ALLEGANY-LIMESTONE CENTRAL SCHOOL 2020 CAPITAL IMPROVEMENT PROJECT KEY FEATURES ELEMENTARY BUILDING RENOVATIONS - SIDEWALK AND RAMP REPLACEMENT - RADIANT HEAT SIDEWALKS - MULTIPURPOSE ROOM RENOVATIONS - GYMNASIUM RENOVATIONS - LOCKER ROOM RENOVATIONS - CORRIDOR FINISH UPGRADES - CORRIDOR DISPLAY CABINETS - STEAM SPACE UPGRADES - CLASSROOM FINISH AND HVAC UPGRADES - KITCHEN AND CAFE RENOVATIONS - LIBRARY FINISHES - TOILET ROOM UPGRADES - BOILER REPLACEMENT - PLUMBING RENOVATIONS - LED LIGHTING UPGRADES - ROOFING UPGRADES BUS GARAGE RENOVATIONS - BUS LIFT REPLACEMENT - OIL SEPARATOR UPGRADES - TRENCH DRAIN REPLACEMENT - WINDOW REPLACEMENT PROJECT ALTERNATES - PLAYGROUND SURFACE UPGRADES - COURTYARD RENOVATIONS - SOLAR RENOVATIONS The Board of Education and our District Leadership Team have worked hard to ensure the items in this project will support our mission to provide our students with access and opportunities for a well-rounded school experience. We understand that our school facilities serve an important role to our community as a place where families and townspeople come together. Over time, items need to be replaced, repaired, or upgraded to meet the many needs of our students, families, and community members. CLASSROOM 1098 CLASSROOM 1093 CLASSROOM 1099 CLASSROOM 1089 CLASSROOM 1090 CLASSROOM 1102 CLASSROOM 1088 TOILET 1096 SINK 1097 TOILET 1092 SINK 1091 SINK 1101 TOILET 1100 CLASSROOM 1087 CLASSROOM 1086 SPECIAL ED. CLASSROOM 1084 VESTIBULE 1083A CLASSROOM 1095 RESOURCE 1103 STAIR 1104 DATA 1105 STOR. 1107 GIRLS 1108 BOYS 1109 COMPUTER 1110 BOYS 1116 GIRLS 1111 JANITOR 1117 SHOWER 1118 TOILET 1121 SHOWER 1120 OFFICE 1122 DRY 1119 STORAGE 1115 TOILET 1124 STORAGE 1126 LOCKER ROOM 1123 MULTIPURPOSE 1127 VESTIBULE 1128 VESTIBULE 1141 TOILET 1140 STORAGE 1142 OFFICE 1129 TOILET 1130 DRY 1137 SHOWER 1138 BOYS LOCKER ROOM 1139 DATA 1131 OFFICE 1132 SPECIAL ED. ANCILLARY 1135 CLASSROOM 1143 GYMNASIUM 1145 CORRIDOR 1173 ART ROOM 1147 STORAGE 1148 TOILET 1150 VESTIBULE 1149 CONFERENCE TEACHER 1151 TOILET 1153 TOILET 1154 CLASSROOM 1152 CLASSROOM 1155 CLASSROOM 1156 VESTIBULE 1157 TOILET 1158 CLASSROOM 1159 CORRIDOR 1164 CLASSROOM 1160 VESTIBULE 1162 TOILET 1161 DATA 1166 JANITOR 1167 MENS 1165 WOMENS 1168 CLASSROOM 1163 CLASSROOM 1169 CLASSROOM 1172 SPECIAL ED. CLASSROOM 1000 CLASSROOM 1001 CLASSROOM 1002 CLASSROOM 1003 CLASSROOM 1004 CLASSROOM 1005 SERVICE ROOM 1005A CORRIDOR 1006 CLASSROOM 1017 CLASSROOM 1018 ELECTRIC 1020 ANCILLARY 1016 RESOURCE 1015 RESOURCE 1014 COMPUTER ROOM 1021 GIRLS 1022 BOYS 1025 JANITOR 1023 MENS 1024 COPIER 1009 BOYS 1013 WOMENS 1012 JANITOR 1011 GIRLS 1010 SERVER 1008 OFFICE 1007 CLASSROOM 1027 CLASSROOM 1028 CLASSROOM 1029 CLASSROOM 1030 SCIENCE CLASSROOM 1031 RESOURCE 1032 CLASSROOM 179 CLASSROOM 178 PRINCIPALS OFFICE 1006 CORRIDOR 1036 CORRIDOR 1033 CLASSROOM 