

A

ll D

ay

312A

- 5

A;

11P

- 1

2A

12A

- 5

A 12A

- 6

A 1

2A

- 7

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

11P

- 1

2A

12A

- 6

A;

9P

- 1

2A

*R

efe

r to

th

e I

nte

rsta

te t

o I

nte

rsta

te r

est

rict

ion

s (C

ha

pte

r 7

) fo

r fu

ll c

losu

res

of

this

la

ne

.

I-64 WB - Segment 34 (Exit 292) through Segment 31 (Exit 286)

I-6

4 W

B -

Se

gm

en

t 3

4 (

Ex

it 2

92

) th

rou

gh

Se

gm

en

t 3

1 (

Ex

it 2

86

)

Fro

mT

o

All

Day

Rt. 1

68

Battle

field

Blv

d

Exit 2

90

Gre

enbrier

Pkw

y

Exit 2

89

32

4 M

LA

ll D

ay

All

Day

Rt. 1

68/I-4

64

Oak G

rove

Connecto

r

Exit 2

91

Rt. 1

68

Battle

field

Blv

d

Exit 2

90

4 M

L31

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 4

07

India

n R

iver

Rd

Exit 2

86

Gre

enbrier

Pkw

y

Exit 2

89

33

All

Day

All

Day

All

Day

26

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 8

A;

4P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

3P

- 1

2A

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

5P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 1

0A

;

4P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

312A

- 4

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

312A

- 4

A 1

2A

- 4

A 1

A -

5A

1A

- 5

A 12A

- 4

A;

11P

- 1

2A

1

2A

- 4

A 12A

- 5

A

1A

- 7

A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

1

2A

- 8

A;

7P

- 1

2A

1

2A

- 9

A;

11A

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 4

A 1

2A

- 5

A 1A

- 5

A;

11P

- 1

2A

12A

- 4

A;

11P

- 1

2A

12A

- 4

A 1

2A

- 5

A 12A

- 7

A;

11P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

1

2A

- 8

A;

7P

- 1

2A

1

2A

- 9

A;

11A

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 4

A 1

2A

- 5

A 1A

- 5

A;

11P

- 1

2A

12A

- 4

A;

11P

- 1

2A

12A

- 4

A 1

2A

- 5

A 12A

- 7

A;

11P

- 1

2A

I-64 WB - Segment 30 (Exit 286) through Segment 27 (Exit 279)

US

13

Nort

ham

pto

n

Blv

d

Exit 2

82

Rt. 1

65

Robin

Hood R

d

Exit 2

81

28

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

I-264

Exit 2

84

US

13

Nort

ham

pto

n

Blv

d

Exit 2

82

29

4 M

L

I-264

Exit 2

84

30

4 M

L

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-6

4 W

B -

Se

gm

en

t 3

0 (

Ex

it 2

86

) th

rou

gh

Se

gm

en

t 2

7 (

Ex

it 2

79

)

All

Day

Rt. 1

65

Robin

Hood R

d

Exit 2

81

Rt. 2

47

Norv

iew

Ave

Exit 2

79

27

3 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

3 M

L

Rt. 4

07

India

n R

iver

Rd

Exit 2

86

27

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

1

2A

- 8

A;

7P

- 1

2A

1

2A

- 9

A;

11A

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 4

A 1

2A

- 5

A 1A

- 5

A;

11P

- 1

2A

12A

- 4

A;

11P

- 1

2A

12A

- 4

A 1

2A

- 5

A 12A

- 7

A;

11P

- 1

2A

112A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 5

A 12A

- 6

A;

10P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

10P

- 1

2A

12A

- 1

0A

;

9P

- 1

2A

112A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 5

A 1

2A

- 5

A 12A

- 6

A;

10P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

10P

- 1

2A

12A

- 1

0A

;

9P

- 1

2A

I-564

Rt. 4

60

Gra

nby

St

Exit 2

76

Bay

Ave

Exit 2

74

23

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 WB - Segment 26 (Exit 279) through Segment 23 (Exit 274)

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

Rt. 1

68

Tid

ew

ate

r D

r

Exit 2

77

25

3 M

L

26

3 M

L

Rt. 1

94

Chesapeake

Blv

d

Exit 2

78

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

68

Tid

ew

ate

r D

r

Exit 2

77

I-564

Rt. 4

60

Gra

nby

St

Exit 2

76

24

3 M

L

Rt. 2

47

Norv

iew

Ave

Exit 2

79

Rt. 1

94

Chesapeake

Blv

d

Exit 2

78

I-6

4 W

B -

Se

gm

en

t 2

6 (

Ex

it 2

79

) th

rou

gh

Se

gm

en

t 2

3 (

Ex

it 2

74

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

28

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Bay

Ave

Exit 2

74

US

60

4th

Vie

w S

t

Exit 2

73

22

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

60

4th

Vie

w S

t

Exit 2

73

Rt. 1

68

Ocean V

iew

15th

Vie

w

Bayv

ille A

ve

Exit 2

72

21

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

68

Ocean V

iew

15th

Vie

w

Bayv

ille A

ve

Exit 2

72

Rt. 1

69

Mallo

ry S

t

Ft. M

onro

e

Exit 2

68

20

2 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-64 WB - Segment 22 (Exit 274) through Segment 20 (Exit 268)A

llo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

I-6

4 W

B -

Se

gm

en

t 2

2 (

Ex

it 2

74

) th

rou

gh

Se

gm

en

t 2

0 (

Ex

it 2

68

)

Fro

mT

oS

eg

men

t

29

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

8P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

8P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

11P

- 1

2A

12A

- 9

A;

8P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

1

2A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

9P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

1

2A

- 5

A;

8P

- 1

2A

1

2A

- 9

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

31A

- 4

A

12A

- 5

A

2A

- 5

A

1A

- 6

A 12A

- 5

A;

11P

- 1

2A

1

2A

- 5

A

2A

- 6

A 12A

- 7

A;

11P

- 1

2A

I-6

4 W

B -

Se

gm

en

t 1

9 (

Ex

it 2

68

) th

rou

gh

Se

gm

en

t 1

6 (

Ex

it 2

63

)

I-664

Exit 2

64

US

258

Merc

ury

Blv

d

Exit 2

63

16

4 M

LA

ll D

ay

All

Day

All

Day

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

Fro

mT

o

3 M

LA

ll D

ay

19

3 M

LA

ll D

ay

All

Day

All

Day

All

Day

18

I-64 WB - Segment 19 (Exit 268) through Segment 16 (Exit 263)# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

3 M

L

US

60

Woodla

nd R

d

Settle

rs L

andin

g

Rd

Exit 2

67

All

Day

All

Day

Rt. 1

67

Lasalle

Ave

Exit 2

65

Rt. 1

69

Mallo

ry S

t

Ft. M

onro

e

Exit 2

68

US

60

Woodla

nd R

d

Settle

rs L

andin

g

Rd

Exit 2

67

All

Day

All

Day

Rt. 1

67

Lasalle

Ave

Exit 2

65

I-664

Exit 2

64

17

30

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

1

2A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

9P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

1

2A

- 5

A;

8P

- 1

2A

1

2A

- 9

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

31A

- 4

A

12A

- 5

A

2A

- 5

A

1A

- 6

A 12A

- 5

A;

11P

- 1

2A

1

2A

- 5

A

12A

- 6

A 1

2A

- 7

A;

11P

- 1

2A

41A

- 4

A

1A

- 4

A

2A

- 5

A

1A

- 6

A 12A

- 4

A;

11P

- 1

2A

1

2A

- 5

A

12A

- 6

A 1

2A

- 7

A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

1

2A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

9P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

1

2A

- 5

A;

8P

- 1

2A

1

2A

- 9

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

31A

- 4

A

12A

- 5

A

2A

- 5

A

1A

- 6

A 12A

- 5

A;

11P

- 1

2A

1

2A

- 5

A

12A

- 6

A 1

2A

- 7

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

1

2A

- 5

A;

9P

- 1

2A

1

2A

- 7

A;

9P

- 1

2A

1

2A

- 9

A;

8P

- 1

2A

1

2A

- 5

A;

7P

- 1

2A

1

2A

- 5

A;

8P

- 1

2A

1

2A

- 9

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

31A

- 4

A

12A

- 5

A

2A

- 5

A

1A

- 6

A 12A

- 5

A;

11P

- 1

2A

1

2A

- 5

A

12A

- 6

A 1

2A

- 7

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

6P

- 1

2A

12A

- 1

2A

;

3P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 5

A 1

2A

- 6

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

11P

- 1

2A

12A

- 8

A;

9P

- 1

2A

I-64 WB - Segment 15 (Exit 263) through Segment 12 (Exit 256)

I-6

4 W

B -

Se

gm

en

t 1

5 (

Ex

it 2

63

) th

rou

gh

Se

gm

en

t 1

2 (

Ex

it 2

56

)

Ham

pto

n R

oads

Cente

r P

kw

y

Exit 2

61

Rt. 1

7

J. C

lyde M

orr

is

Blv

d

Exit 2

58

13

4 M

LA

ll D

ay

All

Day

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

15

5 M

LA

ll D

ay

All

Day

All

Day

Rt. 1

34

Magru

der

Blv

d

Exit 2

62

Ham

pto

n R

oads

Cente

r P

kw

y

Exit 2

61

14

4 M

LA

ll D

ay

US

258

Merc

ury

Blv

d

Exit 2

63

Rt. 1

34

Magru

der

Blv

d

Exit 2

62

All

Day

All

Day

Rt. 1

7

J. C

lyde M

orr

is

Blv

d

Exit 2

58

Rt. 1

71

Vis

tory

Blv

d

Exit 2

56

12

4 M

LA

ll D

ay

All

Day

All

Day

31

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 1

1A

;

6P

- 1

2A

12A

- 1

2A

;

3P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 5

A 1

2A

- 6

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 6

A;

11P

- 1

2A

12A

- 8

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

2* 1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

2* 1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

2*

*C

on

tact

Tra

ffic

En

gin

ee

rin

g f

or

an

All

ow

ab

le L

an

e C

losu

re H

ou

rs e

xce

pti

on

fo

r 2

la

ne

clo

sure

s in

Se

gm

en

ts 6

th

rou

gh

10

.

