al meraikhi precast - almeraikhialmgroup.ae/uploads/meraikhi brochures/al meraikhi... ·  ·...

55
Al Meraikhi Precast Established in 1975 and registered in the Emirates of Abu Dhabi and Dubai. A 30+ year history in production of exceptional quality precast architectural and structural concrete products. ISO 9001 certified in year 1996 for design and production. Registered member of: The American Concrete Institute (ACI), USA. The Precast/Pre stressed Concrete Institute (PCI), USA The Glass Reinforced Cement Association (GRCA) U.S. Green Building Council (USGBC) Al Meraikhi Precast

Upload: vuanh

Post on 18-May-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Established in 1975 and registered in the Emirates of Abu Dhabi and Dubai.

A 30+ year history in production of exceptional quality precast architectural and structural concrete products.

ISO 9001 certified in year 1996 for design and production.

Registered member of: The American Concrete Institute (ACI), USA. The Precast/Pre stressed Concrete Institute (PCI), USA The Glass Reinforced Cement Association (GRCA) U.S. Green Building Council (USGBC)

Al Meraikhi Precast

Page 2: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

AMP Approach to Rapid & Cost Effective Construction

• Complete engineering solution including sequence of construction, planning and positioning of cranes and construction scheduling

• Re-design and provision of alternative construction solutions using precast prestressed beam, post-tensioned girders and composite concrete systems

• Value Engineering

• High Quality Precast products fabricated under strict, factory controlled conditions to an agreed production schedule

• The use of high quality, not necessarily expensive and locally available materials

• Commitment to Quality and Energy Efficiency

• One-Source solution for entire precast structure. Single source provider reduces number of subcontractors engaged and minimizes cost.

Page 3: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Parking Structures

Page 4: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Precast Underground ParkingStructures

• Car park 66C – Abu Dhabi. Completed in 2001

• Car park 66I – Abu Dhabi. Completed in 2002

• Car park 983 – Abu Dhabi. Completed in 2002

• Car park 984 – Abu Dhabi. Completed in 2003

• PWD Car park – Abu Dhabi. Completed in 2004

• Car park 986 – Abu Dhabi. Completed in 2006

• Grand Mosque VVIP Car park – Abu Dhabi. Completed in 2009

Page 5: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastCar park 66C – Abu Dhabi

Page 6: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastCar park 66I – Abu Dhabi

Page 7: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastCar park 983 – Abu Dhabi

Page 8: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastCar park 986 – Abu Dhabi

Page 9: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastVVIP Car park Grand Mosque – Abu Dhabi

Page 10: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Above Ground Precast Parking Structures

• ZADCO GASCO – Abu Dhabi. Completed 1997

• WD Car park – Abu Dhabi. Completed 2004

• ADDC Car park – Abu Dhabi. Completed 2006

• Nissan Showroom - Musaffah. Completed 2007

• Park Place Car park – Dubai. Completed 2007

• 8 Car parks in Al Nahda First – Dubai. Completed 2008

• Injazat Car park – Musaffah. Completed 2008

• South East & West Car Parks – YAS Island. Completed 2009

Page 11: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastZADCO GASCO Car Park – Abu Dhabi

Page 12: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastWorks Department Car Park – Abu Dhabi, 18.5m Long HCS

Page 13: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastNissan Showroom - Musaffah

Page 14: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast8 Nos Car Parks in Dubai at AL Nahda First

Page 15: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastInjazat Carpark - Musaffah

Page 16: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastSouth East & West Carparks – YAS Island

Page 17: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Shopping Malls and Hotels

Page 18: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastMarina Mall – Abu Dhabi Breakwater

Page 19: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastAl Raha Beach Hotel and Shopping Mall

Page 20: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastKhalidiya Mall Abu Dhabi

Page 21: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastMall of The Emirates – Carrefour Hypermarket

Page 22: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Precast Villas

Page 23: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast8 Nos. ADNOC Villas – Abu Dhabi

Page 24: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast236 Villas for First Gulf Bank – Abu Dhabi

Page 25: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastMeadows Villas - Dubai

Page 26: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Architectural Cladding Panels

Page 27: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastEmirates Palace – Abu Dhabi

Page 28: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Page 29: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Page 30: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Page 31: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Page 32: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Page 33: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastJBR04 Jumeirah Beach Residence Dubai

Page 34: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastZayed University Dubai

Page 35: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastShangrila Hotel Abu Dhabi

Page 36: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastFour Season Hotel Complex Doha, Qatar

Page 37: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Bridges

Page 38: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Precast Pre-Tensioned and Post-Tensioned Bridges

Advantages:

• Mass production of standardized sections results in very economical structures of high quality

• Clear Spans of up to 55m

• Precast concrete factory environment that includes optimum quality control during production

• The use of high quality, not necessarily expensive and locally available materials

• Rapid erection and construction. Minimum labour force required

• Less congested construction site

• No heavy scaffold required

Page 39: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Al Meraikhi Product Range:

• Precast/prestressed concrete AASHTO and modified AASHTO girders

• Precast/prestressed concrete beams (Inverted T-Beams, I-girders, Hollow Beams)

• Hollow-Core Slabs

• Precast traffic barriers and bollards

• Precast fascia panels and railing parapets

• GRP moulds/shutters for piers and abutments

• Reinforced Soil Walls and Geo-blocks for approaching ramps

• Post-tensioning of concrete bridge structures

• Bridge bearings

• Expansion joints

Page 40: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastTRIP Contract 2015A/2016 Abu Dhabi Sheraton Bridge

Page 41: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastTRIP Contract 980 Umm Al Nar Bridge

Page 42: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastTRIP Contract 987 Breakwater – Abu Dhabi

Page 43: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastTRIP Contract 221 Widening of Musaffah Bridge – Abu Dhabi

Page 44: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastShahama Saadiyat Freeway

Page 45: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastKhalifa Port Causeway Bridge

Page 46: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastSowa Bridges and Elevated Roads

Page 47: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Marine Works

Page 48: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastAbu Dhabi Corniche

Page 49: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastRaha Beach Marine Wall

Page 50: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

Al Meraikhi Plant & Equipment:

• 3 Production Plants

• 7 Batching pants.

