ali cv new11

16
CV Ali Faroug DATE June 2016 Page 1 PERSONEL INFORMATIONS Nationality: Sudanese Date Of Birth / Place: 05/06/1957 Marital Status Married Language Spoken: Arabic, English Fluent CONTACT INFORMATION Permanent Address Alsafia Block 9 House 272 Current Work Address SUDAPET Africa street , Sudan Building Block 9/10 . Contact Number(s) +249(0)9123-02871 Email (s) [email protected] [email protected] EDUCATION University of Khartoum On Progress - M.Sc. Major : Petroleum Production Engineering Award on process . University of Tronheim Degree Awarded - Higher Diploma Major: Petroleum Exploration & Production Year of Award: 1991 Suez Canal University Faculty of Petroleum and Mining Country : Egypt Degree Awarded: B.SC. Major: Petroleum Engineering Year of Award: December 1982 Professional Societies : Society of petroleum Engineering ( SPE) , Chairperson of SPICE , Sudan Petroleum International Conference and Exhibition , Khartoum , January , 2012. 2 published technical papers and 4 technical papers ( not published yet). I am a member of Production Group and Reservoir & EOR Group. Ali Faroug Shahin Petroleum Engineer Executive Summary A Petroleum Engineer with more than 30 years of varied Oil Industry experience with broad exposure to technical and managerial issues from exploration to field development and production operations. Born and raised in the international oil and gas industry and living more than 5 years outside Sudan, including the Middle East, Europe, United States , Africa and Asia. The results are cultural maturity and the ability to communicate with people .

Upload: ali-faroug

Post on 15-Apr-2017

97 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 1

PERSONEL INFORMATIONS

Nationality: Sudanese

Date Of Birth / Place: 05/06/1957

Marital Status Married

Language Spoken: Arabic, English Fluent

CONTACT INFORMATION

Permanent Address Alsafia Block 9 House 272

Current Work Address SUDAPET Africa street , Sudan Building Block 9/10 .

Contact Number(s) +249(0)9123-02871

Email (s)

[email protected] [email protected]

EDUCATION

University of Khartoum

On Progress - M.Sc. Major : Petroleum Production Engineering Award on process .

University of Tronheim

Degree Awarded - Higher Diploma

Major: Petroleum Exploration & Production Year of Award: 1991

Suez Canal University Faculty of Petroleum and Mining Country : Egypt Degree Awarded: B.SC. Major: Petroleum Engineering Year of Award: December 1982

Professional Societies :

Society of petroleum Engineering ( SPE) , Chairperson of SPICE , Sudan

Petroleum International Conference and Exhibition , Khartoum ,

January , 2012.

2 published technical papers and 4 technical papers ( not published yet).

I am a member of Production Group and Reservoir & EOR Group.

Ali Faroug Shahin

Profession:

Petroleum Engineer

Executive Summary

A Petroleum Engineer with more than 30

years of varied Oil Industry experience

with broad exposure to technical and

managerial issues from exploration to

field development and production

operations.

Born and raised in the international oil

and gas industry and living more than 5

years outside Sudan, including the Middle

East, Europe, United States , Africa and

Asia. The results are cultural maturity and

the ability to communicate with people .

Page 2: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 2

EXPERIENCE PROFILE:

Total Years of Experiences: 30 years Field(s): Petroleum Engineering and Management Sector: Petroleum Engineering and Management EMPLOYMENT HISTORY June 2013 - Current Consultant at SUDAPET for Production Engineering & IOR in blocks 6 , 2,4 & 2B Report to MD . Propose & follow Initiatives in production to increase oil production levels through IOR/EOR activities . Coordinate all the research on IOR/EOER April 2007- June 2013 Company SUDAPET / WNPOC /BNPOC Position: Vice President , Country: Sudan Duration :6 years Sector: Sr. Management

Vice President RESPONSIBILITIES & DUTIES Basic function and scope

President Office

I was the second man in the company and vice-chairman in the Management , Human Resources, Tendering and HSE committees.

