Algorithms for the Automatic Generation of Urban
Streets and Buildings
Soon Tee Teoh
Department of Computer Science, San Jose State UniversitySan Jose, California, USA
Abstract - We describe the algorithms we have developed
to automatically generate street networks and building
plots in the automatic procedural creation of a realistic
city. Our system first sites the important regions of a city,
such as the commercial center, historical center, and
residential areas. Then, a network of freeway and main
roads are built. Finally, a network of streets are built
throughout the city. The main contribution described in
this paper is the design of the freeways, main streets andminor streets, and the allocation of space for the roads and
buildings in the city. Compared to existing methods, our
system creates cities that more closely mimics real-world
cities, and can also generate millions of streets in seconds.
Keywords: procedural modeling, 3D graphics
1 Introduction
Virtual graphical model of cities are frequently used
as the setting of computer games and virtual movie sets.The automatic generation of realistic city models is
therefore very useful. Furthermore, algorithms used inrealistic computer-generated city plans can be used as
instructional tools in city-planning and geography classes.In creating new virtual environments for a computer gamelevel, the automatic city generation tool must (1) create a
new unique city, (2) create a city that is ``realistic'', sharingcommon-sense similarities with real-world cities, and (3)
generate the city within a few seconds.
We have developed a system that creates a new city onan empty terrain, according to user preferences. Beginning
with the city layout found by the Autopolis [9] proceduralcity creation process, we create freeways, major streets andminor streets. We then find the boundaries of building
parcels, and split the parcels into multiple plots. The majorcontributions of this paper are: (1) the allocation of space to
simulate the width of freeways, (2) a fast algorithm to buildgrid minor streets, (3) a fast algorithm to build curvy
suburban style minor streets, (4) a fast method to findbuilding parcels, and (5) a fast method to split buildingparcels into multiple building plots. We first describe the
existing work in procedural city generation, and thendescribe the novel features of our system.
2 Related Works
Greuter et al. [2] presented a procedural method to
generate ``pseudo-infinite'' virtual cities in real-time. Theyare able to generate buildings with different facades, using
different textures, in real-time. As the user pans across,their program creates more random buildings in real-time,
giving the illusion of an infinite city. In our work, we focuson more realistic cities, not only office buildings. We createresidential areas, industrial areas, historical areas, and
commercial areas, for example. Also, we create a morevaried and realistic road network with freeways, main
streets, and smaller streets.
Lechner et al. [3] proposes using autonomous agentsto grow a city. Urban land-use is classified into three types:
commercial, residential and industrial. Different types havedifferent preferences, for example, residential developers
prefer regions where roads are less congested, are close towater, and are far away from industrial areas. This issimilar to the process that we use to site commercial and
industrial centers. However, we consider even moredetailed land-use areas, such as airports, seaports, historical
areas and government areas. Also, we have developed asystem to generate realistic streets.
Parish and Mueller's [5] system, called CityEngine,uses L-systems to generate streets and buildings. The inputs
to the system are height maps, land/water/vegetation maps,population density maps, zone maps, street patterns (such
as regular grids or radial), and building-height maps. This
method focuses on generating street patterns and does notdetermine the land-use type of different areas of the city.
Therefore, this method can only generate the commercial(downtown) area of the city, but not the entire city, because
the distribution of building heights and street density isuniform throughout the entire scene. Our work tries to
mimic the complexity of different patterns of city streetsand layouts.
8/12/2019 Algorithm for the Automatic Generation of Urban Streets
http://slidepdf.com/reader/full/algorithm-for-the-automatic-generation-of-urban-streets 2/7
8/12/2019 Algorithm for the Automatic Generation of Urban Streets
http://slidepdf.com/reader/full/algorithm-for-the-automatic-generation-of-urban-streets 3/7
we introduce methods to design the fine features of a city:the street network and building plots. In this way, we make
significant progress to building a highly realistic complexcity environment in real-time.
4 Space for Freeways
Freeways are built between the centers of the city.