I-64 WB - Segment 11 (Exit 256) through Segment 8 (Exit 247)

93 M

L

York

tow

n R

d

Exit 2

47

Rt. 1

43/R

t. 2

38

Jeffers

on A

ve

Exit 2

47

83 M

L

I-6

4 W

B -

Se

gm

en

t 1

1 (

Ex

it 2

56

) th

rou

gh

Se

gm

en

t 8

(E

xit

24

7)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Rt. 1

43

Jeffers

on A

ve

Exit 2

55

Rt. 1

05/R

t. 1

43

Ft. E

ustis B

lvd

Exit 2

50

10

2 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

All

Day

Rt. 1

71

Vis

tory

Blv

d

Exit 2

56

Rt. 1

43

Jeffers

on A

ve

Exit 2

55

11

4 M

LA

ll D

ay

All

Day

Rt. 1

05/R

t. 1

43

Ft. E

ustis B

lvd

Exit 2

50

York

tow

n R

d

Exit 2

47

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

32

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

2* 1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

2*

Rt. 1

99

Hum

els

ine P

kw

y

Exit 2

42

Rt. 1

43

Merr

imac T

rail

Exit 2

38

52 M

L1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

43

Merr

imac T

rail

Exit 2

38

Rt. 1

99/R

t. 6

46

Hum

els

ine P

kw

y

New

man R

d

Exit 2

34

42 M

L1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

*C

on

tact

Tra

ffic

En

gin

ee

rin

g f

or

an

All

ow

ab

le L

an

e C

losu

re H

ou

rs e

xce

pti

on

fo

r 2

la

ne

clo

sure

s in

Se

gm

en

ts 6

th

rou

gh

10

.

I-64 WB - Segment 7 (Exit 247) through Segment 4 (Exit 234)

I-6

4 W

B -

Se

gm

en

t 7

(E

xit

24

7)

thro

ug

h S

eg

me

nt

4 (

Ex

it 2

34

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Rt. 1

43/R

t. 2

38

Jeffers

on A

ve

Exit 2

47

Rt.60/R

t.143

Busch G

ard

ens

Exit 2

43

73 M

L

Rt. 6

0/R

t.143

Busch G

ard

ens

Exit 2

43

Rt. 1

99

Hum

els

ine P

kw

y

Exit 2

42

63 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

33

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

99/R

t. 6

46

Hum

els

ine P

kw

y

New

man R

d

Exit 2

34

Rt. 6

07

Cro

aker

Rd

Exit 2

31

32 M

L1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 6

07

Cro

aker

Rd

Exit 2

31

Rt. 3

0

Old

Sta

ge R

d

Exit 2

27

22 M

L1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 3

0

Old

Sta

ge R

d

Exit 2

27

Rt. 3

3

Eltham

Rd

Exit 2

20

12 M

L1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-6

4 W

B -

Se

gm

en

t 3

(E

xit

23

4)

thro

ug

h S

eg

me

nt

1 (

Ex

it 2

20

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-64 WB - Segment 3 (Exit 234) through Segment 1 (Exit 220)

34

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

NC

Sta

te L

ine

Rt. 6

29

Moore

's F

err

y

Rd

Exit 4

12 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

12A

- 2

P;

3P

- 1

2A

All

Day

All

Day

All

Day

Rt. 6

29

Moore

's F

err

y

Rd

Exit 4

US

301

Skip

pers

Rd

Exit 8

22 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

12A

- 2

P;

3P

- 1

2A

All

Day

All

Day

All

Day

I-9

5 N

B -

Se

gm

en

t 1

(N

C S

tate

Lin

e)

thro

ug

h S

eg

me

nt

2 (

Ex

it 8

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 NB - Segment 1 (NC State line) through Segment 2 (Exit 8)

35

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

US

301

Skip

pers

Rd

Exit 8

US

58

W. A

tlantic S

t

Exit 1

1

32 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

12A

- 2

P;

3P

- 1

2A

All

Day

All

Day

All

Day

US

58

W. A

tlantic S

t

Exit 1

1

US

301

Sussex D

r

Exit 1

2

42 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

US

301

Sussex D

r

Exit 1

2

Rt. 6

14

Otterd

am

Rd

Exit 1

3

52 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 N

B -

Se

gm

en

t 3

(E

xit

8)

thro

ug

h S

eg

me

nt

5 (

Ex

it 1

3)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 NB - Segment 3 (Exit 8) through Segment 5 (Exit 13)

36

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

14

Otterd

am

Rd

Exit 1

3

US

301

Blu

e S

tar

Hw

y

Exit 1

7

62 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

US

301

Blu

e S

tar

Hw

y

Exit 1

7

Rt. 6

31

Henry

Rd

Exit 2

0

72 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 6

31

Henry

Rd

Exit 2

0

Rt. 6

45

Ow

en R

d

Exit 2

4

82 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 N

B -

Se

gm

en

t 6

(E

xit

13

) th

rou

gh

Se

gm

en

t 8

(E

xit

24

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 NB - Segment 6 (Exit 13) through Segment 8 (Exit 24)

37

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

45

Ow

en R

d

Exit 2

4

Rt. 4

0

Sussex D

r

Exit 3

1

92 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 4

0

Sussex D

r

Exit 3

1

Rt. 6

02

Cabin

Poin

t R

d

St. J

ohn C

hurc

h

Rd

Exit 3

3

10

2 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 6

02

Cabin

Poin

t R

d

St. J

ohn C

hurc

h

Rd

Exit 3

3

Prince G

eorg

e

County

Lin

e11

2 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 9

A;

6P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 N

B -

Se

gm

en

t 9

(E

xit

24

) th

rou

gh

Se

gm

en

t 1

1 (

Pri

nce

Ge

org

e C

ou

nty

Lin

e)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 NB - Segment 9 (Exit 24) through Segment 11 (Prince George County Line)

38

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Prince G

eorg

e

County

Lin

e

Rt. 6

02

Cabin

Poin

t R

d

St. J

ohn C

hurc

h

Rd

Exit 3

3

11

2 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 6

02

Cabin

Poin

t R

d

St. J

ohn C

hurc

h

Rd

Exit 3

3

Rt. 4

0

Sussex D

r

Exit 3

1

10

2 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 4

0

Sussex D

r

Exit 3

1

Rt. 6

45

Ow

en R

d

Exit 2

4

92 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 S

B -

Se

gm

en

t 1

1 (

Pri

nce

Ge

org

e C

ou

nty

Lin

e)

thro

ug

h S

eg

me

nt

9 (

Ex

it 3

1)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 SB - Segment 11 (Prince George County Line) through Segment 9 (Exit 31)

39

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

45

Ow

en R

d

Exit 2

4

Rt. 6

31

Henry

Rd

Exit 2

0

82 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 6

31

Henry

Rd

Exit 2

0

US

301

Blu

e S

tar

Hw

y

Exit 1

7

72 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

US

301

Blu

e S

tar

Hw

y

Exit 1

7

Rt. 6

14

Otterd

am

Rd

Exit 1

3

62 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 S

B -

Se

gm

en

t 8

(E

xit

24

) th

rou

gh

Se

gm

en

t 6

(E

xit

13

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 SB - Segment 8 (Exit 24) through Segment 6 (Exit 13)

40

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

14

Otterd

am

Rd

Exit 1

3

US

301

Sussex D

r

Exit 1

2

52 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

US

301

Sussex D

r

Exit 1

2

US

58

W. A

tlantic S

t

Exit 1

1

42 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

5P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

US

58

W. A

tlantic S

t

Exit 1

1

US

301

Skip

pers

Rd

Exit 8

32 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 7

A;

6P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 S

B -

Se

gm

en

t 5

(E

xit

13

) th

rou

gh

Se

gm

en

t 3

(E

xit

8)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 SB - Segment 5 (Exit 13) through Segment 3 (Exit 8)

41

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

US

301

Skip

pers

Rd

Exit 8

Rt. 6

29

Moore

's F

err

y

Rd

Exit 4

22 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 7

A;

6P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 6

29

Moore

's F

err

y

Rd

Exit 4

NC

Sta

te L

ine

12 M

L1

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 7

A;

6P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 7

A;

9A

- 4

P;

6P

- 1

2A

12A

- 7

A;

6P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

I-9

5 S

B -

Se

gm

en

t 2

(E

xit

8)

thro

ug

h S

eg

me

nt

1 (

NC

Sta

te L

ine

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-95 SB - Segment 2 (Exit 8) through Segment 1 (NC State Line)

42

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

I-64/I-6

64

Rt.13/R

t. 5

8

Rt. 4

60

Gre

enw

ood D

r

Exit 2

12

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 2

P;

3P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

Gre

enw

ood D

r

Exit 2

Rt.239

Vic

tory

Blv

d

Exit 3

22

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 2

P;

3P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

I-2

64

EB

- S

eg

me

nt

1 (

I-6

4/I

-66

4)

thro

ug

h S

eg

me

nt

3 (

Ex

it 4

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

Rt.239

Vic

tory

Blv

d

Exit 3

Rt. 3

37

Port

sm

outh

Blv

d

Exit 4

33

All

Day

All

Day

I-264 EB - Segment 1 (I-64/I-664) through Segment 3 (Exit 4)

43

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

6P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

6P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-2

64

EB

- S

eg

me

nt

4 (

Ex

it 4

) th

rou

gh

Se

gm

en

t 6

(E

xit

7)

Rt. 3

37

Port

sm

outh

Blv

d

Exit 4

Rt.17

Fre

derick B

lvd

Exit 5

43

All

Day

All

Day

All

Day

I-264 EB - Segment 4 (Exit 4) through Segment 6 (Exit 7)

Rt.17

Fre

derick B

lvd

Exit 5

Rt. 1

64

Mart

in L

uth

er

Kin

g F

wy

E

xit

6

53

All

Day

All

Day

All

Day

Rt. 1

64

Mart

in L

uth

er

Kin

g F

wy

E

xit

6

Rt. 1

41

Effin

gham

St

Exit 7

63

All

Day

All

Day

All

Day

44

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

41

Effin

gham

St

Exit 7

I-464

Exit 8

72

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

7P

-12A

12A

- 1

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-464

Exit 8

Mark

et S

t

Exit 9

82

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

7P

-12A

12A

- 1

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Mark

et S

t

Exit 9

Tid

ew

ate

r D

r

Exit 1

09

21

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

7P

-12A

12A

- 1

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

312A

-5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A12A

- 9

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A12A

- 7

A12A

- 9

A;

8P

- 1

2A

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-2

64

EB

- S

eg

me

nt

7 (

Ex

it 7

) th

rou

gh

Se

gm

en

t 1

0 (

Ex

it 1

1)

I-264 EB - Segment 7 (Exit 7) through Segment 10 (Exit 11)

Tid

ew

ate

r D

r

Exit 1

0

US

460/R

t. 1

66

E. B

ram

ble

ton

Ave

Cam

poste

lla R

d

Exit 1

1

10

4

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

45

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

312A

- 5

A;

11P

- 1

2A

12A

-5

A

12A

- 6

A12A

- 9

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A12A

- 7

A12A

- 9

A;

8P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

P;

2P

- 3

P;

4P

- 1

2A

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

312A

- 5

A;

11P

- 1

2A

12A

- 5

A12A

- 7

A12A

- 8

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A12A

- 7

A12A

- 9

A;

8P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

312A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 9

A;

11P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

-5

A;

8P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 1

2P

;

7P

- 1

2A

2 C

D1

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

12A

- 1

P;

