alexandria fire station 3 community presentation pre ... · • two and a half (2.5) operational...
TRANSCRIPT
![Page 1: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/1.jpg)
ALEXANDRIA FIRE STATION 3COMMUNITY PRESENTATION:
PRE-CONSTRUCTION
![Page 2: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/2.jpg)
Agenda
• Introduction (Department of General Services)- Bill Miner, Chief, Capital Projects- Adrian King, Capital Projects Manager
• Fire Station Operations (Alexandria Fire Department)- Robert Dubé, Fire Chief- David Povlitz, Assistant Fire Chief
• Design Overview (WGM, Architects)- Jeremy Kline, Project Architect
• Construction Overview (Dustin Construction)- Sarah Palmer, Construction Project Executive- Kelly Kopp, Pre-Construction Project Executive- John Pickett, Pre-Construction Project Manager
• Questions & Answers (Community Feedback)
![Page 3: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/3.jpg)
Station 203 Current Facility Issues• Built in 1948• Administrative and
living accommodations not adequate for increased staffing
• Modern fire and EMS vehicles are significantly larger
• No space to provide additional units to meet service needs
![Page 4: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/4.jpg)
Station 3 Public Safety Needs
• Target Fire & EMS arrival within 4 minutes
• Surrounding stations cannot meet arrival times
• Temporary facility will remain in the community to support a medic (transport) unit and an engine company
• New, three bay station will have flexibility to support a wider variety of units and personnel to meet changing demands of community
![Page 5: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/5.jpg)
Station 3 Response Profile
![Page 6: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/6.jpg)
Project Details
• Two and a half (2.5) Operational Bays, including drive-through capability
• Two (2) Story Structure• Engine, Medic, and Admin Units, with Capacity for Special Service• Programmed for up to 12 personnel• 14 On-site Parking Spaces• LEED Silver Certification• New station provides roughly 233% the square footage of the
existing building to support modern fire equipment and operations• Extensive community outreach program culminating in Planning
Commission and Mayor and Council approval
![Page 7: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/7.jpg)
Site Development: New Station
![Page 8: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/8.jpg)
8
First Floor Plan
APPARATUSBAYS
ENTRY/OFFICESLIVING
SUPPORT
Second Floor Plan
SLEEPING
LOCKERS
REST / SHOWERS
![Page 9: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/9.jpg)
View from Northwest Corner (On Cameron Mills)
![Page 10: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/10.jpg)
Summary of Experience
Successfully completed 11 Community Facilities in the last 10 years
7 Governmental Apparatus Facilities
5 Public Safety facilities in the last 10 years
2 New Fire Stations in the last 3 years
Majority of projects have achieved LEED certification
Strong local presence
Onsite replacement projects in neighborhoods
Extensive experience in Northern Virginia
![Page 11: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/11.jpg)
Travilah Fire Station No. 32 26,000 SF LEED Silver Fire Station
Rockville, MD (Montgomery County DGS)
Completed January 2014
Completed On Time and On Budget
![Page 12: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/12.jpg)
Travilah Fire Station No. 32
![Page 13: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/13.jpg)
Mt. Weather EOC Public Safety Building New 23,000 SF LEED Silver Fire Station
Mt. Weather, VA (Federal Emergency Management Agency)
Completed August 2017
Completed On Time and On Budget
*Due to the secure nature of the facility, completed photos are for official use only and not permissible for distribution. Rendering shown above.
![Page 14: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/14.jpg)
Alexandria Fire Station 3
![Page 15: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/15.jpg)
Phasing – Alexandria Fire Station 3 Phase 1 – Erect Temporary Facility
Phase 2 – Abate and demolish existing facility
Phase 3 – Construct new facility
Phase 4 – Remove temporary facility and complete site work
![Page 16: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/16.jpg)
Phase 1 – Temporary Facility
![Page 17: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/17.jpg)
Phase 2 – Demolition
![Page 18: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/18.jpg)
Phase 3 – New Facility Construction
![Page 19: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/19.jpg)
Phase 4 – Deconstruct Temporary Facility and Complete Site Work
![Page 20: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/20.jpg)
Maintain operations of Fire Station at all times
Safety of all is Paramount
Security Fencing
Be a Good Neighbor
Contractor/Staff/Community Parking
Cleanliness – trash pick up on site, sweep streets to keep clear of dirt
Dust Control and Wash Rack
Sediment Control and Runoff
Noise Control – Respect Noise Ordinances: 7AM-6PM (M-F), 9AM-6PM (Sat)
Construction Impacts to Community & Daily Life
![Page 21: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/21.jpg)
Minimize disturbance to adjacent community facilities
No anticipated Sunday Work, Limited Saturday Work
Avoid deliveries during pick up and drop off at George Mason ES
Traffic Control
Truck Routes
Limited work in street
Temporary street and sidewalk closures
Construction Impacts to Community & Daily Life
![Page 22: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/22.jpg)
Construction traffic will be routed to avoid neighborhood roads to the maximum extent
Traffic Management
Dustin will coordinate construction traffic and deliveries with drop-off and pickup times.
![Page 23: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/23.jpg)
Sidewalk / Street Closures
![Page 24: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/24.jpg)
Parking
![Page 25: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/25.jpg)
Alexandria Fire Station 3
![Page 26: ALEXANDRIA FIRE STATION 3 COMMUNITY PRESENTATION PRE ... · • Two and a half (2.5) Operational Bays, including drive -through capability • Two (2) Story Structure • Engine,](https://reader035.vdocuments.mx/reader035/viewer/2022070801/5f027cfb7e708231d40482d4/html5/thumbnails/26.jpg)
Questions
Contact: Adrian King, Capital Projects ManagerPhone: 571-215-5345Email: [email protected]
Project information can be found on City of Alexandria, General Services website:https://www.alexandriava.gov/generalservices