I approve the Exploration budget and follow with Managers to ensure that MC directives are fully implemented , company exploration objectives are met and proposed reserve increment is achieved on the time.

I was the project director , responsible of Project Management process to ensure all development projects including new fields tie-in , facilities upgrading, debottlenecking the old facilities and IOR/EOR projects in brown fields are on time schedule and as per budget ; without compromising quality.

I initiated, followed-through and implemented the Chemical EOR as Huff and Puff to Improve Oil Recovery for Heavy Oil Field by Chemical Treatment (SEMAR) in Bamboo Oil Field. The result was oil gained of 18,000 BBls in 50 days . See SPE-189-MS.

I discussed & approved all Plans of production operations in all fields to ensure that crude oil and associated gases are

Page 3: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 3

produced in the quantities and at the qualities level to meet shareholder need and off take requirements. I managed to present news concepts of four scenarios to the Hosting Government to approve the incremental of WNPOC Production level by 400%. Finally the government approved the plan and agreed that WNPOC can build a pipeline to Fulla and mix their crude with Block 6 . That allowed WNPOC to increase the production to 40,000 BOPD instead of 12,000 BOPD.

I managed a specialized group of engineers and specialists to formulate strategies and plans to maximize commercial oil recovery of developed fields through well/well review and performance enhancement. I initiated a full study of steam injection to increase the recovery factor of Tharjath Field by 12% . I achieved the 3 project steps and reached the Sector model , reservoir simulation and the economical model stage.

I was fully responsible of Company's occupational health , safety, and environment policy . I effectively follow the implementation of these policies in all operations assets and departments. I continuously lead audit teams to inspect the systems and to ensure all procedures are adequately implemented. During my time in WNPOC we achieved the minimum LTI in all projects and WNPOC was awarded the ISO 14001 and OHSAS 18001 after 2 years of system preparation and enhancement , staff training and orientation program and internal and external rigorous auditing . . During my time in SUDAPET as VP , I initiated the process of Quality management in the company . I enforced all the departments to map their work processes and procedures and hired a reputable consultant to help on gap filling to ensure proper system management is in place. After three years I managed to change Sudapet from a local Governmental Company to an international E&P company and Oil Service Provider of Excellence . I managed to improve work process, staff competencies . SUDAPET has been awarded the awarded the ISO 9001 , ISO 14001 and OHSAS 18001.

I was supervising the company WP&B Cycle from the begging of preliminary thoughts, through SWOT analysis . approval , Budget Performance Review and analysis and Reporting to the shareholders and the host government.

Due to my previous experience in GNPOC , I managed to initiate the ERP system and established enthusiastic team to drive this project.

The team chosen SAP system in SUDAPET & other operating companies. After many years of hard work , the system now is fully functioning .

This ERP system caused drastic changes in resources

Page 4: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 4

management, affected positively procurement procedure, warehousing management, finance and accounting, and assets operations &maintenance.

BLUE NILE PETROLEUM OPERATING COMPANY ( BNPOC ) :- The shareholders of the company were Gain Yield Investment Ltd., Hong-Kong 90 % & SUDAPET Ltd. 10%. This company was registered as off- Shore Company.

I managed to register a branch in Sudan in two weeks’ time, established the company HQ in Khartoum and I managed to negotiate the contract with the landlord and reduced the cost by 20% compared to the similar building in the area.

In the beginning the company establishment, and due to limited budget and work, interviewed the local staff and hired only 3 support , trained them to be of multi-skilled disciplines who can work on many projects and trades like accounting , secretary , logistics , GS , PR , translation , receptionist , driver ,..etc.

I managed to fully furnish the HQ building , established good tele-communication system with full ICT infrastructure , including provision of future expansion with very reduced prices.