1037 DATA 1039 WOMENS 1133 MENS 1134 VESTIBULE 1050 NURSE OFFICE 1054 TOILET 1052 ART ROOM 1056 STORAGE 1059 STORAGE 1058 KILN 1057 MUSIC 1060 STORAGE 1061 MUSIC PRACTICE 1062 CORRIDOR 1055 CAFETERIA 1083 SERVING 1082 JANITOR 1081 JANITOR 1080 OFFICE 1079 LKRS 1070 VESTIBULE 1114A ELECTRIC 1114 RESOURCE 1112 RESOURCE 1113 CORRIDOR 1146 CORRIDOR 1094 VESTIBULE 1106 CORRIDOR 1144 CORRIDOR 1085 RECEIVING 1077 TOILET 1076 KITCHEN STORAGE 1073 GENERAL STORAGE 1072 VESTIBULE 1067 MUSIC 1065 ELECTRIC ROOM 1069 BOILER ROOM 1068 CORRIDOR 1071 KITCHEN 1078 PT/OT 1038 STORAGE 1053 MAIL ROOM 1002 VAULT 1004 OPEN OFFICE 1001 EXISTING VESTIBULE 1008 LIBRARY 1026 CORRIDOR 1164 TOILET ROOM 1003 CORRIDOR 1055 TOTAL CAPITAL IMPROVEMENTS REFERENDUM: $ 10M PUBLIC VOTE DATE - FEB 11, 2020 12PM-9PM IN THE MS/HS BUILDING DISTRICT OFFICE PUBLIC INFORMATIONAL MEETING - JAN 14, 2020 6PM IN THE ELEMENTARY MULTI-PURPOSE ROOM • UPGRADE EXISTING SPACE TO BE A NEW MAKER STEAM SPACE. • SPACE WILL RECEIVE A FULL WALL OF CABINETRY WITH A SINK. • NEW PAINT, NEW FLOORING & ELECTRICAL UPGRADES TO CREATE A SPACE WHERE STUDENTS CAN LEARN, CREATE AND COLLABORATE. • REPLACE WALK OFF MAT WITH NEW WALK OFF MAT. • REPAIR ANY DAMAGED TERRAZZO. • PROVIDE FLEXIBLE FURNITURE FOR PRE-K GATHERINGS IN SENSORY CORRIDOR. • REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN CORRIDORS. • PAINT EXISTING LOCKERS SCHOOL COLORS. • REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING AND FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS. • REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING. • INSTALL NEW ROCK WALL WITH TALLER AREA. • INSTALL NEW DROP-DOWN CENTER CURTAIN. • UPDATE SOUND SYSTEM. • PROVIDE PROJECTION SCREEN. • PA SYSTEM UPGRADES. • REPLACEMENT OF TOILET PARTITIONS AND FIXTURES. • NEW FINISHES. • CONFIRM SPACES MEET ADA REQUIREMENTS. STEAM - SCIENCE, TECHNOLOGY, ENGINEERING, THE ARTS, AND MATHEMATICS EXISTING CORRIDOR CORRIDOR EXISTING TOILET ROOM BOILER ROOM SIDEWALK MULTIPURPOSE ROOM EXISTING EXISTING • REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL. • PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT ABOVE. • PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL SOFFITS, ETC. • AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT. REVENUE SOURCES CAPITAL RESERVE & FUND BALANCE 25% NYS BUILDING AID 75% LOCAL SHARE/TAXES 0% NO ANTICIPATED TAX IMPACT! PUBLIC VOTE FEB 11, 2020 12PM-9PM PROJECT DESIGN FEB 2020 – JULY 2020 SED SUBMISSION/REVIEW AUG 2020 – JAN 2021 BIDDING SPRING 2021 CONSTRUCTION SUMMER 2021 – SUMMER 2022 ELEMENTARY SCHOOL • REPLACEMENT OF 4 EXISTING BOILERS WITH NEW HIGH EFFICIENCY BOILERS • PLUMBING UPGRADES INCLUDED ADDED ISOLATION VALVES AND NEW GAS PIPING • ELECTRICAL PANEL REPLACEMENT • CRACKED SIDEWALK REPLACEMENT • RADIANT HEATED SIDEWALKS AT FRONT AND PLAYGROUND ENTRANCE

