Alaskan Way Viaduct Replacement ProgramAlaskan Way Viaduct Replacement Program
OrganizationD tSeattle Design CommissionA il 5 2012DateApril 5, 2012
SDC COMMENTS - FEBRUARY 2, 2012
• Revise the form, color, lighting and design of the stacks so that they appear continuous when they pierce the roof of the fan room. If the mechanical requirements prevent the stacks from being a continuous form below and above the roof, use light, color and composition to create a design that unifies the pieces into a simple legible form.
• Integrate the design of the head house and its ground and its ground plane with the design of the operations building.
• Review and further refine the joinery of the façade so that its design and patterning of bands and joints is intentional. While the design of the joinery has improved, it needs more fine tuning.
1
SDC COMMENTS - FEBRUARY 2, 2012
• Integrate sustainability and storm water strategies into the design. Consider placement of the storm water collection on the north side of the building.
• Simplify the detail around the garage doors.
• Remove the apron and its unique paving treatment from the base of the fan room. Consider using a sidewalk pattern instead.
• Recognize that the site boundary will likely shift as the waterfront team moves forward with its planning and design work.
2
PROPORTION STUDY
3
DETAIL – TYPICAL EXTERIOR FINISH MODULE
4
DETAIL – PRECAST AND METAL PANEL MODULE
5
DETAIL – PRECAST MODULE
6
SOUTH OPERATIONS BUILDING – DETAILED ELEVATION
7
COLOR CONCEPT
8
NORTH OPERATIONS BUILDING
29
NORTH OPERATIONS BUILDING – SKYLINE
30
NORTH OPERATIONS BUILDING – HARRISON STREET
31
NORTH OPERATIONS BUILDING – SIDEWALK ELEVATION (6TH AVENUE NORTH)
32
NORTH OPERATIONS BUILDING – STREET ELEVATION (6TH AVENUE NORTH)
33
NORTH OPERATIONS BUILDING – SIDEWALK ELEVATION (THOMAS STREET)
34
NORTH OPERATIONS BUILDING – STREET ELEVATION (THOMAS STREET)
35
NORTH OPERATIONS BUILDING – EGRESS TO GRADE (THOMAS STREET)
36
NORTH OPERATIONS BUILDING – SOIL STRATIFICATION MURAL
37
NORTH OPERATIONS BUILDING: SITE PLAN
Street/ Pedestrian Lighting
Pedestrian Lighting
Pedestrian Refuge Areas with Food Cart Option
Green Screen
Raised Planters with Benches
Security Fence with Green Screen
Double Row Autumn Flame Maple
Street Trees
Scarlet Oak Street Trees
Interpretive Lighting and Signage
North Operations
Building
Temporary Parking Lot
Seatwalls / Benches with LED Lighting
Illuminated Fan Room
Alley
6TH AVE N
THO
MAS
ST
AURORA AVE N
HAR
RIS
ON
ST
Future Bus Shelter
Signature Tree
Bench
Pedestrian Overlook
Pedestrian Lighting
Cimarron Ash Street Trees
Scale: Not to Scale
Raised Planter
Allee Elm Street Trees
Main Entry
Raised Planter
Existing Hotel
URBAN MEADOW
URBAN EDGE Seatwalls / Benches
with LED Lighting
GREEN STREET
URBAN EDGE
Tunnel Walls Below
NORTH OPERATIONS BUILDING - PLAZA
39
NORTH OPERATIONS BUILDING: HARDSCAPE PLAN
Exposed Aggregate
North Operations
Building
Illuminated Fan Room
6TH AVE N
HAR
RIS
ON
ST
Scale: Not to Scale
Corten Steel Walls
4’ Concrete Paving Pattern
2’ Concrete Paving Pattern
Curved Wood Bench
Concrete Planter Walls
Concrete Seatwalls / Benches with LED Lighting
Soil Stratification Inspiration
Recycled Wood Product with Interpretive Lighting Concrete Pavers
NORTH OPERATIONS BUILDING – PLAZA LIGHTING
41
URBAN EDGE
6TH AVENUE AND PLAZA PLANT PALLETTE
Kelsey Dogwood
North Operations
Building
Illuminated Fan Room
6TH AVE N
HAR
RIS
ON
ST
Scale: Not to Scale
Little Bunny Fountain Grass
Autumn Moor Grass
Sword Fern Avalanche Reed Grass
Sausage Vine
Allee Elm
GREEN SCREEN
Low Oregon Grape
Cimarron Ash
PLAZA PLANTING
URBAN MEADOW
Little Bunny Fountain Grass
Autumn Moor Grass
Ice Dance Carex
PLAZA PLANTING
Dwarf Pavement Rose
Mt. Vernon Laurel
Dwarf Japanese Holly
Privet Honeysuckle
THOMAS STREET AND PARKING LOT PLANT PALLETTE
GREEN STREET FOUNDATION
Autumn Flame Maple
URBAN EDGE
Privet Honeysuckle
Vine Maple
Scarlet Oak
Boston Ivy
Heuchera
Privet Honeysuckle
Mt. Vernon Laurel
Dwarf Japanese Holly
Temporary Parking Lot
PARKING LOT BUFFER
North Operations
Building
Kelsey Dogwood Low Oregon Grape
Ice Dance Carex Robust Male
Fern
Low Oregon Grape
Oakleaf Hydrangea
GREEN STREET
Sausage Vine
90’
180’
THOMAS STREET SECTION
NORTH OPERATIONS BUILDING – SKYLINE
45
HARRISON STREET ABOE NORTH PORTAL – WEST END
AURORA AVE N Signature Tree
Scale: Not to Scale
URBAN EDGE
Tunnel Walls Below
HARRISON STREET OVERLOOK ABOVE NORTH PORTAL
HARRISON STREET OVERLOOK ABOVE NORTH PORTAL
AURORA AVE N
Signature Tree
Scale: Not to Scale
Tunnel Walls Below
SECTION THROUGH PLAZA, HARRISON AND PORTAL WALL
Signature Tree
Scale: Not to Scale
Tunnel Walls Below
NORTH OPERATIONS BUILDING –ELEVATION LIGHTING (6TH AVENUE NORTH)
CHANGE – HLB TO UPDATE
49
NORTH OPERATIONS BUILDING - NIGHT VIEW
50
NORTH OPERATIONS BUILDING - NIGHT VIEW
51
MATERIALS BOARD
52
NORTH OPERATIONS BUILDING – STREET ELEVATION (6TH AVENUE NORTH)
53
54