• 13 Gantry cranes. Max Span 40m. Capacity 70 tons

• 2 Overhead Cranes. Span 28m. Capacity 15 tons

• 30 Tower Cranes

• 2 Crawler Cranes. Capacity 120 tons

• 10 special dolly trailers. Max capacity 200 tons

• 33 prestressing lines of up to 140m with capacity of 1200 tons

• Fleet of 7 Telescopic trailers 18-22m

• Fleet of 40 standard trailers (different application)

Page 51: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastMusaffah Factory

Page 52: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi PrecastAshoush Factory

Page 53: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

REFERENCE LIST OF BRIDGES:

Project Client Main Contractor Consultant Year Remark

1. Pedestrian Bridge Between Two Hotels in Ghantoot PWD Arab Contractors PWD 1997 Design & build

2. Al Rahba Market Access Ramp PWD Al Meraikhi Gen.Cont. PWD 1998 Design & build

3. Pipe Protection Structures at Al Ghanadah Island PWD BRICC Gen. Cont. Parkman 1999 Design & build

4. TRIP Contract 987Breakwater Access Road Bridge

Abu DhabiMunicipality HILALCO De Leuw Cather

International 2001

5. TRIP Contract 980Umm al Nar Bridge and Tunnel Interchange

Abu DhabiMunicipality ADMAK De Leuw Cather

International2001/2002

6. TRIP Contract 981Interchange in Mussafah

Abu DhabiMunicipality

Al Muhairy Gen.Cont.

De Leuw CatherInternational 2002

7. Access Bridge to Sas al Nakheel Island ADWEA Bin Hafeez Gen.Cont.

Rendel Palmer &Tritton 2003 Design & build

8. TRIP Contract 2015ABridges for the New Corniche Road Project

Abu DhabiMunicipality

Al Muhairy Gen.Cont.

De Leuw CatherInternational 2003

9. TRIP Contract 982Interchange in Mussafah

Abu DhabiMunicipality ADMAK De Leuw Cather

International 2004

10. TRIP Contract 221Widening of Mussafah Bridge

Abu DhabiMunicipality

Al Muhairy Gen.Cont.

De Leuw CatherInternational 2004

11. TRIP Contract 2016Bridges for the New Corniche Road Project

Abu DhabiMunicipality

Al Muhairy Gen.Cont.

De Leuw CatherInternational 2004

12. TRIP Contract 222Airport Road – Al Ain Road Interchange

Abu DhabiMunicipality ADMAK De Leuw Cather

International 2004

13. TRIP Contract 974Interchange at Al Falah Area

Abu DhabiMunicipality

Ghantoot Gen.Cont.

Frederic & HarrisInc. 2005

14. Construction of Connecting Bridge Between the Islandsof Abu Dhabi and Abu Al Shoum

Private Dept. of H.H.Sheikh Zayed NUROL llc The Consultants 2005 Design & build

Page 54: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

REFERENCE LIST OF BRIDGES:

Project Client Main Contractor Consultant Year Remark

15. Gerain AL Aish WD Arab Contractors Frederic Harris 2006 Design & build

16. Umm Al Nar Independent Water and Power project Arabian PowerCompany Toshiba Mott MacDonald 2006 Design & build

17. Al Madam-Al Shweib Road Bridge Ministry of WorksDubai Ghantoot Italconsult 2007 Design & build

18. Yas Island Temporary bridge (90t CAPACITY) ALDAR Al Meraikhi Ind.Co. Halcrow 2007 Design & build

19. Shahama Saadiyat Freeway (BI1,BI2, BI12-15,GPC1,GPC2 GPC3 & GPC4) ALDAR SIXCO Halcrow 2007 Design & build

20. Khalifa Port KPIZ Archirodon Halcrow 2008/09 Design & build Ongoing

21 Shahama Saadiyat Freeway Bridges BC5&BC6 ALDAR Taisei Halcrow 2008

22 Umm Lafina Bridges 1,2 & 3 Tasamim HEEC DNEC 2008 Design & build Ongoing

22 Roads for the New Industrial Area, South of the Channelin Mussafah West – Bridges 1 & 2

Abu DhabiMunicipality

Ghantoot Gen.Cont. Maunsell 2008/09 Ongoing

23 Al Sowa Island Roads, Bridges and Elevated Structure(B1, B2, B12, B13, P1,P2, P3,P4, P6) Mubadala Al Naboodah Atkins 2008/09 Design & build

Ongoing

24 Abu Dhabi Al Sila Road Interchange Municipality, AbuDhabi Al Jaber Parsons 2008/09 Ongoing

Page 55: Al Meraikhi Precast - Almeraikhialmgroup.ae/uploads/Meraikhi Brochures/Al Meraikhi... ·  · 2009-12-21Al Meraikhi Precast AMP Approach to Rapid & Cost Effective Construction •

Al Meraikhi Precast

AASHTO 1500mm DEEPAASHTO 1295mm DEEPAASHTO 1200mm DEEP AASHTO 1800mm DEEP

ALMP AASHTO I-GIRDER SECTIONS

AASHTO 1980mm DEEP AASHTO 2200mm DEEP