Upload: others

Post on 31-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ALLEGANY-LIMESTONE CENTRAL SCHOOL · 2020-01-07 · - oil separator upgrades - trench drain replacement - window replacement ... kiln 1057 music 1060 storage 1061 music practice 1062

ALLEGANY-LIMESTONE CENTRAL SCHOOL

2020 CAPITAL IMPROVEMENT PROJECT

KEY FEATURESELEMENTARY BUILDING RENOVATIONS- SIDEWALK AND RAMP REPLACEMENT- RADIANT HEAT SIDEWALKS- MULTIPURPOSE ROOM RENOVATIONS- GYMNASIUM RENOVATIONS- LOCKER ROOM RENOVATIONS- CORRIDOR FINISH UPGRADES- CORRIDOR DISPLAY CABINETS- STEAM SPACE UPGRADES- CLASSROOM FINISH AND HVAC UPGRADES- KITCHEN AND CAFE RENOVATIONS- LIBRARY FINISHES- TOILET ROOM UPGRADES- BOILER REPLACEMENT- PLUMBING RENOVATIONS- LED LIGHTING UPGRADES- ROOFING UPGRADES

BUS GARAGE RENOVATIONS- BUS LIFT REPLACEMENT- OIL SEPARATOR UPGRADES- TRENCH DRAIN REPLACEMENT- WINDOW REPLACEMENT

PROJECT ALTERNATES- PLAYGROUND SURFACE UPGRADES- COURTYARD RENOVATIONS- SOLAR RENOVATIONS

The Board of Education and our District Leadership Team have worked hard to ensure the items in this project will support our mission to provide our students with access and opportunities for a well-rounded school experience. We understand that our school facilities serve an important role to our community as a place where families and townspeople come together. Over time, items need to be replaced, repaired, or upgraded to meet the many needs of our students, families, and community members.

CLASSROOM1098

CLASSROOM1093

CLASSROOM1099

CLASSROOM1089

CLASSROOM1090

CLASSROOM1102

CLASSROOM1088

TOILET1096

SINK1097

TOILET1092

SINK1091

SINK1101

TOILET1100

CLASSROOM1087

CLASSROOM1086

SPECIALED.

CLASSROOM1084

VESTIBULE1083A

CLASSROOM1095

RESOURCE1103

STAIR1104

DATA1105

STOR.1107

GIRLS1108

BOYS1109

COMPUTER1110

BOYS1116

GIRLS1111

JANITOR1117

SHOWER1118

TOILET1121

SHOWER1120

OFFICE1122

DRY1119

STORAGE1115

TOILET1124STORAGE

1126LOCKERROOM

1123

MULTIPURPOSE1127

VESTIBULE1128

VESTIBULE1141

TOILET1140

STORAGE1142

OFFICE1129

TOILET1130

DRY1137

SHOWER1138

BOYSLOCKERROOM

1139

DATA1131

OFFICE1132

SPECIALED.