Centers include commercial centers, industrial centers,airports and seaports. Additional ring freeways are builtoutside of the downtown area. Simple path-finding is used
to create the freeways. There is an increase in cost for goingover water, and for going to a neighboring cell with a
different elevation. When the path of a freeway has beenfound, it is denoted as a connection between cells in a
coarse grid. The coarse grid is used for fast path-finding forfreeways. The terrain height map, city centers, and generalland-use are all defined on the coarse grid. Each coarse grid
cell is defined to be 50 meters across.
Before building fine streets, a fine grid is set up. Eachgrid cell size in the fine grid is set to be 10 meters across.
Each fine grid cell has a use type. First, the freeway is scan-converted to the fine grid cells. The original representationof a freeway is a connection between coarse grid cells.
When scan converting to a fine grid, the freeway is treatedas a piecewise continuous quadratic Bezier spline. In other
words, if any three consecutive freeway control points arenot in a straight line, these three control points are taken to
be the control points of a quadratic Bezier curve. This isshown in Figure 2. In this way, the freeway (unlike local
streets) cannot have abrupt turns. This is because freewaysare designed for continuous fast-moving traffic with no
stops, and therefore they cannot have abrupt turns.
After the freeway has been scan-converted, for each
fine grid cell that is assigned the freeway type, all fine gridcells within four fine grid cells are assigned the ``freeway
reserved'' type, so that no minor street or building can bebuilt on these reserved cells. The scan-conversion process isshown in Figure 3. An example of the final generated map
is shown in Figure 4, showing that fine grid cells areundeveloped (green) around freeway cells. Minor roads and
building parcels are not allowed near freeways. Major roadsare allowed to intersect freeways via overpasses. Access
ramps can then be built from the major roads to the
freeways.
Figure 2: A quadratic Bezier curve for a freeway
Figure 3: Scan-Converting a freeway
Figure 4: A freeway
8/12/2019 Algorithm for the Automatic Generation of Urban Streets
http://slidepdf.com/reader/full/algorithm-for-the-automatic-generation-of-urban-streets 4/7
8/12/2019 Algorithm for the Automatic Generation of Urban Streets
http://slidepdf.com/reader/full/algorithm-for-the-automatic-generation-of-urban-streets 5/7
First, a region of residential land bounded by majorstreets is set to have the curvy suburban minor street
pattern. Then, for every fine grid cell in the region, run theGrowCurvyStreet method. The GrowCurvyStreet methodstarts by finding a random adjacent existing street, and
connects to this street. Then, it repeatedly finds the nextcell to grow to, with the condition that the next cell must
not be adjacent to any existing street. When no morecandidate next cell can be found, it finds an existing street
one cell away and joins to this existing street. An exampleof curvy minor streets generated by our algorithm is shownin Figure 6.
8 Building Parcels
After all the streets, major and minor, have beencreated, each piece of land bounded by streets is consideredone parcel on which a building can be built. We first
determine the geometry of the parcels, and then optionallysplit each parcel into multiple plots. One building can be
built on each plot.
Streets are represented as zero-width lines. To createparcels for buildings, it is necessary that the parcels bereceded from the streets so that the buildings do not grow
on top of any street. We have designed a fast algorithm toquickly find the parcels. The diagrams in Figure 7 show the
steps. First, each fine grid cell is divided into equal fourtriangles that meet at the center of the grid cell. Each
triangle can either be reserved by a street or else be part of aparcel. Next, each street is scan-converted to the triangles.
Figure 7 shows how to scan-convert an axis-aligned streetand a diagonal street. In each case, the triangles
surrounding the street are reserved for the street.
Figure 7: Top: Dividing a fine grid cell into four triangles.Middle: Scan-converting a horizontal street to reserve the
surrounding triangles. Bottom: Scan-converting a diagonal
street to reserve the surrounding triangles.
After all the triangles have been reserved by all thestreets. The remaining contiguous triangles together form
one parcel. This is shown in Figure 8.
Figure 8: The colored triangles are the remaining triangles
of a parcel after all the street segments have reserved theirtriangles. All contiguous un-reserved triangles form oneparcel where a building can be built.
