ALLEGANY-LIMESTONE CENTRAL SCHOOL
2020 CAPITAL IMPROVEMENT PROJECT
KEY FEATURESELEMENTARY BUILDING RENOVATIONS- SIDEWALK AND RAMP REPLACEMENT- RADIANT HEAT SIDEWALKS- MULTIPURPOSE ROOM RENOVATIONS- GYMNASIUM RENOVATIONS- LOCKER ROOM RENOVATIONS- CORRIDOR FINISH UPGRADES- CORRIDOR DISPLAY CABINETS- STEAM SPACE UPGRADES- CLASSROOM FINISH AND HVAC UPGRADES- KITCHEN AND CAFE RENOVATIONS- LIBRARY FINISHES- TOILET ROOM UPGRADES- BOILER REPLACEMENT- PLUMBING RENOVATIONS- LED LIGHTING UPGRADES- ROOFING UPGRADES
BUS GARAGE RENOVATIONS- BUS LIFT REPLACEMENT- OIL SEPARATOR UPGRADES- TRENCH DRAIN REPLACEMENT- WINDOW REPLACEMENT
PROJECT ALTERNATES- PLAYGROUND SURFACE UPGRADES- COURTYARD RENOVATIONS- SOLAR RENOVATIONS
The Board of Education and our District Leadership Team have worked hard to ensure the items in this project will support our mission to provide our students with access and opportunities for a well-rounded school experience. We understand that our school facilities serve an important role to our community as a place where families and townspeople come together. Over time, items need to be replaced, repaired, or upgraded to meet the many needs of our students, families, and community members.
CLASSROOM1098
CLASSROOM1093
CLASSROOM1099
CLASSROOM1089
CLASSROOM1090
CLASSROOM1102
CLASSROOM1088
TOILET1096
SINK1097
TOILET1092
SINK1091
SINK1101
TOILET1100
CLASSROOM1087
CLASSROOM1086
SPECIALED.
CLASSROOM1084
VESTIBULE1083A
CLASSROOM1095
RESOURCE1103
STAIR1104
DATA1105
STOR.1107
GIRLS1108
BOYS1109
COMPUTER1110
BOYS1116
GIRLS1111
JANITOR1117
SHOWER1118
TOILET1121
SHOWER1120
OFFICE1122
DRY1119
STORAGE1115
TOILET1124STORAGE
1126LOCKERROOM
1123
MULTIPURPOSE1127
VESTIBULE1128
VESTIBULE1141
TOILET1140
STORAGE1142
OFFICE1129
TOILET1130
DRY1137
SHOWER1138
BOYSLOCKERROOM
1139
DATA1131
OFFICE1132
SPECIALED.
ANCILLARY1135
CLASSROOM1143
GYMNASIUM1145
CORRIDOR1173
ARTROOM
1147
STORAGE1148
TOILET1150
VESTIBULE1149
CONFERENCETEACHER
1151
TOILET1153
TOILET1154
CLASSROOM1152
CLASSROOM1155
CLASSROOM1156
VESTIBULE1157
TOILET1158
CLASSROOM1159
CORRIDOR1164
CLASSROOM1160
VESTIBULE1162
TOILET1161
DATA1166
JANITOR1167
MENS1165
WOMENS1168
CLASSROOM1163
CLASSROOM1169
CLASSROOM1172
SPECIALED.
CLASSROOM1000
CLASSROOM1001
CLASSROOM1002
CLASSROOM1003
CLASSROOM1004
CLASSROOM1005
SERVICEROOM
1005A
CORRIDOR1006
CLASSROOM1017
CLASSROOM1018
ELECTRIC1020
ANCILLARY1016
RESOURCE1015
RESOURCE1014
COMPUTERROOM
1021
GIRLS1022
BOYS1025
JANITOR1023
MENS1024
COPIER1009
BOYS1013
WOMENS1012
JANITOR1011
GIRLS1010
SERVER1008
OFFICE1007
CLASSROOM1027
CLASSROOM1028
CLASSROOM1029
CLASSROOM1030
SCIENCECLASSROOM
1031RESOURCE
1032
CLASSROOM179
CLASSROOM178
PRINCIPALSOFFICE
1006
CORRIDOR1036
CORRIDOR1033
CLASSROOM1037
DATA1039
WOMENS1133
MENS1134
VESTIBULE1050
NURSEOFFICE
1054
TOILET1052
ARTROOM
1056
STORAGE1059
STORAGE1058
KILN1057
MUSIC1060
STORAGE1061
MUSICPRACTICE
1062
CORRIDOR1055
CAFETERIA1083
SERVING1082
JANITOR1081
JANITOR1080
OFFICE1079
LKRS1070
VESTIBULE1114AELECTRIC
1114
RESOURCE1112
RESOURCE1113
CORRIDOR1146
CORRIDOR1094
VESTIBULE1106
CORRIDOR1144
CORRIDOR1085
RECEIVING1077
TOILET1076
KITCHENSTORAGE
1073
GENERALSTORAGE
1072
VESTIBULE1067
MUSIC1065
ELECTRICROOM
1069
BOILERROOM
1068
CORRIDOR1071
KITCHEN1078
PT/OT1038
STORAGE1053
MAILROOM
1002
VAULT1004
OPENOFFICE
1001
EXISTINGVESTIBULE
1008
LIBRARY1026
CORRIDOR1164
TOILETROOM
1003
CORRIDOR1055
CORRIDORS: • REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN
LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL.• PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT
ABOVE.• PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL
SOFFITS, ETC.• AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED
AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT.• REPLACE WALK OFF MAT WITH NEW WALK OFF MAT.• REPAIR ANY DAMAGED TERRAZZO.• PROVIDE FLEXIBLE FURNITURE FOR PREK GATHERINGS IN SENSORY CORRIDOR.• REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN
CORRIDORS.• PAINT EXISTING LOCKERS SCHOOL COLORS.• REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING AND
FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS.