ANCILLARY1135

CLASSROOM1143

GYMNASIUM1145

CORRIDOR1173

ARTROOM

1147

STORAGE1148

TOILET1150

VESTIBULE1149

CONFERENCETEACHER

1151

TOILET1153

TOILET1154

CLASSROOM1152

CLASSROOM1155

CLASSROOM1156

VESTIBULE1157

TOILET1158

CLASSROOM1159

CORRIDOR1164

CLASSROOM1160

VESTIBULE1162

TOILET1161

DATA1166

JANITOR1167

MENS1165

WOMENS1168

CLASSROOM1163

CLASSROOM1169

CLASSROOM1172

SPECIALED.

CLASSROOM1000

CLASSROOM1001

CLASSROOM1002

CLASSROOM1003

CLASSROOM1004

CLASSROOM1005

SERVICEROOM

1005A

CORRIDOR1006

CLASSROOM1017

CLASSROOM1018

ELECTRIC1020

ANCILLARY1016

RESOURCE1015

RESOURCE1014

COMPUTERROOM

1021

GIRLS1022

BOYS1025

JANITOR1023

MENS1024

COPIER1009

BOYS1013

WOMENS1012

JANITOR1011

GIRLS1010

SERVER1008

OFFICE1007

CLASSROOM1027

CLASSROOM1028

CLASSROOM1029

CLASSROOM1030

SCIENCECLASSROOM

1031RESOURCE

1032

CLASSROOM179

CLASSROOM178

PRINCIPALSOFFICE

1006

CORRIDOR1036

CORRIDOR1033

CLASSROOM1037

DATA1039

WOMENS1133

MENS1134

VESTIBULE1050

NURSEOFFICE

1054

TOILET1052

ARTROOM

1056

STORAGE1059

STORAGE1058

KILN1057

MUSIC1060

STORAGE1061

MUSICPRACTICE

1062

CORRIDOR1055

CAFETERIA1083

SERVING1082

JANITOR1081

JANITOR1080

OFFICE1079

LKRS1070

VESTIBULE1114AELECTRIC

1114

RESOURCE1112

RESOURCE1113

CORRIDOR1146

CORRIDOR1094

VESTIBULE1106

CORRIDOR1144

CORRIDOR1085

RECEIVING1077

TOILET1076

KITCHENSTORAGE

1073

GENERALSTORAGE

1072

VESTIBULE1067

MUSIC1065

ELECTRICROOM

1069

BOILERROOM

1068

CORRIDOR1071

KITCHEN1078

PT/OT1038

STORAGE1053

MAILROOM

1002

VAULT1004

OPENOFFICE

1001

EXISTINGVESTIBULE

1008

LIBRARY1026

CORRIDOR1164

TOILETROOM

1003

CORRIDOR1055

CORRIDORS: • REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN

LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL.• PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT

ABOVE.• PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL

SOFFITS, ETC.• AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED

AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT.• REPLACE WALK OFF MAT WITH NEW WALK OFF MAT.• REPAIR ANY DAMAGED TERRAZZO.• PROVIDE FLEXIBLE FURNITURE FOR PREK GATHERINGS IN SENSORY CORRIDOR.• REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN

CORRIDORS.• PAINT EXISTING LOCKERS SCHOOL COLORS.• REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING AND

FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS.

GYMNASIUM: • REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING.• INSTALL NEW ROCK WALL WITH TALLER AREA.• INSTALL NEW DROP-DOWN CENTER CURTAIN.• UPDATE SOUND SYSTEM.• PROVIDE PROJECTION SCREEN.• PA SYSTEM UPGRADES.