The next step is to find the outline of a parcel. The
outline of a parcel is a subset of all the edges of thetriangles belonging to the parcel. First, set all edges to
unmarked. Then, for each triangle belonging to the parcel,toggle all its edges (from unmarked to marked, or frommarked to unmarked). After this, all edges that are marked
form the outline of the parcel. In other words, these are allthe edges that belong to only one triangle belonging to the
parcel.
Once the outline of a parcel is found, the parcel can besplit up into multiple plots. A building is built on each plot.
To split a parcel into two plots, find the longest straightedge of the parcel. Then, find the midpoint of the straightedge. At this midpoint, split the parcel along the
perpendicular direction. An example is shown in Figure 9.
8/12/2019 Algorithm for the Automatic Generation of Urban Streets
http://slidepdf.com/reader/full/algorithm-for-the-automatic-generation-of-urban-streets 6/7
Figure 9: Split a parcel into two building plots
9 Performance
This program is run on an Intel Pentium 1.6GHzprocessor, with 504 MB of RAM. It takes 5.25 seconds to
create minor streets on 2225 x 2225 (4,950,625) cells. Ittakes a further 9.64 seconds to define all the building
parcels. It takes 0.19 seconds to split the parcels in 540 x540 (291,600) of these cells into two building plots. Due tomemory constraints, we do not create minor streets and
building parcels in the entire 100km $\times$ 100km city.However, as the user moves through the scene, these can be
created on-demand. An overview of the city is shown inFigure 10 and a close-up view of the city is shown in Figure
11.
Figure 10: Overview of the city
Figure 11: Close-up view of the city center, showing a
freeway, freeway overpasses, and office buildings built onplots of land.
10 Future Work
The next step is to build more detailed models ofbuildings, streets and other landscape details. For example,
graphics models are needed for divided freeways, lanes,ramps, and streets need to be modeled as well, with street
lamps, lanes, traffic signals. More varied building modelsand textures can be created. Currently, buildings are grown
straight up in their plots. We can next create circularbuildings, sloping buildings and other variations to makethe city look more interesting. Models are also needed for
suburban houses, shopping malls, schools and otherbuildings. Parks, open spaces and gardens also need to be
modeled.
For the more basic creation of street networks and cityland-use, we can also enhance the algorithm. For example,the curvy minor street pattern can be modified to take into
account the terrain, as streets sometimes follow thecontours of the terrain. Also, we can have more interesting
street patterns that are not restricted to the axis-aligned anddiagonal directions.
11 Conclusions
We have presented methods to quickly create streets
and building plots for a realistic procedurally-generatedvirtual city.
We first use the Autopolis process to site commercialcenters, industrial centers, ports and airports according to
city-planning heuristics. Then, a network of freeways isautomatically generated to connect these centers.
Commercial and industrial regions are grown from theirrespective centers, and residential centers are also grown
around them. Then, within the commercial area,government and historical areas are allocated. This processcreates a realistic layout of the city, according to city-
planning principles. For example, airports tend to be on flatland, industrial areas tend to be near airports and seaports.
Historical centers tend to be near the government civiccenters. Commercial centers with a high concentration of
skyscrapers are usually not far away. Urban areas also tendto grow along coasts and on low land. Some scenic areas
along rivers are also reserved as parks and open spaces.
From the general layout of the various land-use typesof the city, our program begins to create streets. First,freeways are created to connect the different centers of the
city. This is done using a simple path-finding method thatminimizes cost. There is cost for going over water and cost
for going to a cell of different height. Cells are then dividedinto fine grid cells and cells next to the freeways arereserved to take into account the width of the freeways so
that no buildings and streets will be created over thefreeways. Major streets are allowed to go across and access
8/12/2019 Algorithm for the Automatic Generation of Urban Streets
http://slidepdf.com/reader/full/algorithm-for-the-automatic-generation-of-urban-streets 7/7
the freeways. The allocation of space for the freeways is thefirst major contribution of this paper.