3P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

6P

- 1

2A

All

Day

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-2

64

EB

- S

eg

me

nt

11

(E

xit

11

) th

rou

gh

Se

gm

en

t 1

3 (

Ex

it 1

4)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

US

460/R

t. 1

66

E. B

ram

ble

ton

Ave

Cam

poste

lla R

d

Exit 1

1

SR

405

Balle

ntine B

lvd

Exit 1

2

11

4

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

I-264 EB - Segment 11 (Exit 11) through Segment 13 (Exit 14)

All

Day

US

13

Mili

tary

Hw

y

Exit 1

3

I-64

Exit 1

413

4 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

SR

405

Balle

ntine B

lvd

Exit 1

2

US

13

Mili

tary

Hw

y

Exit 1

3

12

4A

ll D

ay

All

Day

46

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 1

1A

;

4P

- 1

2A

12A

- 1

2P

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

7P

- 1

2A

312A

- 5

A;

10P

- 1

2A

12A

- 5

A; 12A

- 8

A; 1

2A

- 9

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A; 12A

- 7

A;

12A

- 8

A;

10P

- 1

2A

2 C

D1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 8

A;

10P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 1

2P

;

2P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

0A

;

5P

- 1

2A

12A

- 1

2P

;

1P

- 1

2A

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 1

0A

;

5P

- 1

2A

312A

- 5

A;

10P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 6

A;

11P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 6

A;

10P

- 1

2A

12A

- 8

A;

9P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

P12A

- 6

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A12A

- 8

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

P12A

- 6

A;

11P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A12A

- 8

A;

11P

- 1

2A

I-2

64

EB

- S

eg

me

nt

14

(E

xit

14

) th

rou

gh

Se

gm

en

t 1

7 (

Ex

it 1

8)

I-264 EB - Segment 14 (Exit 14) through Segment 17 (Exit 18)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-64

Exit 1

4

Rt. 4

03

New

tow

n R

d

Exit 1

5

14

4 M

L

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 4

03

New

tow

n R

d

Exit 1

5

SR

190

Witchduck R

d

Exit 1

6

15

4

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

SR

190

Witchduck R

d

Exit 1

6

Rt.225

Independence

Blv

d

Exit 1

7

16

412A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt.225

Independence

Blv

d

Exit 1

7

Rt. 4

11

S. R

osem

ont R

d

Exit 1

8

17

412A

- 3

P;

7P

- 1

2A

All

Day

All

Day

47

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 9

A;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

312A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

-6P

12A

-6A

;

11P

-12A

12A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 6

A12A

- 8

A;

11P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

P;

5P

- 1

2A

12A

- 1

2P

;

3P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

All

Day

312A

- 5

A;

11P

- 1

2A

12A

- 5

A

12A

- 7

A12A

- 8

A;

11P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 7

A12A

- 8

A;

8P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

312A

- 5

A;

10P

- 1

2A

12A

- 5

A;

11P

- 1

2A

12A

- 9

A;

11P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 8

A;

10P

- 1

2A

12A

- 1

0A

;

6P

- 1

2A

1A

ll D

ay

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

All

Day

212A

- 7

A;

9P

- 1

2A

12A

- 8

A;

10P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 8

A;

9A

- 3

P;

7P

- 1

2A

All

Day

12A

- 8

A;

9A

- 1

2P

;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

1A

ll D

ay

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

All

Day

All

Day

All

Day

All

Day

212A

- 7

A;

9P

- 1

2A

12A

- 8

A;

10P

- 1

2A

12A

- 8

A;

11P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 8

A;

9A

- 3

P;

7P

- 1

2A

All

Day

12A

- 8

A;

9A

- 1

2P

;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

I-2

64

EB

- S

eg

me

nt

18

(E

xit

18

) th

rou

gh

Se

gm

en

t 2

2 (

Pa

rks

Av

e/2

1st

St/

22

nd

St)

I-264 EB - Segment 18 (Exit 18) through Segment 22 (Parks Ave/21st St/22nd St)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Rt. 4

11

S. R

osem

ont R

d

Exit 1

8

Rt. 4

14

Lyn

nhaven P

kw

y

Exit 1

9

18

412A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 4

14

Lyn

nhaven P

kw

y

Exit 1

9

US

58

Virgin

ia B

each

Blv

d

Laskin

Rd

Exit 2

0

19

4A

ll D

ay

All

Day

All

Day

US

58

Virgin

ia B

each

Blv

d

Laskin

Rd

Exit 2

0

First C

olo

nia

l R

d

Exit 2

120

4A

ll D

ay

All

Day

N B

irdneck R

d

Exit 2

2

Park

s A

ve

21st S

t/22nd S

t22

3A

ll D

ay

All

Day

All

Day

All

Day

First C

olo

nia

l R

d

Exit 2

1

N B

irdneck R

d

Exit 2

221

3A

ll D

ay

All

Day

All

Day

48

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

1A

ll D

ay

All

Day

All

Day

All

Day

All

Day

All

Day

All

Day

All

Day

212A

-7A

;

9P

-12A

12A

-7A

;

10P

-12A

12A

-9A

12A

-10A

;

9P

-12A

12A

-7A

;

9A

-3P

;

6P

-12A

12A

-7A

;

7P

-12A

12A

-10A

;

7P

-12A

12A

-10A

;

5P

-12A

1A

ll D

ay

All

Day

All

Day

All

Day

All

Day

All

Day

All

Day

All

Day

212A

-7A

;

9P

-12A

12A

-7A

;

10P

-12A

12A

-9A

12A

-10A

;

9P

-12A

12A

-7A

;

9A

-3P

;

6P

-12A

12A

-7A

;

7P

-12A

12A

-10A

;

7P

-12A

12A

-10A

;

5P

-12A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

312A

-5A

;

11P

-12A

12A

-5A

12A

-10A

12A

-9A

;

11P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

9P

-12A

12A

-8A

;

10P

-12A

12A

-9A

;

7P

-12A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

-2P

;

5P

-6P

;

12A

-3P

;

6P

-12A

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

-12P

;

5P

-12A

All

Day

312A

-5A

12A

-5A

12A

-8A

1A

-8A

;

11P

-12A

12A

-5A

;

9P

-12A

12A

-5A

;

11P

-12A

12A

-7A

12A

-9A

;

8P

-12A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

All

Day

All

Day

212A

-5A

;

8P

-12A

12A

-5A

;

9P

-12A

12A

-10A

;

10P

-12A

12A

-10A

;

8P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

-10A

;

8P

-12A

12A

-12P

;

5P

-12A

312A

-5A

12A

-5A

1A

-6A

3A

-7A

12A

-5A

;

10P

-12A

12A

-5A

12A

-6A

12A

-8A

;

11P

-12A

All

Day

Park

s A

ve

21st S

t/22nd S

t

First C

olo

nia

l R

d

Exit 2

121

3A

ll D

ay

All

Day

All

Day

Park

s A

ve

21st S

t/22nd S

t

First C

olo

nia

l R

d

Exit 2

122

3A

ll D

ay

All

Day

All

Day

I-2

64

WB

- S

eg

me

nt

22

(P

ark

s A

ve

/21

st S

t/2

2n

d S

t) t

hro

ug

h S

eg

me

nt

18

(E

xit

17

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-264 WB - Segment 22 (Parks Ave/21st St/22nd St) through Segment 18 (Exit 17)

US

58

Virgin

ia B

each

Blv

d

Laskin

Rd

Exit 2

0

Rt. 4

14

Lyn

nhaven P

kw

y

Exit 1

9

19

4A

ll D

ay

All

Day

All

Day

First C

olo

nia

l R

d

Exit 2

1

US

58

Virgin

ia B

each

Blv

d

Laskin

Rd

Exit 2

0

20

4A

ll D

ay

All

Day

All

Day

Rt. 4

14

Lyn

nhaven P

kw

y

Exit 1

9

Rt. 4

11

S. R

osem

ont R

d

Exit 1

8

18

4A

ll D

ay

All

Day

49

Mon

day

- Th

ursd

ayFr

iday

Satu

rday

Sund

ayM

onda

y -

Thur

sday

Frid

aySa

turd

aySu

nday

Mon

day

- Fr

iday

Satu

rday

Sund

ay

112

A -

5A;

7P

- 12

A12

A -

5A;

7P

- 12

AA

ll D

ayA

ll D

ay12

A -

5A;

7P

- 12

A12

A -

5A;

7P

- 12

AA

ll D

ayA

ll D

ay

212

A-5

A;

8P

-12A

12A

-5A

;

9P-1

2A12

A-1

0A;

10P

-12A

12A

-10A

;

8P-1

2A12

A-5

A;

7P

-12A

12A

-5A

;

8P-1

2A12

A-1

0A;

8P

-12A

12A

-12P

;

5P-1

2A

312

A-5

A

12A

-5A

1A-6

A3A

-7A

12A

-5A

;

10P

-12A

12A

-5A

12A

-6A

12A

-8A

;

11P

-12A

112

A -

5A;

7P

- 12

A12

A -

5A;

7P

- 12

AA

ll D

ayA

ll D

ay12

A -

5A;

7P

- 12

A12

A -

5A;

7P

- 12

AA

ll D

ayA

ll D

ay

212

A-5

A;

7P

-12A

12A

-5A

;

8P-1

2A12

A-1

0A;

7P

-12A

12A

-12P

;

7P-1

2A12

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2A12

A-1

1A;

7P

-12A

12A

-12P

;

5P-1

2A

312

A-5

A12

A-5

A1A

-6A

1A-7

A12

A-4

A;

11

P-1

2A12

A-5

A12

A-6

A1A

-7A

;

11P

-12A

112

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2AA

ll D

ayA

ll D

ay12

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2AA

ll D

ayA

ll D

ay

212

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2A12

A-3

A;

7P

-12A

12A

-4P

;

5P-1

2A12

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2A12

A-1

2P;

6P

-12A

All

Da y

312

A-5

A;

9P

-12A

12A

-5A

;

10P

-12A

12A

-8A

;

11P

-12A

12A

-10A

;

9P-1

2A12

A-5

A;

8P

-12A

12A

-5A

;

10P

-12A

12A

-8A

;

10P

-12A

12A

-10A

;

8P-1

2A

412

A-5

A;

11

P-1

2A12

A-5

A12

A-6

A1A

-7A

;

11P

-12A

12A

-5A

;

11P

-12A

12A

-5A

12A

-6A

1A-7

A;

10

P-1

2A

112

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2A12

A-1

P;

7P

-12A

12A

-5A

;

6P-1

2A12

A-5

A;

7P

-12A

12A

-5A

;

7P-1

2A12

A-4

P;

6P

-12A

All

Day

212

A-5

A;

11

P-1

2A12

A-5

A12

A-7

A12

A-9

A;

11

P-1

2A12

A-5

A;

10

P-1

2A12

A-5

A;

11

P-1

2A12

A-7

A;

11

P-1

2A12

A-9

A;

9P

-12A

2 C

D1

12A

-5A

;

11P

-12A

12A

-5A

*12

A-7

A12

A-9

A;

11

P-1

2A12

A-5

A;

10

P-1

2A12

A-5

A;

11

P-1

2A12

A-7

A;

11

P-1

2A12

A-9

A;

8P

-12A

From

ToSe

gmen

t

# of

Ex

istin

g La

nes

(ML/

CD

)

# of

La

nes

Clo

sed

Allo

wab

le L

ane

Clo

sure

Hou

rsSu

mm

er (A

pril

15-O

ctob

er 1

5)A

llow

able

Lan

e C

losu

re H

ours

Non

-Sum

mer

(Oct

ober

16-

Apr

il 14

)A

llow

able

Sho

ulde

r Clo

sure

Hou

rs

(Rem

ovab

le O

nly)

All

Year

I‐264

 WB ‐ Segmen

t 17 (Exit 1

8) th

rough Segm

ent 1

4 (Exit 1

4)

I‐264 WB ‐ Segment 17 (Exit 18) through Segment 14 (Exit 14)

Rt.