GYMNASIUM: • REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING.• INSTALL NEW ROCK WALL WITH TALLER AREA.• INSTALL NEW DROP-DOWN CENTER CURTAIN.• UPDATE SOUND SYSTEM.• PROVIDE PROJECTION SCREEN.• PA SYSTEM UPGRADES.
MULTIPURPOSE ROOM: • REPLACE BLEACHERS WITH POSSIBLE BLEACHER/RETRACTABLE SEAT SYSTEM.• ADD RETRACTABLE SEATING ON EACH SIDE TO MAXIMIZE NUMBER OF SEATS.• REMOVE BASKETBALL HOOPS.• REMOVE ROCK CLIMBING WALL (NEW TO BE INSTALLED IN GYMNASIUM).• PROVIDE NEW SOUND SYSTEM AND PROJECTION SCREENS.• REFINISH HARDWOOD FLOOR WITH NEW STRIPING.• ACOUSTICAL UPGRADES.• PA SYSTEM UPGRADES, CURRENTLY NOT LOUD ENOUGH.• NEW BATTING CAGE FOR SOFTBALL.
SITEWORK: • REPLACE CRACKED AND DAMAGED SIDEWALKS ADJACENT TO PARKING LOT.• REMOVE WOOD CHIPS FROM PLAYGROUND AND POUR RUBBER SURFACING.• REPLACE RAMP TO PLAYGROUND.• PAINT ALL CHIPPED HANDRAILS.• PROVIDE HEATED SIDEWALKS AT ENTRANCES.
COURTYARD: • REMOVE (2) TREES IN THEIR ENTIRETY.• REMOVE CONCRETE PAVERS AND PARTIAL WALL.• LANDSCAPE ENTIRE COURTYARD WITH NEW SHRUBS, TREES, GRASS AND HARD
SURFACING.• PROVIDE RUBBER SURFACING WITH TIER SEATING FOR CLASSROOM SETTINGS IN
ADDITION TO PICNIC TABLES, BENCHES, AND FLEXIBLE FURNITURE.• PROVIDE ACCESS, INTEREST, AND CONNECTION FROM PLAYGROUND TO
COURTYARD.• PROVIDE DIGITAL GRAPHIC MURAL ON LARGE BRICK WALL.• PROVIDE SUNSHADE FEATURES.
MAKER SPACE (ROOM ADJACENT TO LIBRARY): • UPDATE DIMMABLE LED LIGHT FIXTURES.• PAINT WALLS.• PROVIDE EPOXY RESINOUS FLOORING WITH RESILIENT BASE.• PROVIDE COIL REELS FROM CEILING.• PROVIDE FLEXIBLE, ADJUSTABLE, STEAM STYLE FURNITURE.• INSTALL NEW WINDOWS TO CREATE A PRINT ROOM BETWEEN LIBRARY AND MAKER
SPACE.• PROVIDE STORAGE FOR LIBRARY WITHIN PRINT ROOM.
CLASSROOMS: • INSTALL NEW LVT/SVT FLOORING IN (8) CLASSROOMS THAT HAVE NOT RECEIVED
UPDATES.
LOCKER ROOMS: • RENOVATE LOCKER ROOMS OFF GYMNASIUM FOR USE DURING MODIFIED GAMES
AND OTHER TEAM NEEDS, ALSO LOCATION FOR PE CHANGING AS NEEDED.
KITCHEN/CAFETERIA: • REMOVE EXISTING STOVE AND PROVIDE A NEW 4 BURNER STOVE.• REWORK EMERGENCY GAS SHUT OFF.• ADJUST SERVING LINE BY ANOTHER 5'-0". REMOVE CENTER WALLS BY MILK. PROVIDE
DUAL SIDED CASE FOR ICE CREAM AND MILK.• PROVIDE A/C TO KITCHEN/CAFE AREA.
LIBRARY: • UPGRADE CARPET AND PAINT COLORS.• PROVIDE THEMING.
HVAC: • REPLACE EXISTING CLASSROOM UV's WITH ROOF TOP UNITS WITH A/C.• PROVIDE ISOLATION VALVES AT HEATING SYSTEM TO ALLOW FOR MAINTENANCE ON
SPECIFIC AREAS OF THE BUILDING.• UPGRADE NURSES ROOM VENTILATION.