MULTIPURPOSE ROOM: • REPLACE BLEACHERS WITH POSSIBLE BLEACHER/RETRACTABLE SEAT SYSTEM.• ADD RETRACTABLE SEATING ON EACH SIDE TO MAXIMIZE NUMBER OF SEATS.• REMOVE BASKETBALL HOOPS.• REMOVE ROCK CLIMBING WALL (NEW TO BE INSTALLED IN GYMNASIUM).• PROVIDE NEW SOUND SYSTEM AND PROJECTION SCREENS.• REFINISH HARDWOOD FLOOR WITH NEW STRIPING.• ACOUSTICAL UPGRADES.• PA SYSTEM UPGRADES, CURRENTLY NOT LOUD ENOUGH.• NEW BATTING CAGE FOR SOFTBALL.

SITEWORK: • REPLACE CRACKED AND DAMAGED SIDEWALKS ADJACENT TO PARKING LOT.• REMOVE WOOD CHIPS FROM PLAYGROUND AND POUR RUBBER SURFACING.• REPLACE RAMP TO PLAYGROUND.• PAINT ALL CHIPPED HANDRAILS.• PROVIDE HEATED SIDEWALKS AT ENTRANCES.

COURTYARD: • REMOVE (2) TREES IN THEIR ENTIRETY.• REMOVE CONCRETE PAVERS AND PARTIAL WALL.• LANDSCAPE ENTIRE COURTYARD WITH NEW SHRUBS, TREES, GRASS AND HARD

SURFACING.• PROVIDE RUBBER SURFACING WITH TIER SEATING FOR CLASSROOM SETTINGS IN

ADDITION TO PICNIC TABLES, BENCHES, AND FLEXIBLE FURNITURE.• PROVIDE ACCESS, INTEREST, AND CONNECTION FROM PLAYGROUND TO

COURTYARD.• PROVIDE DIGITAL GRAPHIC MURAL ON LARGE BRICK WALL.• PROVIDE SUNSHADE FEATURES.

MAKER SPACE (ROOM ADJACENT TO LIBRARY): • UPDATE DIMMABLE LED LIGHT FIXTURES.• PAINT WALLS.• PROVIDE EPOXY RESINOUS FLOORING WITH RESILIENT BASE.• PROVIDE COIL REELS FROM CEILING.• PROVIDE FLEXIBLE, ADJUSTABLE, STEAM STYLE FURNITURE.• INSTALL NEW WINDOWS TO CREATE A PRINT ROOM BETWEEN LIBRARY AND MAKER

SPACE.• PROVIDE STORAGE FOR LIBRARY WITHIN PRINT ROOM.

CLASSROOMS: • INSTALL NEW LVT/SVT FLOORING IN (8) CLASSROOMS THAT HAVE NOT RECEIVED

UPDATES.

LOCKER ROOMS: • RENOVATE LOCKER ROOMS OFF GYMNASIUM FOR USE DURING MODIFIED GAMES

AND OTHER TEAM NEEDS, ALSO LOCATION FOR PE CHANGING AS NEEDED.

KITCHEN/CAFETERIA: • REMOVE EXISTING STOVE AND PROVIDE A NEW 4 BURNER STOVE.• REWORK EMERGENCY GAS SHUT OFF.• ADJUST SERVING LINE BY ANOTHER 5'-0". REMOVE CENTER WALLS BY MILK. PROVIDE

DUAL SIDED CASE FOR ICE CREAM AND MILK.• PROVIDE A/C TO KITCHEN/CAFE AREA.

LIBRARY: • UPGRADE CARPET AND PAINT COLORS.• PROVIDE THEMING.

HVAC: • REPLACE EXISTING CLASSROOM UV's WITH ROOF TOP UNITS WITH A/C.• PROVIDE ISOLATION VALVES AT HEATING SYSTEM TO ALLOW FOR MAINTENANCE ON

SPECIFIC AREAS OF THE BUILDING.• UPGRADE NURSES ROOM VENTILATION.