411

S

. Ros

emon

t Rd

Exi

t 18

Rt.2

25

Inde

pend

ence

B

lvd

Exi

t 17

174

12A

- 5A

;

9A -

12A

All

Day

All

Day

Rt.2

25

Inde

pend

ence

B

lvd

Exi

t 17

Rt.

190

W

itchd

uck

Rd

Exi

t 16

164

12A

- 5A

;

9A -

12A

All

Day

All

Day

Rt.

190

W

itchd

uck

Rd

Exi

t 16

Rt.

403

N

ewto

wn

Rd

Exi

t 15

155

12A

-5A

;

9A-3

P;

7P-1

2A

All

Day

All

Day

Rt.

403

N

ewto

wn

Rd

Exi

t 15

I-64

Exi

t 14

143

ML

12A

-5A

;

9A-3

P;

7P-1

2AA

ll D

ayA

ll D

ay

Revised April 2019 50

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-3P

;

7P

-12A

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

8P

-12A

12A

-5A

;

9P

-12A

12A

-9A

;

8P

-12A

12A

-10A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

-5A

;

8P

-12A

12A

-9A

;

7P

-12A

12A

-10A

;

6P

-12A

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-6P

;

7P

-12A

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-6P

;

7P

-12A

All

Day

312A

-5A

;

11P

-12A

12A

-5A

12A

-6A

12A

-8A

;

11P

-12A

12A

-5A

;

10P

-12A

12A

-5A

;

11P

-12A

12A

-6A

12A

-8A

;

9P

-12A

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

312A

-5A

;

11P

-12A

12A

-5A

12A

-6A

12A

-9A

;

11P

-12A

12A

-5A

;

10P

-12A

12A

-5A

;

11P

-12A

12A

-6A

12A

-9A

;

9P

-12A

I-2

64

WB

- S

eg

me

nt

13

(E

xit

14

) th

rou

gh

Se

gm

en

t 1

1 (

Ex

it 1

1)

I-264 WB - Segment 13 (Exit 14) through Segment 11 (Exit 11)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Rt. 4

05

Balle

ntine B

lvd

Exit 1

2

12

4A

ll D

ay

All

Day

All

Day

I-64

Exit 1

4

US

13

Mili

tary

Hw

y

Exit 1

3

13

3 M

L12A

-5A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

3 C

D

US

13

Mili

tary

Hw

y

Exit 1

3

All

Day

Rt. 4

05

Balle

ntine B

lvd

Exit 1

2

US

460/R

t. 1

66

E. B

ram

ble

ton

Ave

Cam

poste

lla R

d

Exit 1

1

11

4

12A

-5A

;

9A

-3P

;

7P

-12A

All

Day

51

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

US

460/R

t. 1

66

E. B

ram

ble

ton

Ave

Cam

poste

lla R

d

Exit 1

1

Tid

ew

ate

r D

r

Exit 1

010

21

12A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

1A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

12A

-5A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

Tid

ew

ate

r D

r

Exit 1

0

Mark

et S

t

Exit 9

92

112A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

1A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

12A

-5A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

Mark

et S

t

Exit 9

I-464

Exit 8

82

112A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

1A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

12A

-5A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

I-464

Exit 8

Rt. 1

41

Effin

gham

St

Exit 7

72

112A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

12A

-5A

;

7P

-12A

12A

-5A

;

8P

-12A

12A

- 1

1A

;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

12A

-5A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

I-2

64

WB

- S

eg

me

nt

10

(E

xit

11

) th

rou

gh

Se

gm

en

t 7

(E

xit

7)

I-264 WB - Segment 10 (Exit 11) through Segment 7 (Exit 7)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

52

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-3P

;

5P

-12A

All

Day

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-3P

;

5P

-12A

All

Day

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-3P

;

5P

-12A

All

Day

I-264 WB - Segment 6 (Exit 7) through Segment 4 (Exit 4)

I-2

64

WB

- S

eg

me

nt

6 (

Ex

it 7

) th

rou

gh

Se

gm

en

t 4

(E

xit

4)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Rt. 1

41

Effin

gham

St

Exit 7

Rt. 1

64

Mart

in L

uth

er

Kin

g F

wy

E

xit

6

63

All

Day

All

Day

All

Day

Rt. 1

64

Mart

in L

uth

er

Kin

g F

wy

E

xit

6

US

17

Fre

drick B

lvd

Exit 5

53

All

Day

All

Day

All

Day

US

17

Fre

drick B

lvd

Exit 5

Rt. 3

37

Port

sm

outh

Blv

d

Exit 4

43

All

Day

All

Day

All

Day

53

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

212A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-12P

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

12A

-3P

;

5P

-12A

All

Day

Rt.239

Vic

tory

Blv

d

Exit 3

Gre

enw

ood D

r

Exit 2

22

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

12A

-1P

;

2P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Gre

enw

ood D

r

Exit 2

I-64/I-6

64

Rt.13/R

t. 5

8

Rt. 4

60

12

112A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

12A

-1P

;

2P

-12A

12A

-5A

;

7P

-12A

12A

-5A

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Rt. 3

37

Port

sm

outh

Blv

d

Exit 4

Rt.239

Vic

tory

Blv

d

Exit 3

33

All

Day

All

Day

All

Day

I-264 WB - Segment 3 (Exit 4) through Segment 1 (I-64/I-664)

I-2

64

WB

- S

eg

me

nt

3 (

Ex

it 4

) th

rou

gh

Se

gm

en

t 1

(I-

64

/I-6

64

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

54

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

9A

- 1

2A

12A

- 5

A;

9A

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 1

2A

12A

- 5

A;

9A

- 1

2A

All

Day

All

Day

2

12A

- 5

A;

11A

- 1

2P

7P

- 1

2A

12A

- 5

A;

10A

- 1

1A

7P

- 1

2A

12A

- 1

1A

;

2P

- 5

P;

6P

- 1

2A

All

Day

12A

- 5

A;

10A

- 1

2P

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

7P

- 1

2A

All

Day

112A

- 5

A;

9A

- 1

2A

12A

- 5

A;

9A

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 1

2A

12A

- 5

A;

9A

- 1

2A

All

Day

All

Day

2

12A

- 5

A;

11A

- 1

2P

7P

- 1

2A

12A

- 5

A;

10A

- 1

1P

7P

- 1

2A

12A

- 1

1A

;

2P

- 5

P;

6P

- 1

2A

All

Day

12A

- 5

A;

10A

- 1

2P

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

7P

- 1

2A

All

Day

I-464 NB - Segment 1 (Exit 1) through Segment 2 (Exit 3)

All

Day

All

Day

I-64

Exit 1

US

13

S. M

ilita

ry H

wy

Exit 2

13 M

LA

ll D

ay

All

Day

All

Day

I-4

64

NB

- S

eg

me

nt

1 (

Ex

it 1

) th

rou

gh

Se

gm

en

t 2

(E

xit

3)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

US

13

S. M

ilita

ry H

wy

Exit 2

Fre

em

an A

ve

Exit 3

23 M

L

55

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

9A

- 1

2A

12A

- 5

A;

9A

- 1

2A

All

Day

All

Day

12A

- 5

A;

9A

- 1

2A

12A

- 5

A;

9A

- 1

2A

All

Day

All

Day

2

12A

- 5

A;

11A

- 1

2P

7P

- 1

2A

12A

- 5

A;

10A

- 1

1P

7P

- 1

2A

12A

- 1

1A

;

2P

- 5

P;

6P

- 1

2A

All

Day

12A

- 5

A;

10A

- 1

2P

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

12A

- 1

2P

;

7P

- 1

2A

All

Day

Rt. 3

37

Poin

dexte

r S

t

Exit 4

S. M

ain

St

Exit 5

42 M

L1

12A

- 5

A;

10A

- 3

P;

6P

- 1

2A

12A

- 5

A;

9A

- 2

P;

7P

- 1

2A

12A

- 1

2P

;

1P

- 1

2A

All

Day

12A

- 5

A;

10A

- 3

P;

6P

- 1

2A

12A

- 5

A;

10A

- 3

P;

7P

- 1

2A

12A

- 1

P;

2P

- 1

2A

All

Day

All

Day

All

Day

All

Day

S. M

ain

St

Exit 5

I-264

W B

erk

ley

Ave

Dow

nto

wn

Tunnel

Exit 6

52 M

L1

12A

- 5

A;

10A

- 3

P;

6P

- 1

2A

12A

- 5

A;

9A

- 2

P;

7P

- 1

2A

12A

- 1

2P

;

1P

- 1

2A

All

Day

12A

- 5

A;

10A

- 3

P;

6P

- 1

2A

12A

- 5

A;

10A

- 3

P;

7P

- 1

2A

12A

- 1

P;

2P

- 1

2A

All

Day

All

Day

All

Day

All

Day

I-4

64

NB

- S

eg

me

nt

3 (

Ex

it 3

) th

rou

gh

Se

gm

en

t 5

(E

xit

6)

I-464 NB - Segment 3 (Exit 3) through Segment 5 (Exit 6)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Fre

em

an A

ve

Exit 3

Rt. 3

37

Poin

dexte

r S

t

Exit 4

33 M

LA

ll D

ay

All

Day

All

Day

56

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

I-264

W B

erk

ley

Ave

Dow

nto

wn

Tunnel

Exit 6

S M

ain

St

Exit 5

52 M

L1

12A

- 2

P;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

All

Day

All

Day

12A

- 2

P;

7P

- 1

2A

12A

- 2

P;

7P

- 1

2A

12A

- 3

P;

6P

- 1

2A

12A

- 3

P;

6P

- 1

2A

All

Day

All

Day

All

Day

S M

ain

St

Exit 5

Rt. 3

37

Poin

dexte

r S

t

Exit 4

42 M

L1

12A

- 2

P;

7P

- 1

2A

12A

- 1

P;

7P

- 1

2A

All

Day

All

Day

12A

- 2

P;

7P

- 1

2A

12A

- 2

P;

7P

- 1

2A

12A

- 3

P;

6P

- 1

2A

12A

- 3

P;

6P

- 1

2A

All

Day

All

Day

All

Day

112A

- 3

P;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 3

P;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

2

12A

- 7

A;

9A

- 1

2P

;

7P

- 1

2A

12A

- 7

A;

9A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

All

Day

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

10A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

6P

- 1

2A

All

Day

I-464 SB - Segment 5 (Exit 6) through Segment 3 (Exit 3)

All

Day

I-4

64

SB

- S

eg

me

nt

5 (

Ex

it 6

) th

rou

gh

Se

gm

en

t 3

(E

xit

3)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

All

Day

Rt.