PLUMBING: • REPLACE EXISTING BACKFLOW PREVENTION DEVICES, POSSIBLE METER UPGRADES.• RELOCATE KITCHEN GAS SOLENOID VALVE TO WALL.• PROVIDE PLUMBING TO POSSIBLE SINK IN STEM LAB.• COURTYARD STORM DRAINAGE UPGRADES AS NEEDED TO ACCOMMODATE NEW
ARRANGEMENT.• PROVIDE ISOLATION VALVES ON DOMESTIC WATER LINES TO ALLOW FOR
MAINTENANCE ON SPECIFIC AREAS OF THE BUILDING.
TOILET ROOMS: • REPLACEMENT OF TOILET PARTITIONS AND FIXTURES.• NEW FINISHES.• CONFIRM SPACES MEET ADA REQUIREMENTS.
ELECTRICAL: • PROVIDE LED LIGHTING REPLACEMENT THROUGHOUT THE BUILDING.
11/12/20192020 CAPITAL IMPROVEMENTS PROJECT SCOPE PLAN
TOTAL CAPITALIMPROVEMENTS REFERENDUM:
$10MPUBLIC VOTE DATE - FEB 11, 2020 12PM-9PM
IN THE MS/HS BUILDING DISTRICT OFFICEPUBLIC INFORMATIONAL MEETING - JAN 14, 2020 6PM
IN THE ELEMENTARY MULTI-PURPOSE ROOM
• UPGRADE EXISTING SPACE TO BE A NEW MAKER STEAM SPACE. • SPACE WILL RECEIVE A FULL WALL OF CABINETRY WITH A SINK.• NEW PAINT, NEW FLOORING & ELECTRICAL UPGRADES TO CREATE A SPACE
WHERE STUDENTS CAN LEARN, CREATE AND COLLABORATE.
• REPLACE WALK OFF MAT WITH NEW WALK OFF MAT.• REPAIR ANY DAMAGED TERRAZZO.• PROVIDE FLEXIBLE FURNITURE FOR PRE-K GATHERINGS IN SENSORY
CORRIDOR.• REMOVE ALL BUILT-IN DISPLAY CASES AND PROVIDE NEW WAYS TO DISPLAY IN
CORRIDORS.• PAINT EXISTING LOCKERS SCHOOL COLORS.• REMOVE ALL SHEET VINYL FLOORING, PREPARE SUBSTRATE WITH LEVELING
AND FEATHERING TO RECEIVE NEW FLOORING. PROVIDE NO WAX FLOORS.
• REMOVE BLEACHERS AND REPAIR RUBBER SHEET FLOORING.• INSTALL NEW ROCK WALL WITH TALLER AREA.• INSTALL NEW DROP-DOWN CENTER CURTAIN.• UPDATE SOUND SYSTEM.• PROVIDE PROJECTION SCREEN.• PA SYSTEM UPGRADES.
• REPLACEMENT OF TOILET PARTITIONS AND FIXTURES.• NEW FINISHES.• CONFIRM SPACES MEET ADA REQUIREMENTS.
STEAM - SCIENCE, TECHNOLOGY, ENGINEERING, THE ARTS, AND MATHEMATICS
EXISTING
CORRIDOR
CORRIDOREXISTING
TOILET ROOM
BOILER ROOM SIDEWALK
MULTIPURPOSE ROOM
EXISTING
EXISTING
• REMOVE ALL DAMAGED TRANSITIONS AND PROVIDE FEATHERED ARDEX IN LOCATIONS THAT RECEIVE A CHANGE IN FLOOR MATERIAL.
• PROVIDE WALL TILE WAINSCOT OVER EXISTING STRUCTURAL GLAZED TILE WITH PAINT ABOVE.
• PROVIDE WAYFINDING THROUGH WALL TILE DESIGN, SIGNAGE, ARTWORK, SMALL SOFFITS, ETC.
• AT EACH INTERSECTION, PROVIDE CEILING NODE THROUGH COLORED, PATTERNED AND/OR WOOD LOOK CEILING AS WAYFINDING AND INTEREST POINT.
REVENUE SOURCES
CAPITAL RESERVE & FUND BALANCE
25%NYS
BUILDING AID
75%
LOCAL SHARE/TAXES
0%
NOANTICIPATED TAX IMPACT!
PUBLIC VOTE FEB 11, 2020 12PM-9PM
PROJECT DESIGN FEB 2020 – JULY 2020
SED SUBMISSION/REVIEWAUG 2020 – JAN 2021
BIDDING SPRING 2021
CONSTRUCTION SUMMER 2021 – SUMMER 2022
ELEMENTARY SCHOOL
• REPLACEMENT OF 4 EXISTING BOILERS WITH NEW HIGH EFFICIENCY BOILERS• PLUMBING UPGRADES INCLUDED ADDED ISOLATION VALVES AND NEW GAS PIPING• ELECTRICAL PANEL REPLACEMENT
• CRACKED SIDEWALK REPLACEMENT • RADIANT HEATED SIDEWALKS AT FRONT AND PLAYGROUND ENTRANCE