I managed to arrange secured, quality and comfortable fields trips (More than 700 KM away from Khartoum ) to the oil fields and around all the concession area with minimum cost and met all the company fields survey and mapping objectives.

Skill Acquired:

Strategic Planning, Project Management, Production Operations, Performance Development, Human Resources management.

Budgeting & Forecasting, Supply Chain Management, Contract Management.

Target Achievement, Driving Growth.

Standardization of Policies & Procedures.

Page 5: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 5

Leadership, Team Management, Motivational Skills, negotiation skills , Interpersonal Communication Skills

Feb. 2005-April 2007

Company: GNPOC Position: Production Manager Country: Sudan Duration: 2 years Sector: Exploration and production Division

Sr. Production Manager RESPONSIBILITIES & DUTIES Basic function and scope

Reporting to : GM E & P

I achieved GNPOC production plateau of 280 KBOPD from 10 Production Fields in Block 1,2 and 4 (. Heglig, Unity, Toma South, El Naar, El Haar, El Toor, Garaad, Bamboo, Munga, Khairat NE Dfra & Neem ). This achievement was above to the approved WP&B ,target of 269 KBOPD.

I managed to achieve 300 KBOPD as peak production in few months. These high Production achievements were realized

because of the following actions taken :

I continuously attend to Well/Well Review.. Took decision on the spot about production issues, such as sand production & completion problems, Water Injection issues , artificial lift issues, workover / Re-completion analysis and production data aquision issues.

I was reviewing with engineers and technologists idle wells status and discuss the plans to bring them back on stream in due course of time.

I was reviewing with reservoir engineers and G&G group well performance and artificial lift or secondary recovery phase required.

I was energizing operations & maintenance by highlighting my observations about processing facilities performance, pipelines integrity, De-bottleneck projects and tank farm performance. I thinking out of box and encourage my staff to do the same .

I was responsible of all electrical feeders to wells and processing plants , that include 600 klms of HV transmission lines , 3 power plants and utilities . I was chairing meetings regarding HV& LV transmission lines, power plants performance, spare parts availability, contracts …etc.

Page 6: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 6

I was very restricted about power outage issues. I encourage the power committee & consultants to suggest many improvement incentives such as transmission line retrofitting, sectionalization , outer closers system protection enhancement .. Lost production index due to power(LPI) reports showed outstanding improvement ; LPI DECREASED from 7% to only 2.5 %.

I managed a professional engineering and specialist team who assess processing facilities, pipelines integrity, Power Plants , tank farm and meters performance .

I was responsible of 412 wells performance ( most of them on PCP& ESP) and water injection plant . Manage 5 power generation plants , 600 klms of HV electrical transmission lines .

I have the ability to motivate and energize staff for performance improvement . I always empower staff and encourage them to make decisions and come with new ideas. I always follow the rule of (make it right first time). This is happening because of training , development & couching programs offered by my subordinates .

When I left the company, I had in my department 400 skilled engineers , technicians and operators. My budget was more than $ 600 MM per year.

I was the HSE System custodian in my department . I ensure all activities are carried out in full accordance with Company's Health, Safety and Environment policies and procedures .

Achieved ISO 2001 certificates to all the 16 installations like e the Field Production Facilities and power plants..

March 1999-Jan. 2005

Company: GNPOC

Position: Deputy Manager , Production . Country: Sudan Duration: 6 years

RESPONSIBILITIES & DUTIES

Page 7: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 7

Reporting to : Sr. Production Manager & Sr. Development Manager.

I was the member of Project Steering Committee. Participated in the pre- commissioning of the main projects in GNPOC and formed a task force to establish Production Operation Philosophy and prepare the fields for production.

Developed with my staff the Fields operation Philosophy. Created the production Organization Structure which consists of Operations, Maintenance, Production Engineering , Planning and Training Sections . Later on two additional sections were developed to achieve the business target (Technical Service & Electrical Power).