337/P

oin

dexte

r

St E

xit 4

Fre

em

an A

ve

Exit 3

33 M

L

57

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 3

P;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 3

P;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

2

12A

- 7

A;

9A

- 1

2P

;

7P

- 1

2A

12A

- 7

A;

9A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

All

Day

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

10A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

6P

- 1

2A

All

Day

112A

- 3

P;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

12A

- 3

P;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

2

12A

- 7

A;

9A

- 1

2P

;

7P

- 1

2A

12A

- 7

A;

9A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

4P

- 1

2A

All

Day

12A

- 7

A;

7P

- 1

2A

12A

- 7

A;

10A

- 1

1A

;

7P

- 1

2A

12A

- 1

2P

;

6P

- 1

2A

All

Day

I-4

64

SB

- S

eg

me

nt

2 (

Ex

it 3

) th

rou

gh

Se

gm

en

t 1

(E

xit

1)

I-464 SB - Segment 2 (Exit 3) through Segment 1 (Exit 1))

3 M

LA

ll D

ay

All

Day

All

Day

3 M

LA

ll D

ay

All

Day

All

Day

Fre

em

an A

ve

Exit 3

US

13

S. M

ilita

ry H

wy

Exit 2

US

13

S. M

ilita

ry H

wy

Exit 2

I-64

Exit 1

12

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

58

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

-3P

;

7P

-12A

12A

-3P

;

7P

-12A

All

Day

All

Day

12A

-3P

;

7P

-12A

12A

-3P

;

7P

-12A

All

Day

All

Day

212A

-1P

;

7P

-12A

12A

-11A

;

7P

-12A

All

Day

All

Day

12A

-2P

;

7P

-12A

12A

-11A

;

7P

-12A

All

Day

All

Day

112A

-3P

;

7P

-12A

12A

-3P

;

7P

-12A

All

Day

All

Day

12A

-3P

;

7P

-12A

12A

-3P

;

7P

-12A

All

Day

All

Day

212A

-1P

;

7P

-12A

12A

-11A

;

7P

-12A

All

Day

All

Day

12A

-2P

;

7P

-12A

12A

-11A

;

7P

-12A

All

Day

All

Day

I-564 EB - Segment 2 (Rt. 337 Admiral Taussig Blvd) through Segment 1 (I-64)

I-5

64

EB

- S

eg

me

nt

2 (

Rt.

33

7 A

dm

ira

l T

au

ssig

Blv

d)

thro

ug

h S

eg

me

nt

1 (

I-6

4)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

Rt. 4

06

Term

inal B

lvd

I-64

13 M

L12A

-3P

;

7P

-12A

All

Day

All

Day

Rt. 3

37

Adm

iral T

aussig

Blv

d

Rt. 4

06

Term

inal B

lvd

23 M

L12A

-3P

;

7P

-12A

All

Day

59

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

12A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

212A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

12A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

112A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

12A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

212A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

12A

-4A

;

9A

-12A

12A

-4A

;

9A

-12A

All

Day

All

Day

I-5

64

WB

- S

eg

me

nt

1 (

I-6

4)

thro

ug

h S

eg

me

nt

2 (

Rt.

33

7 A

dm

ira

l T

au

ssig

Blv

d)

I-564 WB - Segment 1 (I-64) through Segment 2 (Rt. 337 Admiral Taussig Blvd)A

llo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-64

Rt. 4

06

Term

inal B

lvd

13 M

L12A

-4A

;

9A

-12A

All

Day

All

Day

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

All

Day

All

Day

Rt. 4

06

Term

inal B

lvd

Rt. 3

37

Adm

iral T

aussig

Blv

d

23 M

L12A

-4A

;

9A

-12A

60

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

I-64/I-2

64

Exit 1

5

US

13/U

S 4

60

S. M

ilita

ry H

wy

Exit 1

4

14

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

13/U

S 4

60

S. M

ilita

ry H

wy

Exit 1

4

US

13/U

S 5

8

US

460

W. M

ilita

ry H

wy

Exit 1

3

13

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

13/U

S 5

8

US

460

W. M

ilita

ry H

wy

Exit 1

3

Rt. 6

63

Dock L

andin

g

Rd

Exit 1

2

12

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 6

63

Dock L

andin

g

Rd

Exit 1

2

Rt. 3

37

Port

sm

outh

Blv

d

Exit 1

1

11

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

A

ll D

ay

All

Day

All

Day

Rt. 3

37

Port

sm

outh

Blv

d

Exit 1

1

Rt. 6

59

Pughsvill

e R

d

Exit 1

0

10

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

A

ll D

ay

All

Day

All

Day

I-6

64

NB

- S

eg

me

nt

14

(I-

64

/I-2

64

) th

rou

gh

Se

gm

en

t 1

0 (

Ex

it 1

0)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-664 NB - Segment 14 (I-64/I-264) through Segment 10 (Exit 10)

61

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

59

Pughsvill

e R

d

Exit 1

0

US

17

Bridge R

d

Rt. 1

64

Weste

rn F

wy

Exit 9

92 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

A

ll D

ay

All

Day

All

Day

US

17

Bridge R

d

Rt. 1

64

Weste

rn F

wy

Exit 9

Rt. 1

35

Colle

ge D

r

Exit 8

82 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

All

Day

All

Day

All

Day

Rt. 1

35

Colle

ge D

r

Exit 8

Term

inal A

ve

Exit 7

72 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-6

64

NB

- S

eg

me

nt

9 (

Ex

it 1

0)

thro

ug

h S

eg

me

nt

7 (

Ex

it 7

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-664 NB - Segment 9 (Exit 10) through Segment 7 (Exit 7)

62

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Term

inal A

ve

Exit 7

25th

St

26th

St/27th

St

Exit 6

62 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

All

Day

All

Day

All

Day

25th

St

26th

St/27th

St

Exit 6

Rt. 1

43

35th

St

Jeffers

on A

ve

Exit 5

52 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

8P

- 1

2A

12A

- 9

A;

8P

- 1

2A

All

Day

All

Day

All

Day

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

A

ll D

ay

All

Day

All

Day

Chestn

ut A

ve

Roanoke A

ve

Exit 4

Aberd

een R

d

Exit 3

33 M

LA

ll D

ay

I-6

64

NB

- S

eg

me

nt

6 (

Ex

it 7

) th

rou

gh

Se

gm

en

t 3

(E

xit

3)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-664 NB - Segment 6 (Exit 7) through Segment 3 (Exit 3)

All

Day

All

Day

Rt. 1

43

35th

St

Jeffers

on A

ve

Exit 5

Chestn

ut A

ve

Roanoke A

ve

Exit 4

43 M

L

63

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

112A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 9

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

1A

;

7P

- 1

2A

I-6

64

NB

- S

eg

me

nt

2 (

Ex

it 3

) th

rou

gh

Se

gm

en

t 1

(E

xit

1)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

I-664 NB - Segment 2 (Exit 3) through Segment 1 (Exit 1)

All

Day

All

Day

Aberd

een R

d

Exit 3

Pow

hata

n P

kw

y

Pow

er

Pla

nt

Pkw

y

Exit 2

23 M

LA

ll D

ay

All

Day

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

All

Day

Pow

hata

n P

kw

y

Pow

er

Pla

nt

Pkw

y

Exit 2

I-64

Exit 1

13 M

LA

ll D

ay

64

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

112A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

All

Day

All

Day

I-64

Exit 1

Pow

hata

n P

kw

y

Pow

er

Pla

nt

Pkw

y

Exit 2

13 M

LA

ll D

ay

All

Day

All

Day

Pow

hata

n P

kw

y

Pow

er

Pla

nt

Pkw

y

Exit 2

Aberd

een R

d

Exit 3

23 M

LA

ll D

ay

I-6

64

SB

- S

eg

me

nt

1 (

Ex

it 1

) th

rou

gh

Se

gm

en

t 2

(E

xit

3)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

I-664 SB - Segment 1 (Exit 1) through Segment 2 (Exit 3)

65

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

112A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

112A

- 5

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

A

ll D

ay

All

Day

12A

- 5

A;

7P

- 1

2A

12A

- 5

A;

7P

- 1

2A

A

ll D

ay

All

Day

212A

- 5

A;

9P

- 1

2A

12A

- 5

A;

10P

- 1

2A

12A

- 7

A;

10P

- 1

2A

12A

- 9

A;

10P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 1

0A

;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

Rt. 1

43

35th

St

Jeffers

on A

ve

Exit 5

25th

St

26th

St/27th

St

Exit 6

52 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

25th

St

26th

St/27th

St

Exit 6

Term

inal A

ve

Exit 7

62 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-6

64

SB

- S

eg

me

nt

3 (

Ex

it 3

) th

rou

gh

Se

gm

en

t 6

(E

xit

7)

I-664 SB - Segment 3 (Exit 3) through Segment 6 (Exit 7)

43 M

LA

ll D

ay

All

Day

All

Day

Aberd

een R

d

Exit 3

Chestn

ut A

ve

Roanoke A

ve

Exit 4

33 M

LA

ll D

ay

Fro

mT

o

All

Day

All

Day

Chestn

ut A

ve

Roanoke A

ve

Exit 4

Rt. 1

43

35th

St

Jeffers

on A

ve

Exit 5

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Seg

men

t

66

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Term

inal A

ve

Exit 7

Rt. 1

35

Colle

ge D

r

Exit 8

72 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 1

35

Colle

ge D

r

Exit 8

US

17

Bridge R

d

Rt. 1

64

Weste

rn F

wy

Exit 9

82 M

L1

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 7

A;

9P

- 1

2A

12A

- 8

A;

9P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

17

Bridge R

d

Rt. 1

64

Weste

rn F

wy

Exit 9

Rt. 6

59

Pughsvill

e R

d

Exit 1

0

92 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-6

64

SB

- S

eg

me

nt

7 (

Ex

it 7

) th

rou

gh

Se

gm

en

t 9

(E

xit

10

)

I-664 SB - Segment 7 (Exit 7) through Segment 9 (Exit 10)A

llo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

67

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

59

Pughsvill

e R

d

Exit 1

0

Rt. 3

37

Port

sm

outh

Blv

d

Exit 1

1

10

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 3

P;

