alice 5 o’clock meeting

34
6/12/10 1 ALICE 5 o’clock meeting Wk 49 http://indico.cern.ch/conferenceDisplay.py?confId=115692

Upload: muncel

Post on 06-Feb-2016

57 views

Category:

Documents


0 download

DESCRIPTION

ALICE 5 o’clock meeting. http://indico.cern.ch/conferenceDisplay.py?confId=115692. Wk 49. Access request Cavern and surface. You should submit an ADI and a task procedure. Attach task procedure. Work breakdown structure – risk associated at each step. Two persons minimum. ADI - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ALICE 5 o’clock meeting

6/12/10 1

ALICE 5 o’clock meeting

Wk 49

http://indico.cern.ch/conferenceDisplay.py?confId=115692

Page 2: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 2

Access requestCavern and surface

• You should submit an ADI and a task procedure

Two persons minimum

Work breakdown structure – risk associated at each step

ADIhttps://edh.cern.ch/Document/ADI

Task procedureTemplate EDMS 1103355

Attach task procedure

Page 3: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 3

ALICE Christmas break schedule

OpenOpenExperimentExperiment

TRDTRDEMCalEMCal CloseClose

ExperimentExperiment

Open L3 doors

Close L3doors

Page 4: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 4

UX25 access

Rules for access restrictions:Removal/installation of shielding (restriction includes RB24 triplets)

• PX24 blocks: no access CR5 and UX25• PX24 beams (35t): no access CR1-5, Expo, and UX-25• All other blocks: no access to UX-25

LHC evacuation test (7/12 after 18:00 and 24/12 tbc) – no access UX25Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25DSO test (12-13/1) (Department Safety Officer) – no access UX25

No access SX2 during manipulation of blocks in SX2 (except ACR and WRs)

Page 5: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 5

L3 (and MNF) access

NoVentilation

EMCal EMCal

EMCal

NoVentilation

+AUG

Wks 50 and 4: access (TPC) to be coordinated with TC (transport)

Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day)When moving from low-beta to yellow platform: no access to MNFWhen inserting the module: no access L3 and MNF

Watcher needed in wk 49 and from wk 4 onwards

Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC)

24 31

Evac.

Page 6: ALICE 5 o’clock meeting

Day-by-day schedule

UX25 and MNF - Wk 49

Page 7: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 7

• 18:00: end HI program– Ramp down both magnets

• 18:00 – 21:00: access system test. No access UX25• 21:00: RPE survey (Jiri + 2nd person)

– Collect samples

– Then go to general mode

• From 21:30: TRD Wiener PS (?)

Week 49 - 6/12 MondayProgram

Page 8: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 8

Activities in UX25 - Week 49 - 6/12 Monday

No access UX-25 - possibility of access from 21:00

ITECO

HAULOTTE

TRD team at CERN: 6 to 10/12

TRD Wiener PS

TRD Wiener PS

TRD: after 21:30

Page 9: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 9

• 8:00 - 18:00: UX25 cavern in Restricted mode– No access UX25 (except Transport, VAC, TC and RP)

– SLIMOS needed (Werner)

• 8:30 - 9:30: RP liquid sampling (Adeline, Pierre) – SPD and TPC priority

• 18:00 - 21:00: evacuation test – No access UX25• From 21:00 - Cavern in General mode

• 14:00 - 15:00: Portuguese Press visit. 10 persons

Week 49 - 7/12 TuesdayProgram

Page 10: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 10

• ALTEAD: PX24 shielding blocks– 8:00 to 18:00: no access CR5

• 14:00 to 15:00: put SM16 into the rotator• VAC: Neon injection preparation

– Transport needed (EDH 4472100)

– Remove “green fence” (P2 technician)

• 9:00: stop flammable gases i-C4H10 and CH4 (Ar/H2 on 10/12)• 8:30: Lock L3 power converter + conpensator• Reinstall crane electronics• Test transmission of alarm lift to FB• 8:30: inspection PHOS cooling plant (Arturo, Dominique, Philippe,

Sasha)• 15:15: VIC SPD• DCS: 10:00 – 12:00, interruptions of the GPN link to/from P2

Week 49 - 7/12 TuesdayActivities

Page 11: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 11

Activities in UX25 - Week 49 - 7/12 Tuesday

8:00 to 18:00: no access UX25 (except Transport, VAC, TC and RP)

18:00 – 21:00: evacuation test (No access UX25)

VA

C

RP samples

8:00 to 18:00: no access CR5

PX24 shielding: blocks

Page 12: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 12

Activities in MNF - Week 49 - 7/12 Tuesday

8:00 to 18:00: no access MNF

18:00 – 21:00: evacuation test (No access UX25)

Page 13: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 13

Activities in UX25 - Week 49 - 8/12 Wednesday

PX24 shielding:

beams (35t)