Developed the Chemical injection program with the assistance of Operations Superintendent and lab supervisor. This was critical job because of the waxy oil nature and to ensure the pipeline will be operated smoothly and safely.

Engaged Operations and Maintenance Contractors to fill the positions and support the operations and maintenance until nationals can take over. I negotiated the contracts and got the best price in the regions. I higher the best contract staff after interview and to ensure, they are willing to transfer knowledge and skills to national grown staff.

Established Operations and Safety procedures and standards to ensure all the plants , Power stations , the 33 KV Over heads transmission lines will be operated continuously and safely .

Established Computerized Maintenance Management System to ensure adequate preventive , corrective maintenance and Overhaul activities are provided to all equipment when required and to monitor the spare parts stock level .

Established the ERP ( Oracle System) in Production Department , I was the steering committee member and responsible about all the processes of ERP establishment in Production department . We managed to work 3 years hand to hand with the consultant in ERP blue print , migration of all the historical facilities data &information to the new system ,established the maintenance procedures and workflow .

Established warehouse processes and spares inventory system . Managed to train staff and encourage them to be the owners of the system. Created with my staff the purchase order system for the routine maintenance spares

Page 8: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 8

I establish a training center in Heglig equipped with all engineering training facilities, such like mechanical, instrumentation& control, electrical and operations equipment . I hired 15 expad training staff

who got the knowledge , skill . I managed to train the operators and technicians over 2-3 years training program to furnish the operations , lab, corrosion and maintenance sections with competent operators and technicians .

I established the career progression for engineers , operators & technicians to understudy the higher jobs and to nationalize them after through assessment . 400 supervisors , specialists , engineers, technicians and operators of very high caliper were graduated and now they are in all the gulf countries like Saudi Arabia ,Kuwait, Iraq, Oman & Abu Dhabi. Some of them also working with contractors such as Haliburton & Schlumberger.

I was member in the commissioning and startup committee to commission step by step 7 fields facilities and pipelines ( Unity , Heglig , Toma South , Elnar , Eltoor , Bamboo , and Munga ) and to produc over 150,000 BOPD.

I was a member of commissioning and startup committee to start two Power Stations , Helig Power Station ( 8 engines X 3.5 MW ) . Unity Power Station ( 10 Engines X 5.8 MW ) . Commission 400 Klms of transmission lines and underground cables .

June 1997- March 1999

Company : (GNPOC)

Position: Deputy Manager , Development

Page 9: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 9

Duration : 2 years Place : Sudan RESPONSIBILITIES & DUTIES

Reporting to : Sr. Development Manager

Worked as (Fields development Plan) FDP milestone sr. reviewer . I reviewed 5 different FDPs in REPID ( china ) , Petronas (Malyasia) & Sudan . I go through the G&G phase until the final geological model is finished. Then I follow with the reservoir engineers on the Engineering Dynamic model. I challenged the field economics to ensure its fit-for-purpose and no additional cost encored.

Worked as project director of Field Surface facilities phase 1 ( FSF1 The scope was 100 wells to be tied in and put on stream to produce 150,000 BOPD . The value of this project was $70 MM and the mode was on fast track bases to be completed/commissioned before June 1999 . ie. In one year time.

Responsible of Tie –in 100 wells in 5 fields ( Unity , Heglig , Toma South , Elnar and Eltoor fields ) to the field production facilities ( FPFs ) . The scope of work is to lead 18 staff ( project team ) to engineer , procure equipment and materials , construct and commission the inter-fields pipelines , oil gathering manifolds , Micro motion meters , overhead transmission lines , high voltage / low voltage transformers , switch gears , underground cables and MCC rooms .

I achieved the project on time and saved 6 million dollars. This saving come from low price of material transportation (negotiated good price) , commissioned the project before raining seasons , (saved on excavation equipment hours), saved the stores rental in mid-way between Port & fields (distance over 1200 KMs) , by applying security and rewards to drivers who achieved logistics goals.