7P

- 1

2A

All

Day

All

Day

Rt. 3

37

Port

sm

outh

Blv

d

Exit 1

1

Rt. 6

63

Dock L

andin

g

Rd

Exit 1

2

11

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

A

ll D

ay

All

Day

All

Day

Rt. 6

63

Dock L

andin

g

Rd

Exit 1

2

US

13/U

S 5

8

US

460

W. M

ilita

ry H

wy

Exit 1

3

12

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

13/U

S 5

8

US

460/

W. M

ilita

ry H

wy

Exit 1

3

US

13/U

S 4

60

S. M

ilita

ry H

wy

Exit 1

4

13

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

US

13/U

S 4

60

S. M

ilita

ry H

wy

Exit 1

4

I-64/I-2

64

Exit 1

514

2 M

L1

12A

- 5

A;

9P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 6

A;

8P

- 1

2A

12A

- 5

A;

8P

- 1

2A

12A

- 5

A;

9P

- 1

2A

12A

- 8

A;

8P

- 1

2A

12A

- 1

0A

;

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

All

Day

All

Day

I-664 SB - Segment 10 (Exit 10) through Segment 14 (I-64/I-264)

I-6

64

SB

- S

eg

me

nt

10

(E

xit

10

) th

rou

gh

Se

gm

en

t 1

4 (

I-6

4/I

-26

4)

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Fro

mT

oS

eg

men

t

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

68

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

US

258

S C

hurc

h S

t

US

258/R

t 32

Bre

wers

Neck

Blv

d

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

US

258/R

t 32/

Bre

wers

Neck

Blv

d

US

258

S C

hurc

h S

t1

2 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Route 10 NB and SB - US 258 S Church St through US 258/Rt 32 Brewers Neck Blvd

Ro

ute

10

SB

- U

S 2

58

/Rt

32

Bre

we

rs N

eck

Blv

d t

hro

ug

h U

S 2

58

S C

hu

rch

St

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

10

NB

- U

S 2

58

S C

hu

rch

St

thro

ug

h U

S 2

58

/Rt

32

Bre

we

rs N

eck

Blv

d

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

69

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Chesapeake

Bay

Bridge-

Tunnel

Mary

land S

tate

Lin

e1

2 M

L1

All

Hours

12A

- 1

2P

None

8P

- 1

2A

All

Hours

12A

- 8

PN

one

8P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mary

land S

tate

Lin

e

Chesapeake

Bay

Bridge-

Tunnel

12 M

L1

All

Hours

12A

- 1

2P

None

8P

- 1

2A

All

Hours

12A

- 8

PN

one

8P

- 1

2A

Ro

ute

13

NB

- C

he

sap

ea

ke

Ba

y B

rid

ge

-Tu

nn

el

thro

ug

h M

ary

lan

d S

tate

Lin

e

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Route 13 NB and SB - Chesapeake Bay Bridge-Tunnel through Maryland State Line

Ro

ute

13

SB

- M

ary

lan

d S

tate

Lin

e t

hro

ug

h C

he

sap

ea

ke

Ba

y B

rid

ge

Tu

nn

el

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

70

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Isle

of W

ight

County

/

Suffolk

City

Lin

e

New

port

New

s

City/

Isle

of W

ight

County

Lin

e

(Jam

es R

iver

Bridge)

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

York

County

/

New

port

New

s

City

Lin

e

Glo

uceste

r

County

/

York

County

Lin

e 2

2 M

L1

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

7P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Glo

uceste

r

County

/

York

County

Lin

e

York

County

/

New

port

New

s

City

Lin

e

22 M

L1

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

7P

- 1

2A

12A

- 5

A;

9A

- 3

P;

7P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

7P

- 1

2A

New

port

New

s

City/

Isle

of W

ight

County

Lin

e

(Jam

es R

iver

Bridge)

Isle

of W

ight

County

/

Suffolk

City

Lin

e

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Route 17 NB and SB - Isle of Wight County/Suffolk City Line through Gloucester County/York County Line

Ro

ute

17

SB

- G

lou

cest

er

Co

un

ty/Y

ork

Co

un

ty L

ine

th

rou

gh

Isl

e o

f W

igh

t C

ou

nty

/Su

ffo

lk C

ity

Lin

e

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

17

NB

- I

sle

of

Wig

ht

Co

un

ty/S

uff

olk

Cit

y L

ine

th

rou

gh

Glo

uce

ste

r C

ou

nty

/Yo

rk C

ou

nty

Lin

e

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

71

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

US

258/R

t 10/

Benns C

hurc

h

Blv

d

US

17/U

S 2

58/

Carr

ollt

on B

lvd

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

US

17/U

S 2

58/

Carr

ollt

on B

lvd

US

258/R

t 10/

Benns C

hurc

h

Blv

d

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Route 32 EB and WB - US 258/Rt 10/Benns Church Blvd through US 17/US 258/Carrollton Blvd

Ro

ute

32

WB

- U

S 1

7/U

S 2

58

/Ca

rro

llto

n B

lvd

th

rou

gh

US

25

8/R

t 1

0/B

en

ns

Ch

urc

h B

lvd

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

32

EB

- U

S 2

58

/Rt

10

/Be

nn

s C

hu

rch

Blv

d t

hro

ug

h U

S 1

7/U

S 2

58

/Ca

rro

llto

n B

lvd

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

72

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Bru

nsw

ick

County

/

Gre

ensvill

e

County

Lin

e

South

am

pto

n

County

/

Suffolk

City

Lin

e

12 M

L1

All

Hours

12A

- 1

2P

None

8P

- 1

2A

All

Hours

12A

- 1

2P

None

8P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

South

am

pto

n

County

/

Suffolk

City

Lin

e

Bru

nsw

ick

County

/

Gre

ensvill

e

County

Lin

e

12 M

L1

All

Hours

12A

- 1

2P

None

8P

- 1

2A

All

Hours

12A

- 1

2P

None

8P

- 1

2A

Ro

ute

58

EB

- B

run

swic

k C

ou

nty

/Gre

en

svil

le C

ou

nty

Lin

e t

hro

ug

h S

ou

tha

mp

ton

Co

un

ty/S

uff

olk

Cit

y L

ine

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

58

WB

- S

ou

tha

mp

ton

Co

un

ty/S

uff

olk

Cit

y L

ine

th

rou

gh

Bru

nsw

ick

Co

un

ty/G

ree

nsv

ille

Co

un

ty L

ine

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Route 58 EB and WB - Brunswick County/Greensville County Line through Southapton County/Suffolk City

Line

73

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

64

Mart

in L

uth

er

Kin

g F

wy

Rt. 3

37

W. B

ram

ble

ton

Ave

Ham

pto

n B

lvd

12 M

L1

12A

- 5

A;

10A

- 1

2A

12A

- 5

A;

10A

- 1

2A

All

Hours

All

Hours

12A

- 5

A;

10A

- 1

2A

12A

- 5

A;

10A

- 1

2A

All

Hours

All

Hours

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt. 3

37

W. B

ram

ble

ton

Ave

Ham

pto

n B

lvd

Rt. 1

64

Mart

in L

uth

er

Kin

g F

wy

12 M

L1

12A

- 2

P;

7P

- 1

2A

12A

-2P

;

7P

- 1

2A

All

Hours

All

Hours

12A

- 2

P;

7P

- 1

2A

12A

- 2

P;

7P

- 1

2A

All

Hours

All

Hours

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Route 58 EB and WB - Midtown Tunnel

Ro

ute

58

EB

- M

idto

wn

Tu

nn

el

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

58

WB

- M

idto

wn

Tu

nn

el

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

74

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt. 3

0/

Rocham

beau

Dr/

Anders

on’s

Corn

er

WC

L

Will

iam

sburg

12 M

L1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

12A

-12P

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

12A

-12P

EC

L

Will

iam

sburg

Rte

. 199/

Hum

els

ine

Pkw

y

22 M

L1

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

Rte

. 199/

Hum

els

ine

Pkw

y

I-64 Inte

rsta

te

Exit 2

43

32 M

L1

12A

-6A

;

10P

-12A

12A

-6A

None

10P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

None

10P

-12A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

I-64 Inte

rsta

te

Exit 2

43

Rte

. 199/

Hum

els

ine

Pkw

y

32 M

L1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

12A

-12P

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

12A

-12P

Rte

. 199/

Hum

els

ine

Pkw

y

EC

L

Will

iam

sburg

22 M

L1

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

All

Hours

WC

L

Will

iam

sburg

Rt. 3

0/

Rocham

beau

Dr/

Anders

on’s

Corn

er

12 M

L1

12A

-6A

;

10P

-12A

12A

-6A

None

10P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

None

10P

-12A

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

60

EB

- R

t. 3

0/R

och

am

be

au

Dr/

An

de

rso

n’s

Co

rne

r th

rou

gh

I-6

4 I

nte

rch

an

ge

Ex

it 2

43

Ro

ute

60

WB

- I

-64

In

terc

ha

ng

e E

xit

24

3 t

hro

ug

h R

t. 3

0/R

och

am

be

au

Dr/

An

de

rso

n’s

Co

rne

r

Route 60 EB and WB - Rt. 30/Rochambeau Dr/Anderson’s Corner through I-64 Interchange Exit 243

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

75

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

New

port

New

s

City/

Jam

es C

ity

County

Lin

e

I-64

Inte

rchange

Exit 2

38

12 M

L1

12A

- 6

A;

9A

-3P

;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

-3P

;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

I-64

Inte

rchange

Exit 2

38

New

port

New

s

City/

Jam

es C

ity

County

Lin

e

12 M

L1

12A

- 6

A;

9A

-3P

;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

-3P

;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Route 143 EB and WB - Newport News City/James City County Line through I-64 Interchange Exit 243

Ro

ute

14

3 E

B -

Ne

wp

ort

Ne

ws

Cit

y/J

am

es

Cit

y C

ou

nty

Lin

e t

hro

ug

h I

-64

In

terc

ha

ng

e E

xit

24

3

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

14

3 W

B -

I-6

4 I

nte

rch

an

ge

Ex

it 2

43

th

rou

gh

Ne

wp

ort

Ne

ws

Cit

y/J

am

es

Cit

y C

ou

nty

Lin

e

Fro

mT

o

76

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

I-664

Colle

ge D

r1

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-12P

;

7P

-12A

12A

-1P

;

6P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Colle

ge D

rT

ow

ne P

oin

t R

d2

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-12P

;

7P

-12A

12A

-1P

;

6P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Tow

ne P

oin

t R

dC

edar

Ln

32

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-12P

;

7P

-12A

12A

-1P

;

6P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Ro

ute

16

4 E

B -

Se

gm

en

t 1

(I-

66

4)

thro

ug

h S

eg

me

nt

3 (

Ce

da

r Ln

)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Route 164 EB - Segment 1 (I-664) through Segment 3 (Cedar Ln)

77

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Cedar

Ln

VA

Int G

ate

way

Blv

d4

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-12P

;

7P

-12A

12A

-1P

;

6P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

VA

Int G

ate

way

Blv

dW

Norf

olk

Rd

52

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-12P

;

7P

-12A

12A

-1P

;

6P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

W N

orf

olk

Rd

Rt 58

Mid

tow

n T

unnel

62

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-12P

;

7P

-12A

12A

-1P

;