PLUMBING: • REPLACE EXISTING BACKFLOW PREVENTION DEVICES, POSSIBLE METER UPGRADES.• RELOCATE KITCHEN GAS SOLENOID VALVE TO WALL.• PROVIDE PLUMBING TO POSSIBLE SINK IN STEM LAB.• COURTYARD STORM DRAINAGE UPGRADES AS NEEDED TO ACCOMMODATE NEW

ARRANGEMENT.• PROVIDE ISOLATION VALVES ON DOMESTIC WATER LINES TO ALLOW FOR

MAINTENANCE ON SPECIFIC AREAS OF THE BUILDING.

TOILET ROOMS: • REPLACEMENT OF TOILET PARTITIONS AND FIXTURES.• NEW FINISHES.• CONFIRM SPACES MEET ADA REQUIREMENTS.

ELECTRICAL: • PROVIDE LED LIGHTING REPLACEMENT THROUGHOUT THE BUILDING.

11/12/20192020 CAPITAL IMPROVEMENTS PROJECT SCOPE PLAN

TOTAL CAPITALIMPROVEMENTS REFERENDUM:

$10MPUBLIC VOTE DATE - FEB 11, 2020 12PM-9PM

IN THE MS/HS BUILDING DISTRICT OFFICEPUBLIC INFORMATIONAL MEETING - JAN 14, 2020 6PM

IN THE ELEMENTARY MULTI-PURPOSE ROOM

• UPGRADE EXISTING SPACE TO BE A NEW MAKER STEAM SPACE. • SPACE WILL RECEIVE A FULL WALL OF CABINETRY WITH A SINK.• NEW PAINT, NEW FLOORING & ELECTRICAL UPGRADES TO CREATE A SPACE

WHERE STUDENTS CAN LEARN, CREATE AND COLLABORATE.

• REPLACE WALK OFF MAT WITH NEW WALK OFF MAT.• REPAIR ANY DAMAGED TERRAZZO.• PROVIDE FLEXIBLE FURNITURE FOR PRE-K GATHERINGS IN SENSORY

CORRIDOR.• REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN

CORRIDORS.• PAINT EXISTING LOCKERS SCHOOL COLORS.• REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING

AND FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS.

• REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING.• INSTALL NEW ROCK WALL WITH TALLER AREA.• INSTALL NEW DROP-DOWN CENTER CURTAIN.• UPDATE SOUND SYSTEM.• PROVIDE PROJECTION SCREEN.• PA SYSTEM UPGRADES.

• REPLACEMENT OF TOILET PARTITIONS AND FIXTURES.• NEW FINISHES.• CONFIRM SPACES MEET ADA REQUIREMENTS.

STEAM - SCIENCE, TECHNOLOGY, ENGINEERING, THE ARTS, AND MATHEMATICS

EXISTING

CORRIDOR

CORRIDOREXISTING

TOILET ROOM

BOILER ROOM SIDEWALK

MULTIPURPOSE ROOM

EXISTING

EXISTING

• REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL.

• PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT ABOVE.

• PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL SOFFITS, ETC.

• AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT.

REVENUE SOURCES

CAPITAL RESERVE & FUND BALANCE

25%NYS

BUILDING AID

75%

LOCAL SHARE/TAXES

0%

NOANTICIPATED TAX IMPACT!

PUBLIC VOTE FEB 11, 2020 12PM-9PM

PROJECT DESIGN FEB 2020 – JULY 2020

SED SUBMISSION/REVIEWAUG 2020 – JAN 2021

BIDDING SPRING 2021

CONSTRUCTION SUMMER 2021 – SUMMER 2022

ELEMENTARY SCHOOL

• REPLACEMENT OF 4 EXISTING BOILERS WITH NEW HIGH EFFICIENCY BOILERS• PLUMBING UPGRADES INCLUDED ADDED ISOLATION VALVES AND NEW GAS PIPING• ELECTRICAL PANEL REPLACEMENT

• CRACKED SIDEWALK REPLACEMENT • RADIANT HEATED SIDEWALKS AT FRONT AND PLAYGROUND ENTRANCE