I was very concerned about the inter-phasing issues between the different projects EPC1 , EPC2B and FSF1 . this is important for ensuring smooth flow achieved between different teams in different projects.

After the FDP reached the final stage , I was responsible about the team who purchased the artificial lift equipment , most of them were Electrical submersible pumps and progressive Cavity pumps. I hired the team who is responsible to complete the wells ,

Page 10: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 10

and achieved successfully PCPs and SPEs installation programs .

Provided a periodical Overall reports to management and partners in JOC meetings about the E&P Fields Projects progression .

May 1995- May 1997 Company : Ministry of Energy & Mining. Position: OEPA , Head of Reservoirs & Production

Country: Sudan Duration: 2 years

RESPONSIBILITIES & DUTIES

Reporting to : Director Development

Manage Hydrocarbon resources in Sudan with respect to

Petroleum Engineering & monitor companies activities.

August 1993- April 1995 Head of Petroleum Engineering Company : Heglig Project , Ministry of Energy & Mining. Country: Sudan Duration: 2 years

RESPONSIBILITIES & DUTIES

Reporting to : General Manager , Heglig Project .

Responsible to study, design, prepare bid documents, evaluate

tenders And prepare heglig field for early production system.

Managed to produce and treat 5000 BOPD in the field tank

Page 11: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 11

area .

Managed to transport the oil by road tankers from heglig to

Almuglad railway station , offload in buffer tank ( mid-way)

through 80 kms. all weather road .

Managed to load the oil by railway tankers to Obeid Refinery.

June 1991 – July 1993, Head of Petroleum Engineering Abu Gabra Project. Company : Abugabra , Ministry of Energy & Mining. Production 2000 BOPD. Country: Sudan Duration: 2 years

RESPONSIBILITIES & DUTIES

Reporting to : General Manager , Abugabra Project .

Abu-gabra and Sharif fields development project , was

the first project in SUDAN . It aimed to develop 1 well in

Sharif field and 3 wells in Abugabra field . to build small

topping plant in Abugara and to truck the oil from

Sharif through all-weather road of 70 kms to Abu-gabra

terminal .

I was responsible of Drilling, Testing, Completion of 3

wells in AbuGabra & Sharif Fields . Design Early

Production Facilities (EPS). Supervise the Production.

Contract Vendors & manage the logistics.

We built small loading facilities in Sharif well , where

105 tankers to be loaded and travel to Abu-gabra

terminal for de-loading .

In Abu-gabara we built tank farm for oil , Naphtha ,

Gasoil ,kerosene and fuel-oil . I have good experience in

handling the crude oil of very high pour point as it gels

in low temperature. We managed to heat the road

tankers and the railway tankers and bring the fuel-oil to

Page 12: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 12

the power plant (800 klms) away from the refinery .

Managed to produce 2000 BOPD for Abugabra Topping

Plant , drilled 2 additional wells in Sharif fields and

recomplete all the wells in Abu-gabra field.

We are fully responsible about the oil treatment , loading , off-loading and oil trucking operation.

April 1990- May 1991 Attended High Post Graduate Diploma Company : Trondheim University , Faculty of Petroleum Country: Norway Duration: 1 year

RESPONSIBILITIES & DUTIES

Reporting to : Trondheim Technical School

Attended all Exploration and Production Diploma full time Courses .

Awarded Diploma Certificate.

May 1988- March 1990 Senior Petroleum Engineer Company : General Petroleum Corporation Country: Sudan Duration: 2 years

RESPONSIBILITIES & DUTIES

Reporting to : Head of Petroleum Engineering .

Supervise Petroleum Engineers and trainees in the drilling rigs.

Evaluate well Testing Analysis, Offer Formation Evaluation

Programs to trainees.

Supervised two Engineers to write the Final Well Reports.