6P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Ro

ute

16

4 E

B -

Se

gm

en

t 4

(C

ed

ar

Ln)

thro

ug

h S

eg

me

nt

6 (

Rt

58

Mid

tow

n T

un

ne

l)

Route 164 EB - Segment 4 (Cedar Ln) through Segment 6 (Rt 58 Midtown Tunnel)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

78

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt 58

Mid

tow

n T

unnel

Cle

vela

nd S

t7

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Cle

vela

nd S

tLondon B

lvd

82

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

London B

lvd

Hig

h S

t9

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Hig

h S

tI-

264

10

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Ro

ute

16

4 E

B -

Se

gm

en

t 7

(R

t 5

8 M

idto

wn

Tu

nn

el)

th

rou

gh

Se

gm

en

t 1

0 (

I-2

64

)

Route 164 EB - Segment 7 (Rt 58 Midtown Tunnel) through Segment 10 (I-264)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

79

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

I-264

Hig

h S

t10

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Hig

h S

tLondon B

lvd

92

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

London B

lvd

Cle

vela

nd S

t8

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Cle

vela

nd S

tR

t 58

Mid

tow

n T

unnel

72

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Ro

ute

16

4 W

B -

Se

gm

en

t 1

0 (

I-2

64

) th

rou

gh

Se

gm

en

t 7

(R

t 5

8/M

idto

wn

Tu

nn

el)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Route 164 WB - Segment 10 (I-264) through Segment 7 (Rt 58/Midtown Tunnel)

80

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Rt 58

Mid

tow

n T

unnel

W N

orf

olk

Rd

62

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

;

1P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

W N

orf

olk

Rd

VA

Int G

ate

way

Blv

d5

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

;

1P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

VA

Int G

ate

way

Blv

dC

edar

Ln

42

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

;

1P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Ro

ute

16

4 W

B -

Se

gm

en

t 6

(R

t 5

8/M

idto

wn

Tu

nn

el)

th

rou

gh

Se

gm

en

t 4

(C

ed

ar

Ln)

Route 164 WB - Segment 6 (Rt 58/Midtown Tunnel) through Segment 4 (Cedar Ln)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

81

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Fri

day

Satu

rday

Su

nd

ay

Cedar

Ln

Tow

ne P

oin

t R

d3

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

;

1P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Tow

ne P

oin

t R

dC

olle

ge D

r2

21

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

;

1P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Colle

ge D

rI-

664

12

1

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-12P

;

1P

-12A

All

Day

12A

-6A

;

9A

-3P

;

7P

-12A

12A

-6A

;

9A

-3P

;

7P

-12A

All

Day

All

Day

All

Day

All

Day

All

Day

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Allo

wab

le S

ho

uld

er

Clo

su

re H

ou

rs

(Rem

ovab

le O

nly

) A

ll Y

ear

Ro

ute

16

4 W

B -

Se

gm

en

t 3

(C

ed

ar

Ln)

thro

ug

h S

eg

me

nt

1 (

I-6

64

)

Route 164 WB - Segment 3 (Cedar Ln) through Segment 1 (I-664)F

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

82

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

1

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

2

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

Rt 17

Georg

e

Washin

gto

n

Mem

orial H

wy

Rt 134

Ham

pto

n

Hig

hw

ay

22 M

L1

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt 134

Ham

pto

n

Hig

hw

ay

Rt 17

Georg

e

Washin

gto

n

Mem

orial H

wy

22 M

L1

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

1

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

2

12A

- 6

A;

9A

-3P

;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

12A

- 6

A;

9A

- 3

P;

8P

- 1

2A

12A

- 6

AN

one

8P

- 1

2A

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

New

port

New

s

City/

York

County

Lin

e

13 M

L

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

Route 171 EB and WB - Newport News City/York County Line through Rt 134 Hampton Highway

Ro

ute

17

1 E

B -

Ne

wp

ort

Ne

ws

Cit

y/Y

ork

Co

un

ty L

ine

th

rou

gh

Rt

13

4 H

am

pto

n H

igh

wa

y

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

17

1 W

B -

Rt

13

4 H

am

pto

n H

igh

wa

y t

hro

ug

h N

ew

po

rt N

ew

s C

ity

/Yo

rk C

ou

nty

Lin

e

Rt 17

Georg

e

Washin

gto

n

Mem

orial H

wy

New

port

New

s

City/

York

County

Lin

e

13 M

L

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Rt 17

Georg

e

Washin

gto

n

Mem

orial H

wy

83

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt 718

Hill

St

US

13

Lankfo

rd H

wy

12 M

L1

All

Hours

12A

- 3

PN

one

8P

- 1

2A

All

Hours

12A

- 8

PN

one

8P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

US

13

Lankfo

rd H

wy

Rt 718

Hill

St

12 M

L1

All

Hours

12A

- 3

PN

one

8P

- 1

2A

All

Hours

12A

- 8

PN

one

8P

- 1

2A

Route 179 EB and WB - Rt. 718 Hill St through US 13 Lankford HwyF

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

17

9 W

B -

US

13

La

nk

ford

Hw

y t

hro

ug

h R

t. 7

18

Hil

l S

t Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Ro

ute

17

9 E

B -

Rt.

71

8 H

ill

St

thro

ug

h U

S 1

3 L

an

kfo

rd H

wy

84

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

I-64

Inte

rchange

Exit 2

34

Rt. 5

Jam

esto

wn R

d1

2 M

L1

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

Rt. 5

Jam

esto

wn R

d

US

60

Pocahonta

s T

r/

Rt. 1

43

Merr

imac T

rail

22 M

L1

12A

- 6

A;

7P

- 1

2A

12A

- 6

AN

one

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

12A

- 6

AN

one

7P

- 1

2A

US

60

Pocahonta

s T

r/

Rt. 1

43

Merr

imac T

rail

Rt. 6

41

Tra

nquili

ty D

r

Pennim

an R

d

32 M

L1

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt. 6

41

Tra

nquili

ty D

r

Pennim

an R

d

US

60

Pocahonta

s T

r/

Rt. 1

43

Merr

imac T

rail

32 M

L1

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

US

60

Pocahonta

s T

r/

Rt. 1

43

Merr

imac T

rail

Rt. 5

Jam

esto

wn R

d2

2 M

L1

12A

- 6

A;

7P

- 1

2A

12A

- 6

AN

one

7P

- 1

2A

12A

- 6

A;

7P

- 1

2A

12A

- 6

AN

one

7P

- 1

2A

Rt. 5

Jam

esto

wn R

d

I-64

Inte

rchange

Exit 2

34

12 M

L1

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

12A

- 6

A;

9A

- 3

P;

7P

- 1

2A

12A

- 6

A;

9A

- 3

PN

one

7P

- 1

2A

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Route 199 EB and WB - I-64 Interchange Exit 234 through Rt. 641 Tranquility Dr/Penniman Rd

Ro

ute

19

9 E

B -

I-6

4 I

nte

rch

an

ge

Ex

it 2

34

th

rou

gh

Rt.

64

1 T

ran

qu

ilit

y D

r/P

en

nim

an

Rd

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Ro

ute

19

9 W

B -

Rt.

64

1 T

ran

qu

ilit

y D

r/P

en

nim

an

Rd

th

rou

gh

I-6

4 I

nte

rch

an

ge

Ex

it 2

34

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Fro

m

85

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Rt. 1

0/R

t. 3

2

Benns C

hurc

h

Rd

US

17/

Carr

ollt

on B

lvd

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

US

17/

Carr

ollt

on B

lvd

Rt. 1

0/R

t. 3

2

Benns C

hurc

h

Rd

12 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

US 258 EB and WB - Rt. 10/Rt. 32 Benns Church Rd through US 17/Carrollton BlvdF

rom

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

US

25

8 S

B -

US

17

/Ca

rro

llto

n B

lvd

th

rou

gh

Rt.

10

/Rt.

32

Be

nn

s C

hu

rch

Rd

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

US

25

8 N

B -

Rt.

10

/Rt.

32

Be

nn

s C

hu

rch

Rd

th

rou

gh

US

17

/Ca

rro

llto

n B

lvd

86

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Prince G

eorg

e

County

/ S

ussex

County

Lin

e

South

am

pto

n

County

/Isle

of

Wig

ht C

ounty

Lin

e

12 M

L1

All

Hours

12A

- 1

2P

None

8P

- 1

2A

All

Hours

12A

- 1

2P

None

8P

- 1

2A

South

am

pto

n

County

/Isle

of

Wig

ht C

ounty

Lin

e

Isle

of W

ight

County

/Suffolk

City

Lin

e

22 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Mo

nd

ay -

Th

urs

day

Fri

day

Satu

rday

Su

nd

ay

Isle

of W

ight

County

/Suffolk

City

Lin

e

South

am

pto

n

County

/Isle

of

Wig

ht C

ounty

Lin

e

22 M

L1

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

12A

- 5

A;

9A

- 3

P;

9P

- 1

2A

12A

- 5

A;

9A

- 3

PN

one

9P

- 1

2A

South

am

pto

n

County

/Isle

of

Wig

ht C

ounty

Lin

e

Prince G

eorg

e

County

/ S

ussex

County

Lin

e

12 M

L1

All

Hours

12A

- 1

2P

None

8P

- 1

2A

All

Hours

12A

- 1

2P

None

8P

- 1

2A

To

Seg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

US 460 EB and WB - Prince George County Line/Sussex County Line through Isle of Wight County/Suffolk City

Line

US

46

0 E

B -

Pri

nce

Ge

org

e C

ou

nty

Lin

e/S

uss

ex

Co

un

ty L

ine

th

rou

gh

Isl

e o

f W

igh

t C

ou

nty

/Su

ffo

lk C

ity

Lin

e

Fro

mT

oS

eg

men

t

# o

f

Exis

tin

g

Lan

es

(ML

/CD

)

# o

f

Lan

es

Clo

sed

Allo

wab

le L

an

e C

losu

re H

ou

rs

Su

mm

er

(Ap

ril 15-O

cto

ber

15)

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

US

46

0 W

B -

Isl

e o

f W

igh

t C

ou

nty

/Su

ffo

lk C

ity

Lin

e t

hro

ug

h P

rin

ce G

eo

rge

Co

un

ty L

ine

/Su

sse

x C

ou

nty

Lin

e

Allo

wab

le L

an

e C

losu

re H

ou

rs

No

n-S

um

mer

(Octo

ber

16-A

pri

l 14)

Fro

m

87

Appendix B

Methodology to Update the Interstate Allowable Lane Closure

Hours

1. Obtain new traffic data for the individual segment to be updated.

2. Perform analysis using the Allowable Lane Closure Hours Spreadsheet Tool developed

by VTRC to determine the new allowable lane closure hours for the individual

segment. This tool is based on the work zone analysis presented in the 2016 Highway

Capacity Manual (HCM). The September 2018 update to the Interstate Allowable

Lane Closure Hours was based on the following parameters:

• Area Type: Urban

• Terrain: Level

• Percentage of heavy vehicles, PT was based on the truck percentages found in the

2017 VDOT Average Annual Daily Traffic Volumes Reports

• Percentage of Traffic Diversion, PD: 0%

• Number of lanes in one direction, N, was determined from the geometry of the

individual segment

• Average lane width assumption, fLW: 12 ft.