Next, a network of main (major) streets is created.This is done by setting a regular, irregular, or hybrid grid of
points on all built-up urban cells. Simple path-finding isused to connect each grid point with adjacent points. In this
way, main streets are created. The frequency of these streetscan be increased near urban centers to simulate increase in
density.
The second major contribution of this paper is the
algorithm for the fast creation of grid minor streets. Theuser sets the frequency of the minor streets in the major and
minor directions. The algorithm creates a grid of minorstreets in a region bounded by major streets. Each fine grid
cell has eight possible streets to the eight adjacent fine gridcells. A flag is set for each street going to an adjacent cell.
The grid can be in the axis-aligned direction or thediagonal direction.
The third major contribution of this paper is thealgorithm for creating curvy suburban minor streets. For
each suburban region bounded by major streets, seed pointsare repeatedly chosen at random. From the seed point, a
curvy minor street is repeatedly grown to a randomneighboring cell. A neighboring cell is only a candidate if itis not currently a street and it is not currently next to an
existing street. In this way, a network of curvy streets isgrown to cover the entire region.
Finally, we have described a fast algorithm to allocate
building parcels. This is done by dividing each cell into
four triangles. The streets first reserve the triangles thatthey intersect. All unreserved triangles belong to buildings.
A set of contiguous unreserved triangles makes up abuilding parcel. The boundary of the building parcel is
found. Each building parcel can be further subdivided intomultiple building plots. Then, a building can be built on
each plot.
We have thus presented methods to quickly create
different types of urban street patterns: freeways, mainstreets, grid minor streets, and curvy suburban minor
streets. In this way, a realistic pattern of streets can beprocedurally created very quickly. Next, we have also
allocated parcels for buildings. Combined with theAutopolis city-creation process, we can build a large layout
model (100km x 100km) of a realistic city within a minute.Graphics models of buildings, streets, trees, bridges, andother landscape features can then be built according to this
layout, and a full virtual city environment is created, readyto be interactively navigated and explored.
12 References
[1] P. DiLorenzo, V. Zordan, and D. Tran. “Interactiveanimation of cities over time.” In Proceedings of the 17th
International Conference on Computer Animation andSocial Agents (CASA 2004), 2004.
[2] S. Greuter, J. Parker, N. Stewart, and G. Leach.
“Real-time procedural generation of ‘pseudo-infinite’cities.” In Proceedings of the 1st International Conferenceon Computer Graphics and Interactive Techniques in
Australasia and Southeast Asia, pages 87-95, 2003.
[3] T. Lechner, B. Watson, U. Wilensky, and M. Felsen.“Procedural city modeling.” In Proceedings of the 1st
Midwestern Graphics Conference, 2003.
[4] P. Muller, P. Wonka, S. Haegler, A. Ulmer, and L.V.
Gool. “Procedural modeling of buildings.” In Proceedingsof ACM Siggraph 2006/ACM Transactions on Graphics
(TOG), 25(3):614-623, 2006.
[5] Y. Parish and P. Muller. “Procedural modeling ofcities.” In Proceedings of ACM SIGGRAPH 2001, pages301-308, 2001.
[6] P. Wonka, M. Wimmer, F. Sillion, and W. Ribarsky.
“Instant Architecture.” ACM Transactions on Graphics,22(3):669-677, July 2003.
[7] W. Ribarsky, T. Wasilweski, and N. Faust. “Fromurban terrain models to visible cities.” IEE Computer
Graphics and Applications, 22(4):231-238, July 2002.
[8] J. Sun, X. Yu, G. Baciu, and M. Green. “Template-based generation of road networks for virtual city
modeling.” In Proceedings of the ACM Symposium onVirtual Reality Software and Technology (VRST 2002),
pages 33-40, 2003.
[9] S. Teoh, “Autopolis: Allowing user influence in the
automatic creation of realistic cities.” In Proceedings of the3rd International Symposium on Visual Computing (ISVC
’07), pages 118-129, 2007.
[10] G. Thomas and S. Donikian. “Modeling virtual cities
dedicated to behavioral animation.” Computer GraphicsForum, 19(3):71-80, 2000.