VA

C

8:00 to 18:00: no access UX25 (except Transport and VAC)

18:00 to 8:00: access in general mode

MoveTRD Wiener PS

TRD Wiener PS

Cut SPD pipes (after

18:00)

Stabilizers

Muon TRG

8:00 to 18:00: no access CR1-5 and Expo

TRD: back-Plane modifications LV Wiener (~80 PSU) and Modified LV patch panels and new cables (after 18:00)

TP

C F

EC

an

d

TR

D L

V

Maintenance Local decision electronics (after 18:00) Upgrade FE threshold distributors, higher segmentation (after 18:00)

TPC coolingEmpty tank

(after 18:00)

Muo

n T

RK

: C

RO

CU

S f

irmw

are

upg

rade

After 18:00

TPC: replacement of damaged FECs (after 21:00)

Page 14: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 14

Activities in MNF - Week 49 - 8/12 Wednesday

8:00 to 18:00: no access UX25

18:00 to 8:00: access in general mode

Page 15: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 15

Activities in UX25 - Week 49 - 9/12 Thursday

VA

C

MNF shielding

18:00 to 8:00: access in general mode

8:00 to 18:00: no access UX25 (except Transport and VAC)

TRD Wiener PS

TRD Wiener PS

RAMSES: removal of Data Acquisition modules CR5

Stabilizers

No access CR1-5 during lifting up of 5 big beams

Interruption on auto-transfert network (from 07:00 till 07:05). No access underground

TP

C F

EC

an

d

TR

D L

V

EMCal team at CERN: fit rollers on all SMs

Muo

n T

RK

: C

RO

CU

S f

irmw

are

upg

rade

Page 16: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 16

Activities in MNF - Week 49 - 9/12 Thursday

8:00 to 18:00: no access UX25

18:00 to 8:00: access in general mode

Page 17: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 17

Activities in UX25 - Week 49 - 10/12 Friday

Move if needed

LV156

Gas functional test (2h no access UX25 and CR1-5)

Maintenance PX24 MAD (transparent)

MNF shielding

No access CR1-5 during lifting up of 5 big beams

18:00 to 8:00: access in general mode

8:00 to 18:00: no access UX25 (except Transport)

TRD Wiener PS

TRD Wiener PS

TP

C F

EC

an

d

TR

D L

V

EMCal team at CERN: fit rollers on all SMs

Muo

n T

RK

: C

RO

CU

S f

irmw

are

upg

rade

Page 18: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 18

Activities in MNF - Week 49 - 10/12 Friday

8:00 to 18:00: no access UX25

18:00 to 8:00: access in general mode

Page 19: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 19

Activities in UX25 - Week 49 - 11/12 Saturday

LV156

MNF shielding

18:00 to 8:00: access in general mode

8:00 to 18:00: no access UX25 (except Transport)

TRD Wiener PS

TRD Wiener PS

TR

D L

V

Page 20: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 20

Activities in MNF - Week 49 - 11/12 Saturday

8:00 to 18:00: no access UX25

18:00 to 8:00: access in general mode

Page 21: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 21

Activities in UX25 - Week 49 - 12/12 Sunday

Access in general mode

Page 22: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 22

Activities in MNF - Week 49 - 12/12 Sunday

Access in general mode

Page 23: ALICE 5 o’clock meeting

Services interruption

Page 24: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 24

Maintenance gas systems

Functional tests

New gas monitoring

13-15/12:• Stop N2, CO2, Neon, Ar and C2H2F4 (24 hours max N2, CO2 and Neon)• TRD backup (N2 bottle in CR5) – HMPID backup (Ar bottle in SG2)

13

Page 25: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 25

Gas system status over Christmas

Albin

• TPC & TRD: ON• TOF: ON – stop from 12 to 21/1 (cooling stop, KNF pump stopped)• HMPID: ON (Ar backup)• PHOS: N2 flushing• PMD: ON (except wks 1-2 – gas stop)• Muon TRK: backup CO2• Muon TRG: backup Ar

• No flammable gases from 7 Dec until 21 Jan PM (after maintenance L3 ventilation)

Page 26: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 26

Maintenance cooling unitsCooling Plants and Primary Network

Cooling towers

Maintenance on production network. No primary water from 12/1 (PM) to 21/1CR1-2-3, the Wiener PS and detector cooling plants affected (plants can RUN, but no cooling power). Part of DCS will keep running

Maintenanceand

consolidation

17

21

12

TOF/PHOSEMC

HMPID

SPD

TPC

TPC 10

Maintenance on cooling plants. Replacement of pneumatic actuators for TOF/TRD/TPC plants + TOF/PHOS flowmeter. CP will be stopped during maintenance