• Right-side lateral clearance assumption, fRLC: 6 ft.

• Number of ramps within +/- 3 mi. assumption: 6

• Base FFS of the basic segment, BFFS: Speed limit of roadway segment + 5 MPH

• Number of lanes closed, Nc: A separate analysis was given for each lane(s) closed

for each individual segment

• Barrier type: Cone, plastic drum, or other soft barrier separation

• Lateral clearance, fLAT: 2 ft.

• Maximum allowable queue length: 0 mi.

• Maximum allowable average delay per vehicle: 0 min.

3. Determine the new allowable hours for the consolidated segment by comparing

the allowable hours for each individual segment and applying the following

rules:

• The beginning of each allowable lane closure period uses the most lenient

hour resulting from the analysis as long as it is within 2 hours of the most

restrictive hour.

• The end of each allowable lane closure period uses the most restrictive

hour resulting from analysis.

88

• No lane closures after 5 am Monday through Friday except:

� I-95

� I-264 First Colonial to Parks

� I-464 SB

� I-564 EB

• No lane closures before 7 pm Monday through Friday except:

� I-95

� I-264 First Colonial to Parks

� I-464 NB

� I-564 WB

• For Summer I-264 EB First Colonial to Parks, no lane closures 3PM-7PM Friday

• For I-95, no lane closures 7AM-9AM/ 4PM-6PM Monday through Thursday,

7AM-6PM Friday

89

Appendix C

Lane Closure Advisory Management System (LCAMS)

Requirements and Expectations

LCAMS provides a collaborative method to plan and monitor work and projects, resolve conflicts,

and exchange information about existing and scheduled work activities across the region, allowing

all users the same level of access to the roadways for construction, maintenance and operations.

Not only does LCAMS allow authorized users to enter and monitor planned closures, it allows the

motoring public to view a map page of the state with planned closures so they may expeditiously

plan trips and routes.

Purpose – This document is to provide a standard of requirements and expectations for users of the

LCAMS system

1. Closures on any state maintained roadway must be planned and therefore an LCAMS

entry is required.

a. The only exception is a mobile closure on secondary roadways.

2. The deadline for LCAMS is Thursday 8am the week before the work is to take place;

a. The due date may change to accommodate major holidays- Easter, Memorial

Day, Independence Day, Labor Day, Thanksgiving, Christmas and New Year’s.

3. All POC’s information must be up to date. The VDOT POC must be the VDOT employee

responsible for the work. The Onsite Org POC must be the contact that will be in the field

while work is being performed.

4. An LCAMS entry should be entered for each week’s worth of work without including

weekends unless work is actually taking place on the weekends.

a. The week starts on the first Sunday after the LCAMS deadline and extends to the following

Saturday.

5. If a LCAMS entry causes a conflict with another LCAMS then it is the responsibility of the user who

caused the conflict to resolve all the conflicts. To resolve the conflict the user must do one of the

two following things before it is approved;

a. Change their requested dates and/or times to avoid the conflict.

b. Send the LCAMS administrator an email stating that that contact between both LCAMS

entry contacts and the conflict has been resolved.

NOTE: The work is considered High Priority work, i.e. Any Design Build, Major Structure

repair, etc. – Contact must be made with original entry (conflicting LCAMS entry) and the

details worked out so as to avoid a conflict and if not possible then the appropriate ADA must

get involved in order to determine what work will be approved. The ROD must be notified as

to the outcome.

6. If a LCAMS user cannot resolve their conflict for any reason that user must notify the LCAMS

90

Administrator of the reason.

a. If the conflict cannot be resolved by the LCAMS Administrator, or TOC Operations

Manager can’t resolve the conflict then the RTOM or ROD will be notified.

7. All LCAMS entries that have lane closures must also be entered into VA Traffic

a. If a user’s LCAMS is a “blanket” entry, Covers more days then needed or more time then

needed, then that users VA traffic’s must be specific to the times and location for each

specific day. This can be achieved by entering VA Traffic entries the day of the work.

8. Entries shall abide by the Allowable Lane Closure hours of operations unless otherwise approved

by the ROD.

a. Users with entries that contain hours that are outside of the Allowable Hours of

Operations may be required to provide further documentation;

i. A Copy of the contract which states the time frame for lane closures.

ii. A work zone traffic impacts assessment from Traffic Engineering that has

been approved by the Regional Operations Director.

91

Appendix D

VA Traffic

Requirements and Expectations

Background. Customers want more timely traffic and travel information and VDOT’s

operational needs require more consistent, accurate, and timely data to meet business

needs and customer expectations.

Overview. VaTraffic is a web-based application that accepts data, entered by VDOT and

contract staff located throughout the state, related to current events and planned events,

such as traffic incidents, congestion, planned events, security events and weather conditions.

VaTraffic disseminates this event information through a data feed service. It is important that

the information entered into VaTraffic is complete and accurate for many reasons; one of

which is the data feeds provide VaTraffic information to:

• 511 Virginia Traveler information website;

• 511 Virginia IVR (Interactive Voice Response) telephone system;

• 511 App used on smart phones

• Twitter

• VDOT Dashboard

• VDOT Customer Service

• Virginia Department of Emergency Management

• VaTraffic global database

VaTraffic also disseminates operational information to:

• VDOT executive management

• VDOT Duty Officers, Safety Officers and other VDOT responders

• Other partner agencies:

o Virginia State Police

o Federal Highway Administration (FHWA),

o Virginia Department of Emergency Management (VDEM)

92

References:

• VaTraffic User Guide

• VaTraffic Job Aids

Hampton Roads

• Lane closures on any state maintained roadway shall have a VA Traffic entry

o Shoulder Closures do not require a VA Traffic unless it may cause a significant

impact to traffic.

• VaTraffic entries should be entered at least 4 hours before the start of the work

• VaTraffic entries must have accurate field contact information filled out

• A Parent Event should not exceed one month

• Prior to starting work (first cone down) you must call the TOC at 757-424-9923 so

your work zone can be activated

• Upon completion of work you must call the TOC at 757-424-9923 so your work

zone can be closed

93

Appendix E

Procedures for Working in the Express Lanes (Reversible Roadway) (HOV-EL/RR)

Express Lanes / Reversible Roadway Allowable Lane Closure Hours – See Chapter 8

Note: Weekday daytime work requires RTOM or ROD approval.

Planning:

• Contact the Hampton Roads TOC (HRTOC) Floor Manager or the TOC Operations

Program Manager to coordinate the date/time. Recommend at least one week prior

to requested work.

• Once a date/time is agreed on, enter the roadwork into LCAMS. Entries must be

made prior to 0800 Thursday, the week prior to the requested work.

Procedures:

• Prior to entering the HOV-EL/RR contact the TOC Shift Supervisor to verify the

closure time and your entry point.

• When entering the HOV-RR for a night time closure enter through the open gates

at the I-64 eastbound gate entrance (past the Granby exit # 276) or stage in the

Little Creek cut thru prior to the closure time.

• When entering for a day time closure enter the HOV-EL/RR through the Twin Bridge

entrance prior to closure and pull over to the shoulder.

• After the gates are closed, an SSP will approach your vehicle and advise you to wait

for a call from the Shift Supervisor advising that it is now safe for you to start

working- this phone call will be after the SSP has swept the HOV-EL/RR making sure

all vehicles are clear.

• While traveling in the HOV-EL/RR, keep your lights and flashers on -- and always travel

in the right lane.

We have a stringent communication protocol for crews working in the HOV-EL/RR. The

HRTOC Shift Supervisor is the primary coordination point. 757-424-9920

• Call the HRTOC Shift Supervisor after you’ve entered the HOV-EL/RR and staged on the

shoulder.

• Call if you need to relocate once at your approved work site.

• Call when you have completed your work and are prepared to leave.

• Call when you verify that your crews are entirely cleared from the HOV-EL/RR.

This coordination enables us to account for all who are working within this dynamic

roadway and coordinate movement of vehicles to keep everyone safe.

94

Appendix F

Lane Closure Precedence Guidance

The Hampton Roads District deals with an average of 750 Planned Lane Closures every week

throughout the year. This is a very busy District with a lot of work happening every day. It is

critically important to the agency and the motoring public that we effectively manage this

work load, from the multi-million dollar construction project to drain cleaning maintenance,

so that it all gets accomplished in an efficient and minimally impacting manner. In VDOT

there are two basic types of Lane Closures; Planned & Emergency. The numbered items

below provide precedence guidance on how work will be scheduled for accomplishment in

the Hampton Roads District:

1. Emergency Work: Work that if not done “will result” in damage to the motorists,

vehicles, or infrastructure. This work can and should be done immediately.

a. Examples include:

i. Snow/Ice on Roadway

ii. Flooding on roadway

iii. Pothole in travel lane

iv. Drain grate at Special facility

v. Infrastructure damage

2. Urgent Work: Work that if not done “may result” in damage to the motorist vehicle or

infrastructure. This work should be scheduled and accomplished as soon as possible,

preferably within 24 hours.

a. Examples include:

i. Pothole in travel lane that is not large enough to be considered an

emergency

ii. Overhead sign that is malfunctioning

3. Contractual Obligated Work: Work that is expected to be accomplished “on-time, on-

budget”.

a. Examples include:

i. District Priority Projects

ii. Paving Schedules

4. Weather Dependent Work: Work that is dependent on the temperature and

clear/dry conditions.

95

a. Examples include:

i. Task Order based Bridge Repairs

5. Routine Maintenance Work: Work that is routine in nature that can be rescheduled and

moved around, within limits, without undue risk. It should be noted that this work

though considered routine is as important as other work and if not accomplished within

reasonable time limits could result in severe consequences.

a. Examples include:

i. Drain Cleaning

ii. Overhead Sign Maintenance

iii. Tree Trimming

iv. Guard Rail Repair

v. Pavement Marking

vi. Lighting Repair

vii. Mowing

All planned work must be entered into the Lane Closure Advisory Management System

(LCAMS). Based on parameters built into and custom conflicts added to this system, lane

closures entered that do not conflict with other lane closures will be approved by LCAMS.

This approval does not constitute final approval. Significant issues/requests are discussed at

the weekly meeting noted below.

Lane Closures entered that conflict with other work scheduled will show up as pending and

will result in an automatic email being sent to the requestor, the POC for the work in conflict

and the System Administrator. The work must then be de-conflicted before either is allowed

to work. The de-confliction starts with the two requestors and moves up the management

chain until it is resolved.

Once a week all key District stakeholders meet to discuss “Significant Lane Closures” and

resolve any issues. This meeting is facilitated by the Regional Operations Director or his

designated representative but every stakeholder has a voice and is expected to articulate

their position clearly and work toward a solution that meets the overall District’s needs and

priorities.

96