Page 13: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 13

March 1985- April 1988 Petroleum Engineering Company : General Petroleum Corporation Country: Sudan Duration: 3 years

RESPONSIBILITIES & DUTIES

Reporting to : Head of Petroleum Engineering .

Attend and witness at well site all the Drilling , Formation

Evaluation and well testing activities .

Evaluate well Testing Analysis , and attend technical Meetings

to evaluate well results .

Write the Final Well Reports .

February 1982 – Feb. 1985 Assistant Petroleum Engineer Company : Trainee with CHEVRON SUDAN & USA Country : Sudan and USA

RESPONSIBILITIES & DUTIES

Reporting to : Head of Drilling Engineering in Sudan and Area Engineer in Chevron South Area ,USA , LAHABRA California .

Worked with Chevron Oil Company as a trainee for three years

in drilling operations, well drilling analysis, cost analysis .

Trained in formation evaluation, well DST, well testing and

analysis.

Attended to On-job training for 6 months with Chevron USA in

Production Fields in LA Habra , California USA . My training was

mainly on production operations , workover and completion

engineering , water injection , well stimulation and Production

Monitoring and Reporting.

Page 14: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 14

TRAINING/CERTIFIATION

Training/Course Title

Location

The Blow Out Prevention in Oil & Gas Wells, Res. & Production Logging, by Schlumberger.

Khartoum , Chevron Well Control 9-14 December 1982 .

Khartoum . 11 August 1983 .

6 Months On – Job training Oil Production, Chevron USA.

California, USA , August 1984 – Feb. 1985

Computerized Information System, University of Khartoum.

Khartoum

Seismic Processing, IHRDC Khartoum , 10-14 July 1989.

Oil & Gas Measurement Systems, IHRDC.

Cairo , 22-26 January 1989.

Reservoir Appraisal & Development GPC.

Khartoum , 24 Sep. to 7 October 1991.

Negotiation strategies & Construction of Oil Exp. Agreements, CAL Engineering

Khartoum 9-14 Oct. 1993.

Development Strategies of Petroleum Fiscal Regime in Sudan, CAL Engineering.

Khartoum, 16 – 21 Oct. 1993.

Surface Production Facilities Design, SCOTIVE,

Khartoum 23 April – 3 May 1995.

Economic Analysis & Cost Control of Petroleum Venture, CAL

London, 18 – 22 Dec. 1995.

Page 15: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 15

Engineering,

Planning Management & Control of Petroleum Projects, CAL Engineering

Khartoum, 13 – 18 January 1996.

Performance Management System

Management Motivation for Performance Improvement ,

Malaysia , THE McCLELLAND INSTITUDE , 28

May 2001

TOTAL Quality and Excellence Conference , By TOTAL Organizational Excellence .

Khartoum , November 2001 .

Senior Management Development Program . Certificate in International Management ,

Malaysia , PETRONAS & INSEAD , March 2004

Pilot EOR , steam Injection Visit to

Issaran Field, HurgadaOperator:

Scimitar Production Egypt Ltd (A

subsidiary of Rally Energy, Canada)

Egypt , Issran Field July 2008 .

Heavy Oil Recovery Process

By David Law

Schlumberger ,

Canada , 2008

Operation Performance Improvement . OPI , WNPOC

Malaysia , PETRONAS , KL , 2009 .

CNLC , Advanced Petroleum Management

Norway , PETRAD , 2009 .

Sudan structural and SEE BASE Project .

Australia , Marlbon , 2010

Page 16: ALI CV NEW11

CV Ali Faroug DATE June 2016 Page 16

Computer Skills

MS Word----------------- very good

Excel---------------------- very good

Power Point--------------very good

Outlook-------------------very good

Eclipse100 & 300.. Reservoir Simulation------good

Petrel RE software -------------------------fair

Aspen Hysis V8.8------------- good

Minitab14---------------- good

PIPESIM for flow assurance. ---------- good

Hobbies

Reading

Watching movies

Walking and jogging

REFERENCES Upon request