SSD/SDD

TRD

Page 27: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 27

Maintenance ventilation units

SG2

UX25, Muon

TRK-TRG

17

12

UX25, Muon TRK-

TRG

L3

Page 28: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 28

Safety and electrical systems

PX24 fire detect.20

UX25 fire detect. + red phones

UPS UPS

AUG

UPS

DSO

Evacuation

DSSSNIFFER mainten.Auto-transfert

Evacuation

Evacuation

Early morning/late evening (tbc)

Page 29: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 29

• EN/EL: interruption on auto-transfert network (9/12 from 07:00 till 07:05):

– All 'normal power‘ will be cut for 5 minutes: wall outlets, non-UPS in the ACR, SXL2, non-UPS power for the cooling plants, gas systems

– It will not affect the 'machine network‘ (all racks will remain powered (part of the 'EXD', machine, network)

– This network also provides the power to the UPSes, so they will run on battery for the time of this cut

– See https://edms.cern.ch/file/1106913/1/ENNC_2010_196.pdf

• EN/EL: AUG Test (20/1) (Arrêt Urgence General – General Emergency Stop)

– Major electrical perturbation. Also ACR affected

• DSS modification (13/1)

– Will stop the full DSS, trigger all interlocks, including stopping power to all racks

• LHC evacuation tests (7/12 after 18:00 and 24/12 tbc)

– no access UX25

Safety and electrical systemsImpact on ALICE

Page 30: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 30

DAQ upgrade plans• 21st Dec PM till the 04th Jan included

– The DAQ will be OFF during the CERN closure.– The ACR PCs will be left ON to give access to the DCS for the detectors teams

who need it.• 5th to the 11th of January included

– DAQ restarted on the first working day for 1 week. The DAQ will be switched ON with the present version of all software. Allow a quick commissioning after the installation of new detector modules or the intervention on existing detectors.

• 12th to the 23rd Jan included– The DAQ will be OFF during the cooling interruption at P2.– DAQ renovated (see TB December)

• 24th January– The DAQ will be ON again. It will run under SLC5 64 bits unless there would be

an unexpected key problem.

• The electronic logbook will remain available during the whole period. When the DAQ will be OFF, it will be running in the DAQ lab in Meyrin. There will be a few hours of interruption to switch from P2 to Meyrin and back.

Pierre/Uli

Page 31: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 3126/11/10 ALICE planning meeting 31

DCS plans• Baseline: DCS will be operational all times where technically possible

– With ‘best effort’ support

– With access restrictions during CERN End-of-Year closure (22/12 – 4/1)

• Many activities and upgrades are planned– Will be coordinated with individual detectors to minimise impact

– For central systems, as much as possible in shadow of other perturbations (e.g. cooling stop)

– Perturbations (e.g. for reboots etc.) cannot be excluded

• Detectors are invited to communicate ‘critical periods’, with services needed– Will try to cater for detector needs as much as possible

• Known perturbations:– Tue 7/12 10:00 – 12:00, interruptions of the GPN link to/from P2

• Upgrade of router, test impact on ALICE

– Wk50 (13-17/12) – major updates to all PC (many perturbations to be expected)

– 12/1 – 21/1 (cooling stop), only minimal central services. All detector DCS switched off, except for special requests and if cooling power allows

• More detailed planning at weekly and daily meetings

André / Peter

Page 32: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 32

Magnet control upgrade

• Wk 49: nous devons intervenir dans la MCR pour:– changement des alimentations 24V et 48 V des systèmes MSS et MCR (préventif)– changement des modules convertisseurs PT100 des hots points du Solénoïde (correctif suite à deux

incidents ayant entrainés l'arrêt du Solénoïde) et en UX25, comme Philippe Bouvier l'a déjà signalé:– recâblage des AU du dipôle et du Solénoïde– signalisation du champ magnétique du dipôle et du Solénoïde

• Nous étudions toujours une solution pour le monitoring des températures du Solénoïde.• L'arrêt de fin d'année va permettre de faire une meilleure approche de ce qui est existant en

UX25.

• En ce qui concerne l'alimentation électrique de la MCR, nous dépendons actuellement d'une seule source de courant sous UPS avec secours diesel.

• Afin d'établir une redondance pour l'alimentation de la MCR je souhaiterais installer une seconde source d'alimentation sous UPS.

• Je sais qu'une étude est faite à ALICE pour augmenter la puissance des UPS existants en 2012.• Je souhaiterais que cette demande soit incluse pour le calcul de puissance des nouveaux UPS

(besoin pour la MCR: 16A en monophasé)

Pascal

Page 33: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 33

VIP visits – wk 49

• Portuguese Press visit to CERN (7/12 14:00 to 15:00). 10 persons

Page 34: ALICE 5 o’clock meeting

6/12/10 ALICE planning meeting 34

AOB

• SLIMOS shifts still missing in wks 49-50 and 4-5